CN106978848A - High-rise building highrise steel structure steel support formula construction method - Google Patents
High-rise building highrise steel structure steel support formula construction method Download PDFInfo
- Publication number
- CN106978848A CN106978848A CN201710338430.8A CN201710338430A CN106978848A CN 106978848 A CN106978848 A CN 106978848A CN 201710338430 A CN201710338430 A CN 201710338430A CN 106978848 A CN106978848 A CN 106978848A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel structure
- truss
- towering
- equine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2484—Details of floor panels or slabs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of high-rise building highrise steel structure steel support formula construction method, including the step such as steel structure roof truss makes, bracket support manufacturing and installation, the lifting of towering steel structure, the installation of towering steel structure, towering steel structure body anti-corrosion.The present invention is additionally arranged H400*200 shaped steel brackets in steel truss support point bottom, it is firm that bracket carries out welding with housing steelframe, avoid steel truss trestle gravity and be directly passed to truss floor plates, significantly accelerate steel truss construction speed, it is ensured that the stability of truss leg environment in the strong wind of high-altitude.
Description
Technical field
The present invention relates to a kind of high-rise building highrise steel structure construction method.
Background technology
Construction of super highrise building is in the nature that the cycle is long, and complex process, difficulty are big, and Roof of Super High-Rise Building is towering steel knot
Structure, then difficulty of construction is bigger.
High-rise building highrise steel structure roof steel truss suspension column type of attachment is complicated, and slenderness ratio is larger, and stability is poor, by
High altitude wind influence frame member supporting & stablizing difficulty is big, and tubular truss beam, post bonding strength is high, and in-depth difficulty is big, high pipe support pipe
Part is more, and installation quality requires high, the problems such as welding capacity is big.
The content of the invention
Significantly accelerate steel truss construction speed it is an object of the invention to provide a kind of, it is ensured that truss leg is in high-altitude strong wind
The high-rise building highrise steel structure steel support formula construction method of middle environmental stability.
The present invention technical solution be:
A kind of high-rise building highrise steel structure steel support formula construction method, it is characterized in that:Comprise the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent
It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and
Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out
Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system
Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace
Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out
Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often
After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by
Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed
Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed
Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist
Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright
Beautiful layer.
Step(One)(1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.
The present invention is additionally arranged H400*200 shaped steel brackets in steel truss support point bottom, and bracket is welded with housing steelframe
It is firm, it is to avoid steel truss trestle gravity is directly passed to truss floor plates, significantly accelerates steel truss construction speed, it is ensured that
The stability of truss leg environment in the strong wind of high-altitude.
With reference to embodiment, the invention will be further described.
Embodiment
A kind of high-rise building highrise steel structure steel support formula construction method, comprises the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent
It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and
Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out
Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system
Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace
Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out
Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often
After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by
Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed
Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed
Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist
Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright
Beautiful layer.
Step(One)(1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.
Claims (2)
1. a kind of high-rise building highrise steel structure steel support formula construction method, it is characterized in that:Comprise the following steps:
(One)Steel structure roof truss makes:Steel roof truss make main points be mainly setting-out, number material, cutting stock, retaining wall on slope, anchoring, prevent
It is rotten;
(1)Setting-out:Drawing, standard element specification, pitch-row are checked, 1 is pressed according to every rod member detail drawing:1 release node and
Milling, making;
(2)Number material:Material is checked, is marked on material:Cutting, plane, bending, bore position, numbering, specification;
(3)Cutting:Using machine cuts or gas cutting, method for plasma cutting, cut by a number material requirement;
(4)Groove processing:Make smooth groove with buffing method processing groove using scraping;
(5)Perforate:By design with positioning specification position using drilling or punching;
(6)Assembling anchoring:According to design assembled and by from top to bottom, from left to right, from the inside to surface order, after assembling carry out
Angle is corrected, when it is determined that without mistaking, being anchored;
(Two)Bracket support manufacturing is with installing:H400*200 shaped steel brackets are set up in steel truss support point bottom, using shaped steel system
Into shaped steel bracket;It is firm that bracket carries out welding with housing girder steel;
(Three)Towering steel structure lifting:Towering steel structure body lifting uses segmental hoisting, and first lifts supporter, then lifts diagonal brace
Body, then roofing body is lifted, hanging method is filled using two-shipper tower crane, and room shelf component is arranged in numerical order before lifting, then colligation, then is carried out
Lifting;
(Four)Towering steel structure is installed:Towering steel structure first installs vertical support column when installing, then installs crossbeam, then installs roof truss;Often
After one component is in place, anchored, then welded immediately, its welding method using is symmetrically welded technique progress, successively by
Section release welding residual stress;
(Five)Towering steel structure body anti-corrosion:Basal plane processing is sprayed using the processing of clear-water high-pressure water spray from tow sides, is removed
Become rusty matter, mud, dust;After water spray processing 4 hours, rule equine A types coating is poured into spray gun and carries out tow sides spraying, generation is closed
Rusty scale;Restrain after the spraying of equine A types coating 12 hours, spray gun is poured into rule equine Type B coating and carries out tow sides spraying and produce to resist
Rotten layer;Restrain after the spraying of equine Type B coating 12 hours, pour into spray gun with rule equine c-type coating and carry out tow sides and spray to form bright
Beautiful layer.
2. high-rise building highrise steel structure steel support formula construction method according to claim 1, it is characterized in that:Step(One)
(1)During setting-out, steel-tube intersection-line in-depth is carried out using Tekla softwares.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710338430.8A CN106978848A (en) | 2017-05-15 | 2017-05-15 | High-rise building highrise steel structure steel support formula construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710338430.8A CN106978848A (en) | 2017-05-15 | 2017-05-15 | High-rise building highrise steel structure steel support formula construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106978848A true CN106978848A (en) | 2017-07-25 |
Family
ID=59342206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710338430.8A Pending CN106978848A (en) | 2017-05-15 | 2017-05-15 | High-rise building highrise steel structure steel support formula construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106978848A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2119213A1 (en) * | 1994-03-16 | 1995-09-17 | S. Krissttovvv | Steel building design incorporating thermal break with integral underfloor |
CN101691787A (en) * | 2009-09-22 | 2010-04-07 | 中铁十二局集团建筑安装工程有限公司 | Converse construction process for middle-high steel structure building |
CN102733599A (en) * | 2012-06-08 | 2012-10-17 | 北京市第三建筑工程有限公司 | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam |
CN102877595A (en) * | 2012-10-30 | 2013-01-16 | 中国二十二冶集团有限公司 | Method for manufacturing large-size and large-span steel truss |
-
2017
- 2017-05-15 CN CN201710338430.8A patent/CN106978848A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2119213A1 (en) * | 1994-03-16 | 1995-09-17 | S. Krissttovvv | Steel building design incorporating thermal break with integral underfloor |
CN101691787A (en) * | 2009-09-22 | 2010-04-07 | 中铁十二局集团建筑安装工程有限公司 | Converse construction process for middle-high steel structure building |
CN102733599A (en) * | 2012-06-08 | 2012-10-17 | 北京市第三建筑工程有限公司 | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam |
CN102877595A (en) * | 2012-10-30 | 2013-01-16 | 中国二十二冶集团有限公司 | Method for manufacturing large-size and large-span steel truss |
Non-Patent Citations (1)
Title |
---|
张良等: "《超高层建筑高耸钢结构施工技术》", 《建筑技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453197B (en) | High Large Cantilever concrete structural steel shape supports platform | |
CN102979312B (en) | Indoor aluminum honeycomb board suspended ceiling reverse installation technology | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN103352428A (en) | Suspension bridge cable bent tower beam non-support construction method | |
CN110748139B (en) | Hanging basket support system | |
CN113123469A (en) | Method for constructing complex curved surface modeling roof grid structure | |
CN105201198A (en) | Tool-type cantilever beam and construction method thereof | |
CN106978848A (en) | High-rise building highrise steel structure steel support formula construction method | |
CN105952129B (en) | Elevator shaft combined type integral lifting operation platform and construction method thereof | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN107419907A (en) | A kind of steel-making tower steel structure platform is staggered installation of welding method | |
CN201714056U (en) | Truss-type operating platform | |
CN102022003A (en) | Suspended ceiling keel sheet assembling and hoisting method | |
CN103112766A (en) | Construction elevator suspending over basement roof of building and construction method thereof | |
CN110130627A (en) | Large Span Structure of Arch surface mesh roofing construction platform and construction method | |
CN102787717B (en) | Self-supporting combined steel template construction method | |
CN105464215A (en) | Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support | |
CN105464218B (en) | One kind landing truss bearing pin connecting joint structure | |
CN104594631B (en) | The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer | |
CN206632937U (en) | A kind of top plate nut locking apparatus | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN103850435A (en) | Hoisting framework device capable of replacing support framework and used for frame construction building concrete floor | |
CN203961092U (en) | The anti-braced structures of a kind of suspension rod | |
CN203067936U (en) | High-altitude pipeline installation safe lifting bracket | |
CN204435859U (en) | Movable platform special for high-rise concrete elevator shaft construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170725 |