CN106787195A - A kind of regulation and control one operation ticket system that lock module is unblocked with safety - Google Patents

A kind of regulation and control one operation ticket system that lock module is unblocked with safety Download PDF

Info

Publication number
CN106787195A
CN106787195A CN201611207168.5A CN201611207168A CN106787195A CN 106787195 A CN106787195 A CN 106787195A CN 201611207168 A CN201611207168 A CN 201611207168A CN 106787195 A CN106787195 A CN 106787195A
Authority
CN
China
Prior art keywords
switch
policer
remote control
ticket
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611207168.5A
Other languages
Chinese (zh)
Other versions
CN106787195B (en
Inventor
施中郎
王建成
徐拥华
陈仁庆
杨威
顾志伟
李践
吴奕
蒋波
杨彬
刘学敏
王星
毛文杰
戚碧云
田晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.
QUZHOU GUANGMING POWER INVESTMENT GROUP Co.,Ltd.
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd, Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201611207168.5A priority Critical patent/CN106787195B/en
Publication of CN106787195A publication Critical patent/CN106787195A/en
Application granted granted Critical
Publication of CN106787195B publication Critical patent/CN106787195B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Selective Calling Equipment (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a kind of regulation and control one operation ticket system that lock module is unblocked with safety, lock function is unblocked by increasing manual remote control setting safety, can realize that the safety of the manual remote control authority of the switch of certain equipment in network system unblocks, effectively prevent the maloperation in manual remote control.

Description

A kind of regulation and control one operation ticket system that lock module is unblocked with safety
Technical field
The present invention relates to areas of information technology, and in particular to a kind of regulation and control one operation order that lock module is unblocked with safety System.
Background technology
According to (2014) No. 72 texts of Guo Wang companies key《Guo Tiao centers are remote on printing and distributing State Grid Corporation of China's switch normalization The notice of square operation element instruction》With (2014) No. 29 texts of key《Guo Tiao centers are on printing and distributing State Grid Corporation of China's failure The notice of management regulation (provisional) is sent in the examination of a stoppage in transit circuit distant place》And provincial company Zhejiang electricity adjusts (2014) No. 647 texts《Guo Wang Zhejiang Province Utilities Electric Co. is on printing and distributing 220 kilovolts of Zhejiang power grid and following switch normalization remote operation implementing method and state's net Zhejiang power saving Power company regulates and controls the notice of center remote operation administrative provisions》Deng requiring, since carrying out switch normalization remote operation work, adjust The workload and security risk of control personnel substantially increase, responsibility is heavier, but the anti-error constraint for straighforward operation and imperfection. As what regulation and control center remote control was operated increases increasingly, need badly and regulation and control centralized telecontrol behaviour is ensured using intelligent error preventing restriction technique That makees is safely controllable, the level of security of lifting regulation and control specialty.
It is at present the integrated dispatch automated system EMS in ground county for more often using scheduling system in power network (OPEN3000) and scheduling Aptitude Operation Order Sheet System, anti-error constraint and anti-error verification to straighforward operation can not still fully meet 《Guo Tiao centers switch the notice of normalization remote operation job guide opinion on printing and distributing State Grid Corporation of China》Middle requirement it is complete Kind Centralized Monitoring function, possesses means such as remote operation simulation preview, the anti-error check of topology etc. and requires.Deposited in remote control anti-misoperation Subject matter it is as follows:
1) multi-level Security Checking function of the regulation and control straighforward operation based on network topology is not perfect;
2) monitoring straighforward operation does not possess the anti-error binding function of operation object, there is remote control risk by mistake.
3) lack technology correlation between monitoring straighforward operation and dispatch command, exist and do not operate hidden danger by dispatch command;
4) monitoring straighforward operation does not have Aptitude Operation Order Sheet System, lacks the simulation to straighforward operation, management of making out an invoice.
For problem above, need badly and take the anti-error restriction technique of straighforward operation, intelligent error preventing operating function is improved, to ensure The safety of regulation and control center remote control operation.
The content of the invention
In view of the shortcomings of the prior art, the present invention is intended to provide a kind of regulation and control one for unblocking lock module with safety is operated Bill system, by increasing by one there is manual remote control to set the policer operation bill system that safety unblocks lock function, it is possible to achieve electricity The safety of the manual remote control authority of the switch of certain equipment unblocks in net system, effectively prevents the maloperation in manual remote control.
A kind of regulation and control one Aptitude Operation Order Sheet System that lock technology is unblocked based on safety, including scheduling operation bill system and electricity Net dispatching automation integrated system, also includes policer operation bill system;The policer operation bill system respectively with the scheduling Operation ticket system and power network schedule automation integrated system are associated;
The policer operation bill system includes such as lower module:
Hand monitor operation order generation module:For the Dispatching generation for manually being generated according to scheduling operation bill system Policer operation ticket is simultaneously stored in memory module, and the content of the policer operation ticket includes operator's user name, machine where operation Name, the switch for needing remote control, operation time started and operation end time;
Security Checking module:Whether policer operation ticket to generating is checked, and checks its safety for meeting operation of power networks Constraints;
Control E file generating modules:In policer operation ticket by generating unblock E texts according to policer operation ticket after Security Checking Part is simultaneously sent to power network schedule automation integrated system side, and power supply network dispatching automation integrated system will be right according to unblock E files Answer the switch unlocking of equipment;And after the completion of straighforward operation, generation locking E file cocurrents deliver to power network schedule automation Integrated system side, power supply network dispatching automation integrated system is according to locking E files by the switch of corresponding device again locking;
Memory module:For the storage of data;
Data transmit-receive module:For the reception and transmission of external data.
The method of monitoring is scheduled using said system, is comprised the following steps:
S1 closes all first by Authority Management Tool priv_manager in power network schedule automation integrated system The control of user role unblocks authority;
S2 is needed to when certain switch is remotely controlled in system, carrying out filling out scheduling behaviour first on scheduling operation bill system Make ticket, be then forwarded to policer operation bill system;
S3 policer operations bill system is received and stored on memory module by data transmit-receive module, and operating personnel are supervising manually On control operation order generation module it is artificial according to Dispatching data genaration policer operation ticket and storage in memory module, the prison Controlling the content of operation order includes operator's user name, machine name, the switch for needing remote control, operation time started and behaviour where operation Make the end time, wherein when needing to fill in operator's user name, operation place machine name, the switch for needing remote control, operation beginning Between;
Security Checking module carries out Security Checking to content therein after the generation of S4 policer operations ticket, checks whether it accords with Close the security constraints of operation of power networks;Next step is carried out if meeting, it is otherwise anti-to hand monitor operation order generation module Feedforward information;Check result is stored in memory module;
S5 controls E file generating modules according to the generation unblock E file storages of policer operation ticket in memory module, and by number Sent to isolating device according to transceiver module, isolating device is sent to power network schedule automation integrated system side, and file content includes Operator's user name, machine name, the switch, the blocking that need remote control where operation, and it is 0 to set blocking, represents and permits Perhaps switch carries out manual remote control;
After S6 power network schedule automation integrated systems side receives file, E files are unlocked by independent process load_yk Parsing, and whether "Yes" will be changed to " allowing manual remote control " domain of inductive switch, while an alarm to alarm window is sent, it is interior It is " XXX switch manual remote controls unlocking " to hold, and " XXX " is the identification title of switch;
After S7 switch unlockings, each Role Users can start split to put row straighforward operation into;
After the completion of S8 straighforward operations, at the end of the operation on policer operation ticket is filled on policer operation ticket generation module Between, fill in and finish and store;Control E file generating modules generate a locking E file, by data transmit-receive module send to every From device, isolating device is sent to power network schedule automation integrated system, and file content is included where operator's user name, operation Machine name, the switch, the blocking that need distant place control, " blocking " place are set to 1, represent and recover the " artificial distant of switch Control locking " state;
After S9 power network schedule automation integrated systems side receives locking E files, by " whether the allowing remote control " of inductive switch Domain is changed to "No", while sending an alarm to alarm window, content is " locking of XXX switch manual remote controls ", and " XXX " is switch Identification title.
It should be noted that in step S1, it is allowed to which there is emergent control to unblock authority to make emergent being used for certain customers.
It should be noted that in step S4, the distant of the switch of remote control the need for filling in policer operation ticket has only been opened Control authority, the switch not being related in policer operation ticket is still within manual remote control blocking.
The beneficial effects of the present invention are:By increasing a monitoring that there is safety to unblock lock function in network system Operation ticket system, it is possible to achieve the safety of the manual remote control authority of the switch of certain equipment unblocks in network system, it is effectively anti- The only maloperation in manual remote control.
Brief description of the drawings
Fig. 1 is principle schematic of the invention;
Fig. 2 is implementation exemplary plot of the invention.
Specific embodiment
Below with reference to accompanying drawing, the invention will be further described, it is necessary to explanation, the present embodiment is with this technology side Premised on case, detailed implementation method and specific operating process is given, but protection scope of the present invention is not limited to this reality Apply example.
As shown in Figure 1-2, a kind of regulation and control one Aptitude Operation Order Sheet System that lock technology is unblocked based on safety, including scheduling behaviour Make bill system and power network schedule automation integrated system, also include policer operation bill system;The policer operation bill system point It is not associated with the scheduling operation bill system and power network schedule automation integrated system;
The policer operation bill system includes such as lower module:
Hand monitor operation order generation module:For the Dispatching generation for manually being generated according to scheduling operation bill system Policer operation ticket is simultaneously stored in memory module, and the content of the policer operation ticket includes operator's user name, machine where operation Name, the switch for needing remote control, operation time started and operation end time;
Security Checking module:Whether policer operation ticket to generating is checked, and checks its safety for meeting operation of power networks Constraints;
Control E file generating modules:In policer operation ticket by generating unblock E texts according to policer operation ticket after Security Checking Part is simultaneously sent to power network schedule automation integrated system side, and power supply network dispatching automation integrated system will be right according to unblock E files Answer the switch unlocking of equipment;And after the completion of straighforward operation, generation locking E file cocurrents deliver to power network schedule automation Integrated system side, power supply network dispatching automation integrated system is according to locking E files by the switch of corresponding device again locking;
Memory module:For the storage of data;
Data transmit-receive module:For the reception and transmission of external data.
The method of monitoring is scheduled using said system, is comprised the following steps:
S1 closes all first by Authority Management Tool priv_manager in power network schedule automation integrated system The control of user role unblocks authority;
S2 is needed to when certain switch is remotely controlled in system, carrying out filling out scheduling behaviour first on scheduling operation bill system Make ticket, be then forwarded to policer operation bill system;
S3 policer operations bill system is received and stored on memory module by data transmit-receive module, and operating personnel are supervising manually On control operation order generation module it is artificial according to Dispatching data genaration policer operation ticket and storage in memory module, the prison Controlling the content of operation order includes operator's user name, machine name, the switch for needing remote control, operation time started and behaviour where operation Make the end time, wherein when needing to fill in operator's user name, operation place machine name, the switch for needing remote control, operation beginning Between;
Security Checking module carries out Security Checking to content therein after the generation of S4 policer operations ticket, checks whether it accords with Close the security constraints of operation of power networks;Next step is carried out if meeting, it is otherwise anti-to hand monitor operation order generation module Feedforward information;Check result is stored in memory module;
S5 controls E file generating modules according to the generation unblock E file storages of policer operation ticket in memory module, and by number Sent to isolating device (because policer operation bill system is arranged on three Zhong III areas of area of safety, and dispatching of power netwoks according to transceiver module Automatic integrated system is arranged on the I areas in 3rd area of safety, therefore data need first to send to isolating device), isolating device hair Power network schedule automation integrated system side is delivered to, file content includes operator's user name, operation place machine name, needs remote control Switch, blocking, and blocking is set for 0, expression allows the switch to carry out manual remote control;
After S6 power network schedule automation integrated systems side receives file, E files are unlocked by independent process load_yk Parsing, and whether "Yes" will be changed to " allowing manual remote control " domain of inductive switch, while an alarm to alarm window is sent, it is interior It is " XXX switch manual remote controls unlocking " to hold, and " XXX " is the identification title of switch;
After S7 switch unlockings, each Role Users can start split to put row straighforward operation into;
After the completion of S8 straighforward operations, at the end of the operation on policer operation ticket is filled on policer operation ticket generation module Between, fill in and finish and store;Control E file generating modules generate a locking E file, by data transmit-receive module send to every From device, isolating device is sent to power network schedule automation integrated system, and file content is included where operator's user name, operation Machine name, the switch, the blocking that need distant place control, " blocking " place are set to 1, represent and recover the " artificial distant of switch Control locking " state;
After S9 power network schedule automation integrated systems side receives locking E files, by " whether the allowing remote control " of inductive switch Domain is changed to "No", while sending an alarm to alarm window, content is " locking of XXX switch manual remote controls ", and " XXX " is switch Identification title.
It should be noted that in step S1, it is allowed to which there is emergent control to unblock authority to make emergent being used for certain customers.
It should be noted that in step S4, the distant of the switch of remote control the need for filling in policer operation ticket has only been opened Control authority, the switch not being related in policer operation ticket is still within manual remote control blocking.
On this basis, following function can also be increased in EMS system:
1. it is system-level to unblock
Because number of switches is more (breaker token record number is more than 10,000) in network system, all switches are all changed One time whether " allowing manual remote control " field is relatively time consuming, while also to take into account the commercial storehouse of modification, workload is huger, herein may be used Increase a master switch in " EMS system parameter ", for setting up one judgement before manual block state is judged, if always opening Whether pass is " opening ", just needs to judge " allowing manual remote control ";If master switch is " closing ", need not judge " whether permit Perhaps manual remote control ".
Master switch is " opening " state in normal operation.Occur in large area blackout, it is necessary to during emergency release, Plant stand blank space clicks on " unblock of system Full remote controlled ", and the function only carries out " closing " operation to master switch, without modification switch " whether allowing manual remote control ".After unlocked time expires, " opening " operation is also only carried out to master switch.
2. lock-switch self-timing locking is solved
This function switch the setting that unblocks with single just for system-level unblocking.In EMS system, " remote control solution is clicked on After locking " or " unblock of system Full remote controlled " menu, login interface is ejected, in interface in addition to being input into username-password, in addition it is also necessary to Selection the entry-into-force time, there is provided option have 30 minutes, 2 hours, 8 hours, 24 hours.
This unblock operation needs write operation information table (617), and when Single switch is unlocked, " measuring ID " domain is switch ID;Entirely When system is solved, " measuring ID " domain is -1.Meanwhile, increase a unblock inspection program, circular test operation letter newly in EMS system Breath table in all action types for " remote controlled unlocking " record, check whether the releasing time expires, expire, recover the switch or System-wide manual remote control locking.
3. operation annotation input
, it is necessary to increase comment field in the login interface mentioned in upper, can not complete to log in if annotation is not input into Operation.Notes content can be displayed in the alarm of operation, the backtracking of convenient operation reason.
For a person skilled in the art, technical scheme that can be according to more than and design, make various corresponding Change and deform, and all these changes and deformation should be construed as being included within the protection domain of the claims in the present invention.

Claims (4)

1. a kind of regulation and control one Aptitude Operation Order Sheet System that lock technology is unblocked based on safety, including scheduling operation bill system and power network Dispatching automation integrated system, it is characterised in that also include policer operation bill system;The policer operation bill system respectively with The scheduling operation bill system and power network schedule automation integrated system are associated;
The policer operation bill system includes such as lower module:
Hand monitor operation order generation module:Dispatching for manually being generated according to scheduling operation bill system generates monitoring Operation order is simultaneously stored in memory module, and the content of the policer operation ticket includes operator's user name, operation place machine name, needs Want switch, operation time started and the operation end time of remote control;
Security Checking module:Whether policer operation ticket to generating is checked, and checks its security constraint for meeting operation of power networks Condition;
Control E file generating modules:In policer operation ticket by generating unblock E files simultaneously according to policer operation ticket after Security Checking Send to power network schedule automation integrated system side, power supply network dispatching automation integrated system sets correspondence according to unblock E files Standby switch unlocking;And after the completion of straighforward operation, it is integrated that generation locking E file cocurrents deliver to power network schedule automation System side, power supply network dispatching automation integrated system is according to locking E files by the switch of corresponding device again locking;
Memory module:For the storage of data;
Data transmit-receive module:For the reception and transmission of external data.
2. the method for monitoring is scheduled using system described in claim 1, it is characterised in that comprised the following steps:
S1 by Authority Management Tool priv_manager, closes all users in power network schedule automation integrated system first The control of role unblocks authority;
S2 is needed to when certain switch is remotely controlled in system, carrying out filling out scheduling operation first on scheduling operation bill system Ticket, is then forwarded to policer operation bill system;
S3 policer operations bill system is received and stored on memory module by data transmit-receive module, and operating personnel grasp in hand monitor Make on ticket generation module it is artificial according to Dispatching data genaration policer operation ticket and store in memory module, the monitoring is grasped Making the content of ticket includes operator's user name, machine name, the switch for needing remote control, operation time started and operation knot where operation The beam time, wherein needing to fill in operator's user name, machine name, the switch for needing remote control, operation time started where operation;
Security Checking module carries out Security Checking to content therein after the generation of S4 policer operations ticket, checks whether it meets electricity The security constraints of network operation;Next step is carried out if meeting, otherwise to hand monitor operation order generation module feedback letter Breath;Check result is stored in memory module;
S5 controls E file generating modules according to the generation unblock E file storages of policer operation ticket in memory module, and is received by data Hair module is sent to isolating device, and isolating device is sent to power network schedule automation integrated system side, and file content includes operation Member's user name, machine name, the switch, the blocking that need remote control where operation, and it is 0 to set blocking, expression is allowed out Put row manual remote control into;
After S6 power network schedule automation integrated systems side receives file, the solution of E files is unlocked by independent process load_yk Analysis, and whether "Yes" will be changed to " allowing manual remote control " domain of inductive switch, while sending an alarm to alarm window, content It is " XXX switch manual remote controls unlocking ", " XXX " is the identification title of switch;
After S7 switch unlockings, each Role Users can start split to put row straighforward operation into;
After the completion of S8 straighforward operations, the operation end time on policer operation ticket is filled on policer operation ticket generation module, filled out Write and finish and store;Control E file generating modules generate a locking E file, are sent to isolation by data transmit-receive module and filled Put, isolating device is sent to power network schedule automation integrated system, and file content includes operator's user name, machine where operation Name, need switch, blocking that a distant place controls, " blocking " place is set to 1, represent recover switch " manual remote control is closed Lock " state;
After S9 power network schedule automation integrated systems side receives locking E files, by whether to " the allowing remote control " of inductive switch, domain is more "No" is changed to, while sending an alarm to alarm window, content is " locking of XXX switch manual remote controls ", and " XXX " is the knowledge of switch Alias claims.
3. method according to claim 2, it is characterised in that in step S1, it is allowed to which certain customers have emergent control solution Locking authority is used with making to meet an urgent need.
4. method according to claim 2, it is characterised in that in step S4, has only opened and filled in policer operation ticket The need for remote control switch remote control authority, the switch not being related in policer operation ticket is still within manual remote control latch like State.
CN201611207168.5A 2016-12-23 2016-12-23 A kind of regulation one operation ticket system and its method unblocking lock module with safety Active CN106787195B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611207168.5A CN106787195B (en) 2016-12-23 2016-12-23 A kind of regulation one operation ticket system and its method unblocking lock module with safety

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611207168.5A CN106787195B (en) 2016-12-23 2016-12-23 A kind of regulation one operation ticket system and its method unblocking lock module with safety

Publications (2)

Publication Number Publication Date
CN106787195A true CN106787195A (en) 2017-05-31
CN106787195B CN106787195B (en) 2019-11-15

Family

ID=58919192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611207168.5A Active CN106787195B (en) 2016-12-23 2016-12-23 A kind of regulation one operation ticket system and its method unblocking lock module with safety

Country Status (1)

Country Link
CN (1) CN106787195B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112308540A (en) * 2020-12-04 2021-02-02 珠海优特电力科技股份有限公司 Method and device for switching on/off state of equipment in rail transit and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3475794B2 (en) * 1998-07-01 2003-12-08 トヨタ自動車株式会社 Parts ordering system
CN101566846A (en) * 2009-05-27 2009-10-28 江西九江供电公司 Distribution grid switching operation bill generation and anti-error system
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal
CN104933535A (en) * 2015-07-03 2015-09-23 国家电网公司 An intelligent monitoring operation ticket management method and a system thereof
CN105809571A (en) * 2015-04-02 2016-07-27 国网山东省电力公司青岛供电公司 Intelligent monitoring method and system for outputting scheduling operation tickets
CN105894210A (en) * 2016-04-21 2016-08-24 国电南瑞科技股份有限公司 Remote operation anti-misoperation method for operation-bill trigger power grid equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3475794B2 (en) * 1998-07-01 2003-12-08 トヨタ自動車株式会社 Parts ordering system
CN101566846A (en) * 2009-05-27 2009-10-28 江西九江供电公司 Distribution grid switching operation bill generation and anti-error system
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal
CN105809571A (en) * 2015-04-02 2016-07-27 国网山东省电力公司青岛供电公司 Intelligent monitoring method and system for outputting scheduling operation tickets
CN104933535A (en) * 2015-07-03 2015-09-23 国家电网公司 An intelligent monitoring operation ticket management method and a system thereof
CN105894210A (en) * 2016-04-21 2016-08-24 国电南瑞科技股份有限公司 Remote operation anti-misoperation method for operation-bill trigger power grid equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112308540A (en) * 2020-12-04 2021-02-02 珠海优特电力科技股份有限公司 Method and device for switching on/off state of equipment in rail transit and storage medium
CN112308540B (en) * 2020-12-04 2024-01-23 珠海优特电力科技股份有限公司 Method, device and storage medium for switching device opening and closing states in rail transit

Also Published As

Publication number Publication date
CN106787195B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN106483890B (en) A kind of regulation intelligent anti-error operation system based on operation ticket system
CN106505742B (en) A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method
CN109740837B (en) Power grid province and land network command and safety error prevention method based on regulation and control integration
CN101951032B (en) Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN205787685U (en) Managing and control system for job safety
CN105262220B (en) Substation's intelligence shutdown telecontrol information check method and system
CN108494089B (en) Rapid, safe and reliable batch remote control method for limited-circuit pull circuits
CN104467183A (en) Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN106710051A (en) Management control system and method for preventing error operations of electrical secondary equipment
CN107834699A (en) Dispatching of power netwoks based on the regulation and control integration of ground county integrates anti-error system
CN101447692B (en) Safe and reliable scheduling operation device in an unattended transformer station
CN105894210B (en) A kind of operation order trigger-type grid equipment remote operation anti-misoperation method
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN104750095B (en) Regulation and control center inspection pilot system and method
CN113746205A (en) One-button programmed remote operation method based on network-side collaborative safety error-proof check
CN106787195B (en) A kind of regulation one operation ticket system and its method unblocking lock module with safety
CN107359702A (en) Intelligent linkage Interlocking Methods based on IES700 systems
CN108879441A (en) Substation inspection and grid switching operation system and its control method
CN104158294A (en) Dispatching anti-misoperation control method
CN106504370B (en) Plant stand security management and control system and control method
CN206400661U (en) Managing and control system for preventing electrical secondary equipment maloperation
CN109285086A (en) A kind of intelligent substation SCD file managing and control system
CN106451788A (en) Method for remotely controlling and operating dispatching automation systems by aid of remote-control safety strategy module
CN106549493B (en) Transformer substation anti-misoperation unlocking control device and control method
CN110571930B (en) Remote management system and remote management method of substation telecontrol device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 324002 No. 6, New River, Zhejiang, Quzhou

Applicant after: Quzhou Power Supply Company, State Grid Zhejiang Electric Power Co., Ltd.

Applicant after: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY CO., LTD.

Address before: 324002 No. 6, New River, Zhejiang, Quzhou

Applicant before: Quzhou electric company of State Grid Zhejiang Electric Power Company

Applicant before: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200602

Address after: 324000 No. 6, New River, Zhejiang, Quzhou

Co-patentee after: QUZHOU GUANGMING POWER INVESTMENT GROUP Co.,Ltd.

Patentee after: QUZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Co-patentee after: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 324002 No. 6, New River, Zhejiang, Quzhou

Co-patentee before: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: QUZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

TR01 Transfer of patent right