CN109995138A - Substation's anti-misoperation locking management system and maintenance isolating closing lock management method - Google Patents

Substation's anti-misoperation locking management system and maintenance isolating closing lock management method Download PDF

Info

Publication number
CN109995138A
CN109995138A CN201811491930.6A CN201811491930A CN109995138A CN 109995138 A CN109995138 A CN 109995138A CN 201811491930 A CN201811491930 A CN 201811491930A CN 109995138 A CN109995138 A CN 109995138A
Authority
CN
China
Prior art keywords
error
maintenance
lock
key
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811491930.6A
Other languages
Chinese (zh)
Other versions
CN109995138B (en
Inventor
朱玛
刘学
沈达
骆培富
邢锐文
王雷
陈德
王勇
杨百鑫
任维阳
卢乾坤
袁卓妮
王秉坤
王雪颖
倪宇飞
肖萍
李俊华
黄骅
楚云江
温朝阳
吕胜
钱祥威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811491930.6A priority Critical patent/CN109995138B/en
Publication of CN109995138A publication Critical patent/CN109995138A/en
Application granted granted Critical
Publication of CN109995138B publication Critical patent/CN109995138B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0013
    • H02J13/0075
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of substation's anti-misoperation locking management system, including microcomputer anti-error host, computer key, communications adapter, anti-error lock, wireless base station, wherein, computer key includes operation error prevention key and maintenance error prevention key, anti-error lock includes operation anti-error lock and maintenance anti-error lock, run error prevention key control operation anti-error lock, overhaul error prevention key control maintenance anti-error lock, operation anti-error lock is for being latched primary equipment, maintenance anti-error lock is for being latched secondary device, the present invention also provides a kind of station isolating closing lock management methods based on above-mentioned power station anti-misoperation locking management system.The present invention provides a kind of substation's anti-misoperation locking management system and maintenance isolating closing lock management method, it will be isolated in normal operation by repair apparatus in maintenance process with realizing, a safe and reliable isolation environment is provided to service work, prevents the security threat because of misdelivery electricity to service personnel's person.

Description

Substation's anti-misoperation locking management system and maintenance isolating closing lock management method
Technical field
The present invention relates to five anti-electric power security fields more particularly to substation's anti-misoperation locking management systems and maintenance isolation to close Lock management method.
Background technique
In the existing station course of work, the work of operations staff and service personnel are completely independent, and And it is carried out separately.Service personnel's application work, operations staff permit work, service personnel's work to finish, operations staff is existing These processes of field inspection, service personnel's power cut-off etc. are closely bound up in entire maintenance process again.So, people is run The operation of member is exercised supervision and is restricted by anti-error system, and the safety of service personnel's work on the spot is then to fully rely on organiztion measure And artificial the means such as differentiate to ensure.So we should provide a set of realistic plan from technical standpoint, will operation and Service work seems independent but has the process being closely related to be controlled again in the process, has repair apparatus unique Operating right will be isolated in normal operation in maintenance process by repair apparatus, provide a safety to service work Reliable isolation environment prevents the security threat because of misdelivery electricity to service personnel's person.
Summary of the invention
The purpose of the present invention is to provide a kind of substation's anti-misoperation locking management system and isolating closing lock management method is overhauled, It will be isolated in normal operation by repair apparatus in maintenance process with realizing, and provide one securely and reliably to service work Isolation environment, prevent because misdelivery electricity is to the security threat of service personnel's person.
In order to achieve the above object, the present invention adopts the following technical scheme:
A kind of substation's anti-misoperation locking management system, including microcomputer anti-error host, microcomputer anti-error host is for interacting power transformation The relevant information of station programming operations is analyzed and processed input information, logic judgment, executes letter according to processing result output Anti-error lock is ceased, realizes that the anti-misoperation locking of programming operations, microcomputer anti-error host include graphic simulation module and open operation order Module;Computer key, computer key include wireless transport module, operation indicating module and unlocking module, the wireless transmission mould Block is for receiving operational order and feedback operation information;Communications adapter, communications adapter for the microcomputer anti-error host with The communication of the computer key is converted;Anti-error lock;Wireless base station, wireless base station are set for computer key with transforming plant primary Standby, secondary device data transmit transfer;Wherein, the computer key includes operation error prevention key and maintenance error prevention key, institute Stating anti-error lock includes operation anti-error lock and maintenance anti-error lock, and the operation error prevention key controls the operation error preventing lock Tool, the maintenance error prevention key control the maintenance anti-error lock, and the operation anti-error lock is described for being latched primary equipment Maintenance anti-error lock is for being latched secondary device.
Further, substation's anti-misoperation locking management system further includes anti-for placing maintenance error prevention key and maintenance The lockset tool box of false-lock tool.
Further, the microcomputer anti-error host is connect by serial ports with monitoring system.
Further, the microcomputer anti-error host is connect by modem with control centre or/and centralized control center.
Further, the communications adapter be equipped with for the computer key charge and discharge charging and discharging circuit with fill Discharge interface.
The present invention also provides a kind of station isolating closing lock management methods, comprising the following steps:
S1 carries out simulation preview operation to relevant primary equipment by graphic simulation module on microcomputer anti-error host, And correct grid switching operation bill is generated, operations staff carries row error prevention key to scene and carries out primary equipment grid switching operation, operation After passback operation error prevention key, update anti-error figure primary equipment state;
S2, operations staff call the exemplary operation ticket in work ticket library according to work ticket content in opening operation order module, Or requirement is arranged according to the peace of work ticket, equipment is arranged in maintenance isolating closing lock management function module centre circle Dingan County, overhauls isolating closing lock Management function module determines the range of delineation for according to the requirement in regulation of inspection and repair library, if meeting the requirement of regulation of inspection and repair library When, then it can automatically generate maintenance isolation locking sequence ticket;If do not meet, the reason of mistake can be prompted, prompts operations staff Corrigendum in time;
S3 is sent to maintenance error prevention key by communications adapter after maintenance isolation locking sequence ticket generates;
S4, operations staff, which carries maintenance error prevention key and maintenance anti-error lock to scene and carries out work ticket peace, arranges locking, transports The content in locking sequence ticket can be isolated in administrative staff according to maintenance, take out corresponding maintenance anti-error lock and corresponding attachment, right Corresponding equipment is locked, and after work ticket peace arranges equipment to lock, operations staff returns maintenance error prevention key, microcomputer anti-error Host locks automatically according to practical executive condition, to relevant device, for overhauling the primary equipment quiescing in isolation face, this When, operations staff can formal license work ticket, service personnel carry out service work;
S5, need to be from service personnel to operation when being such as related to the equipment for needing to test in maintenance process in maintenance process Personnel propose maintenance prerun application, by operations staff according to primary equipment operating condition, in maintenance isolating closing lock management module, Maintenance prerun sequence ticket is generated, maintenance key is transmitted to, maintenance key can be met at service personnel, carry out specified set by operations staff Standby maintenance unlocking operation;
S6 after overhauling prerun, gives back maintenance error prevention key to operations staff, operations staff is anti-error by reporting maintenance Key, microcomputer anti-error host determine primary equipment state original before must restoring automatically, and allowing to overhaul prerun terminates;
S7, after maintenance, operations staff takes maintenance error prevention key and is unlocked to scene to locking range, and recycles The case where maintenance anti-error lock returns reporting operations situation, and microcomputer anti-error host is unlocked according to locking range, automatically to inspection The isolation face equipment of repairing is unlocked, and personnel of resuming operation preview operation of making out an invoice to the simulation of equipment.
After adopting the above technical scheme, the present invention has the advantage that
1, the achievable five anti-anti-error functions of the present invention and overhaul management function.Microcomputer anti-error host, operation error prevention key, fortune Row anti-error lock realizes that the anti-misoperation locking of primary equipment, microcomputer anti-error host, maintenance error prevention key, maintenance anti-error lock realize two The anti-misoperation locking of secondary device, to realize five anti-anti-error functions;When tour, maintenance, checking experiment process etc. need to unlock, inspection is used Error prevention key is repaired to unlock.During ensuring service work with this, operations staff is forbidden to carry out the equipment in maintenance isolation face Grid switching operation, in addition, also maintenance error prevention key can be used to carry out checking experiment operation to the equipment in service work face for service personnel.
2, microcomputer anti-error host is connect, by modem and control centre or/and collection with monitoring system by serial ports The connection of control center, realizes resource-sharing and information exchange.
3, communications adapter is equipped with charging and discharging circuit and charge and discharge electrical interface, can be effective for giving computer key charge and discharge Eliminate computer key battery polarization phenomenon.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the schematic diagram of substation's anti-misoperation locking management system in the present invention.
Fig. 2 is the flow chart of station isolating closing lock management method in the present invention.
Specific embodiment
Below in conjunction with drawings and the specific embodiments, the present invention is described in further detail.
The present embodiment provides a kind of substation's anti-misoperation locking management systems, as shown in Figure 1, the system includes microcomputer anti-error master Machine 1, computer key, communications adapter 2, anti-error lock, wireless base station.
Wherein, computer key includes operation error prevention key 3 and maintenance error prevention key 4, and anti-error lock includes operation error preventing lock Tool 5 and maintenance anti-error lock 6, the operation control operation anti-error lock 5 of error prevention key 3, the maintenance control maintenance error preventing lock of error prevention key 4 Tool 6, operation anti-error lock 5 is for being latched primary equipment, and maintenance anti-error lock 6 is for being latched secondary device.
Microcomputer anti-error host 1 includes graphic simulation module and opens operation order module, and graphic simulation module is primary for carrying out The operation of the analog simulation of equipment and secondary device can judge automatically the correctness of operation according to five anti-principles and the method for operation, It sounds a warning to maloperation;Operation order module is opened to make out an invoice for providing graphic simulation, call typical operation ticket, call additional operation Ticket opens a variety of modes of making out an invoice such as operation order with manual, meets the needs of different.
Microcomputer anti-error host is used to interact the relevant information of sequential operation in substation, carries out at analysis to input information Reason, logic judgment export execution information to anti-error lock according to processing result, realize the anti-misoperation locking of programming operations.Computer Key includes wireless transport module, operation indicating module and unlocking module, and wireless transport module is for receiving operational order and anti- Present operation information.Communication of the communications adapter 2 for microcomputer anti-error host 1 and computer key is converted.Wireless base station is used for computer The data of key and transforming plant primary equipment, secondary device transmit transfer.
Maintenance error prevention key and maintenance anti-error lock can be placed in lockset tool box, and easy to carry and arrangement uses.
Microcomputer anti-error host can be connect by serial ports with monitoring system;Microcomputer anti-error host can pass through modem and tune Degree center or/and centralized control center's connection, realize resource-sharing and information exchange.
In the present embodiment, communications adapter 2 is equipped with charging and discharging circuit and charge and discharge electrical interface, gives computer key charge and discharge, Computer key battery polarization phenomenon can be effectively eliminated.
The present embodiment also provides a kind of station isolating closing lock management method, as shown in Figure 2, comprising the following steps:
S1 carries out simulation preview operation to relevant primary equipment by graphic simulation module on microcomputer anti-error host, And correct grid switching operation bill is generated, operations staff carries row error prevention key to scene and carries out primary equipment grid switching operation, operation After passback operation error prevention key, update anti-error figure primary equipment state;
S2, operations staff call the exemplary operation ticket in work ticket library according to work ticket content in opening operation order module, Or requirement is arranged according to the peace of work ticket, equipment is arranged in maintenance isolating closing lock management function module centre circle Dingan County, overhauls isolating closing lock Management function module determines the range of delineation for according to the requirement in regulation of inspection and repair library, if meeting the requirement of regulation of inspection and repair library When, then it can automatically generate maintenance isolation locking sequence ticket;If do not meet, the reason of mistake can be prompted, prompts operations staff Corrigendum in time;
S3 is sent to maintenance error prevention key by communications adapter after maintenance isolation locking sequence ticket generates;
S4, operations staff, which carries maintenance error prevention key and maintenance anti-error lock to scene and carries out work ticket peace, arranges locking, transports The content in locking sequence ticket can be isolated in administrative staff according to maintenance, take out corresponding maintenance anti-error lock and corresponding attachment, right Corresponding equipment is locked, and after work ticket peace arranges equipment to lock, operations staff returns maintenance error prevention key, microcomputer anti-error Host locks automatically according to practical executive condition, to relevant device, for overhauling the primary equipment quiescing in isolation face, this When, operations staff can formal license work ticket, service personnel carry out service work;
S5, need to be from service personnel to operation when being such as related to the equipment for needing to test in maintenance process in maintenance process Personnel propose maintenance prerun application, by operations staff according to primary equipment operating condition, in maintenance isolating closing lock management module, Maintenance prerun sequence ticket is generated, maintenance key is transmitted to, maintenance key can be met at service personnel, carry out specified set by operations staff Standby maintenance unlocking operation;
S6 after overhauling prerun, gives back maintenance error prevention key to operations staff, operations staff is anti-error by reporting maintenance Key, microcomputer anti-error host determine primary equipment state original before must restoring automatically, and allowing to overhaul prerun terminates;
S7, after maintenance, operations staff takes maintenance error prevention key and is unlocked to scene to locking range, and recycles The case where maintenance anti-error lock returns reporting operations situation, and microcomputer anti-error host is unlocked according to locking range, automatically to inspection The isolation face equipment of repairing is unlocked, and personnel of resuming operation preview operation of making out an invoice to the simulation of equipment.
Five anti-anti-error functions and overhaul management function can be achieved in the present invention.Microcomputer anti-error host, operation error prevention key, operation Anti-error lock realizes that the anti-misoperation locking of primary equipment, microcomputer anti-error host, maintenance error prevention key, maintenance anti-error lock are realized secondary The anti-misoperation locking of equipment, to realize five anti-anti-error functions;When tour, maintenance, checking experiment process etc. need to unlock, use and maintenance Error prevention key is unlocked.During ensuring service work with this, operations staff is forbidden to fall the equipment in maintenance isolation face Lock operation, in addition, also maintenance error prevention key can be used to carry out checking experiment operation to the equipment in service work face for service personnel.
The present invention is according to power grid enterprises' characteristics of the production and operation, by analyzing the practical business of power transformation, clear two tickets, Relationship and process between grid switching operation, inspection operation, each business such as turn powered operation;From operation control point, maintenance control point, dimension Three, control point etc. aspect is protected, management is combed out and dangerous point that technological means needs to control, as operations staff's operating point (prevents Occur to miss when operation operation and draw, accidentally close disconnecting link and switch, be strayed into interval, electricity etc. of misdelivering to scene);Service personnel's setting is (main It prevents the security risk of the anti-power transmission of user when upkeep operation, change repair apparatus state, mistakenly entering charged chamber and danger without authorization Region, accidentally touch charging equipment and not electrical verification, accidentally hang, leakage dismounting ground wire and leap or movement are blocked);Maintenance personnel is closed safely Key point (mainly prevents from occurring when other operations to accidentally the touching of cabinet door, mechanism case or overhead transmission line, accidentally touches, is strayed into, accidentally steps on).
In addition to above preferred embodiment, there are other embodiments of the invention, and those skilled in the art can be according to this Invention makes various changes and modifications, and as long as it does not depart from the spirit of the invention, should belong to appended claims of the present invention and determines The range of justice.

Claims (6)

1. substation's anti-misoperation locking management system, which is characterized in that including
Microcomputer anti-error host, microcomputer anti-error host are used to interact the relevant information of sequential operation in substation, to input information into Row analysis processing, logic judgment export execution information to anti-error lock according to processing result, realize that the anti-error of programming operations closes Lock, microcomputer anti-error host include graphic simulation module and open operation order module;
Computer key, computer key include wireless transport module, operation indicating module and unlocking module, the wireless transport module For receiving operational order and feedback operation information;
Communications adapter, communication of the communications adapter for the microcomputer anti-error host and the computer key are converted;
Anti-error lock;
Wireless base station, data of the wireless base station for computer key and transforming plant primary equipment, secondary device transmit transfer;
Wherein, the computer key includes operation error prevention key and maintenance error prevention key, and the anti-error lock is anti-error including running Lockset and maintenance anti-error lock, the operation error prevention key control the operation anti-error lock, the maintenance error prevention key control The maintenance anti-error lock, the operation anti-error lock is for being latched primary equipment, and the maintenance anti-error lock is for being latched two Secondary device.
2. substation's anti-misoperation locking management system according to claim 1, which is characterized in that substation's anti-misoperation locking Management system further includes for placing maintenance error prevention key and overhauling the lockset tool box of anti-error lock.
3. substation's anti-misoperation locking management system according to claim 1, which is characterized in that the microcomputer anti-error host is logical Serial ports is crossed to connect with monitoring system.
4. substation's anti-misoperation locking management system according to claim 1, which is characterized in that the microcomputer anti-error host is logical Toning modulator-demodulator is connect with control centre or/and centralized control center.
5. substation's anti-misoperation locking management system according to claim 1, which is characterized in that set on the communications adapter Have for the charging and discharging circuit and charge and discharge electrical interface to the computer key charge and discharge.
6. station isolating closing lock management method, which comprises the following steps:
S1 carries out simulation preview operation to relevant primary equipment by graphic simulation module, and raw on microcomputer anti-error host At correct grid switching operation bill, operations staff carries row error prevention key to scene and carries out primary equipment grid switching operation, end of operation Passback operation error prevention key afterwards, updates anti-error figure primary equipment state;
S2, operations staff call the exemplary operation ticket or root in work ticket library according to work ticket content in opening operation order module Requirement is arranged according to the peace of work ticket, is arranged equipment in maintenance isolating closing lock management function module centre circle Dingan County, is overhauled isolating closing lock management Functional module determines the range of delineation for according to the requirement in regulation of inspection and repair library, if meet the requirement of regulation of inspection and repair library, Maintenance isolation locking sequence ticket can be automatically generated;If do not meet, the reason of mistake can be prompted, prompts operations staff in time more Just;
S3 is sent to maintenance error prevention key by communications adapter after maintenance isolation locking sequence ticket generates;
S4, operations staff, which carries maintenance error prevention key and maintenance anti-error lock to scene and carries out work ticket peace, arranges locking, operation people The content in locking sequence ticket can be isolated in member according to maintenance, corresponding maintenance anti-error lock and corresponding attachment are taken out, to corresponding Equipment lock, work ticket peace arrange equipment lock after, operations staff return maintenance error prevention key, microcomputer anti-error host According to practical executive condition, relevant device is locked automatically, for overhauling the primary equipment quiescing in isolation face, at this point, fortune Administrative staff can formal license work ticket, service personnel carry out service work;
S5, need to be from service personnel to operations staff when being such as related to the equipment for needing to test in maintenance process in maintenance process It proposes maintenance prerun application, is generated in maintenance isolating closing lock management module by operations staff according to primary equipment operating condition Prerun sequence ticket is overhauled, maintenance key is transmitted to, maintenance key can be met at service personnel, carry out designated equipment by operations staff Overhaul unlocking operation;
S6 after overhauling prerun, gives back maintenance error prevention key to operations staff, operations staff overhauls anti-error key by reporting Spoon, microcomputer anti-error host determine primary equipment state original before must restoring automatically, and allowing to overhaul prerun terminates;
S7, after maintenance, operations staff takes maintenance error prevention key and is unlocked to scene to locking range, and recycles maintenance Anti-error lock, return reporting operations situation, microcomputer anti-error host according to locking range be unlocked the case where, automatically to maintenance every It is unlocked from face equipment, personnel of resuming operation preview operation of making out an invoice to the simulation of equipment.
CN201811491930.6A 2018-12-07 2018-12-07 Misoperation-preventive locking management system and overhauling isolation locking management method for transformer substation Active CN109995138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811491930.6A CN109995138B (en) 2018-12-07 2018-12-07 Misoperation-preventive locking management system and overhauling isolation locking management method for transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811491930.6A CN109995138B (en) 2018-12-07 2018-12-07 Misoperation-preventive locking management system and overhauling isolation locking management method for transformer substation

Publications (2)

Publication Number Publication Date
CN109995138A true CN109995138A (en) 2019-07-09
CN109995138B CN109995138B (en) 2023-12-12

Family

ID=67128684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811491930.6A Active CN109995138B (en) 2018-12-07 2018-12-07 Misoperation-preventive locking management system and overhauling isolation locking management method for transformer substation

Country Status (1)

Country Link
CN (1) CN109995138B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110428533A (en) * 2019-08-14 2019-11-08 珠海理想科技有限公司 One kind realizing the anti-error integrated intelligent lock management system of lock control based on Internet of Things
CN111583453A (en) * 2020-04-20 2020-08-25 深圳供电局有限公司 Secondary equipment screen cabinet operation method and device, computer equipment and storage medium
CN111934230A (en) * 2019-12-27 2020-11-13 南京南瑞继保电气有限公司 Transformer substation safety maintenance isolation locking management and control method
CN112116252A (en) * 2020-09-21 2020-12-22 武汉瑞莱保能源技术有限公司 Safety control method for electrical equipment isolation
CN112360234A (en) * 2020-11-17 2021-02-12 国网新疆电力有限公司阿勒泰供电公司 Outdoor anti-misoperation locking electric operating mechanism box
CN112488644A (en) * 2020-11-24 2021-03-12 南方电网调峰调频发电有限公司鲁布革水力发电厂 Intelligent management system and method for valve operation of hydraulic power plant
CN112700995A (en) * 2020-12-18 2021-04-23 广东电网有限责任公司 Power distribution room maintenance method and device
CN112837451A (en) * 2021-01-06 2021-05-25 许继集团有限公司 Transformer substation maintenance isolation management and control method
CN112927397A (en) * 2021-01-22 2021-06-08 贵州电网有限责任公司 220kv transformer substation maintenance isolation management and control method and system based on Internet of things
CN113991854A (en) * 2021-10-28 2022-01-28 珠海华伟电气科技股份有限公司 Power anti-misoperation maintenance management method, system, equipment and storage medium
CN114050643A (en) * 2021-10-15 2022-02-15 国网浙江省电力有限公司浦江县供电公司 Transformer station equipment operation inspection management and control system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120140367A1 (en) * 2009-06-12 2012-06-07 Abb Technology Ag Protection lockout in substation automation
CN204270285U (en) * 2014-12-05 2015-04-15 国家电网公司 A kind of error proof locking system of microcomputer being applied to transformer station
CN104979900A (en) * 2014-04-09 2015-10-14 珠海优特电力科技股份有限公司 Substation programmed operation anti-misoperation system and method
CN106505743A (en) * 2016-12-29 2017-03-15 国网山东省电力公司德州供电公司 Transformer station's Interlocking Methods
CN107591892A (en) * 2017-08-07 2018-01-16 许继集团有限公司 A kind of intelligent substation O&M method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120140367A1 (en) * 2009-06-12 2012-06-07 Abb Technology Ag Protection lockout in substation automation
CN104979900A (en) * 2014-04-09 2015-10-14 珠海优特电力科技股份有限公司 Substation programmed operation anti-misoperation system and method
CN204270285U (en) * 2014-12-05 2015-04-15 国家电网公司 A kind of error proof locking system of microcomputer being applied to transformer station
CN106505743A (en) * 2016-12-29 2017-03-15 国网山东省电力公司德州供电公司 Transformer station's Interlocking Methods
CN107591892A (en) * 2017-08-07 2018-01-16 许继集团有限公司 A kind of intelligent substation O&M method and system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110428533A (en) * 2019-08-14 2019-11-08 珠海理想科技有限公司 One kind realizing the anti-error integrated intelligent lock management system of lock control based on Internet of Things
CN111934230A (en) * 2019-12-27 2020-11-13 南京南瑞继保电气有限公司 Transformer substation safety maintenance isolation locking management and control method
CN111583453A (en) * 2020-04-20 2020-08-25 深圳供电局有限公司 Secondary equipment screen cabinet operation method and device, computer equipment and storage medium
CN111583453B (en) * 2020-04-20 2022-06-03 深圳供电局有限公司 Secondary equipment screen cabinet operation method and device, computer equipment and storage medium
CN112116252A (en) * 2020-09-21 2020-12-22 武汉瑞莱保能源技术有限公司 Safety control method for electrical equipment isolation
CN112360234A (en) * 2020-11-17 2021-02-12 国网新疆电力有限公司阿勒泰供电公司 Outdoor anti-misoperation locking electric operating mechanism box
CN112488644A (en) * 2020-11-24 2021-03-12 南方电网调峰调频发电有限公司鲁布革水力发电厂 Intelligent management system and method for valve operation of hydraulic power plant
CN112700995A (en) * 2020-12-18 2021-04-23 广东电网有限责任公司 Power distribution room maintenance method and device
CN112837451A (en) * 2021-01-06 2021-05-25 许继集团有限公司 Transformer substation maintenance isolation management and control method
CN112927397A (en) * 2021-01-22 2021-06-08 贵州电网有限责任公司 220kv transformer substation maintenance isolation management and control method and system based on Internet of things
CN114050643A (en) * 2021-10-15 2022-02-15 国网浙江省电力有限公司浦江县供电公司 Transformer station equipment operation inspection management and control system and method
CN113991854A (en) * 2021-10-28 2022-01-28 珠海华伟电气科技股份有限公司 Power anti-misoperation maintenance management method, system, equipment and storage medium

Also Published As

Publication number Publication date
CN109995138B (en) 2023-12-12

Similar Documents

Publication Publication Date Title
CN109995138A (en) Substation's anti-misoperation locking management system and maintenance isolating closing lock management method
CN109326034B (en) Intelligent lock work ticket management system for electric cabinet
CN110428533B (en) Intelligent lockset management system for realizing integration of misoperation-preventive lock control based on Internet of things
CN106710051A (en) Management control system and method for preventing error operations of electrical secondary equipment
CN205787685U (en) Managing and control system for job safety
CN107346109A (en) Managing and control system and method for job safety
CN102591223B (en) Intelligentized diagnostic system of substation-operation operation tickets
CN106611452A (en) Maintenance isolation latching system and method
CN106505742B (en) A kind of integrated Aptitude Operation Order Sheet System of regulation and its dispatching and monitoring method
CN109146321A (en) Upkeep operation security control method and system
CN104318650A (en) Dynamic coded lock management and control system
CN109636116A (en) A kind of equipment of security power construction
CN110474429A (en) Power distribution network power transmission Interlocking Methods and system
CN108879441A (en) Substation inspection and grid switching operation system and its control method
CN107887878B (en) A kind of fool proof method and apparatus of relay protection soft pressing plate
CN104464032B (en) Intelligent panel lock anti-error locking system and its method of work
CN109542013A (en) The parallel electrical anti-misoperation locking device of microcomputer
CN106919109A (en) A kind of intelligent electric power lock based on internet
CN101206963B (en) '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN204390320U (en) A kind of dynamic puzzle-lock system
CN204946135U (en) Plant stand security management and control system
CN105701612A (en) Overhauling isolation management system
CN108305357A (en) A method of the error-unlocking prevention based on intelligent unlocking key
CN201126962Y (en) Five-prevention intelligent unlocking and uninterrupted maintenance apparatus for distribution system
CN206400661U (en) Managing and control system for preventing electrical secondary equipment maloperation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant