CN101566846A - Distribution grid switching operation bill generation and anti-error system - Google Patents

Distribution grid switching operation bill generation and anti-error system Download PDF

Info

Publication number
CN101566846A
CN101566846A CNA2009101154364A CN200910115436A CN101566846A CN 101566846 A CN101566846 A CN 101566846A CN A2009101154364 A CNA2009101154364 A CN A2009101154364A CN 200910115436 A CN200910115436 A CN 200910115436A CN 101566846 A CN101566846 A CN 101566846A
Authority
CN
China
Prior art keywords
bill
database
distribution grid
generates
switching operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009101154364A
Other languages
Chinese (zh)
Inventor
吴越
苏克明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI JIUJIANG POWER SUPPLY CO Ltd
Original Assignee
JIANGXI JIUJIANG POWER SUPPLY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI JIUJIANG POWER SUPPLY CO Ltd filed Critical JIANGXI JIUJIANG POWER SUPPLY CO Ltd
Priority to CNA2009101154364A priority Critical patent/CN101566846A/en
Publication of CN101566846A publication Critical patent/CN101566846A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a distribution grid switching operation bill generation and anti-error system, comprising a system maintenance module which is connected with a database server, capable of appropriately operating an operation bill storage database, an operation rule database, an electrical grid information database, and a user information database closely related to the system. The automatic bill making and the manual bill making complements each other, making the whole system convenient and practical. Reasonable anti-false determination can be made according to operation rule of the distribution grid during bill making process so as to ensure accuracy of the system bill making. According to the invention, layered operation rule template is adopted, operation rules are clarified based on equipment types, operation rules are stored in the database, and a favorable human-machine interface is provided for user to modify. The system has advantage of bill making easiness, bill making accuracy, and maintenance convenience.

Description

A kind of distribution grid switching operation bill generates and anti-error system
Technical field
The present invention relates to a kind of distribution grid switching operation bill generates and anti-error system.
Background technology
The electric grid operating ticket is the effective measures that guarantee safe operation of power system and management.For many years, for alleviating the pressure of manually making out an invoice, improve the automatization level of dispatching of power netwoks operation and make operation order standard more, carried out a large amount of research and developments in the field of people's active computer formation operation order, artificial intelligence technology is the dark day by day people of application on power system, and it is comparatively successful to electric substation and generating plant to form operation ticket system for computing machine at present.But the maintainable and not fine yet solution of versatility problem for power distribution network.
At present, the popularization of electric grid operating ticket expert system is slower always, and its main cause is that existing operation ticket system does not reach good maintainability and versatility well.The relevant expert is divided into 6 classes with existing Operation Ticket Expert System, and its characteristics are as follows:
A. inquire about the mode of making out an invoice, development cost are low, the cycle is short, but do not have intelligent;
B. based on the production system mode, exploitation is difficult, and the construction cycle is long;
C. subroutine module mode, the user can't safeguard, and it is very big to transplant workload, and versatility is relatively poor;
D. figure is checked the mode of making out an invoice, and can not go out the operation order content by automated reasoning;
E. based on the switch control logic mode, because number of states is very big, program realizes having certain difficulty;
F. object-oriented way, existing expert system just all is abstracted into class to all electrical equipments, has not given play to the good characteristic of Object-oriented Technique fully, not exclusively is fit to the carrying out of reasoning, and the system maintenance of developing is very poor.
The problem of above-mentioned indication 6 class expert systems, key point are that knowledge representation just at concrete electrical equipment, is not at the operation of equipment incidence relation, have only considered the characteristics of certain single mode and comprehensive inadequately.Too plain owing to knowledge representation, directly perceived and concrete, level of abstraction is not high, advances the people in program code with regard to having some very concrete domain knowledges, makes such system flexibility and versatility not strong.Program will change when knowledge changes, and the user participates in its maintenance and uses and all have any problem.The common shortcoming of these systems is that working rule is solidificated in the program with the more complicated that concerns between the Frame Theory apparatus for establishing, and the user is difficult for the attended operation rule.
Summary of the invention
Its purpose of the present invention just is to provide a kind of distribution grid switching operation bill to generate and anti-error system, and this system has and is easy to make out an invoice, and makes out an invoice accurately, is convenient to characteristics such as maintenance.
Realize above-mentioned purpose and the technical scheme taked, this system includes:
System maintaining module, itself and database server link together closely, can be to carrying out suitable operation with the closely-related operation order thesaurus of native system, working rule storehouse, electric network information storehouse, user information database;
The line chart graphics module is finished every function for total system a basic platform is provided, and also allows total system more simple and easy to do;
The operation order generation module, have automatic invoice issuance, figure preview, manual bill and four functions of procedure management, automatic invoice issuance and manual bill complement each other, finish generation work jointly to all operations ticket, the operation order generation module also is connected with the SCADA system by the system coordination module, real time data shared with it.
The invention has the advantages that: adopt OO expression way, can explain Properties of Objects in the power distribution network easily; Automatically the generating run ticket combines easy operating with manual generating run ticket; Anti-misinterpretation is fit to field condition, has improved the accuracy of making out an invoice greatly; Adopt layering dynamic template rule, be easy to the user and safeguard.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing.
Fig. 1 is an allomeric function block diagram of the present invention
Fig. 2 is the flow process of the anti-misinterpretation of distribution grid switching operation bill among the present invention
Fig. 3 is the process flow diagram of the automatic generating run ticket of the present invention
Embodiment
This system adopts OO expression way, and the primary equipment that needs in the line chart to operate is abstracted into class, simultaneously the data member of secondary device as class is encapsulated in the class.In addition, adopt the dynamic template rule, be easy to user's modification.Simultaneously, native system has also been realized sharing real time data with the SCADA system, and automatic invoice issuance or manual the click are made out an invoice, and the good anti-misinterpretation and the function of analog demenstration.This system includes:
System maintaining module, itself and database server link together closely, can be to carrying out suitable operation with the closely-related operation order thesaurus of native system, working rule storehouse, electric network information storehouse, user information database, since satisfy the real time altering of required various information in the native system, the dynamic operation rule template technology that is adopted in the maintenance to the working rule storehouse particularly, just be easy to the modification of implementation rule and perfect more, thereby improved the versatility of total system greatly;
The line chart graphics module, it is a supplementary module of native system, it is finished every function for total system a basic platform is provided, and also allows total system more simple and easy to do;
The operation order generation module, it is the nucleus module of native system, it has automatic invoice issuance, the figure preview, manual bill and four functions of procedure management, automatic invoice issuance and manual bill complement each other, finish generation work jointly to all operations ticket, figure is previewed then let us and is more clearly recognized after the executable operations the influence that each equipment produced and some problems that wherein may exist, procedure management then allows the generative process accurate and effective more of whole operation ticket, the operation order generation module also is connected with the SCADA system by the system coordination module, real time data shared with it, the real-time benefit of lifting total system.
Adopt OO expression way that line chart is carried out modeling, realized the auto-initiation of line chart, on the geography information such as coordinate with equipment are stored in basis in the database, the coordinate of native system by equipment on line chart, draw automatically in the power distribution network equipment and carry out topological initialization, if judge that through program topological initialization is correct, effectively, then the initialized result of topology is write database, the numbering of storage pel in database, information such as current direction.
Only the primary equipment that needs in the line chart to operate is abstracted into class, simultaneously the data member of secondary device as class is encapsulated in the class.
Realize that by a graphic operation the manual of operation order generates.
The mode that ponders a problem of imitation expert with the operation of primary equipment and secondary device separately, has realized automatic invoice issuance.
Can come the influence situation of analog demenstration practical operation by operation to relevant device in the line chart to real world devices.
According to the working rule of power distribution network, carried out reasonably preventing misinterpretation.The operation that can not carry out is pointed out to forbid, what improves the accuracy rate that total system is made out an invoice from.
Adopt the hierarchical operations rule template, working rule is classified, working rule is stored in the database, and provide good man computer interface for user's modification by device type.
Adopt OO expression way that line chart is carried out modeling, realized the auto-initiation of line chart.Realize that by a graphic operation the manual of operation order generates.According to the working rule of power distribution network, carried out reasonably preventing misinterpretation.The mode that ponders a problem of imitation expert with the operation of primary equipment and secondary device separately, has realized automatic invoice issuance.Adopt the hierarchical operations rule template, working rule is classified, working rule is stored in the database, and provide good man computer interface for user's modification by device type.This system has and is easy to make out an invoice, and makes out an invoice accurately the advantage of being convenient to safeguard.
The technical solution adopted for the present invention to solve the technical problems:
This operation ticket system comprises the operation order generation module, line chart graphics module etc.Wherein, the operation order generation module comprises automatic invoice issuance again, manual bill, graphic modeling demonstration, functions such as procedure audit.
1. the generation of operation order
The generation of operation order is the process of a more complicated.The generative process of operation order has comprised network topology, traversal mode, the integrated use of working rule etc.The generating run ticket has dual mode: generate automatically and manual the generation.Native system has automatic one-tenth ticket and the function that manually becomes ticket simultaneously.Below introduce the generative process of native system operation order from four aspects.
(1) topological model of line chart
Equipment in the power distribution network comprises switch, disconnecting link, controlled distribution box, ring main unit, substation transformer etc.These equipment just are expressed as pel one by one on line chart.And the equipment in the power distribution network contains numbering, title, and electric pressure, whether rated current attribute such as disconnects.How expressing pel, is the problem that we must consider.
The OO representation of knowledge is a kind of desirable representation of knowledge form, and it can describe static characteristics, dynamic behaviour and the interaction of complex object easily based on abstract data type, has the advantage of general knowledge representation concurrently.What native system adopted is exactly the object-oriented representation method, and the pel in the line chart is abstracted into class, numbering, and whether title the attribute of attribute as class such as disconnects.Like this, when the state that changes equipment, as with switch when closure state transfers off-state to, only need to change an attribute of switch, express very simple and convenient.
For the problem that whether is necessary all pels in the line chart all are abstracted into class in the native system, we find, each sequence of operation only relates to switch in the operation order, disconnecting link, controlled distribution box, 4 kinds of primary equipments of ring main unit, and attached disconnecting link, secondary devices such as ground connection disconnecting link, and controlled distribution box, ring main unit finally also can be decomposed into the operation of disconnecting link and switch, and promptly various operation tasks only need relevant switch, disconnecting link and secondary device are operated and can be finished.Therefore, will bus and primary equipment such as transformer be abstracted into class separately, but only switch abstract be 1 class, be other 1 class with disconnecting link is abstract.Because the operation of various secondary devices, as " disconnecting the attached disconnecting link of so-and-so switch " etc., all be as the replenishing or cooperate of switch and switch operation, in order to carry out efficient reasoning, so all secondary devices are encapsulated in the corresponding primary equipment class as data member, and are not abstracted into class separately.
The annexation of equipment is that the topological model of line chart is the major issue that must consider in the line chart.Topological model is concerning the quality of the speed and the algorithm of speed when traveling through.Owing to be stored in the database by the geography information of measuring equipment such as coordinate, the coordinate of native system by equipment on line chart, draw automatically in the power distribution network equipment and carry out topological initialization.If judge that through program topological initialization is correct, effectively, then the initialized result of topology is write database.In database, stored the numbering of pel, information such as current direction.
(2) from the order of operation phrase generating run
Manual generating run ticket is finished by a graphic operation in the native system.The operation of native system equipment is divided into simple operations and complex operations.Simple operations comprises cut-off switch, and Closing Switch hangs up warning sign etc.Complex operations comprises the transhipment row, changes standby, changes maintenance etc.Complex operations can be decomposed into some simple operationss through after the analysis of program.When the user has selected an equipment, when clicking right-click menu, thereby program can be judged attributes such as the type of this equipment and states and shows corresponding menu.As selected the switch of a closure, click right-click menu.Program is through demonstrating menus such as " cut-off switch change standby, changes maintenance " in right-click menu after certain judgement.The menu has here mainly shown operational motion, does not show about the out of Memory of equipment pel.When having clicked some actions menus, system can obtain the title of equipment, and then obtain the ring or the circuit at equipment place according to the numbering of the equipment of selection, thus the generating run order.Operational order is by operation verb, line name, device name, four compositions of device type.
In addition, because certain, some operation is difficult to generate by a graphic operation, at this moment can generate by inserting operational order in the form of operation steps.The method of inserting operational order is: inserts operational order when clicking menu, can eject forms, in forms, select to want the ring at apparatus operating place, and device name, initial state, final states can the generating run order.
(3) the anti-misinterpretation of each step command
Computer generation not only will improve and intend ticket efficient for people's formulation operation order, also will improve the accuracy of intending ticket.Therefore, in operation ticket system, whether successful the operation order correctness of leaving be one of this system essential condition.Therefore, operation order is prevented that misinterpretation is essential.For the anti-misinterpretation of operation order, must be according to the working rule of power distribution network.Can not the on-load drawing as disconnecting link, switch and attached disconnecting link thereof disconnect and certain sequence of operation etc. are being arranged when closed.
(4) automatic generating run ticket
The automatic generating run ticket of system is a comprehensive stronger job.In the process of generating run ticket, need to consider network topology, factors such as inference mode.Here, imitate the mode that the expert ponders a problem.At first consider the sequence of operation of primary equipment, and then add the operation of people's secondary device that such knowledge arranges system succinct, clear, lucid and lively.
2. the realization of working rule template
An operation order is according at particular device and specific operation task, according to the power distribution network working specification, changes the operational order collection of relevant devices running status according to the operational term of standard.Therefore, can think operation order by operand, operation task, working rule, operational term constitutes.Wherein, operand comprises all exercisable primary equipment and secondary devices in the power distribution network, all operations that circuit and equipment are carried out in the operation task assignment electrical network, the standard that should follow when working rule refers to carry out some operation, operational term refers to the expression way of these operations.Wherein, working rule has in operation order and important effect.Working rule is a basic strategy of guaranteeing electric power netting safe running, and the formulation of guiding operation order need combine closely with real-time electric equipment operation situation and power network wiring mode, protection.
Because the complex structure of power distribution network, the formulation of working rule and a constantly perfect major issue that becomes operation ticket system.For this reason, native system proposes a kind of working rule template of layering, and is corresponding with inhomogeneous operation of equipment rule.Simultaneously, this working rule template can be safeguarded by the user.
The working rule template is divided into circuit by device type, switch, disconnecting link, controlled distribution box, ring main unit five classes.Wherein, every class is pressed operation task again, relevant device, and initial state, final states is divided.
After having designed the working rule template, the user can be according to the characteristics customized rules template of power distribution network, and formation rule storehouse sacrificial vessel body equipment is quoted.System provides selection equipment on wiring diagram, formulates the function of operation task, and program can be carried out topological analysis according to operation task, seeks associated connections and equipment, and carries out reasoning by working rule, finally generates consistent satisfactory operation order.No matter be simple operations task or complex operations task, can both dynamically generate corresponding rule base, and dynamic operation rule template technology is easy to the modification of implementation rule and perfect, improved the versatility of system with rule template.
The present invention adopts OO expression way, and the primary equipment that needs in the line chart to operate is abstracted into class, simultaneously the data member of secondary device as class is encapsulated in the class.In addition, adopt the dynamic template rule, be easy to user's modification.Simultaneously, native system has also been realized sharing real time data with the SCADA system, and automatic invoice issuance or manual the click are made out an invoice, and the good anti-misinterpretation and the function of analog demenstration.
Referring to Fig. 1, native system is made up of operation order generation module, line chart graphics module, system maintaining module three big modules.
System maintaining module and database server link together closely, can be to carrying out suitable operation with the closely-related operation order thesaurus of native system, working rule storehouse, electric network information storehouse, user information database, since satisfy the real time altering of required various information in the native system.The dynamic operation rule template technology that is adopted in the maintenance to the working rule storehouse particularly just is easy to the modification of implementation rule and perfect more, thereby has improved the versatility of total system greatly.
The line chart graphics module is a supplementary module of native system, and it is finished every function for total system a basic platform is provided, and also allows total system more simple and easy to do.
The operation order generation module is the nucleus module of native system, and it has automatic invoice issuance, figure preview, manual bill and four functions of procedure management.Automatic invoice issuance and manual bill complement each other, and finish the generation work to all operations ticket jointly.Figure is previewed then let us and is more clearly recognized after the executable operations the influence that each equipment produced and some problems that wherein may exist.Procedure management then allows the generative process accurate and effective more of whole operation ticket.The operation order generation module also is connected with the SCADA system by the system coordination module, real time data shared with it, the real-time benefit of lifting total system.
Referring to Fig. 3, what this figure showed is the flow process of automatic generating run ticket among the present invention.The mode that this flow process imitation expert ponders a problem, when the operation task that system obtains being submitted to by the user, the automatic analysis operation task of system's meeting, and the formation equipment relevant and the subsystem of state thereof with operation task, and then form the network chart of this subsystem, our state of manual amendment's relevant device as required to make things convenient for next step to reasonings that equipment was carried out such as switch, disconnecting links, is exported a complete operation order at last therein.After obtaining operation order, the user can carry out analog demenstration in native system, if pinpoint the problems and can correct, confirms just operation order to be printed after errorless in analog demenstration.
Intend the accuracy of ticket in order to improve computing machine, operation order is carried out anti-misoperation then be absolutely necessary.Referring to Fig. 2, enter after the determination flow, whole defence judgement just divides for three kinds of situations:
(1) operational grounding line, warning sign, ground connection disconnecting link
A, to test main equipment and whether all disconnect.If do not disconnect then quiescing; If disconnect, then carry out the detection of concrete operations.
(2) test during closed procedure
Whether A, ground wire, ground connection disconnecting link are removed or are disconnected.
B, cyclization test.If the cyclization operation, then quiescing; If not, then increase load newly and calculate.
Whether C, newly-increased load calculate, and be whether disconnecting link or switch and newly-increased load are zero judgement.
If newly-increased load is not 0, prompting: the former load of power lead, newly-increased load, the back of closing a floodgate add up to load.
If disconnecting link, whether on-load closes disconnecting link.If, then quiescing.
If switch sees whether attached disconnecting link all closes.If do not close, then quiescing.
(3) test during opening operation
A, calculation control circuit and capacity of distribution transform, and whether be whether disconnecting link and deenergizing circuit are empty judgement.
If disconnecting link, whether test on-load broaching tool lock.If for denying then quiescing.
If deenergizing circuit is not empty, then point out deenergizing circuit.

Claims (8)

1, a kind of distribution grid switching operation bill generates and anti-error system, it is characterized in that, includes:
System maintaining module, itself and database server link together closely, can be to carrying out suitable operation with the closely-related operation order thesaurus of native system, working rule storehouse, electric network information storehouse, user information database;
The line chart graphics module is finished every function for total system a basic platform is provided, and also allows total system more simple and easy to do;
The operation order generation module, have automatic invoice issuance, figure preview, manual bill and four functions of procedure management, automatic invoice issuance and manual bill complement each other, finish generation work jointly to all operations ticket, the operation order generation module also is connected with the SCADA system by the system coordination module, real time data shared with it.
2, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that, adopt OO expression way that line chart is carried out modeling, realized the auto-initiation of line chart, on the geography information such as coordinate with equipment are stored in basis in the database, the coordinate of native system by equipment on line chart, draw automatically in the power distribution network equipment and carry out topological initialization, if judge that through program topological initialization is correct, effectively, then the initialized result of topology is write database, the numbering of storage pel in database, information such as current direction.
3, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that, only the primary equipment that needs in the line chart to operate is abstracted into class, simultaneously the data member of secondary device as class is encapsulated in the class.
4, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that, realizes that by a graphic operation the manual of operation order generates.
5, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that the mode that the imitation expert ponders a problem with the operation of primary equipment and secondary device separately, has realized automatic invoice issuance.
6, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that, can come the influence situation of analog demenstration practical operation to real world devices by the operation to relevant device in the line chart.
7, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that,, carried out reasonably preventing misinterpretation according to the working rule of power distribution network, the operation that can not carry out is pointed out to forbid, what improves the accuracy rate that total system is made out an invoice from.
8, a kind of distribution grid switching operation bill according to claim 1 generates and the defence system, it is characterized in that, adopt the hierarchical operations rule template, working rule is classified by device type, working rule is stored in the database, and provides good man computer interface for user's modification.
CNA2009101154364A 2009-05-27 2009-05-27 Distribution grid switching operation bill generation and anti-error system Pending CN101566846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009101154364A CN101566846A (en) 2009-05-27 2009-05-27 Distribution grid switching operation bill generation and anti-error system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009101154364A CN101566846A (en) 2009-05-27 2009-05-27 Distribution grid switching operation bill generation and anti-error system

Publications (1)

Publication Number Publication Date
CN101566846A true CN101566846A (en) 2009-10-28

Family

ID=41283044

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009101154364A Pending CN101566846A (en) 2009-05-27 2009-05-27 Distribution grid switching operation bill generation and anti-error system

Country Status (1)

Country Link
CN (1) CN101566846A (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102186063A (en) * 2011-05-06 2011-09-14 江苏省电力试验研究院有限公司 Intelligent substation video monitoring method
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制系统有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN102591223A (en) * 2012-02-13 2012-07-18 福建省电力有限公司福州电业局 Intelligentized diagnostic system of substation-operation operation tickets
CN102073305B (en) * 2009-11-24 2012-12-05 广东电网公司中山供电局 Cross-platform power grid intelligent program-controlled error-preventing system and operation method and interface communication way
CN102957203A (en) * 2011-08-31 2013-03-06 珠海优特电力科技股份有限公司 Electrical equipment anti-misoperation method, device and system
CN103164159A (en) * 2013-03-13 2013-06-19 国家电网公司 Solid power transformation standard operation procedure touch workbook
CN103199455A (en) * 2013-03-13 2013-07-10 国家电网公司 Solidification power transformation specification operation system
CN103247087A (en) * 2012-09-27 2013-08-14 苏州瑞盈科技有限公司 City distribution network graphical intelligent anti-misoperation system and method of system
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN104134163A (en) * 2014-07-11 2014-11-05 国家电网公司 Power distribution network graph and model management system and power distribution network graph and model management method based on CIM/E and CIM/G
CN104166944A (en) * 2014-07-28 2014-11-26 济南联盛电子科技有限公司 Switching operation bill generation method of railway transformation and distribution substation
CN104376500A (en) * 2013-01-04 2015-02-25 湖州电力局 Method for temporarily changing power grid topological structure
CN104376499A (en) * 2013-01-04 2015-02-25 湖州电力局 Power grid topological structure conflict resolution method in graph dispatching operating ticket system
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal
CN104539044A (en) * 2014-12-12 2015-04-22 国家电网公司 Power distribution equipment state control method and device
CN105119237A (en) * 2015-10-08 2015-12-02 南京南瑞继保电气有限公司 Method of operating and checking under relay protection
CN106296467A (en) * 2016-08-31 2017-01-04 金现代信息产业股份有限公司 A kind of method generating operation order
CN106505742A (en) * 2016-12-23 2017-03-15 国网浙江省电力公司衢州供电公司 A kind of regulation and control one Aptitude Operation Order Sheet System and its dispatching and monitoring method
CN106787195A (en) * 2016-12-23 2017-05-31 国网浙江省电力公司衢州供电公司 A kind of regulation and control one operation ticket system that lock module is unblocked with safety
CN107608295A (en) * 2017-10-18 2018-01-19 国家电网公司 A kind of optimization method of electricity grid substation O&M operation order
CN108233536A (en) * 2018-01-09 2018-06-29 国家电网公司 A kind of intelligent program remote handling system
CN108846485A (en) * 2018-04-28 2018-11-20 国家电网公司 A kind of generation method of operation order
CN109523240A (en) * 2018-11-30 2019-03-26 国电南瑞科技股份有限公司 Intelligent substation billing system and method
CN109740837A (en) * 2018-11-20 2019-05-10 海南电网有限责任公司 Based on regulating and controlling integrated power grid and save ground network to issue an order and safe related function method
CN110188898A (en) * 2019-06-21 2019-08-30 广东电网有限责任公司 A kind of power distribution network Dispatching intelligent tickets system and method based on line chart
CN110716454A (en) * 2019-10-23 2020-01-21 国网冀北电力有限公司承德供电公司 Method and device for generating scheduling switching operation ticket
CN111260338A (en) * 2020-02-19 2020-06-09 云南电网有限责任公司昆明供电局 Intelligent generation method, device and platform for substation operation ticket
CN111738874A (en) * 2020-06-19 2020-10-02 内蒙古电力(集团)有限责任公司包头供电局 Method and device for automatically generating operation steps of new power grid equipment based on starting model
CN112380818A (en) * 2020-11-16 2021-02-19 深圳供电局有限公司 Automatic ticket forming system based on graphic operation change order
CN112381413A (en) * 2020-11-16 2021-02-19 安徽亦能电力科技有限公司 Two-ticket software system based on industrial internet and digitization technology
CN112700995A (en) * 2020-12-18 2021-04-23 广东电网有限责任公司 Power distribution room maintenance method and device
CN113011771A (en) * 2021-03-31 2021-06-22 广东电网有限责任公司 Rapid ticketing method, device, equipment and storage medium

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102073305B (en) * 2009-11-24 2012-12-05 广东电网公司中山供电局 Cross-platform power grid intelligent program-controlled error-preventing system and operation method and interface communication way
CN102186063A (en) * 2011-05-06 2011-09-14 江苏省电力试验研究院有限公司 Intelligent substation video monitoring method
CN102957203B (en) * 2011-08-31 2014-11-26 珠海优特电力科技股份有限公司 Electrical equipment anti-misoperation method, device and system
CN102957203A (en) * 2011-08-31 2013-03-06 珠海优特电力科技股份有限公司 Electrical equipment anti-misoperation method, device and system
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制系统有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN102508059B (en) * 2011-10-18 2013-09-25 北京科东电力控制系统有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN102591223B (en) * 2012-02-13 2013-12-04 国家电网公司 Intelligentized diagnostic system of substation-operation operation tickets
CN102591223A (en) * 2012-02-13 2012-07-18 福建省电力有限公司福州电业局 Intelligentized diagnostic system of substation-operation operation tickets
CN103247087A (en) * 2012-09-27 2013-08-14 苏州瑞盈科技有限公司 City distribution network graphical intelligent anti-misoperation system and method of system
CN104376499A (en) * 2013-01-04 2015-02-25 湖州电力局 Power grid topological structure conflict resolution method in graph dispatching operating ticket system
CN104376499B (en) * 2013-01-04 2018-01-30 湖州电力局 Topological structure of electric conflict resolution method in graphical schedule operation ticket system
CN104376500A (en) * 2013-01-04 2015-02-25 湖州电力局 Method for temporarily changing power grid topological structure
CN104376500B (en) * 2013-01-04 2017-09-08 湖州电力局 A kind of method of Iterim Change topological structure of electric
CN103164159B (en) * 2013-03-13 2015-12-09 国家电网公司 Solidification power transformation specification operation procedure touch working copy
CN103199455A (en) * 2013-03-13 2013-07-10 国家电网公司 Solidification power transformation specification operation system
CN103164159A (en) * 2013-03-13 2013-06-19 国家电网公司 Solid power transformation standard operation procedure touch workbook
CN103199455B (en) * 2013-03-13 2015-09-30 国家电网公司 Solidification power transformation specification operation system
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
CN104134163A (en) * 2014-07-11 2014-11-05 国家电网公司 Power distribution network graph and model management system and power distribution network graph and model management method based on CIM/E and CIM/G
CN104166944B (en) * 2014-07-28 2017-07-04 济南联盛电子科技有限公司 A kind of grid switching operation bill automatic generation method of railway substation
CN104166944A (en) * 2014-07-28 2014-11-26 济南联盛电子科技有限公司 Switching operation bill generation method of railway transformation and distribution substation
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal
CN104539044A (en) * 2014-12-12 2015-04-22 国家电网公司 Power distribution equipment state control method and device
CN105119237B (en) * 2015-10-08 2017-11-24 南京南瑞继保电气有限公司 The method that relay protection operation is checked
CN105119237A (en) * 2015-10-08 2015-12-02 南京南瑞继保电气有限公司 Method of operating and checking under relay protection
CN106296467B (en) * 2016-08-31 2019-04-09 金现代信息产业股份有限公司 A method of generating operation order
CN106296467A (en) * 2016-08-31 2017-01-04 金现代信息产业股份有限公司 A kind of method generating operation order
CN106505742A (en) * 2016-12-23 2017-03-15 国网浙江省电力公司衢州供电公司 A kind of regulation and control one Aptitude Operation Order Sheet System and its dispatching and monitoring method
CN106787195A (en) * 2016-12-23 2017-05-31 国网浙江省电力公司衢州供电公司 A kind of regulation and control one operation ticket system that lock module is unblocked with safety
CN106787195B (en) * 2016-12-23 2019-11-15 国网浙江省电力有限公司衢州供电公司 A kind of regulation one operation ticket system and its method unblocking lock module with safety
CN106505742B (en) * 2016-12-23 2019-05-24 国网浙江省电力有限公司衢州供电公司 A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method
CN107608295A (en) * 2017-10-18 2018-01-19 国家电网公司 A kind of optimization method of electricity grid substation O&M operation order
CN108233536A (en) * 2018-01-09 2018-06-29 国家电网公司 A kind of intelligent program remote handling system
CN108846485A (en) * 2018-04-28 2018-11-20 国家电网公司 A kind of generation method of operation order
CN109740837A (en) * 2018-11-20 2019-05-10 海南电网有限责任公司 Based on regulating and controlling integrated power grid and save ground network to issue an order and safe related function method
CN109740837B (en) * 2018-11-20 2023-07-07 海南电网有限责任公司 Power grid province and land network command and safety error prevention method based on regulation and control integration
CN109523240A (en) * 2018-11-30 2019-03-26 国电南瑞科技股份有限公司 Intelligent substation billing system and method
CN110188898A (en) * 2019-06-21 2019-08-30 广东电网有限责任公司 A kind of power distribution network Dispatching intelligent tickets system and method based on line chart
CN110716454A (en) * 2019-10-23 2020-01-21 国网冀北电力有限公司承德供电公司 Method and device for generating scheduling switching operation ticket
CN110716454B (en) * 2019-10-23 2022-10-14 国网冀北电力有限公司承德供电公司 Method and device for generating scheduling switching operation ticket
CN111260338B (en) * 2020-02-19 2022-03-29 云南电网有限责任公司昆明供电局 Intelligent generation method, device and platform for substation operation ticket
CN111260338A (en) * 2020-02-19 2020-06-09 云南电网有限责任公司昆明供电局 Intelligent generation method, device and platform for substation operation ticket
CN111738874A (en) * 2020-06-19 2020-10-02 内蒙古电力(集团)有限责任公司包头供电局 Method and device for automatically generating operation steps of new power grid equipment based on starting model
CN111738874B (en) * 2020-06-19 2024-05-28 内蒙古电力(集团)有限责任公司包头供电局 Method and device for automatically generating operation steps of new equipment of power grid based on starting model
CN112381413A (en) * 2020-11-16 2021-02-19 安徽亦能电力科技有限公司 Two-ticket software system based on industrial internet and digitization technology
CN112380818A (en) * 2020-11-16 2021-02-19 深圳供电局有限公司 Automatic ticket forming system based on graphic operation change order
CN112380818B (en) * 2020-11-16 2024-01-23 深圳供电局有限公司 Automatic ticket forming system based on graphic operation change list
CN112700995A (en) * 2020-12-18 2021-04-23 广东电网有限责任公司 Power distribution room maintenance method and device
CN113011771A (en) * 2021-03-31 2021-06-22 广东电网有限责任公司 Rapid ticketing method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN101566846A (en) Distribution grid switching operation bill generation and anti-error system
CN202041837U (en) Intelligent power distribution grid operation ticket generation management system
Cavalieri et al. Integration of IEC 61850 SCL and OPC UA to improve interoperability in Smart Grid environment
CN110059356A (en) A kind of bulk power grid intelligent control system and method based on big data and artificial intelligence
CN103150426A (en) Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN103248127B (en) Multi-space-time navigating power system restoration decision support system and restoration decision method
CN104008223B (en) Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN102867091B (en) The quantitation modification method of a kind of electric network current diagram
CN102663912A (en) Computer simulation systems for integrated dispatching and monitoring of regional power network
CN106227527B (en) Human-computer interface automatic generation method based on entity object relevance
CN106097158A (en) A kind of visual implementation method of intelligent substation panoramic information
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
Zhu et al. Application of design patterns for object-oriented modeling of power systems
Raju et al. Iot based autonomous demand side management of a micro-grid using arduino and multi agent system
CN111199091A (en) Power system interactive simulation method based on augmented virtual reality
CN106776750B (en) Graph-mode integrated digital preplan system for power distribution network
CN112184881A (en) Multi-level overall process monitoring method for power equipment
Afzalian et al. Systematic supervisory control solutions for under-load tap-changing transformers
CN104091225A (en) Object-oriented electric power system scheduling operation ticket system
CN108446767A (en) A kind of knowledge encapsulation standard method and system based on model
Dean et al. A graphical user interface platform to support power electronic converters and integrated systems
Dillon et al. Solution of power system problems through the use of the object-oriented paradigm
Bin et al. Research on key technologies of intelligent operation control of super-large urban power grid based on multi-center structure
CN107016105A (en) A kind of knowledge base modeling method of the intelligent substation operational system based on semantic net
Li Design and Implementation of 10kV Distribution Network Distribution Dispatching System Based on Eclipse Development Platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20091028