CN107165466A - 复合横担及输电杆 - Google Patents
复合横担及输电杆 Download PDFInfo
- Publication number
- CN107165466A CN107165466A CN201710431830.3A CN201710431830A CN107165466A CN 107165466 A CN107165466 A CN 107165466A CN 201710431830 A CN201710431830 A CN 201710431830A CN 107165466 A CN107165466 A CN 107165466A
- Authority
- CN
- China
- Prior art keywords
- arm
- rod
- cross
- plug
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Materials Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Earth Drilling (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
- Joining Of Building Structures In Genera (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本发明公开一种复合横担,该复合横担固定在输电杆的杆体上,复合横担包括:芯棒、绝缘层及承力件,绝缘层及承力件均包覆固定于芯棒的外周面,承力件位于芯棒与杆体连接的中部,绝缘层位于除中部外的其他区域。本发明还公开一种应用上述复合横担的输电杆。通过上述方式,在芯棒与杆体连接的部位预设一承力件,一方面芯棒无需通过打孔的方式实现与杆体的连接,另一方面固定连接的荷载直接作用于承力件上,不会对绝缘层造成损坏,承力件和绝缘层均包覆固定在芯棒的外周面,避免外部环境对芯棒的腐蚀,保证复合横担的力学性能。
Description
技术领域
本发明涉及一种输电绝缘设备领域,更具体地涉及一种复合横担及输电杆。
背景技术
在电力设备领域,输电线路用的横担是输电杆重要的配套结构件,用于支承导线、避雷线等,并使之按规定保持一定的安全距离。目前35kV及以下电压等级的输电线路中广泛使用的多为铁横担、钢横担等金属横担,金属横担质量重,绝缘性差,易造成闪络问题。
为了解决金属横担的上述问题,发展一种复合横担,复合横担通常是由绝缘芯棒及固定在绝缘芯棒上的伞裙组成。CN106088785A中揭示的复合横担的两端设有挂线金具,复合横担的中间部位与输电杆的杆体相固定连接,固定连接的方式是在复合横担上打孔,利用抱箍和紧固件将该复合横担固定在输电杆上,但是在复合横担上打孔会严重影响其力学性能,降低其对荷载的承受能力。
发明内容
本发明的目的在于提供一种复合横担及输电杆,以解决现有复合横担与输电杆的杆体固定时,会对复合横担的力学性能造成影响,从而降低其荷载承受能力的问题。
为实现上述目的,本发明所采用的技术方案如下:提供一种复合横担,该复合横担固定在输电杆的杆体上,复合横担包括:
芯棒、绝缘层及承力件,绝缘层及承力件均包覆固定于芯棒的外周面,承力件位于芯棒与杆体连接的中部,绝缘层位于除中部外的其他区域。
一方面,通过在芯棒与杆体连接的部位预设一承力件,当复合横担安装在输电杆上时,两者之间固定的荷载直接施加在承力件上,而不是施加在芯棒或绝缘层上,芯棒无需打孔,芯棒本身不会发生变形,绝缘层也不会因为长期受力而磨损,绝缘层包覆的芯棒不会暴露在空气中,避免外部环境对芯棒的腐蚀,而承力件具有足够的强度,其本身不会因为长期受力而损坏,从而保证了复合横担的力学性能;
另一方面,承力件与绝缘层位于芯棒的不同区域,且均包覆固定在芯棒的外周面,使得芯棒不受外部环境的腐蚀,同样会避免对复合横担力学性能的影响;
再次,承力件位于芯棒与杆体连接的中部,该复合横担与输电杆配合使用时,只需一次安装即可实现复合横担上至少两相导线的排布,相比在杆体两侧分别固定两个完全一样的复合横担,安装工艺简单,降低高空作业的复杂度。
其中,绝缘层与承力件之间为密封连接。
绝缘层与承力件之间密封连接可进一步避免湿气等外部环境对芯棒的腐蚀,降低对复合横担力学性能的影响。
其中,绝缘层为伞裙和/或护套,伞裙和/或护套与承力件密封连接。
其中,承力件包覆固接于芯棒的中部后,使绝缘层在芯棒上除中部外的其他区域包覆固定。
该复合横担的芯棒制作完成后,首先将承力件包覆固接于芯棒的中部后,再在芯棒的外部包覆固定绝缘层,使生产工艺简单,同时有利于绝缘层与承力件之间的连接。
其中,承力件为套筒,套筒的内壁形状与包覆在内的芯棒的横截面相吻合。
其中,套筒为通过金属冲压工艺成型。
金属冲压工艺流程简单、成本较低,可便于冲压各种形状的截面,适应性强,满足芯棒不同横截面的要求。
其中,复合横担通过固定装置固定在杆体上。
其中,固定装置包括横担容置件和杆体连接件,横担容置件用于容置套筒,杆体连接件用于连接杆体和横担容置件。
其中,横担容置件包括横担抱箍和连接板,杆体连接件为杆体抱箍,连接板上设有与横担抱箍配合的第一安装、及与杆体抱箍配合的第二安装;横担抱箍沿套筒的周向半包围套筒后通过第一安装实现固定,杆体抱箍沿杆体的周向半包围杆体后通过第二安装实现固定。
其中,连接板朝向杆体的一侧设有与杆体相适应的弧形件。
其中,横担容置件包括容置部和设于容置部上的第一连接片,杆体连接件包括抱箍和设于抱箍上的第二连接片,容置部用于容置套筒,抱箍套设与杆体上,第一连接片与第二连接片通过紧固件固定。
其中,承力件为套筒机构,套筒机构包括套筒和连接板,套筒包覆固接于芯棒的外周面,连接板固接于套筒的一侧,连接板用于与杆体进行连接。
在套筒一侧设有连接板,利用连接板直接与杆体之间实现连接,利用承力件实现横担侧固定的作用,简化装配流程,降低安装复杂度。
为解决上述技术问题,本发明提供的另一技术方案是:提供一种输电杆,包括杆体和固定在杆体上的上述复合横担。
附图说明
图1至图5是本发明实施例一的示意图,
其中:
图1是复合横担10的结构示意图;
图2是图1中套筒103的结构示意图;
图3是复合横担10通过固定装置11安装到杆体12上的结构示意图;
图4是横担容置件110的立体示意图;
图5是横担容置件110上弧形件的结构示意图。
图6-图8是本发明实施例二的示意图,
其中:
图6是固定装置21的结构示意图;
图7是横担容置件210的结构示意图;
图8是杆体连接件211的结构示意图。
图9-图11是本发明实施例三的示意图,
其中:
图9是复合横担30的结构示意图;
图10是套筒机构303的结构示意图;
图11是复合横担30连接到杆体32上的结构示意图。
图12-图15是本发明实施例四的示意图,
其中:
图12是复合横担40的结构示意图;
图13是套筒机构403的结构示意图;
图14是杆体连接板43的结构示意图;
图15是复合横担40连接到杆体42上的结构示意图。
具体实施方式
根据要求,这里将披露本发明的具体实施方式。然而,应当理解的是,这里所披露的实施方式仅仅是本发明的典型例子而已,其可体现为各种形式。因此,这里披露的具体细节不被认为是限制性的,而仅仅是作为权利要求的基础以及作为用于教导本领域技术人员以实际中任何恰当的方式不同地应用本发明的代表性的基础,包括采用这里所披露的各种特征并结合这里可能没有明确披露的特征。
实施例一:
请一起参阅图1-图5。如图1所示,该复合横担10包括芯棒101、绝缘层102及承力件103,绝缘层102及承力件103均包覆固定于芯棒101的外周面,承力件103位于芯棒101与杆体12连接的中部,绝缘层102位于除中部外的其他区域。
具体地,芯棒101是复合横担10的主要构成要件,需要有足够的支承强度,通常是由玻璃纤维和树脂混合后拉挤成型,当然,也可以由玻璃纤维和树脂混合后模压成型,或采用其他的工艺成型,对此不做限定。树脂可选聚氨酯、环氧树脂或乙烯基树脂等。
芯棒101可以为实心体,或者至少具有一个腔室的管体,芯棒101的截面形状可选圆形、多边形或工字型,实际工程应用中可根据需要进行选择。本实施例的芯棒101为实心矩形的结构。
芯棒101长期暴露在空气中,容易受到各种自然因素如光、电、水、酸等的腐蚀,造成表面老化产生强度降低等现象,因此通常需要对芯棒101的表面进行处理,常用的做法是在芯棒101表面包覆固定绝缘层102,可进一步提高芯棒101的绝缘性能和/或起到防腐蚀的作用。
绝缘层102可选为伞裙1021和延伸到芯棒101上的护套1022,或者直接为包覆在芯棒101表面的护套1022,伞裙1021或护套1022可以采用模压硫化成型的硅橡胶制成,或者采用整体注射成型的硅橡胶制成,该绝缘层102具有良好的憎水性和抗老化性,使用寿命高。
但是该绝缘层102不具有承受荷载的能力,如果荷载直接作用在绝缘层102上,容易导致绝缘层102的开裂或是脱落,从而使得芯棒101暴露在空气中,强度降低,力学性能下降。
因此,本实施例的复合横担10,在芯棒101与杆体12连接的部位预设一承力件103,该承力件103通常为金属承力件103,当然也不排除其他具有足够强度的材料承力件,该承力件103可直接与杆体12连接,或者通过额外的固定装置11进行连接,无论哪一种连接方式,都无需都芯棒101进行打孔设置来实现连接,固定连接的荷载都是直接施加在承力件103上,通过承力件103再传递到芯棒101上,不会对绝缘层102造成损坏而使芯棒101的外周面暴露在空气中。
如图2所示,承力件103可选为套筒103,套筒103为两端开口的中空结构,套筒103的内壁形状适应芯棒101的截面形状,设置为矩形。套筒103可选通过金属冲压工艺成型,流程简单、成本较低,可便于冲压各种形状的截面,适应性强,满足芯棒不同横截面的要求;套筒103也可选为钢制型材钢管。
芯棒101通过拉挤工艺成型后,使套筒103通过胶装或压接的方式固接在芯棒101上的中部,该中部并非限制在芯棒101正中间的区域,该芯棒101的左右两个端部用来连接挂线金具或者针式绝缘子(图中未示出),中部是指该芯棒101上除两个端部外的区域。
伞裙1021和护套1022在套筒103两侧的芯棒101上注塑成型,每一侧的伞裙1021和护套1022可选一体注塑成型,伞裙1021和护套1022的注塑可避开端部挂线金具处的区域,由于套筒103上设有翻边1031,翻边1031的设置有利于套筒103和护套1022之间的密封连接。
需要说明的是,对于端部区域的芯棒101,可在伞裙1021和护套1022注塑前,使挂线金具通过胶装或压接的方式先固接在端部,再在除套筒103和挂线金具处的芯棒101上进行注塑。也可选使得伞裙1021和护套1022注塑在端部区域的表面,挂线金具或是针式绝缘子的设置能满足需求即可,在此不做具体讨论。
套筒103固接在芯棒101的中部,并包覆中部全部的外周面,伞裙1021和护套1022包覆芯棒101除中部及端部外的其他区域的全部外周面,套筒103与伞裙1021和护套1022之间密封连接,使得芯棒101被包覆在套筒103和护套1022内,免受外部环境的腐蚀。
请参阅图3-图5,将上述复合横担10通过额外的固定装置11固定在杆体12上,固定装置11包括横担容置件110和杆体连接件111,横担容置件110用于容置套筒103,杆体连接件111用于连接杆体12和横担容置件110。
横担容置件110包括横担抱箍1101和连接板1102,横担抱箍1101包括位于杆体12左右两侧的两个U型抱箍1101,连接板1102为一矩形面板;杆体连接件111为杆体抱箍111,杆体抱箍111包括位于复合横担10上下两侧的两个U型抱箍111;在连接板1102上设有对应横担抱箍1101的四个安装孔1103,以及对应杆体抱箍111的四个安装孔1104,连接板1102朝向杆体12的一侧设有弧形件1105,弧形件1105的弯曲程度与杆体12的外表面相适应,弧形件1105能够增大连接板1102与杆体12的接触面积,使固定更加稳固。
考虑套筒103的形状和固定的便捷性,U型抱箍1101包括矩形箍1107和固接在矩形箍1107上的圆柱件1108两部分,矩形箍1107适应套筒103的形状,圆柱件1108穿过安装孔1103后利用螺栓进行固定。
实际安装时,可首先将复合横担10与横担抱箍1101安装完毕,即两个U型抱箍1101沿套筒103的周向半包围套筒103后,穿过安装孔1103后利用螺栓进行固定,复合横担10在杆体12上合适的位置时,利用两个U型抱箍111穿过连接板1102上的安装孔1104进行固定,从而将复合横担10固定在杆体12上。
U型抱箍1101固定在套筒103上,在长期运行过程中,U型抱箍1101有可能在套筒103上左右滑动,当滑动到套筒103边缘时会对护套1022造成损坏,因此为了避免这种滑动,可选在套筒103上对应U型抱箍1101的位置设置凹槽(图中未示出),起到限位的作用。
本实施例复合横担10固定到杆体12上时,由于是中部对应固定在杆体12上,复合横担10的两个端部均可用来支撑导线,因此可实现至少两相导线的排布,之所以这样说,是因为在一些场合下,复合横担10的中部也可设置挂线金具或针式绝缘子来支撑导线,该复合横担10安装方便,简化了高空操作的复杂度;
上述复合横担10通常应用于35kV及以下电压领域,如10kV、20kV或35kV的配电线路中。在长期线路运行过程中,复合横担10与杆体12连接的中部,荷载直接作用在套筒103上,套筒103具有足够的支承强度,避免对芯棒101的力学性能造成影响。
在其他具体的实施方式中,绝缘层也可选为在芯棒外周面涂覆防腐功能层,如氟碳漆,氟碳漆涂覆在芯棒上除承力件的的其他区域,当然,在承力件的外周面也可涂覆该氟碳漆,使得氟碳漆和承力件之间无缝接触;该防腐功能层同样不具有承受荷载的能力,如果荷载直接作用在该防腐功能层上,容易导致它的脱落,从而使得芯棒暴露在空气中,强度降低,力学性能下降。
在其他具体的实施方式中,套筒上可设置凹槽或凸块,从而能够对放置在套筒上的横担容置件起到限位作用。
实施例二:
本实施例中,复合横担的结构与实施例一类似,在此不再赘述。不同的是复合横担通过固定装置固定到杆体上时,该固定装置有所不同。
如图6-图8所示,该固定装置21包括横担容置件210和杆体连接件211。
横担容置件210包括容置部2101和位于容置部2101两侧的连接片2102。容置部2101用于容置复合横担10上的套筒103,连接片2102用于连接杆体连接件211。容置部2101是一个截面为空心矩形的壳体,壳体内壁与待容置复合横担的外表面相吻合。当然,壳体的内腔截面也可以是圆形或其他多边形。
杆体连接件211包括U型抱箍2110和与U型抱箍2110两侧连接的连接片2111。U型抱箍2110用于容置杆体12,且U型抱箍2110的内表面与其所容置的杆体12的表面吻合。在连接片2111上设置有四个安装孔2112,连接片2102上设置有与连接片2111相对应的四个安装孔2103。
通过该固定装置21将复合横担固定在杆体上。套筒103位于容置部2101内,容置部2101沿套筒外周面局部包围复合横担,U型抱箍2110局部包围杆体,紧固件212通过连接片2111与连接片2102上对应的孔将杆体连接件211与横担容置件210连接在一起,紧固件212可选为螺栓。
实施例三:
如图9-图11所示,复合横担30包括芯棒301、绝缘层302和承力件303。芯棒301为空心的矩形管体,芯棒301内填充聚氨酯泡沫;绝缘层302为在芯棒301上一体注塑成型的硅橡胶伞裙3021和护套3022;承力件303为套筒机构303,通常为金属材质,包括套筒3031和连接板3032,套筒3031包覆固接于芯棒301的外周面,连接板3032固接于套筒3031的一侧,连接板3032用于与杆体32进行连接。
芯棒301通过拉挤工艺成型后,将套筒机构303通过胶装或压接的方式固接到芯棒301上,使得套筒3031包覆芯棒301中部的全部外周面,在套筒3031的两侧分别一体注塑成型硅橡胶伞裙3021和护套3022,套筒3031上设有翻边3034,翻边3034的设置有利于实现与护套3022的密封连接。
套筒3031朝向杆体32的一侧设有连接板3032,连接板3032可选与套筒3031一体模压成型,或者通过焊接或粘接的方式固定在套筒3031上。连接板3032通过杆体连接件31与杆体32进行连接,杆体连接件31包括位于复合横担30上下两侧的U型抱箍31,U型抱箍31套设在杆体32上半包围杆体32的外周面,连接板3032上设有与U型抱箍31配合的四个安装孔3033,U型抱箍穿过安装孔3033后利用螺栓进行紧固,使得复合将横担30固定在杆体32上。
复合横担30固定在杆体32上,在长期运行过程中,杆体32与复合横担30连接部位的荷载作用在套筒3031上,不会对绝缘层302造成损坏,避免外部环境对芯棒301的腐蚀。
在其他具体的实施方式中,连接板3032上可设弧形件,弧形件焊接在连接板3032上,与电杆连接时能够增大受力面积,使固定更加稳固。
实施例四:
请一起参阅图12-图15。复合横担40包括芯棒401、绝缘层402和承力件403。芯棒401为实心的圆形棒,绝缘层402包括一体注塑成型的硅橡胶伞裙4021和护套4022;承力件403为套筒机构403,通常为金属材质,包括套筒4031和连接板4032,套筒4031包覆固接于芯棒401的外周面,连接板4032上设弧形的卡槽,通过焊接的方式使套筒4031卡接在连接板4032的卡槽内。
芯棒401通过拉挤工艺成型后,将套筒机构403通过胶装或压接的方式固接到芯棒401上,使得套筒4031包覆芯棒401中部的全部外周面,在套筒4031的两侧分别一体注塑成型硅橡胶伞裙4021和护套4022,套筒4031上设有翻边4034,翻边4034的设置有利于实现与护套4022的密封连接。
连接板4032可直接与杆体42进行连接,如实施例三中采用的在杆体42上设U型抱箍,U型抱箍穿过连接板4032上的连接孔后,通过螺栓进行连接。具体到本实施例中,如图14所示,为了保证工程应用的通用性,在连接板4032与杆体42之间设置另一杆体连接板43,连接板4032上设有安装孔4033,与杆体连接板43设有的安装孔431相对应,可通过螺栓将连接板4032固定在杆体连接板43上,也即将复合横担40固定在杆体连接板43上。
杆体连接板43上还设有安装孔432,用于与U型抱箍44进行连接,杆体连接板43靠近杆体42的一侧设有弧形件435,能够增大与杆体42的接触面积,使固定更加稳固。
将复合横担40架设在杆体42上,U型抱箍44半包围杆体42后,穿过安装孔432,再利用螺母进行固定,从而使得复合横担40固定在杆体42上。
杆体连接板43的顶端还设有延伸的耳片433,耳片433上设有安装孔434,安装孔434可用于与顶相横担进行连接,实现单回三相导线的布置,这里不做具体讨论。
复合横担40固定在杆体42上,无需在复合横担40上打孔,在长期运行过程中,杆体42与复合横担40连接部位的荷载作用在套筒机构403上,不会对绝缘层402造成损坏,避免外部环境对芯棒401的腐蚀。
以上实施例一-实施例四中,承力件设置为套筒或套筒机构,这样做的好处在于套筒与芯棒之间实现无缝连接,套筒上无打孔设置,可以更好地避免湿气等外部环境对芯棒的腐蚀,但是并非将承力件限定在套筒类机构上,例如,将套筒换成两个抱箍套设在芯棒上,两个抱箍之间通过螺栓进行紧固,也可实现包覆固定的作用,虽然防腐蚀效果上有些减弱,但是同样在本发明保护范围内。
本发明的技术内容及技术特点已揭示如上,然而可以理解,在本发明的创作思想下,本领域的技术人员可以对上述结构和材料作各种变化和改进,包括这里单独披露或要求保护的技术特征的组合,明显地包括这些特征的其它组合。这些变形和/或组合均落入本发明所涉及的技术领域内,并落入本发明权利要求的保护范围。
Claims (13)
1.一种复合横担,所述复合横担固定在输电杆的杆体上,其特征在于,所述复合横担包括:
芯棒、绝缘层及承力件,所述绝缘层及所述承力件均包覆固定于所述芯棒的外周面,所述承力件位于所述芯棒与所述杆体连接的中部,所述绝缘层位于除所述中部外的其他区域。
2.如权利要求1所述的复合横担,其特征在于,所述绝缘层与所述承力件之间为密封连接。
3.如权利要求2所述的复合横担,其特征在于,所述绝缘层为伞裙和/或护套,所述伞裙和/或护套与所述承力件之间为密封连接。
4.如权利要求1所述的复合横担,其特征在于,所述承力件包覆固接于所述芯棒的中部后,使所述绝缘层在所述芯棒上除所述中部外的其他区域包覆固接。
5.如权利要求1所述的复合横担,其特征在于,所述承力件为套筒,所述套筒的内壁形状与包覆在内的所述芯棒的横截面相吻合。
6.如权利要求5所述的复合横担,其特征在于,所述套筒为通过金属冲压工艺成型。
7.如权利要求5所述的复合横担,其特征在于,所述复合横担通过固定装置固定在所述杆体上。
8.如权利要求7所述的复合横担,其特征在于,所述固定装置包括横担容置件和杆体连接件,所述横担容置件用于容置所述套筒,所述杆体连接件用于连接所述杆体和所述横担容置件。
9.如权利要求8所述的复合横担,其特征在于,所述横担容置件包括横担抱箍和连接板,所述杆体连接件为杆体抱箍,所述连接板上设有与所述横担抱箍配合的第一安装、及与所述杆体抱箍配合的第二安装;所述横担抱箍沿所述套筒的周向半包围所述套筒后通过所述第一安装实现固定,所述杆体抱箍沿所述杆体的周向半包围所述杆体后通过所述第二安装实现固定。
10.如权利要求9所述的复合横担,其特征在于,所述连接板朝向所述杆体的一侧设有与所述杆体相适应的弧形件。
11.根据权利要求8所述的复合横担,其特征在于,所述横担容置件包括容置部和设于所述容置部上的第一连接片,所述杆体连接件包括抱箍和设于所述抱箍上的第二连接片,所述容置部用于容置所述套筒,所述抱箍套设与所述杆体上,所述第一连接片与所述第二连接片通过紧固件固定。
12.如权利要求1所述的复合横担,其特征在于,所述承力件为套筒机构,所述套筒机构包括套筒和连接板,所述套筒包覆固接于所述芯棒的外周面,所述连接板固接于所述套筒的一侧,所述连接板用于与所述杆体进行连接。
13.一种输电杆,其特征在于,包括杆体和固定在所述杆体上的如权利要求1-12任一项所述的复合横担。
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431830.3A CN107165466A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
CN202110130328.5A CN112854876A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
US16/304,997 US11421437B2 (en) | 2017-06-09 | 2018-05-17 | Composite crossarm and transmission pole |
NZ748819A NZ748819B2 (en) | 2017-06-09 | 2018-05-17 | Composite crossarm and transmission pole |
CA3025358A CA3025358C (en) | 2017-06-09 | 2018-05-17 | Composite crossarm and transmission pole |
BR112019025922-8A BR112019025922B1 (pt) | 2017-06-09 | 2018-05-17 | Cruzeta composta e poste de transmissão |
PCT/CN2018/087362 WO2018223829A1 (zh) | 2017-06-09 | 2018-05-17 | 复合横担及输电杆 |
ES18804217T ES2958770T3 (es) | 2017-06-09 | 2018-05-17 | Cruceta de composite y mástil de transmisión |
AU2018271335A AU2018271335B9 (en) | 2017-06-09 | 2018-05-17 | Composite cross-arm and transmission mast |
EP18804217.0A EP3461972B1 (en) | 2017-06-09 | 2018-05-17 | Composite cross-arm and transmission mast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710431830.3A CN107165466A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110130328.5A Division CN112854876A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107165466A true CN107165466A (zh) | 2017-09-15 |
Family
ID=59825904
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710431830.3A Pending CN107165466A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
CN202110130328.5A Pending CN112854876A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110130328.5A Pending CN112854876A (zh) | 2017-06-09 | 2017-06-09 | 复合横担及输电杆 |
Country Status (7)
Country | Link |
---|---|
US (1) | US11421437B2 (zh) |
EP (1) | EP3461972B1 (zh) |
CN (2) | CN107165466A (zh) |
AU (1) | AU2018271335B9 (zh) |
CA (1) | CA3025358C (zh) |
ES (1) | ES2958770T3 (zh) |
WO (1) | WO2018223829A1 (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107706871A (zh) * | 2017-10-30 | 2018-02-16 | 江苏神马电力股份有限公司 | 架空配电线路 |
CN107939095A (zh) * | 2017-12-14 | 2018-04-20 | 广州南方电力技术工程有限公司 | Gis专用防尘棚 |
CN107975287A (zh) * | 2017-12-13 | 2018-05-01 | 江苏神马电力股份有限公司 | 一种复合横担及输电杆 |
WO2018223829A1 (zh) * | 2017-06-09 | 2018-12-13 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
CN109372315A (zh) * | 2018-11-30 | 2019-02-22 | 江苏神马电力股份有限公司 | 一种横担组件及输电杆 |
CN111029054A (zh) * | 2019-12-09 | 2020-04-17 | 华南理工大学 | 一种光纤复合绝缘子预制芯棒、模具及其制造方法 |
WO2022048454A1 (zh) * | 2020-09-04 | 2022-03-10 | 江苏神马电力股份有限公司 | 一种绝缘横担及其制备方法以及输电杆 |
WO2022099718A1 (zh) * | 2020-11-12 | 2022-05-19 | 中国电力科学研究院有限公司 | 挂线金具及具有挂线金具的t型复合绝缘横担 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220112737A1 (en) * | 2020-10-10 | 2022-04-14 | James E. Morrison | Crossarm for an electrical pole |
CN113775233A (zh) * | 2021-10-12 | 2021-12-10 | 浙江华保电力科技股份有限公司 | 一种轻量化易装式复合绝缘横担 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1019536B (zh) * | 1988-11-15 | 1992-12-16 | 尤大千 | 低压玻璃钢架空电路横担 |
CN2361754Y (zh) * | 1998-10-20 | 2000-02-02 | 冯长富 | 绝缘横担 |
US6626406B1 (en) * | 2000-10-03 | 2003-09-30 | Ted Olson, Jr. | Utility pole with removable crossarm |
CN201217967Y (zh) * | 2008-04-22 | 2009-04-08 | 汪迎瞬 | 玻璃钢熔丝绝缘横担和拉杆 |
CN201601455U (zh) * | 2009-12-04 | 2010-10-06 | 河南省电力公司洛阳供电公司 | 绝缘横担 |
CN102270529A (zh) * | 2010-05-05 | 2011-12-07 | 江苏神马电力股份有限公司 | 绝缘子用芯棒及其制造方法、以及具有该芯棒的复合绝缘子 |
CN105971365A (zh) * | 2016-06-08 | 2016-09-28 | 江苏神马电力股份有限公司 | 一种固定装置及输电杆 |
CN106088785A (zh) * | 2016-06-08 | 2016-11-09 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
CN206917388U (zh) * | 2017-06-09 | 2018-01-23 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2437375A (en) * | 1944-05-20 | 1948-03-09 | Frank E Buxton | Crossarm for transmission wires |
US2606952A (en) * | 1947-08-20 | 1952-08-12 | Thomas N Cofer | Transmission line support |
FR2466888A1 (fr) * | 1979-10-03 | 1981-04-10 | Arconnerie Fse L | Armature metallique, notamment pour poteaux portant des lignes electriques |
FR2566973B1 (fr) * | 1984-06-29 | 1986-12-19 | Arconnerie Fse Sa | Poutre a deformation plastique controlee soumise a des efforts de flexions exerces a chacune de ses extremites |
DE19654687A1 (de) * | 1996-12-30 | 1998-07-02 | Abb Research Ltd | Mastkopf zum Stützen von Leitern und dergleichen auf Masten für oberirdische Mittel- und Hochspannungsnetzleitungen |
US5961248A (en) * | 1997-04-18 | 1999-10-05 | Tourtellotte; Mills C. | Structural member connection and method |
FR2768485B1 (fr) * | 1997-09-18 | 1999-12-10 | Cogema | Systeme de supportage pour tuyauteries en galeries techniques, notamment de l'industrie nucleaire |
WO2009049377A1 (en) * | 2007-10-19 | 2009-04-23 | Farallon Capital Pty Ltd | Cross arm |
WO2009049376A1 (en) * | 2007-10-19 | 2009-04-23 | Farallon Capital Pty Ltd | Power line supporting apparatus |
CN102054545B (zh) * | 2009-11-11 | 2012-08-29 | 西北电网有限公司 | 750kV格构式复合横担绝缘子 |
KR100950096B1 (ko) * | 2010-01-29 | 2010-03-26 | (주)중앙일렉파워 | 배전 전선케이블용 경완금 연결장치 |
CN102852370B (zh) * | 2012-10-10 | 2014-05-28 | 北京玻钢院复合材料有限公司 | 一种高压输电线路杆塔用的复合材料组合式横担 |
CN103306382B (zh) * | 2013-07-01 | 2016-03-09 | 北京玻钢院复合材料有限公司 | 一种复合材料节点的连接装置及其组装方法 |
US9912135B2 (en) * | 2013-09-17 | 2018-03-06 | San Diego Gas & Electric Company | Cross arm covers for utility poles and related methods |
CN103700453A (zh) * | 2013-11-28 | 2014-04-02 | 国家电网公司 | 一种1200kV特高压棒形悬式复合绝缘子 |
CN105952242A (zh) * | 2016-06-08 | 2016-09-21 | 江苏神马电力股份有限公司 | 横担及输电杆 |
US10167997B2 (en) * | 2016-09-01 | 2019-01-01 | William F. BRITT, JR. | Gain plate |
CN107165466A (zh) | 2017-06-09 | 2017-09-15 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
-
2017
- 2017-06-09 CN CN201710431830.3A patent/CN107165466A/zh active Pending
- 2017-06-09 CN CN202110130328.5A patent/CN112854876A/zh active Pending
-
2018
- 2018-05-17 AU AU2018271335A patent/AU2018271335B9/en active Active
- 2018-05-17 EP EP18804217.0A patent/EP3461972B1/en active Active
- 2018-05-17 CA CA3025358A patent/CA3025358C/en active Active
- 2018-05-17 WO PCT/CN2018/087362 patent/WO2018223829A1/zh unknown
- 2018-05-17 ES ES18804217T patent/ES2958770T3/es active Active
- 2018-05-17 US US16/304,997 patent/US11421437B2/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1019536B (zh) * | 1988-11-15 | 1992-12-16 | 尤大千 | 低压玻璃钢架空电路横担 |
CN2361754Y (zh) * | 1998-10-20 | 2000-02-02 | 冯长富 | 绝缘横担 |
US6626406B1 (en) * | 2000-10-03 | 2003-09-30 | Ted Olson, Jr. | Utility pole with removable crossarm |
CN201217967Y (zh) * | 2008-04-22 | 2009-04-08 | 汪迎瞬 | 玻璃钢熔丝绝缘横担和拉杆 |
CN201601455U (zh) * | 2009-12-04 | 2010-10-06 | 河南省电力公司洛阳供电公司 | 绝缘横担 |
CN102270529A (zh) * | 2010-05-05 | 2011-12-07 | 江苏神马电力股份有限公司 | 绝缘子用芯棒及其制造方法、以及具有该芯棒的复合绝缘子 |
CN105971365A (zh) * | 2016-06-08 | 2016-09-28 | 江苏神马电力股份有限公司 | 一种固定装置及输电杆 |
CN106088785A (zh) * | 2016-06-08 | 2016-11-09 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
CN206917388U (zh) * | 2017-06-09 | 2018-01-23 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018223829A1 (zh) * | 2017-06-09 | 2018-12-13 | 江苏神马电力股份有限公司 | 复合横担及输电杆 |
US11421437B2 (en) | 2017-06-09 | 2022-08-23 | Jiangsu Shemar Electric Co., Ltd. | Composite crossarm and transmission pole |
CN107706871B (zh) * | 2017-10-30 | 2020-02-14 | 江苏神马电力股份有限公司 | 架空配电线路 |
WO2019085706A1 (zh) * | 2017-10-30 | 2019-05-09 | 江苏神马电力股份有限公司 | 架空配电线路 |
CN107706871A (zh) * | 2017-10-30 | 2018-02-16 | 江苏神马电力股份有限公司 | 架空配电线路 |
AU2018360214B2 (en) * | 2017-10-30 | 2021-12-09 | Jiangsu Shemar Electric Co., Ltd. | Overhead power distribution line |
US11322923B2 (en) | 2017-10-30 | 2022-05-03 | Jiangsu Shemar Electric Co., Ltd. | Overhead power distribution line |
CN107975287A (zh) * | 2017-12-13 | 2018-05-01 | 江苏神马电力股份有限公司 | 一种复合横担及输电杆 |
CN107975287B (zh) * | 2017-12-13 | 2024-02-23 | 江苏神马电力股份有限公司 | 一种复合横担及输电杆 |
CN107939095A (zh) * | 2017-12-14 | 2018-04-20 | 广州南方电力技术工程有限公司 | Gis专用防尘棚 |
CN109372315A (zh) * | 2018-11-30 | 2019-02-22 | 江苏神马电力股份有限公司 | 一种横担组件及输电杆 |
WO2020108084A1 (zh) * | 2018-11-30 | 2020-06-04 | 江苏神马电力股份有限公司 | 一种横担组件及输电杆 |
CN111029054A (zh) * | 2019-12-09 | 2020-04-17 | 华南理工大学 | 一种光纤复合绝缘子预制芯棒、模具及其制造方法 |
WO2022048454A1 (zh) * | 2020-09-04 | 2022-03-10 | 江苏神马电力股份有限公司 | 一种绝缘横担及其制备方法以及输电杆 |
WO2022099718A1 (zh) * | 2020-11-12 | 2022-05-19 | 中国电力科学研究院有限公司 | 挂线金具及具有挂线金具的t型复合绝缘横担 |
Also Published As
Publication number | Publication date |
---|---|
EP3461972B1 (en) | 2023-07-05 |
ES2958770T3 (es) | 2024-02-14 |
CA3025358C (en) | 2020-12-15 |
NZ748819A (en) | 2021-04-30 |
WO2018223829A1 (zh) | 2018-12-13 |
AU2018271335A1 (en) | 2019-01-17 |
CA3025358A1 (en) | 2018-12-09 |
US20210180358A1 (en) | 2021-06-17 |
CN112854876A (zh) | 2021-05-28 |
US11421437B2 (en) | 2022-08-23 |
BR112019025922A2 (pt) | 2020-06-30 |
EP3461972A4 (en) | 2020-03-11 |
AU2018271335B2 (en) | 2020-07-02 |
EP3461972A1 (en) | 2019-04-03 |
AU2018271335B9 (en) | 2020-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107165466A (zh) | 复合横担及输电杆 | |
RU2265267C2 (ru) | Концевая заделка кабеля | |
WO2017025036A1 (zh) | 绝缘管及带有这种绝缘管的绝缘套管 | |
CN207017750U (zh) | 复合横担及输电杆 | |
CN201886843U (zh) | 内伞裙式空芯复合支柱绝缘子 | |
KR20180015861A (ko) | 키(Key)홈 결합식 구조를 갖는 상부 체결형 1차측 고압 부싱의 취부구조 | |
CN1864309B (zh) | 聚合物套管及使用该套管的电缆端接部 | |
CN207017751U (zh) | 一种固定装置及横担和输电杆 | |
CN105952235B (zh) | 一种异型横担及输电杆 | |
CN206917388U (zh) | 复合横担及输电杆 | |
CN209603585U (zh) | 一种线路横担 | |
CN204089140U (zh) | 一种138千伏预制干式电缆终端 | |
CN106054044B (zh) | 充气柜用绝缘试验装置 | |
CN205622178U (zh) | 用于输电线路钢管杆的电缆固定装置 | |
CN209199687U (zh) | 一种输电线路悬垂绝缘子串 | |
CN107975287B (zh) | 一种复合横担及输电杆 | |
KR100812714B1 (ko) | 주상변압기용 저압부싱 | |
CN206922394U (zh) | 一种复合横担 | |
CN109802351B (zh) | 全干式电缆终端和电缆组件及其制造、组装或改进方法 | |
CN221143776U (zh) | 连接金具及输电杆 | |
CN201256277Y (zh) | 一种电缆终端头 | |
CN221442257U (zh) | 一种复合横担 | |
NZ748819B2 (en) | Composite crossarm and transmission pole | |
CN209585784U (zh) | 10kV复合外套绝缘横担 | |
CN220928908U (zh) | 中间金具、复合横担及输电杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |