CN106978848A - High-rise building highrise steel structure steel support formula construction method - Google Patents

High-rise building highrise steel structure steel support formula construction method Download PDF

Info

Publication number
CN106978848A
CN106978848A CN201710338430.8A CN201710338430A CN106978848A CN 106978848 A CN106978848 A CN 106978848A CN 201710338430 A CN201710338430 A CN 201710338430A CN 106978848 A CN106978848 A CN 106978848A
Authority
CN
China
Prior art keywords
steel
steel structure
truss
towering
equine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710338430.8A
Other languages
Chinese (zh)
Inventor
史江疆
袁志钢
刘徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tianyi Construction Engineering Co Ltd
Original Assignee
Jiangsu Tianyi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tianyi Construction Engineering Co Ltd filed Critical Jiangsu Tianyi Construction Engineering Co Ltd
Priority to CN201710338430.8A priority Critical patent/CN106978848A/en
Publication of CN106978848A publication Critical patent/CN106978848A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2484Details of floor panels or slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of high-rise building highrise steel structure steel support formula construction method, including the step such as steel structure roof truss makes, bracket support manufacturing and installation, the lifting of towering steel structure, the installation of towering steel structure, towering steel structure body anti-corrosion.The present invention is additionally arranged H400*200 shaped steel brackets in steel truss support point bottom, it is firm that bracket carries out welding with housing steelframe, avoid steel truss trestle gravity and be directly passed to truss floor plates, significantly accelerate steel truss construction speed, it is ensured that the stability of truss leg environment in the strong wind of high-altitude.

Description

High-rise building highrise steel structure steel support formula construction method
Technical field
The present invention relates to a kind of high-rise building highrise steel structure construction method.
Background technology
Construction of super highrise building is in the nature that the cycle is long, and complex process, difficulty are big, and Roof of Super High-Rise Building is towering steel knot Structure, then difficulty of construction is bigger.
High-rise building highrise steel structure roof steel truss suspension column type of attachment is complicated, and slenderness ratio is larger, and stability is poor, by High altitude wind influence frame member supporting & stablizing difficulty is big, and tubular truss beam, post bonding strength is high, and in-depth difficulty is big, high pipe support pipe Part is more, and installation quality requires high, the problems such as welding capacity is big.
The content of the invention
Significantly accelerate steel truss construction speed it is an object of the invention to provide a kind of, it is ensured that truss leg is in high-altitude strong wind The high-rise building highrise steel structure steel support formula construction method of middle environmental stability.
The present invention technical solution be:
A kind of high-rise building highrise steel structure steel support formula construction method, it is characterized in that:Comprise the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright Beautiful layer.
Step(One)(1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.
The present invention is additionally arranged H400*200 shaped steel brackets in steel truss support point bottom, and bracket is welded with housing steelframe It is firm, it is to avoid steel truss trestle gravity is directly passed to truss floor plates, significantly accelerates steel truss construction speed, it is ensured that The stability of truss leg environment in the strong wind of high-altitude.
With reference to embodiment, the invention will be further described.
Embodiment
A kind of high-rise building highrise steel structure steel support formula construction method, comprises the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright Beautiful layer.
Step(One)(1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.

Claims (2)

1. a kind of high-rise building highrise steel structure steel support formula construction method, it is characterized in that:Comprise the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright Beautiful layer.
2. high-rise building highrise steel structure steel support formula construction method according to claim 1, it is characterized in that:Step(One) (1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.
CN201710338430.8A 2017-05-15 2017-05-15 High-rise building highrise steel structure steel support formula construction method Pending CN106978848A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710338430.8A CN106978848A (en) 2017-05-15 2017-05-15 High-rise building highrise steel structure steel support formula construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710338430.8A CN106978848A (en) 2017-05-15 2017-05-15 High-rise building highrise steel structure steel support formula construction method

Publications (1)

Publication Number Publication Date
CN106978848A true CN106978848A (en) 2017-07-25

Family

ID=59342206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710338430.8A Pending CN106978848A (en) 2017-05-15 2017-05-15 High-rise building highrise steel structure steel support formula construction method

Country Status (1)

Country Link
CN (1) CN106978848A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2119213A1 (en) * 1994-03-16 1995-09-17 S. Krissttovvv Steel building design incorporating thermal break with integral underfloor
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building
CN102733599A (en) * 2012-06-08 2012-10-17 北京市第三建筑工程有限公司 Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN102877595A (en) * 2012-10-30 2013-01-16 中国二十二冶集团有限公司 Method for manufacturing large-size and large-span steel truss

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2119213A1 (en) * 1994-03-16 1995-09-17 S. Krissttovvv Steel building design incorporating thermal break with integral underfloor
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building
CN102733599A (en) * 2012-06-08 2012-10-17 北京市第三建筑工程有限公司 Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN102877595A (en) * 2012-10-30 2013-01-16 中国二十二冶集团有限公司 Method for manufacturing large-size and large-span steel truss

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张良等: "《超高层建筑高耸钢结构施工技术》", 《建筑技术》 *

Similar Documents

Publication Publication Date Title
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN104652827A (en) Three-stage-relay hoisting construction method for large-span arc-shaped truss
CN110748139B (en) Hanging basket support system
CN105201198A (en) Tool-type cantilever beam and construction method thereof
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN113123469A (en) Method for constructing complex curved surface modeling roof grid structure
CN104675171B (en) Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN107419907B (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN110130627A (en) Large Span Structure of Arch surface mesh roofing construction platform and construction method
CN106978848A (en) High-rise building highrise steel structure steel support formula construction method
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN105089194B (en) A kind of furred ceiling conversion layer prolongs the construction method of formula erecting by overhang certainly
CN204876526U (en) Instrument formula girder steel of encorbelmenting
CN102022003A (en) Suspended ceiling keel sheet assembling and hoisting method
CN102787717B (en) Self-supporting combined steel template construction method
CN105484483A (en) Construction method for bottom decoration construction platform of steel truss ceiling
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN104878933A (en) Construction method for setting up over roof curtain wall hanging basket support scaffolding
CN105464218B (en) One kind landing truss bearing pin connecting joint structure
CN212478505U (en) Detachable hanging flower basket truss support device
CN205046828U (en) Circular orbit movable hanging flower basket curtain construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170725