CN106505742B - A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method - Google Patents

A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method Download PDF

Info

Publication number
CN106505742B
CN106505742B CN201611207166.6A CN201611207166A CN106505742B CN 106505742 B CN106505742 B CN 106505742B CN 201611207166 A CN201611207166 A CN 201611207166A CN 106505742 B CN106505742 B CN 106505742B
Authority
CN
China
Prior art keywords
module
policer operation
ticket
policer
operation ticket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611207166.6A
Other languages
Chinese (zh)
Other versions
CN106505742A (en
Inventor
王建成
施中郎
徐拥华
陈仁庆
杨威
顾志伟
李践
吴奕
蒋波
杨彬
刘学敏
王星
毛文杰
戚碧云
田晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.
QUZHOU GUANGMING POWER INVESTMENT GROUP Co.,Ltd.
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd
Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd, Quzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201611207166.6A priority Critical patent/CN106505742B/en
Publication of CN106505742A publication Critical patent/CN106505742A/en
Application granted granted Critical
Publication of CN106505742B publication Critical patent/CN106505742B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0013

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring methods, by increasing policer operation bill system in network system, and human-computer interaction interface module is set in policer operation bill system, manually generates policer operation ticket module, automatically generate policer operation ticket module, data transmit-receive module, data analysis module, policer operation ticket auditing module, control E formatted file generation module and memory module, effectively scheduling operation can be monitored, prevent scheduling operation anti-error.

Description

A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method
Technical field
The present invention relates to information technology fields, and in particular to a kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring Method.
Background technique
According to (2014) No. 72 texts of Guo Wang company tune, " state's tune center is remote about State Grid Corporation of China's switch normalization is printed and distributed The notice of square operation element instruction " and (2014) No. 29 texts of tune " state's tune center is about printing and distributing State Grid Corporation of China's failure Try to send the notice of management regulation (provisional) in a stoppage in transit route distant place " and (2014) No. 647 text " Zhejiang Province Guo Wang of provincial company Zhejiang electricity tune Utilities Electric Co. about print and distribute 220 kilovolts of Zhejiang power grid and with lower switch normalization remote operation implementing method and state net Zhejiang power saving Power company regulation center remote operation administrative provisions notice " etc. require, carry out switch normalization remote operation work since, adjust The workload and security risk of control personnel obviously increases, responsibility is heavier, but for the anti-error constraint of remote control operation and not perfect. With increasing increasingly for regulation center remote control operation, need to ensure regulation centralized telecontrol behaviour using intelligent error preventing restriction technique That makees is safely controllable, promotes the level of security of regulation profession.
At present for it is more commonly used in power grid be scheduling system for ground county's integration dispatch automated system EMS (OPEN3000) it cannot still be fully met with scheduling Aptitude Operation Order Sheet System, anti-error constraint and anti-error verification to remote control operation It is required in " state's tune center is about the notice for printing and distributing State Grid Corporation of China's switch normalization remote operation job guide opinion " complete Kind Centralized Monitoring function has means such as remote operation simulation preview, the anti-error check of topology etc. and requires.It is deposited in remote control anti-misoperation Main problem it is as follows:
1) regulation multi-level Security Checking function of the remote control operation based on network topology is not perfect;
2) monitoring remote control operation does not have the anti-error constraint function of operation object, there is accidentally remote control risk.
3) it monitors between remote control operation and dispatch command and lacks technology correlation, exist and do not operate hidden danger by dispatch command;
4) monitoring remote control operation does not have Aptitude Operation Order Sheet System, lacks the simulation to remote control operation, management of making out an invoice.
In view of the above problems, needing to take the anti-error restriction technique of remote control operation, intelligent error preventing operating function is improved, to ensure The safety of regulation center remote control operation.
Summary of the invention
In view of the deficiencies of the prior art, the present invention is intended to provide a kind of regulation one Aptitude Operation Order Sheet System and its scheduling prison Prosecutor method realizes the dispatching and monitoring of rigorous, effective network system by the way that a series of system module is arranged.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of integrated Aptitude Operation Order Sheet System of regulation, including scheduling Aptitude Operation Order Sheet System and power network schedule automation integrate System further includes having policer operation bill system, integrated respectively at the scheduling Aptitude Operation Order Sheet System and power network schedule automation System is associated;The policer operation bill system includes:
Human-computer interaction interface module: the selection of mode is generated for being monitored operation order, manually generates policer operation ticket Operation and information warning reception;
It manually generates policer operation ticket module: generating policer operation ticket for being manually operated for user;
Automatically generate policer operation ticket module: for according to the scheduling outputed to the scheduling Aptitude Operation Order Sheet System received Operation order automatically generates policer operation ticket;
Data transmit-receive module: for sending and receiving for external data;
Data analysis module: the Dispatching for outputing to scheduling Aptitude Operation Order Sheet System carries out data analysis, supplies It automatically generates policer operation ticket module and automatically generates policer operation ticket accordingly;
Policer operation ticket auditing module: for policer operation ticket to be audited and confirmed;
Control E formatted file generation module: for unlocking E file or locking E file, for being sent to the power grid tune Spend the remote control permission of automatic integrated system unlock or the locking switch to be remotely controlled;
Memory module: the storage for data.
The method for being scheduled monitoring using above system, includes the following steps:
When S1 needs to be remotely controlled some switch in network system, first passes through scheduling Aptitude Operation Order Sheet System and output tune Operation order is spent, and is sent to policer operation bill system;
S2 data transmit-receive module receives Dispatching and is stored in memory module, pops up in human-computer interaction interface module Policer operation ticket generates the selection window of mode, and operator's selection manually or automatically generates policer operation ticket;Policer operation ticket At the end of information includes machine name where operator's user name, operation, the switch for needing to be remotely controlled, operation time started and operation Between, machine name, the switch for needing to be remotely controlled, operation time started where needing to fill in operator's user name, operation when wherein generating;
When selection manually generates policer operation ticket, user enters to manually generate policer operation human-computer interaction interface is enterprising S3 Ticket module is manually entered the every terms of information of policer operation ticket, manually generates policer operation ticket module according to the information of input and generates prison Control operation order is simultaneously stored in memory module;
When selection automatically generates policer operation ticket, data analysis module carries out data analysis to Dispatching, automatically Policer operation ticket module is generated to automatically generate policer operation ticket according to data analysis result and be stored in memory module;
After S4 generates policer operation ticket, policer operation ticket is examined in policer operation ticket auditing module policer operation ticket Core by audit user's signature after audit is errorless, and carries out in next step;If wrong, policer operation ticket auditing module generates warning Information is simultaneously shown in human-computer interaction interface module;Auditing result is stored in memory module;
S5 control E formatted file generation module generates unlock E file storage module and is sent to by data transmit-receive module Isolating device, isolating device are sent to power network schedule automation integrated system, and power network schedule automation integrated system is according to unlock E File unlocks the remote control permission of corresponding switch;After remote control operation executes, the return of power network schedule automation integrated system executes knot Fruit, implementing result are sent to isolating device, and isolating device is sent to data transmit-receive module and is received and stored on memory module, control E formatted file generation module, which generates, to lock E file and is sent to isolating device by data transmit-receive module, and isolating device is sent to Power network schedule automation integrated system, remote control of the power network schedule automation integrated system according to locking E file locking to inductive switch Permission forbids being remotely controlled operation to the switch again.
It should be noted that the specific steps of step S1 are as follows:
There is the human-computer interaction interface module data transmit-receive module to enter window, opens the data transmit-receive module and enters After window enters data transmit-receive module, data transmit-receive module has detected whether not received Dispatching, if it is not, connecing Receipts terminate, if so, then receiving the Dispatching and being stored.
It should be noted that the specific steps of step S4 are as follows:
Enter policer operation ticket auditing module by human-computer interaction interface module, is manually monitored examining for operation order content Core, if it find that it is wrong, then it needs to return manually generated policer operation ticket module or automatically generates policer operation ticket module weight Newly-generated policer operation ticket, and information warning is shown in human-computer interaction interface module.
Need further exist for explanation, policer operation ticket content after the approval, recycle network system topological diagram Pre-operation is carried out to policer operation operation order according to scheduled operation logic, judges whether there is maloperation;If errorless, examine Core people signature, if wrong, need to return manually generated policer operation ticket module or automatically generates policer operation ticket module Policer operation is regenerated, and pops up information warning in human-computer interaction interface module.
The beneficial effects of the present invention are: the present invention is being supervised by increasing policer operation bill system in network system Human-computer interaction interface module is set in control operation ticket system, manually generates policer operation ticket module, automatically generate policer operation ticket Module, data transmit-receive module, data analysis module, policer operation ticket auditing module, control E formatted file generation module and storage Module can effectively be monitored scheduling operation, prevent scheduling operation anti-error.
Detailed description of the invention
Fig. 1 is the principle of the present invention schematic diagram.
Fig. 2 is implementation exemplary diagram of the invention.
Specific embodiment
Below with reference to attached drawing, the invention will be further described, it should be noted that the present embodiment is with this technology side Premised on case, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to this reality Apply example.
As shown in Figs. 1-2, the integrated Aptitude Operation Order Sheet System of a kind of regulation, including scheduling Aptitude Operation Order Sheet System and power grid tune Automatic integrated system is spent, further includes having policer operation bill system, respectively at the scheduling Aptitude Operation Order Sheet System and power grid tune It is associated to spend automatic integrated system;The policer operation bill system includes:
Human-computer interaction interface module: the selection of mode is generated for being monitored operation order, manually generates policer operation ticket Operation and information warning reception;
It manually generates policer operation ticket module: generating policer operation ticket for being manually operated for user;
Automatically generate policer operation ticket module: for according to the scheduling outputed to the scheduling Aptitude Operation Order Sheet System received Operation order automatically generates policer operation ticket;
Data transmit-receive module: for sending and receiving for external data;
Data analysis module: the Dispatching for outputing to scheduling Aptitude Operation Order Sheet System carries out data analysis, supplies It automatically generates policer operation ticket module and automatically generates policer operation ticket accordingly;
Policer operation ticket auditing module: for policer operation ticket to be audited and confirmed;
Control E formatted file generation module: for unlocking E file or locking E file, for being sent to the power grid tune Spend the remote control permission of automatic integrated system unlock or the locking switch to be remotely controlled;
Memory module: the storage for data.
The method for being scheduled monitoring using above system, includes the following steps:
When S1 needs to be remotely controlled some switch in network system, first passes through scheduling Aptitude Operation Order Sheet System and output tune Operation order is spent, and is sent to policer operation bill system;
S2 data transmit-receive module receives Dispatching and is stored in memory module, pops up in human-computer interaction interface module Policer operation ticket generates the selection window of mode, and operator's selection manually or automatically generates policer operation ticket;Policer operation ticket At the end of information includes machine name where operator's user name, operation, the switch for needing to be remotely controlled, operation time started and operation Between, machine name, the switch for needing to be remotely controlled, operation time started where needing to fill in operator's user name, operation when wherein generating;
When selection manually generates policer operation ticket, user enters to manually generate policer operation human-computer interaction interface is enterprising S3 Ticket module is manually entered the every terms of information of policer operation ticket, manually generates policer operation ticket module according to the information of input and generates prison Control operation order is simultaneously stored in memory module;
When selection automatically generates policer operation ticket, data analysis module carries out data analysis to Dispatching, automatically Policer operation ticket module is generated to automatically generate policer operation ticket according to data analysis result and be stored in memory module;
After S4 generates policer operation ticket, policer operation ticket is examined in policer operation ticket auditing module policer operation ticket Core by audit user's signature after audit is errorless, and carries out in next step;If wrong, policer operation ticket auditing module generates warning Information is simultaneously shown in human-computer interaction interface module;Auditing result is stored in memory module;
S5 control E formatted file generation module generates unlock E file storage module and is sent to by data transmit-receive module (since the area III in 3rd area of safety of power grid is arranged in policer operation bill system, and power network schedule automation integrates system to isolating device System is then arranged in the area I, therefore data need to be sent to isolating device), isolating device is sent to the integrated system of power network schedule automation System, power network schedule automation integrated system unlock the remote control permission of corresponding switch according to unlock E file;Remote control operation executes Afterwards, power network schedule automation integrated system returns to implementing result, and implementing result is sent to isolating device, and isolating device is sent to number It is received and stored on memory module according to transceiver module, control E formatted file generation module, which generates, to lock E file and receive by data Hair module is sent to isolating device, and isolating device is sent to power network schedule automation integrated system, and power network schedule automation is integrated System forbids being remotely controlled operation to the switch again according to E file locking is locked to the remote control permission of inductive switch.
It should be noted that the specific steps of step S1 are as follows:
There is the human-computer interaction interface module data transmit-receive module to enter window, opens the data transmit-receive module and enters After window enters data transmit-receive module, data transmit-receive module has detected whether not received Dispatching, if it is not, connecing Receipts terminate, if so, then receiving the Dispatching and being stored.
It should be noted that the specific steps of step S4 are as follows:
Enter policer operation ticket auditing module by human-computer interaction interface module, is manually monitored examining for operation order content Core, if it find that it is wrong, then it needs to return manually generated policer operation ticket module or automatically generates policer operation ticket module weight Newly-generated policer operation ticket, and information warning is shown in human-computer interaction interface module.
Need further exist for explanation, policer operation ticket content after the approval, recycle network system topological diagram Pre-operation is carried out to policer operation operation order according to scheduled operation logic, judges whether there is maloperation;If errorless, examine Core people signature, if wrong, need to return manually generated policer operation ticket module or automatically generates policer operation ticket module Policer operation is regenerated, and pops up information warning in human-computer interaction interface module.
For those skilled in the art, it can be made various corresponding according to above technical solution and design Change and modification, and all these change and modification should be construed as being included within the scope of protection of the claims of the present invention.

Claims (4)

1. the method for being scheduled monitoring using integrated Aptitude Operation Order Sheet System is regulated and controled, which is characterized in that the integrated intelligence of the regulation Energy operation ticket system, including scheduling Aptitude Operation Order Sheet System and power network schedule automation integrated system, further include having policer operation Bill system, it is associated respectively at the scheduling Aptitude Operation Order Sheet System and power network schedule automation integrated system;The monitoring behaviour Include: as bill system
Human-computer interaction interface module: the selection of mode is generated for being monitored operation order, manually generates the behaviour of policer operation ticket Make the reception with information warning;
It manually generates policer operation ticket module: generating policer operation ticket for being manually operated for user;
Automatically generate policer operation ticket module: for according to the scheduling operation outputed to the scheduling Aptitude Operation Order Sheet System received Ticket automatically generates policer operation ticket;
Data transmit-receive module: for sending and receiving for external data;
Data analysis module: the Dispatching for outputing to scheduling Aptitude Operation Order Sheet System carries out data analysis, for automatic It generates policer operation ticket module and automatically generates policer operation ticket accordingly;
Policer operation ticket auditing module: for policer operation ticket to be audited and confirmed;
Control E formatted file generation module: for unlocking E file or locking E file, for being sent to the dispatching of power netwoks certainly The remote control permission of the unlock of dynamicization integrated system or the locking switch to be remotely controlled;
Memory module: the storage for data;
Described method includes following steps:
When S1 needs to be remotely controlled some switch in network system, first passes through scheduling Aptitude Operation Order Sheet System and output scheduling behaviour Make ticket, and is sent to policer operation bill system;
S2 data transmit-receive module receives Dispatching and is stored in memory module, and monitoring is popped up in human-computer interaction interface module Operation order generates the selection window of mode, and operator's selection manually or automatically generates policer operation ticket;The information of policer operation ticket Including machine name, the switch for needing to be remotely controlled, operation time started where operator's user name, operation and the end time is operated, Machine name, the switch for needing to be remotely controlled, operation time started where needing to fill in operator's user name, operation when middle generation;
When selection manually generates policer operation ticket, user enters to manually generate policer operation ticket mould human-computer interaction interface is enterprising S3 Block is manually entered the every terms of information of policer operation ticket, manually generates policer operation ticket module according to the information of input and generates monitoring behaviour Make ticket and is stored in memory module;
When selection automatically generates policer operation ticket, data analysis module carries out data analysis to Dispatching, automatically generates Policer operation ticket module automatically generates policer operation ticket according to data analysis result and is stored in memory module;
After S4 generates policer operation ticket, policer operation ticket is audited in policer operation ticket auditing module policer operation ticket, Audit it is errorless after by audit user's signature, and carry out in next step;If wrong, policer operation ticket auditing module generates information warning And it is shown in human-computer interaction interface module;Auditing result is stored in memory module;
S5 control E formatted file generation module generates unlock E file storage module and is sent to isolation by data transmit-receive module Device, isolating device are sent to power network schedule automation integrated system, and power network schedule automation integrated system is according to unlock E file Unlock the remote control permission of corresponding switch;After remote control operation executes, power network schedule automation integrated system returns to implementing result, holds Row result is sent to isolating device, and isolating device is sent to data transmit-receive module and is received and stored on memory module, controls E format File generating module, which generates, to lock E file and is sent to isolating device by data transmit-receive module, and isolating device is sent to power grid Dispatching automation integrated system, power network schedule automation integrated system according to locking E file locking to the remote control permission of inductive switch, Again forbid being remotely controlled operation to the switch.
2. the method according to claim 1, wherein the specific steps of step S1 are as follows:
There is the human-computer interaction interface module data transmit-receive module to enter window, opens the data transmit-receive module and enters window Into after data transmit-receive module, data transmit-receive module has detected whether not received Dispatching, if it is not, receiving knot Beam, if so, then receiving the Dispatching and being stored.
3. the method according to claim 1, wherein the specific steps of step S4 are as follows:
Enter policer operation ticket auditing module by human-computer interaction interface module, be manually monitored the audit of operation order content, If it find that it is wrong, then it needs to return manually generated policer operation ticket module or automatically generates policer operation ticket module and give birth to again Information warning is shown at policer operation ticket, and in human-computer interaction interface module.
4. according to the method described in claim 3, it is characterized in that, policer operation ticket content after the approval, recycle Network system topological diagram carries out pre-operation to policer operation operation order according to scheduled operation logic, judges whether there is and accidentally grasps Make;If errorless, auditor's signature needs to return manually generated policer operation ticket module or automatic raw if wrong Policer operation is regenerated at policer operation ticket module, and pops up information warning in human-computer interaction interface module.
CN201611207166.6A 2016-12-23 2016-12-23 A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method Active CN106505742B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611207166.6A CN106505742B (en) 2016-12-23 2016-12-23 A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611207166.6A CN106505742B (en) 2016-12-23 2016-12-23 A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method

Publications (2)

Publication Number Publication Date
CN106505742A CN106505742A (en) 2017-03-15
CN106505742B true CN106505742B (en) 2019-05-24

Family

ID=58333768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611207166.6A Active CN106505742B (en) 2016-12-23 2016-12-23 A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method

Country Status (1)

Country Link
CN (1) CN106505742B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107092222B (en) * 2017-05-23 2019-08-20 国网辽宁省电力有限公司 Based on the integrated power grid regulation operational administrative system of anti-error check analysis
CN109428907B (en) * 2017-08-23 2021-05-28 南京南瑞继保电气有限公司 Cross-power dispatching area network operation ticket system
CN109782724B (en) * 2019-02-25 2020-09-04 国家电网有限公司 Control method for preventing misoperation-locking and terminal equipment
CN110086251B (en) * 2019-03-29 2023-05-23 国网山东省电力公司邹城市供电公司 Monitoring method and system for improving operation safety of power grid
CN110852697B (en) * 2019-10-08 2023-05-30 国家电网有限公司 Automatic generation system for switching operation ticket of transformer substation
CN111861791A (en) * 2020-07-28 2020-10-30 国网冀北电力有限公司检修分公司 Automatic error correction method and system for operation ticket
CN113656532B (en) * 2021-08-16 2024-05-07 雅砻江流域水电开发有限公司 Intelligent retrieval system for work ticket and operation ticket
CN114825619B (en) * 2022-04-02 2022-11-22 法诺信息产业有限公司 Regulation and control integrated anti-error control system and control method based on smart power grid

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101566846A (en) * 2009-05-27 2009-10-28 江西九江供电公司 Distribution grid switching operation bill generation and anti-error system
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010098900A (en) * 2008-10-20 2010-04-30 Panasonic Corp Power monitoring device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101566846A (en) * 2009-05-27 2009-10-28 江西九江供电公司 Distribution grid switching operation bill generation and anti-error system
CN104460607A (en) * 2014-11-17 2015-03-25 国家电网公司 Production system graphic ticketing method based on simulated rehearsal

Also Published As

Publication number Publication date
CN106505742A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN106505742B (en) A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method
CN106483890B (en) A kind of regulation intelligent anti-error operation system based on operation ticket system
CN109995138A (en) Substation's anti-misoperation locking management system and maintenance isolating closing lock management method
CN205787685U (en) Managing and control system for job safety
CN102157983B (en) GOOSE (generic object oriented substation event)-based five-prevention locking method of measuring and controlling device
CN103761624A (en) Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN107834699A (en) Dispatching of power netwoks based on the regulation and control integration of ground county integrates anti-error system
CN108494089B (en) Rapid, safe and reliable batch remote control method for limited-circuit pull circuits
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN107611969A (en) Possess the regulation and control anti-error system and method for transfer order binding function
CN108233536A (en) A kind of intelligent program remote handling system
DE112012006566B4 (en) Onboard power line communication system
CN110728424A (en) Cloud five-prevention intelligent scheduling system
CN104318652A (en) Intelligent door lock management method of hydropower station
CN102419725A (en) Method for testing input/output interface of integrated modular avionic type computing module in aircraft and device thereof
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN109521751A (en) A kind of nuclear power plant's key work center method failure mitigation method
CN104750095B (en) Regulation and control center inspection pilot system and method
CN105894210B (en) A kind of operation order trigger-type grid equipment remote operation anti-misoperation method
CN104979900B (en) Substation programmed operation anti-misoperation system and method
CN105701612A (en) Overhauling isolation management system
CN204946135U (en) Plant stand security management and control system
CN110322232A (en) A kind of distribution scheduling task ticket automatic generation method, apparatus and system
CN112508384B (en) Visual automatic monitoring equipment and method for power dispatching operation ticket
CN106787195B (en) A kind of regulation one operation ticket system and its method unblocking lock module with safety

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 324002 No. 6 along Xinhe River, Quzhou City, Zhejiang Province

Applicant after: Quzhou Power Supply Company, State Grid Zhejiang Electric Power Co., Ltd.

Applicant after: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY CO., LTD.

Address before: 324002 No. 6 along Xinhe River, Quzhou City, Zhejiang Province

Applicant before: Quzhou electric company of State Grid Zhejiang Electric Power Company

Applicant before: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200528

Address after: 324000 No. 6, New River, Zhejiang, Quzhou

Co-patentee after: QUZHOU GUANGMING POWER INVESTMENT GROUP Co.,Ltd.

Patentee after: QUZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Co-patentee after: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.

Address before: 324002 No. 6, New River, Zhejiang, Quzhou

Co-patentee before: QUZHOU FUTENG INFORMATION SCIENCE & TECHNOLOGY Co.,Ltd.

Patentee before: QUZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

TR01 Transfer of patent right