CN206400661U - Managing and control system for preventing electrical secondary equipment maloperation - Google Patents

Managing and control system for preventing electrical secondary equipment maloperation Download PDF

Info

Publication number
CN206400661U
CN206400661U CN201720086618.3U CN201720086618U CN206400661U CN 206400661 U CN206400661 U CN 206400661U CN 201720086618 U CN201720086618 U CN 201720086618U CN 206400661 U CN206400661 U CN 206400661U
Authority
CN
China
Prior art keywords
lockset
interim
equipment
resident
computer key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720086618.3U
Other languages
Chinese (zh)
Inventor
修洪江
褚兆勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Unitech Power Technology Co Ltd
Original Assignee
Zhuhai Unitech Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Unitech Power Technology Co Ltd filed Critical Zhuhai Unitech Power Technology Co Ltd
Priority to CN201720086618.3U priority Critical patent/CN206400661U/en
Application granted granted Critical
Publication of CN206400661U publication Critical patent/CN206400661U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lock And Its Accessories (AREA)

Abstract

The utility model offer is a kind of to be used to prevent the managing and control system of electrical secondary equipment maloperation, including for receiving set information and according to the master control set of set information generation operation order;The computer key being connected is communicated with the master control set, the computer key is used to receive the operation order that the master control set is sent;The resident lockset and interim lockset that are connected are communicated with the computer key, the resident lockset is arranged on and need to resided on the normally closed lock device of locking, and the computer key controls the resident lockset to perform operation according to the operation order.The interim lockset is arranged on and needed in the temporary latch equipment of temporary latch, and the computer key controls the interim lockset to perform operation according to the operation order.Classification management and control to electrical equipment is realized by the resident lockset and the interim lockset, misoperation of electrical equipment is effectively prevented and causes the accident, improve the safety of plant stand production operation process.

Description

Managing and control system for preventing electrical secondary equipment maloperation
Technical field
The utility model is related to industrial enterprise's job safety control technology field, more particularly to a kind of to be used to prevent electrically The managing and control system of secondary device maloperation.
Background technology
Power system uses substantial amounts of electric first and second operation equipment, bag in generating, power transformation, transmission of electricity, the link of distribution The electricity such as the electrical primary equipment such as breaker, disconnecting switch, grounding switch, and pressing plate, secondary switch, button, switching switch are included Gas secondary device, switching operation of such first and second electrical equipment in operation and maintenance process, directly influences the fortune of power network Row safety, and operation and the personal safety of maintainer.
To prevent the generation of electric fault-operation accident, the person, power network and equipment safety are ensured, State Grid Corporation of China formulates 《Prevent electric misoperation Security Administration》(national grid safety supervision [6] 904),《Electric power safety working regulation》(state's household electrical appliances Net safety supervision [9] 664),《Production operation security management and control standardization effort specification》National grid pacifies [2016] No. 356 isotactics of matter Model, these administrative provisions and specification prevent maloperation from proposing clear and definite measure requirement electric first and second equipment.
As error-proof device/system is in the popularization and application of transformer station, there is more perfect safe skill at present for primary equipment Art measure.And the technical safety measures of secondary device mainly hangs nameplate in upkeep operation and (fence) is blocked in installing, This technical measures can not prevent secondary switch leakage from closing, leakage point, and the mistake of air switch closes, by mistake point, pressing plate miscarrying, move back by mistake, current terminal and The misconnection of wiring, the generation for the maloperation such as touching by mistake.
Therefore, in order to ensure《Production operation security management and control standardization effort specification》Technical measures implements in " three arrange " Position, and prevent the generation of electrical secondary equipment maloperation, realize to electrical secondary equipment (such as:Clamp operation, current terminal behaviour Make, switching switching manipulation, plug operation, secondary switching manipulation, push-botton operation etc.) operation management and control, it is desirable to provide one kind Electrical secondary equipment anti-misoperation requirement is realized, the operation system of interim locking scope according to business needs, can be flexibly set again System, to fill up the blank in current electrical secondary equipment anti-misoperation field.
Utility model content
Based on this, it is necessary to for above-mentioned technical problem, operating safety of the electrical secondary equipment in operation process, There is provided a kind of for preventing the managing and control system of electrical secondary equipment maloperation.
It is a kind of to be used to prevent the managing and control system of electrical secondary equipment maloperation, including:
Master control set, for receiving set information, and according to the operation order of set information generation electrical secondary equipment, The operation order includes locking operation instruction;
Electrical secondary equipment, including normally closed lock device and temporary latch equipment, the normally closed lock device can accommodate some The individual temporary latch equipment;
Anti-error lock, including resident lockset and interim lockset, the resident lockset are used to reside normally closed lock device Locking, the interim lockset is used to carry out temporary latch equipment interim locking;
Computer key, is connected with master control set communication, for receiving the operation order that the master control set is sent, according to The resident lockset of the locking operation instruction control and/or interim lockset perform corresponding operating;
The anti-error lock includes graded latch combination, for different working condition time stage control the resident lockset and The interim lockset, the graded latch combination includes group level locking and individual locking combination;
Described group of level locking combination, refers in normal operating condition, the normally closed lock device is entered using resident lockset The resident locking of row, in the uncommitted unblock of normally closed lock device, the temporary latch being contained in the normally closed lock device is set It is standby to be operated into;
The individual locking combination, refers in upkeep operation or special operation condition, institute is used to the temporary latch equipment State interim lockset and carry out interim locking, in the interim lockset idle interval, authorize and open the described of the normally closed lock device Resident lockset, the temporary latch equipment is in independent blocking, described interim after the interim lockset is authorized to unblock Interlock is then allowed to operation.
In one embodiment, the normally closed lock device is the carrier of electrical secondary equipment, and the temporary latch equipment is The body of electrical secondary equipment;In the carrier of electrical secondary equipment, the body of several electrical secondary equipments is accommodated.
In one embodiment, the normally closed lock device is one kind in observing and controlling screen cabinet, terminal box, mechanism case and control room Or it is a variety of;The temporary latch equipment include air switch, pressing plate, terminal, repair line, operating handle and operation button in one kind or It is a variety of.
In one embodiment, the resident lockset includes one kind or many in padlock, grip handle lock, insertion-core lock and link lock Kind;The interim lockset includes the one or more in plastics padlock, alloy padlock and air switch small padlock.
In one embodiment, the computer key obtains the resident lockset and/or the interim lockset is performed accordingly Operation information, the master control set receives the operation information that the computer key is obtained.
In one embodiment, the interim lockset includes information logging modle, the shape for recording the interim lockset State information;
Radio frequency electronic tag, for by the computer key wireless identification;
The computer key, is additionally operable to the status information of record in read/write described information logging modle.
In one embodiment, the interim lockset also includes processing module, is sent for receiving the computer key Interim locking operation instruction, handles the interim locking operation instruction, is converted to corresponding operating action.
In one embodiment, the computer key radio frequency electronic tag is identified and to described information The status information recorded in logging modle is judged, and the interim lockset is entered according to recognition result and judged result Row corresponding operating.
In one embodiment, the managing and control system also includes transmission adaptor, for connecting the master control set and institute Computer key is stated, the data communication between the master control set and the computer key is controlled.
In one embodiment, the computer key inserts the transmission adaptor, and the transmission adaptor is to the electricity Brain key conveys electric energy.
In one embodiment, the managing and control system also includes latching accessory, and the latching accessory coordinates the interim lock On tool, the body that the interim lockset is latched in the temporary latch equipment electrical secondary equipment.
What the utility model was provided is used to prevent the managing and control system of electrical secondary equipment maloperation, by electrical secondary equipment Carrier carries out locking using resident lockset, the body of electrical secondary equipment uses the interim locking of interim lockset.By locking temporarily Tool realizes the operation management and control to temporary latch equipment, by residing operation management and control of the lockset realization to normally closed lock device.Using master Device generation electrical secondary equipment operation order is controlled, is realized using computer key to interim lockset and/or resident lockset in operation order The operation management and control of the sequence of operation.There is provided a kind of managing and control system on the premise of standardization, standardization, make electrical secondary equipment Switching operation is more safe and reliable.
Brief description of the drawings
Fig. 1 prevents the knot of the managing and control system of electrical secondary equipment maloperation for being used in the utility model one embodiment Structure schematic diagram;
Fig. 2 is the managing and control system for being used to prevent electrical secondary equipment maloperation in the utility model another embodiment Structural representation;
Fig. 3 is the managing and control system for being used to prevent electrical secondary equipment maloperation in the utility model another embodiment Concrete structure schematic diagram;
Fig. 4 prevents from facing in the managing and control system of electrical secondary equipment maloperation for being used in the utility model one embodiment When lockset structural representation;
Fig. 5 prevents the stream of the management-control method of electrical secondary equipment maloperation for being used in the utility model one embodiment Journey schematic diagram;
Fig. 6 prevents the tool of the management-control method of electrical secondary equipment maloperation for being used in the utility model one embodiment Body flow chart.
Description of reference numerals:
Managing and control system 100 for preventing electrical secondary equipment maloperation
Master control set 10
Transmission adaptor 11
Computer key 20
Interim lockset 30
Radio frequency electronic tag 31
Information logging modle 32
Processing module 33
Latching accessory 34
Resident lockset 40
Temporary latch equipment 50
Normally closed lock device 60
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example is used to prevent the managing and control system of electrical secondary equipment maloperation to be further elaborated to the utility model.It should manage Solution, specific embodiment described herein only to explain the utility model, is not used to limit the utility model.
Refer to Fig. 1, Fig. 2 and Fig. 3 is used to prevent the managing and control system 100 of electrical secondary equipment maloperation there is provided a kind of. Wherein, electrical secondary equipment, including normally closed lock device 60 and temporary latch equipment 50.The normally closed lock device 60 includes electric two The carrier of secondary device, the temporary latch equipment 50 includes the body of electrical secondary equipment.The carrier of electrical secondary equipment can Accommodate the body of several electrical secondary equipments.In the managing and control system 100 for preventing electrical secondary equipment maloperation also Including anti-error lock, the anti-error lock includes resident lockset 40 and interim lockset 30, and the resident lockset 40 is used for described Normally closed lock device 60 carries out resident locking, and the interim lockset 30 is closed for carrying out stage to the temporary latch equipment 50 Lock.
It is described to be used to prevent the managing and control system 100 of electrical secondary equipment maloperation from also including:Master control set 10 and computer key Spoon 20.Wherein, the master control set 10 is used for the operation that the set information that is inputted according to user automatically generates electrical secondary equipment Include resident locking operation instruction and/or interim locking operation instruction in ticket, the operation order.Herein, the master control set 10 host computers managed as all locksets, can be stored with the higher computer of performance, the master control set 10 it is described The information such as interim lockset 30, the resident lockset 40, the temporary latch equipment 50, the normally closed lock device 60.The master control Device 10 is preset between the normally closed lock device 60 and the temporary latch equipment 50, and several described temporary latches are set Operative relationship between standby 50.The master control set 10 is taken out of associated automatically when generating the operation order of electrical secondary equipment The operating procedure of equipment;Or, carry out logic checking automatic to operation order, the step of refusal violates operating condition generation is in behaviour Make in ticket.In one embodiment, the master control set 10 obtains electrical primary facility information, and is preset with electrical secondary equipment With the operative relationship between electrical primary equipment.When generating operation order, electrical secondary equipment is verified by logical relation automatically Operation order.The resident lockset 40 and/or the interim lockset 30 is controlled to perform after corresponding operating according to the operation order, institute State computer key 20 and obtain corresponding operation information, and the operation information is passed back into the master control set 10.
The computer key 20, is connected with the master control set 10 communication, for according to the operation order received, control Lockset (the i.e. described interim lockset 30 and/or the resident lockset of electrical secondary equipment main body processed and electrical secondary equipment carrier 40) corresponding operating is performed.
The anti-error lock is combined including graded latch, and the resident lockset 40 is controlled for different working condition time stage With the interim lockset 30, the graded latch combination includes group level locking combination and individual locking combination.Described group of level locking Combination, refers in normal operating condition, and resident locking is carried out using the resident lockset 40 to the normally closed lock device 60, During the normally closed 60 uncommitted unblock of lock device, the temporary latch equipment 50 in the normally closed lock device 60 is contained in not It can be operated into.The individual locking combination, refers in upkeep operation or special operation condition, the temporary latch equipment 50 is adopted Interim locking is carried out with the interim lockset 30, in the interim idle interval of lockset 30, authorizes the opening normally closed lock to set The standby 60 resident lockset 40, the temporary latch equipment 50 is in independent blocking, when the interim lockset 30 is awarded After power unblock, the temporary latch equipment 50 is then allowed to operation.
In the present embodiment, it is above-mentioned to be used to prevent the managing and control system 100 of electrical secondary equipment maloperation, electric secondary is set Standby carrier carries out locking using the resident lockset 40, the body of electrical secondary equipment uses the interim lockset 30 interim Locking.Operation management and control to the temporary latch equipment 50 is realized by the interim lockset 30, passes through the resident lockset 40 Realize the operation management and control to the normally closed lock device 60.Electrical secondary equipment operation order is generated using the master control set 10, made The operation to interim lockset 30 and/or the sequence of operation of resident lockset 40 described in operation order is realized with the computer key 20 Management and control.There is provided a kind of managing and control system on the premise of standardization, standardization, the switching operation of electrical secondary equipment is set more to pacify Entirely, reliably.What the utility model was provided simultaneously is used to prevent the management-control method of electrical secondary equipment maloperation, uses foregoing pipe Control system, with simple operation, safe advantage.
In one embodiment, the interim lockset 30 deposits in the interim lockset cabinet of Work tool room when being not used by In, before service work, taken out according to operational order from interim lockset cabinet, and the interim lockset 30 is arranged on what is specified In the temporary latch equipment 50, the temporary latch equipment 50 is for upkeep operation or in particular cases, during deployment secure measure Need the electrical secondary equipment body such as air switch, pressing plate, terminal, repair line, operating handle, operation button of interim locking.Institute Interim lockset 30 is stated for single hole arrangements, is easy to be operated by computer key.The interim lockset 30 can be hung for plastic hanging lock, alloy One or more than one kinds of combinations in lock, air switch small padlock.The resident lockset 40 is arranged on the normally closed lock device 60 On.The normally closed lock device 60 is mainly the carrier of electrical secondary equipment, including:Observing and controlling screen cabinet, terminal box, mechanism case, instrument Room (for example, control room of switch cubicle) etc..The resident lockset 40 is single hole arrangements, is easy to be operated by computer key, described normal Can be one or more kinds of combinations in the locksets such as padlock, grip handle lock, insertion-core lock, link lock in lockset 40.
In one embodiment, the coding letter that can be recognized by the computer key 20 is provided with the resident lockset 40 Breath.The coding information that can be recognized by the computer key 20 is provided with the interim lockset 30, the computer key 20 leads to Cross and control the interim lockset 30 to realize the management and control to temporary latch equipment 50.What deserves to be explained is, the resident lockset 40 Coding information and the coding information of the interim lockset 30 are ID (identification, unique identifier) codings, are used for Identify and be different from other locksets.The normally closed lock device 60 that coding information in the resident lockset 40 is latched is then long Phase association binding, and it is mutually unique.And the coding information of interim lockset 30, only it is latched in temporary latch in interim lockset 30 and sets When standby upper, binding is associated with the presently described stage of temporary latch equipment 50, and the interim lockset 30 is in the different periods It can be locked out in the different temporary latch equipment 50.
Fig. 4 is referred to, in one embodiment, the interim lockset 30 includes:Radio frequency electronic tag 31, information Logging modle 32 and processing module 32.Described information logging modle 32 is used for the status information for recording interim lockset 30, the electricity Record information of the read/writable of brain key 20 in it, and distinguish the application category of the resident lockset 40 and the interim lockset 30. Wherein, the interim lockset 30 can also be defined as the resident lockset 40 by the master control set 10.It is described wireless Radio electronic label 31, for by the wireless identification of computer key 20.The processing module 32, for receiving the computer key The interim locking operation instruction that spoon 20 is sent, handles the instruction of interim locking operation, is converted to corresponding operational motion.
It should be noted that processing module 32 can not also be included in the interim lockset 30, i.e., the computer is not received The interim locking operation instruction that key 20 is sent, but described information logging modle 32 is recorded by the computer key 20 Status information judged and the radio frequency electronic tag 31 is identified, and straight according to judged result and recognition result Connect and the interim lockset 30 is operated.
For example:If recognizing that the obtained radio frequency electronic tag 31 is corresponding information in binding information, and sentence The status information of disconnected now described interim lockset 30 is blocking, and now needs to be unlocked behaviour to the interim lockset 30 Make, then the interim lockset 30 is unlocked operation.
In one embodiment, the computer key 20, is additionally operable to controlling the resident lockset according to the operation order 40 and/or the interim lockset 30 perform after corresponding operation, obtain corresponding operation information, and operation information is passed back into institute Master control set 10 is stated, the timely passback of operation information is realized.In one embodiment, it is described to be used to prevent electrical secondary equipment from missing The managing and control system of operation further comprises transmission adaptor 11.The transmission adaptor 11 is used to connect the He of master control set 10 The data communication between the master control set 10 and the computer key 20 is realized in the computer key 20, control.It is preferred that, institute State computer key 20 and operation information is back to by master control set by the conventional adapter 11, to realize master control set to operation The management such as record, inquiry, statistics of information supplies function.In addition, the computer key 20 is inserted into the transmission adaptor 11, it is described Transmission adaptor 11 can also convey electric energy to the computer key 20.
In the present embodiment, the computer key 20 is arranged in the transmission adaptor 11, simplied system structure.It is described Transmission adaptor 11 can be charged for computer key 20, it is ensured that computer key 20 will not can not be performed because of not enough power supply Operation, it is ensured that the reliability of system operation.
In one embodiment, what the utility model was provided is described for preventing the management and control system of electrical secondary equipment maloperation System 100 also includes:Latching accessory 34, the latching accessory 34 is suitably mounted in the temporary latch equipment 50.According to institute The difference of temporary latch equipment 50 is stated, from different structure, the latching accessory 34 of unlike material, the purpose is to set temporary latch It is standby to be fixed on a certain particular state, and interim lockset 30 can be made to be positively locked in temporary latch equipment by latching accessory 34 This particular state.Certainly, for having there is the equipment of lockset installation site, then without increasing latching accessory 34 in addition.
In one embodiment, the scope of normally closed lock device 60 can be extended to electrical primary equipment, such as breaker, isolation Disconnecting link, grounding switch etc., the lock set of electrical primary equipment include padlock, electric puzzle lock, locking box, romote controlled locking device etc. One or more kinds of combinations in lockset.For the anti-misoperation system and method for electrical primary equipment, its technology is non- Often ripe, the fool proof managing and control system of electrical secondary equipment and management-control method in this programme can be prevented electrically with mature The management system and management method of primary equipment maloperation are combined, and by the master control set 10, preset electric secondary Operative relationship between equipment and electrical primary equipment, when generating operation order, electric two can be verified automatically by logical relation The correctness of secondary device operation order, further strengthens anti-error tight during electrical secondary equipment operation.
Because the normally closed lock device 60 of electrical primary equipment class is in terms of management, mandate, operation, with electric secondary The normally closed lock device 60 of apparatus carriers class is different (such as:When operation order is generated, the normally closed lock of electrical primary equipment class is set It is standby to strictly observe the logical condition between equipment, and electrical secondary equipment carrier class then can unconstrained conditions;In operation, The resident lockset 40 of electrical primary equipment class must in strict accordance with the computer key 20 show operation instruction information by Step is carried out, and electrical secondary equipment carrier class then can unordered and multi-pass operation etc.), it is not influence the understanding of reader, therefore this theory Normally closed lock device in bright book subsequent content introduction is only electrical secondary equipment carrier, not to the described normal of electrical primary equipment class Interlock 60 is introduced.
Referring to Fig. 5, additionally providing a kind of for preventing the management-control method of electrical secondary equipment maloperation, this method bag Include:
S100, the master control set 10 receives set information, and the resident lockset 40 and/or institute are generated according to set information The operation order of interim lockset 30 is stated, and sends the operation order to the computer key 20, wherein, included in the operation order There is resident locking operation to instruct and/or interim locking operation instruction.
S200, the computer key 20 is received after operation order, according to the operation order control the resident lockset 40 and/ Or the interim lockset 30 performs and locks or unlock operation accordingly, to realize to the normally closed lock device 60 and/or described face When interlock 50 management and control.
In the present embodiment, the master control set 10 receives the set information of user's input and automatically generated according to set information The operation order of the resident lockset 40 and/or the interim lockset 30, and send the operation order to the computer key 20. The computer key 20 controls the resident lockset 40 and/or the interim lockset 30, and then realization pair according to the operation order The management and control of the normally closed lock device 60 and/or the temporary latch equipment 50.It is used once the energy of computer key 20 is real The existing normally closed lock device 60 and/or the operational administrative of temporary latch equipment 50, before effective guarantee equipment operation safety Put, make equipment operation operation more smooth, improve operating efficiency.
Fig. 6 is referred to, in one embodiment, operating personnel are by the master control set 10 setting generation only comprising described , can be according to the unblock needs to the normally closed lock device 60, arbitrarily during the operation order of normally closed lock device 60 (such as in patrol task) Specify, out-of-order is constrained.
In one embodiment, operating personnel are set by the master control set 10 and generate the temporary latch equipment 50 During operation order (such as in maintenance task), can according to the need for 50 lockings of the temporary latch equipment/unblock, being arbitrarily designated, nothing Sequence constraint.Certainly, according to user's request, can also the temporary latch equipment 50 be preset to the master control set 10 and faced with described When interlock 50 between operate sequencing logical relation, violate preset relation operational order will be rejected generation operation Instruction.
In one embodiment, operating personnel pass through (such as maintenance during the master control set 10 setting generation married operation ticket In task), it can successively select to need the normally closed lock device 60 of Authorized operation and the temporary latch equipment 50 manually, also may be used The normally closed lock device 60 is preset into logical relation with the corresponding temporary latch equipment 50.In the master control set 10 When generating operation order, the temporary latch equipment 50 is only selected to be authorized, the normally closed lock device 60 associated therewith will It is automatically added in the range of Authorized operation equipment.
In one embodiment, it is described to be used to prevent the management-control method of electrical secondary equipment maloperation from including:
If only instructed in operation order comprising resident locking operation, the computer key 20 receives the master control set 10 and passed After the resident locking operation instruction sent, detected by the computer key 20 and be arranged on described normal on the normally closed lock device 60 In the coding information of lockset 40, and judge coding information whether with the coding information phase in the resident locking operation instruction Match somebody with somebody, if so, then controlling the resident lockset 40 to open, realize the management and control to the normally closed lock device 60;If it is not, then sending alarm Information simultaneously refuses unblock.
It should be noted that when the resident locking operation for having more than one in operation order is instructed, the computer key 20 According to the operational order authorized, the resident lockset 40 is detected, the obtained coding of the resident lockset 40 is judged Whether information matches with residing a certain coding information in locking operation instruction within the scope of authority.If matching, solution is performed Lock operation, otherwise, simultaneously rejection is unlocked alert, after the completion of all command operatings in the computer key 20, will be believed Breath passes back to the master control set 10.
In one embodiment, if in operation order only comprising the instruction of interim locking operation, master control set is by interim lockset Operational order sends computer key 20 to, wherein, interim locking operation instruction includes lock operational order and unblock operational order. Step also includes:
When the instruction of interim locking operation is to lock operational order, operating personnel are faced by the computer key 20 from described When the management box of lockset 30 in appoint take the interim lockset 30, the interim lockset 30 is latched in the temporary latch equipment 50 On, and the status information of the interim lockset 30 is updated, while by the coding information of the interim lockset 30 and computer key 20 Temporary latch equipment described in the sequence of operation 50 is associated.
In one embodiment, if the locking to the temporary latch equipment 50 is, it is necessary to which the latching accessory 34 coordinates Complete, operating personnel take out the latching accessory 34 while interim lockset 30 are taken in the lump.The locking is used first Annex 34 fixes the temporary latch equipment 50, then using the interim lockset 30 by the latching accessory 34, by institute State the reliable locking of temporary latch equipment 50.
When have more than one lock operational order when, operating personnel by the computer key 20 from interim lockset manage Appoint the interim lockset 30 taken no less than isolating closing lock number of devices in case, in the process of implementation, according to the computer key 20 hint instructions, carry out locking, and update the shape of the used interim lockset 30 to the temporary latch equipment 50 one by one State information, while the coding information of the interim lockset 30 is set with temporary latch described in the sequence of operation of computer key 20 After the completion of standby 50 association correspondence, all command operatings in the computer key 20, all record informations and operation are believed Breath is uploaded to the master control set 10.
When the instruction of interim locking operation is unblock operational order, the computer key 20 detection is latched in described closes temporarily The coding information of the interim lockset 30 on lock device 50, judge that it is received with the computer key 20 needs in operational order Whether the coding information for releasing the interim lockset 30 corresponds to, if so, opening the institute being latched in the temporary latch equipment 50 Interim lockset 30 is stated, and updates the status information of the interim lockset 30, and the interim lockset 30 is recycled to interim lockset In management box, used during so as to follow-up 50 lock operation of temporary latch equipment;If it is not, then the computer key 20 sends sound The warning messages such as light, point out staff, and now staff needs to redefine the temporary latch that need to correctly unlock Equipment 50.
In one embodiment, if the temporary latch equipment 50 is to carry out locking by the latching accessory 34, After unblock operation, the latching accessory 34 is together withdrawn.
Explanation is needed, when unblock operational order has more than one of unblock operational order, the computer key 20 is pressed According to the order of unblock operational order, checking successively needs to unlock the volume of the interim lockset 30 in the temporary latch equipment 50 Code information, and the unblock operation of the interim lockset 30 is performed when correct.Further, the interim lockset 30 is being performed During unblock operation, unordered it can also operate, the computer key 20 detects that be latched in the temporary latch equipment 50 described faces When lockset 30 coding information, judge whether it belongs to the computer key 20 and receive interim lockset 30 described in operational order One of coding information, if so, then carrying out the unblock of interim lockset 30 operation;If it is not, then computer key 20 sends the report such as acousto-optic Alert information, points out staff, and now staff needs to redefine the temporary latch equipment 50 that need to correctly unlock, After the completion of all operational orders in the computer key 20, operation information is passed back into the master control set 10.
In one embodiment, when the married operation instruction that operation order is the resident lockset 40 and the interim lockset 30 When, operating personnel are when performing operation order, and the resident lockset 40 can be executed out, as long as belong to the operation order content The resident lockset 40, the computer key 20 can carry out unordered, repetition unblock operation;The operation of the interim lockset 30 is then needed To show that operation instruction information is operated according to the computer key 20 one by one, if locking operational order, then according to described Interim lockset 30 is locked operational order execution, if unblock operational order, is then performed according to unblock operational order.Operation order is operated After the completion of, the operation information of the computer key 20 is back to the master control set 10, institute by the transmission adaptor 11 State that master control set 10 is automatic to operation order processing, record and store the state of the resident lockset 40, the interim lockset 30 The information such as state and the interim lockset 30 and the corresponding relation of the temporary latch equipment 50, and record preservation.
Due to the method solve problem principle with it is foregoing it is a kind of be used for prevent the management and control system of electrical secondary equipment maloperation System is similar, therefore implementations of the system may refer to the implementation of preceding method, be repeated no more in place of repeating.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment method, being can be with The hardware of correlation is instructed to complete by computer program, described program can be stored in a computer read/write memory medium In, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, described storage medium can be magnetic Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access Memory, RAM) etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (11)

1. a kind of be used to prevent the managing and control system of electrical secondary equipment maloperation, it is characterised in that including:
Master control set, it is described for receiving set information, and according to the operation order of set information generation electrical secondary equipment Operation order includes locking operation instruction;
Electrical secondary equipment, including normally closed lock device and temporary latch equipment, the normally closed lock device can accommodate several institutes State temporary latch equipment;
Anti-error lock, including resident lockset and interim lockset, the resident lockset are used to carry out normally closed lock device resident locking, The interim lockset is used to carry out temporary latch equipment interim locking;
Computer key, is connected with master control set communication, for receiving the operation order that the master control set is sent, according to described The locking operation resident lockset of instruction control and/or interim lockset perform corresponding operating;
The anti-error lock is combined including graded latch, and the resident lockset is controlled and described for different working condition time stage Interim lockset;The graded latch combination includes group level locking combination and individual locking combination;
Described group of level locking combination, refers in normal operating condition, the resident lockset carries out normal to the normally closed lock device In locking, in the uncommitted unblock of the normally closed lock device, the temporary latch being contained in the normally closed lock device is set It is standby to be operated into;
The individual locking combination, refers in upkeep operation or special operation condition, the temporary latch equipment is carried out interim Locking, in the interim lockset idle interval, authorizes the resident lockset for opening the normally closed lock device, the temporary latch Equipment is in independent blocking, and after the interim lockset is authorized to unblock, the temporary latch equipment is then allowed to operation.
2. managing and control system according to claim 1, it is characterised in that the normally closed lock device is the load of electrical secondary equipment Body, the temporary latch equipment is the body of electrical secondary equipment;In the carrier of electrical secondary equipment, several electricity are accommodated The body of gas secondary device.
3. managing and control system according to claim 2, it is characterised in that the normally closed lock device be observing and controlling screen cabinet, terminal box, One or more in mechanism case and control room;The temporary latch equipment includes air switch, pressing plate, terminal, repair line, operation handlebar One or more in hand and operation button.
4. managing and control system according to claim 1, it is characterised in that the resident lockset includes padlock, grip handle lock, lock pin One or more in lock and link lock;The interim lockset includes one in plastics padlock, alloy padlock and air switch small padlock Plant or a variety of.
5. managing and control system according to claim 1, it is characterised in that the computer key obtain the resident lockset and/ Or the interim lockset performs corresponding operating information, the master control set receives the operation information that the computer key is obtained.
6. managing and control system according to claim 1, it is characterised in that the interim lockset includes information logging modle, is used In the status information for recording the interim lockset;
Radio frequency electronic tag, for by the computer key wireless identification;
The computer key, is additionally operable to the status information of record in read/write described information logging modle.
7. the managing and control system according to claim 6, it is characterised in that the interim lockset also includes processing module, is used In receiving the interim locking operation instruction that the computer key is sent, the interim locking operation instruction is handled, changed Acted for corresponding operating.
8. the managing and control system according to claim 6, it is characterised in that the computer key is to the less radio-frequency electronics Label is identified and the status information recorded in described information logging modle is judged, and according to recognition result and Judged result carries out corresponding operating to the interim lockset.
9. the managing and control system according to any one of claim 1 to 8, it is characterised in that also including transmission adaptor, is used for The master control set and the computer key are connected, the data communication between the master control set and the computer key is controlled.
10. managing and control system according to claim 9, it is characterised in that the computer key inserts the transmission adaptor, The transmission adaptor conveys electric energy to the computer key.
11. the managing and control system according to any one of claim 1 to 8, it is characterised in that also including latching accessory, described Latching accessory coordinates the interim lockset, and the interim lockset is latched in the sheet of the temporary latch equipment electrical secondary equipment On body.
CN201720086618.3U 2017-01-19 2017-01-19 Managing and control system for preventing electrical secondary equipment maloperation Active CN206400661U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720086618.3U CN206400661U (en) 2017-01-19 2017-01-19 Managing and control system for preventing electrical secondary equipment maloperation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720086618.3U CN206400661U (en) 2017-01-19 2017-01-19 Managing and control system for preventing electrical secondary equipment maloperation

Publications (1)

Publication Number Publication Date
CN206400661U true CN206400661U (en) 2017-08-11

Family

ID=59515104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720086618.3U Active CN206400661U (en) 2017-01-19 2017-01-19 Managing and control system for preventing electrical secondary equipment maloperation

Country Status (1)

Country Link
CN (1) CN206400661U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108648318A (en) * 2018-05-18 2018-10-12 长园共创电力安全技术股份有限公司 It is online to authorize Interlocking Methods and system
CN110599642A (en) * 2019-08-23 2019-12-20 珠海优特电力科技股份有限公司 Unlocking equipment, lock and lock control system
CN112927397A (en) * 2021-01-22 2021-06-08 贵州电网有限责任公司 220kv transformer substation maintenance isolation management and control method and system based on Internet of things

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108648318A (en) * 2018-05-18 2018-10-12 长园共创电力安全技术股份有限公司 It is online to authorize Interlocking Methods and system
CN108648318B (en) * 2018-05-18 2022-01-14 长园共创电力安全技术股份有限公司 Online authorization anti-misoperation locking method and system
CN110599642A (en) * 2019-08-23 2019-12-20 珠海优特电力科技股份有限公司 Unlocking equipment, lock and lock control system
CN110599642B (en) * 2019-08-23 2022-03-22 珠海优特电力科技股份有限公司 Unlocking equipment, lock and lock control system
CN112927397A (en) * 2021-01-22 2021-06-08 贵州电网有限责任公司 220kv transformer substation maintenance isolation management and control method and system based on Internet of things

Similar Documents

Publication Publication Date Title
CN106710051A (en) Management control system and method for preventing error operations of electrical secondary equipment
CN205787685U (en) Managing and control system for job safety
CN109995138B (en) Misoperation-preventive locking management system and overhauling isolation locking management method for transformer substation
CN107346109A (en) Managing and control system and method for job safety
CN206400661U (en) Managing and control system for preventing electrical secondary equipment maloperation
CN102842162B (en) Comprehensive managing system and managing method of anti-error and intelligent locking group of electric microcomputer
CN109146321A (en) Upkeep operation security control method and system
CN107704739A (en) Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock
CN103985174A (en) Power distribution network lock control system and working method thereof
CN101492982A (en) Intelligent electronic lock monitoring system applying to outdoor communication equipment room and cabinet
US9423780B2 (en) Handheld device for preventing misoperations in an electric power system
CN107195027A (en) The secondary fool proof locking method of electrical equipment and system
CN204103597U (en) Have the monitoring system of electric substation of gate, anti-error and wireless temporary grounding wire management concurrently
CN105488872A (en) Switch cabinet misoperation-preventive locking device and working method thereof
CN108648318B (en) Online authorization anti-misoperation locking method and system
CN110474429A (en) Power distribution network power transmission Interlocking Methods and system
CN201377223Y (en) Intelligent electronic lock monitoring system applied to outdoor telecommunication rooms and cabinets
CN207731273U (en) Microcomputer anti-error operating system with listed function and anti-error host, Intelligent key, intelligent lock
CN109919451A (en) Based on true power network topology analysis and security knowledge base digital electric network system and method
CN204946135U (en) Plant stand security management and control system
CN106504370B (en) Plant stand security management and control system and control method
CN208819285U (en) Key safety management system
CN101206963B (en) '5-prevention' intelligent unlocking and non-intermittence maintenance system of distribution system
CN108305357A (en) A method of the error-unlocking prevention based on intelligent unlocking key
CN109272626A (en) Key safety management system and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant