CN104933535A - An intelligent monitoring operation ticket management method and a system thereof - Google Patents

An intelligent monitoring operation ticket management method and a system thereof Download PDF

Info

Publication number
CN104933535A
CN104933535A CN201510388501.6A CN201510388501A CN104933535A CN 104933535 A CN104933535 A CN 104933535A CN 201510388501 A CN201510388501 A CN 201510388501A CN 104933535 A CN104933535 A CN 104933535A
Authority
CN
China
Prior art keywords
order
ticket
verification
intelligent monitoring
operation order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510388501.6A
Other languages
Chinese (zh)
Inventor
杨志刚
刘晓敏
李膨源
王东力
刘坚强
李国统
康伟
逯洋
李晶
闫贺群
张昊
宋庆昌
谢亮
陈达威
李刚
赵堃
贾文昭
闵睿
邓竟超
王鑫泽
娄凌君
许文强
王晓峰
张宇
张锐
郝东升
姚东
刘晓鹏
刘冉杰
何洪亮
王冠楠
季震
陈澜
蒋辰临
付伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Kedong Electric Power Control System Co Ltd
State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Beijing Kedong Electric Power Control System Co Ltd
State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Kedong Electric Power Control System Co Ltd, State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510388501.6A priority Critical patent/CN104933535A/en
Publication of CN104933535A publication Critical patent/CN104933535A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an intelligent monitoring operation ticket management method. The method comprises the following steps: S1, via an interaction interface connected to a real time SCADA system, a real time data section is synchronized to generate a present connection graph; whether switch operation exists in a dispatching order is determined; if no switch operation exists in the dispatching order, S4 is conducted; otherwise, the S2 is conducted; an operation ticket is generated according to the present connection graph and the present state and a target state of a device which needs to be operated; S3, safety verification is carried out on the generated operation ticket; S4, the operation ticket is forwarded to a centralized control station to be subjected to unified operation; all information generated in an intelligent monitor operation ticket execution process is recorded and stored in a scheduling information management system; and S5, whether secondary switch operation exists in the dispatching order is determined; and if no second switch operation exists, operation ticket management monitoring ends; otherwise, a second operation ticket is generated, and the steps S3-S4 are repeated. The method guarantees safety of dispatching operation and provides a strong guarantee for safe and stable operation of a power grid.

Description

A kind of intelligent monitoring operation order management method and system thereof
Technical field
The present invention relates to a kind of intelligent monitoring operation order management method, relate to a kind of intelligent monitoring operation ticket management system simultaneously, belong to dispatching automation of electric power systems field.
Background technology
Along with the fast development of intelligent grid, structure and the method for operation of electric system are increasingly sophisticated, and scheduling operation bill system gradually adopts the mode of intelligent generating run ticket, by artificial setting operation targeted manner, automatic generating run sequence of steps, the automatization level of generating run ticket improves gradually.
Along with the field integrated automatization level of electric system improves constantly, unattended transformer station quantity constantly increases, and the data message of electric system presents the trend of magnanimity growth.But along with the magnanimity of electric power system data information increases, the control ability of intelligent grid staff to data message presents remarkable downward trend.Specific to power scheduling, because existing electric power dispatching system is difficult to comprehensively, obtains mass data information in real time, make power dispatcher be difficult to control the data message of electric system by existing electric power dispatching system comprehensively, not only have impact on the accuracy of power scheduling thus, and have impact on the promptness of power scheduling, thus have a strong impact on the safe operation of intelligent grid.
In order to solve the problem, be in the Chinese patent application of CN104600840A at publication number, disclose a kind of intelligent scheduling anti-misoperation management system and method, it comprises graphic platform module, intends ticket management system, operation ticket management system, data memory module and interface management system; Its step is as follows: (1) is by external system data processing server Real-time Collection public electric wire net topological graph and model, comprehensive electric quantity data and grid equipment real time status information; (2) build by graphic platform module converts the simulated environment operated for dispatcher; (3) foundation dispatcher is to the operation information of device model in simulated environment, by intending the operation information of ticket management system realization based on device model, utilizing topological relation intelligence to generate dispatch command ticket and operating anti-error check prompting; (4) coordinated by operation ticket management system and data memory module, interface management system and realize the examination & verification of operation order flow process and statistical query, externally distributing data.The method can effectively realize drafting operation order fast, synchronously checks, prevents maloperation from occurring in time.
But in existing electric system, each system is still in segmentation separate state, forms numerous information islands.Existing data resource is not integrated by prior art well, realizing the basis that operation order effectively manages realizing checking and sharing of information, with effective auxiliary dispatching operation work, increases work efficiency.
Summary of the invention
For the deficiencies in the prior art, primary technical matters to be solved by this invention is to provide a kind of intelligent monitoring operation order management method.
Another technical matters to be solved by this invention is to provide a kind of intelligent monitoring operation ticket management system.
For achieving the above object, the present invention adopts following technical scheme:
A kind of intelligent monitoring operation order management method, comprises the steps:
S1, by the interactive interface with real-time SCADA system, synchronous real time data section, generates current connection layout according to real time data section; Judge whether have switching manipulation in traffic order, if there is no switching manipulation in traffic order, then turn to step S4; Otherwise, turn to step S2;
S2, according to current state and the dbjective state of current connection layout and equipment to be operated, generates first operation order;
S3, carries out safety check to the operation order generated, if not by safety check, forbids carrying out operation order operation; Otherwise, turn to step S4;
S4, is transmitted to concentrator station unification and operates, all information records produced are stored into scheduling information management system simultaneously in intelligent monitoring operation order implementation by operation order;
S5, judges whether there is second time switching manipulation in traffic order, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, generate second operation order, repeat step S3 ~ S4.
Wherein more preferably, the mode of generating run ticket comprise intelligence become ticket become ticket with phrase.
Wherein more preferably, select target state on the equipment that described intelligence becomes ticket to show at current connection layout, according to current state and dbjective state generating run instruction on operation order of equipment;
Described phrase becomes ticket to adopt automatic semantic matches technology, by selecting plant stand, operand and mode of operation, generating run instruction on operation order.
Wherein more preferably, in step s3, safety check comprises topological anti-error School Affairs tidal current analysis verification.;
Wherein more preferably, whether the nominal value content of the anti-error verification of described topology to operation order reaches operation object and whether operational order meets anit-misoperation rules and verify;
Described tidal current analysis verifies the power flow changing in the electric system caused by the operational order of checked operation ticket, and whether verification operation result can bring circuit heavy duty or out-of-limit.
Wherein more preferably, in step s 4 which, before operation order being transmitted to concentrator station is unified and operating, topological anti-error verification is carried out to operation order.
A kind of intelligent monitoring operation ticket management system, for realizing described intelligent monitoring operation order management method, comprises policer operation ticket workflow management unit, in real time SCADA system interactive unit, Security Checking interface unit, scheduling information management system interactive unit;
Wherein, described policer operation ticket workflow management unit is used for according to traffic order generating run ticket, the examination & verification of line operate ticket of going forward side by side;
Synchronizing information in order to carry out the real-time synchronization of electric network model, figure and real time data, and is sent to described policer operation ticket workflow management unit by described real-time SCADA system interactive unit;
Described Security Checking interface unit is checked in order to the operation order generated described policer operation ticket workflow management unit;
Described scheduling information management system interactive unit is in order to synchronous and check that described policer operation ticket workflow management unit to carry out whole recorded informations of processing procedure to traffic order.
Wherein more preferably, described policer operation ticket workflow management unit comprise the first operator unit, the second operator unit and return make subelement;
Wherein, described first operator unit is in order to carry out plan ticket, examination & verification and verification to first time switching manipulation;
Described second operator unit is in order to carry out plan ticket, examination & verification and verification to second time switching manipulation;
Described yardman returns and makes subelement in order to after operation completes, and according to traffic order, operating result is carried out synchronizing information to scheduling information management system.
Wherein more preferably, described Security Checking interface unit, comprises topological anti-error correction verification module and tidal current analysis correction verification module;
Wherein, whether the anti-error correction verification module of described topology meets anit-misoperation rules in order to the operational order in verification operation ticket;
Power flow changing in the electric system that described tidal current analysis correction verification module causes in order to the operational order of checked operation ticket, whether verification operation result can bring circuit heavy duty or out-of-limit.
Intelligent monitoring operation order management method provided by the present invention, by the interactive interface with real-time SCADA system, automatic synchronization real time data section, meets the requirement of electric system to real-time.Judge whether have switching manipulation in traffic order, if there is switching manipulation in traffic order, then generate first operation order, safety check is carried out to the operation order generated, and operation order is transmitted to concentrator station is unified to be operated, all information records produced in intelligent monitoring operation order implementation are stored into scheduling information management system simultaneously; Achieve and the Security Checking in the combination of D5000 system figure and model and policer operation process.By judging whether there is second time switching manipulation in traffic order, generate second operation order, re-start Security Checking and synchronizing information, improve the security of operation, reduce the possibility of the operation that makes a mistake, substantially increase efficiency and the lean management level of electric power system dispatching signalman.
Accompanying drawing explanation
Fig. 1 is the structural representation of intelligent monitoring operation ticket management system provided by the present invention;
Fig. 2 is the process flow diagram of intelligent monitoring operation order management method provided by the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, detailed specific description is carried out to technology contents of the present invention.
As shown in Figure 1, intelligent monitoring operation ticket management system provided by the present invention, based on intelligent grid supporting system technology (referred to as D5000 system) basic platform, comprise policer operation ticket workflow management unit, in real time SCADA system interactive unit, Security Checking interface unit, scheduling information management system interactive unit.Wherein, policer operation ticket workflow management unit comprise the first operator unit, the second operator unit and return make subelement.First operator unit comprises that first time intends ticket module, the long auditing module of the first sub-value, first time policer operation module, first time turn and make operational module, in order to carry out plan ticket, examination & verification and verification to first time switching manipulation.Second operator unit comprises second time plan ticket module, the long auditing module of the second sub-value, second time policer operation module, second time turns makes operational module; In order to carry out plan ticket, examination & verification and verification to second time switching manipulation.By traffic order is generated operation order and second this operation order for the first time respectively according to switching manipulation, separately carry out Security Checking, improve the security of operation, reduce the possibility of the operation that makes a mistake.Returning makes subelement in order to after operation completes, and according to traffic order, the result of grid switching operation is carried out synchronizing information to scheduling information management system.
Real-time SCADA system interactive unit comprises synchronised grids model module and obtains real time data section module; Monitoring and scheduling person according to the traffic order received, before generating first time operation order, real-time SCADA system interactive unit is in order to real-time synchronization electric network model, figure and real time data.Policer operation ticket workflow management unit is according to real-time synchronization electric network model, figure and real time data generating run ticket.When the first operator unit, the second operator unit are audited the operation order that switching manipulation generates, call Security Checking interface unit, whether the operational order in verification operation ticket meets anit-misoperation rules, and whether verification operation result can bring more serious circuit heavy duty or out-of-limit.Security Checking interface unit comprises topological anti-error correction verification module and tidal current analysis correction verification module; Whether the anti-error correction verification module of topology meets anit-misoperation rules in order to the operational order in verification operation ticket, power flow changing in the electric system that tidal current analysis correction verification module causes in order to the operational order of checked operation ticket, whether verification operation result can bring more serious circuit heavy duty or out-of-limit.
The all information records produced in intelligent monitoring operation order implementation are stored into scheduling information management system by scheduling information management system interactive unit, achieve the support of " the transregional office " of management and running work, " multi-region management ", improve convenience and the high efficiency of the work of management and running.
Fig. 2 is the process flow diagram of intelligent monitoring operation order management method provided by the present invention.Specifically comprise the steps: first, by the interactive interface with real-time SCADA system, automatic synchronization electric network model, figure and real time data, generate current connection layout according to real time data; Judge whether have switching manipulation in traffic order, if there is no switching manipulation in traffic order, then carry out first time turn order operation; Otherwise, carry out first time and intend ticket operation, according to current state and the dbjective state of current connection layout and equipment to be operated, generate first operation order.Then, enter the long examination & verification of the first sub-value, safety check is carried out to the operation order generated, if not by safety check, forbids carrying out operation order operation; Otherwise, operation order is transmitted to concentrator station unification and operates, all information records produced are stored into scheduling information management system simultaneously in intelligent monitoring operation order implementation.Finally, judge whether there is second time switching manipulation in traffic order, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, repeat above-mentioned steps.Detailed specific description is done to this process below.
S1, by the interactive interface with real-time SCADA system, automatic synchronization real time data section, generates current connection layout according to real time data section; Judge whether have switching manipulation in traffic order, if there is no switching manipulation in traffic order, then turn to step S4, carry out first time turn order operation; Otherwise turn to step S2, carry out first time and intend ticket operation.
By the interactive interface with real-time SCADA system, automatic synchronization electric network model, figure and real time data, generate current connection layout according to real time data.Wherein, synchronised grids model realization horizontal integrating dispatching center types of applications, the uniform service of the model of longitudinally through scheduling at different levels, figure, real time data and the name of Pyatyi Scheduling criteria.Efficiently solve in old system, the problem of the verification of dispatching terminology standard title cannot be carried out.
By the interactive interface automatic synchronization real time data section with real-time SCADA system, the section management service that intelligent grid supporting system technology provides, usage data mirror image synchronization technology, read the real time data of SCADA system, not only increase the high efficiency of data syn-chronization and the integrality of data, and enhance stability and the security of system.Then generate current connection layout according to real time data, so that during generating run ticket, obtain the real-time annexation of equipment to be operated.According to annexation generating run step.
By the interactive interface with real-time SCADA system, after automatic synchronization real time data section, data in intelligent monitoring operation ticket management system are the real time data in electric system actual moving process, just can according to real time data generating run ticket by analyzing traffic order.Before generating run ticket, judge whether have switching manipulation in traffic order, if there is no switching manipulation in traffic order, then turn to step S4, carry out first time turn order operation; Otherwise turn to step S2, carry out first time and intend ticket operation.
S2, according to current state and the dbjective state of current connection layout and equipment to be operated, generates first operation order.
The dbjective state of equipment to be operated and equipment to be operated is determined according to traffic order, the current state of equipment to be operated and the annexation with other equipment is obtained, according to current state, the dbjective state of equipment to be operated and generate first operation order with the annexation of other equipment by the current connection layout obtained in step S1.
In embodiment provided by the present invention, the mode of generating run ticket comprises intelligence and becomes ticket to become ticket with phrase.As long as intelligence becomes ticket to be select target state on the equipment that shows at current connection layout, the operational order of correspondence just can be generated according to the current state of equipment and dbjective state, this one-tenth ticket method intuitive and convenient on operation order.Phrase becomes ticket to adopt automatic semantic matches technology, as long as select plant stand, operand and mode of operation, can generate complete operational order on operation order.Operation order comprises detailed content, as confirmed, switch gap picture recalls, check switch really in target location, check switch telemetry etc.
S3, carries out safety check to the operation order generated, if not by safety check, forbids carrying out operation order operation; Otherwise, turn to step S4, carry out turning order operation.
After generating first operation order, safety check is carried out to the operation order generated.In embodiment provided by the present invention, safety check comprises topological anti-error School Affairs tidal current analysis verification.Wherein, the content of topological anti-error verification to operation order is audited, and is on the one hand to check whether nominal value content can reach operation object; Be whether verification operation instruction meets anit-misoperation rules on the other hand, if equipment to be operated violates working rules such as " five prevent ", then the content of operation of this operation order can not operate.In embodiment provided by the present invention, Network topology is passed through in the anti-error verification of topology, be aided with associated safety working rule criterion again, as the blocking function (can not on-load broaching tool lock, ground wire power transmission etc. can not be with) between primary equipment operation, the maloperation arbitration functions under any mode of connection just can be realized.
Wherein, Network topology, also claims " network topology analysis ", and Main Function is the bus and the network model that generate electrical network analysis according to the state of the equipment such as intelligent grid breaker in middle, disconnecting link and the annexation of each electrical equipment.
Dispatcher Power Flow system is called in tidal current analysis verification support, and before plan ticket and before performing, can trigger Dispatcher Power Flow system, carry out electric network swim calculating, obtain circuit heavy duty and out-of-limit information, automatic synchronization is to scheduling information management system simultaneously, for yardman's reference.In embodiment provided by the present invention, tidal current analysis verifies the power flow changing in the electric system caused by the operational order of checked operation ticket, and whether verification operation result can bring more serious circuit heavy duty or out-of-limit.
If the operation order generated, not by safety check, is forbidden carrying out operation order operation, is again intended ticket.Otherwise, operation order is transmitted to concentrator station unification and operates.
S4, is transmitted to concentrator station unification and operates, all information records produced are stored into scheduling information management system simultaneously in intelligent monitoring operation order implementation by operation order.
If the operation order generated is by safety check, then operation order is transmitted to concentrator station is unified to be operated by turning order operation.Before carrying out turning order operation, by by the interactive interface with real-time SCADA system, autosynchronous electric network model, figure and real time data, contrast with by the equipment physical location of camera Real-time Obtaining and status information, carry out policer operation, when checking that monitoring primary equipment picture is identical with status information with equipment physical location, operation order being transmitted to concentrator station unification and operating.
In embodiment provided by the present invention, turn order operation is the scheduling operation for needing concentrator station to carry out on the one hand, and mainly the operation of disconnecting link, is transmitted to concentrator station by Surveillance center by instruction.Be after operation order carries out safety check on the other hand, operate by concentrator station is unified.
By concentrator station to operation order unified operate before, the topological anti-error function of real-time calling Security Checking.In operation, meet the phenomenons such as accident, exception, anti-error verification be unsuccessful, answer shut-down operation.If during because of above-mentioned phenomena impair operation task, answer report schedule, and remodify operation order according to traffic order; Due to Equipment can not operate time, answer shut-down operation, check reason, answer report schedule and production management department when can not process.Prohibit the use improper method operating equipment by force, effectively reduce the generation of faulty operation, improve the security of operation order operation.
After having operated, all information records that intelligent monitoring operation order implementation is produced, as the content of policer operation ticket, intend the personal informations such as ticket people, person approving, guardian, executor, traffic order switching record etc., scheduling information management system carries out synchronizing information, scheduling information management system can carry out the operation such as to check of above-mentioned information, achieve the support of " the transregional office " of management and running work, " multi-region management ", improve convenience and the high efficiency of the work of management and running.
S5, judges whether there is second time switching manipulation in traffic order, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, generate second operation order, repeat step S3 ~ S4.
Yardman, according to the traffic order received, has judged whether second time switching manipulation, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, generate second operation order, repeat step S3 ~ S4, Security Checking is carried out to second operation order, the operation order that check is passed through is transmitted to concentrator station unification to operate, all information records produced is stored into scheduling information management system simultaneously in intelligent monitoring operation order implementation.
By by first time switching manipulation and second time switching manipulation generating run ticket respectively, separately carry out Security Checking, improve the security of operation, reduce the possibility making a mistake and operate, for the safe and stable operation of electrical network provides sound assurance.
In sum, intelligent monitoring operation order management method provided by the present invention, by the interactive interface with real-time SCADA system, automatic synchronization real time data section, generates current connection layout according to real time data section; Judge whether have switching manipulation in traffic order, if there is switching manipulation in traffic order, then generate first operation order, safety check is carried out to the operation order generated, and operation order is transmitted to concentrator station is unified to be operated, all information records produced in intelligent monitoring operation order implementation are stored into scheduling information management system simultaneously; Judge whether there is second time switching manipulation in traffic order, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, generate second operation order, safe school and synchronizing information re-started to second operation order.Achieve and the Security Checking in the combination of D5000 system figure and model and policer operation process, substantially increase efficiency and the lean management level of electric power system dispatching signalman, by traffic order is generated operation order and second this operation order for the first time respectively according to switching manipulation, separately carry out Security Checking, improve the security of operation, reduce the possibility of the operation that makes a mistake.
Above intelligent monitoring operation order management method provided by the present invention and system thereof are described in detail.For one of ordinary skill in the art, to any apparent change that it does under the prerequisite not deviating from connotation of the present invention, all by formation to infringement of patent right of the present invention, corresponding legal liabilities will be born.

Claims (9)

1. an intelligent monitoring operation order management method, is characterized in that comprising the steps:
S1, by the interactive interface with real-time SCADA system, synchronous real time data section, generates current connection layout according to real time data section; Judge whether have switching manipulation in traffic order, if there is no switching manipulation in traffic order, then turn to step S4; Otherwise, turn to step S2;
S2, according to current state and the dbjective state of current connection layout and equipment to be operated, generates first operation order;
S3, carries out safety check to the operation order generated, if not by safety check, forbids carrying out operation order operation; Otherwise, turn to step S4;
S4, is transmitted to concentrator station unification and operates, all information records produced are stored into scheduling information management system simultaneously in intelligent monitoring operation order implementation by operation order;
S5, judges whether there is second time switching manipulation in traffic order, if there is no second time switching manipulation, then the management of policer operation ticket terminates; Otherwise, generate second operation order, repeat step S3 ~ S4.
2. intelligent monitoring operation order management method as claimed in claim 1, is characterized in that:
The mode of generating run ticket comprises intelligence and becomes ticket to become ticket with phrase.
3. intelligent monitoring operation order management method as claimed in claim 2, is characterized in that:
Select target state on the equipment that described intelligence becomes ticket to show at current connection layout, according to current state and dbjective state generating run instruction on operation order of equipment;
Described phrase becomes ticket to adopt automatic semantic matches technology, by selecting plant stand, operand and mode of operation, generating run instruction on operation order.
4. intelligent monitoring operation order management method as claimed in claim 1, is characterized in that:
In step s3, safety check comprises topological anti-error School Affairs tidal current analysis verification.
5. intelligent monitoring operation order management method as claimed in claim 4, is characterized in that:
Whether the nominal value content of the anti-error verification of described topology to operation order reaches operation object and whether operational order meets anit-misoperation rules and verify;
Described tidal current analysis verifies the power flow changing in the electric system caused by the operational order of checked operation ticket, and whether verification operation result can bring circuit heavy duty or out-of-limit.
6. intelligent monitoring operation order management method as claimed in claim 1, is characterized in that:
In step s 4 which, before operation order being transmitted to concentrator station is unified and operating, topological anti-error verification is carried out to operation order.
7. an intelligent monitoring operation ticket management system, for realizing the intelligent monitoring operation order management method that profit requires described in 1, it is characterized in that comprising policer operation ticket workflow management unit, in real time SCADA system interactive unit, Security Checking interface unit, scheduling information management system interactive unit;
Wherein, described policer operation ticket workflow management unit is used for according to traffic order generating run ticket, the examination & verification of line operate ticket of going forward side by side;
Synchronizing information in order to carry out the real-time synchronization of electric network model, figure and real time data, and is sent to described policer operation ticket workflow management unit by described real-time SCADA system interactive unit;
Described Security Checking interface unit is checked in order to the operation order generated described policer operation ticket workflow management unit;
Described scheduling information management system interactive unit is in order to synchronous and check that described policer operation ticket workflow management unit to carry out whole recorded informations of processing procedure to traffic order.
8. intelligent monitoring operation ticket management system as claimed in claim 7, is characterized in that:
Described policer operation ticket workflow management unit comprises the first operator unit, the second operator unit and returns makes subelement;
Wherein, described first operator unit is in order to carry out plan ticket, examination & verification and verification to first time switching manipulation;
Described second operator unit is in order to carry out plan ticket, examination & verification and verification to second time switching manipulation;
Described yardman returns and makes subelement in order to after operation completes, and according to traffic order, operating result is carried out synchronizing information to scheduling information management system.
9. intelligent monitoring operation ticket management system as claimed in claim 7, is characterized in that:
Described Security Checking interface unit, comprises topological anti-error correction verification module and tidal current analysis correction verification module;
Wherein, whether the anti-error correction verification module of described topology meets anit-misoperation rules in order to the operational order in verification operation ticket;
Power flow changing in the electric system that described tidal current analysis correction verification module causes in order to the operational order of checked operation ticket, whether verification operation result can bring circuit heavy duty or out-of-limit.
CN201510388501.6A 2015-07-03 2015-07-03 An intelligent monitoring operation ticket management method and a system thereof Pending CN104933535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510388501.6A CN104933535A (en) 2015-07-03 2015-07-03 An intelligent monitoring operation ticket management method and a system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510388501.6A CN104933535A (en) 2015-07-03 2015-07-03 An intelligent monitoring operation ticket management method and a system thereof

Publications (1)

Publication Number Publication Date
CN104933535A true CN104933535A (en) 2015-09-23

Family

ID=54120693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510388501.6A Pending CN104933535A (en) 2015-07-03 2015-07-03 An intelligent monitoring operation ticket management method and a system thereof

Country Status (1)

Country Link
CN (1) CN104933535A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105611247A (en) * 2015-12-25 2016-05-25 国网浙江省电力公司丽水供电公司 Visual operation full-process monitoring method
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket
CN106296467A (en) * 2016-08-31 2017-01-04 金现代信息产业股份有限公司 A kind of method generating operation order
CN106787195A (en) * 2016-12-23 2017-05-31 国网浙江省电力公司衢州供电公司 A kind of regulation and control one operation ticket system that lock module is unblocked with safety
CN108921724A (en) * 2018-06-04 2018-11-30 国网浙江省电力有限公司温州供电公司 A kind of distribution grid operation ticket management method
CN109740837A (en) * 2018-11-20 2019-05-10 海南电网有限责任公司 Based on regulating and controlling integrated power grid and save ground network to issue an order and safe related function method
CN109978301A (en) * 2017-12-28 2019-07-05 广东电网有限责任公司电力调度控制中心 A kind of Dispatching anti-misoperation method
CN110086251A (en) * 2019-03-29 2019-08-02 国网山东省电力公司邹城市供电公司 A kind of monitoring method and system improving electric grid operating safety
CN110930066A (en) * 2019-12-09 2020-03-27 泰豪软件股份有限公司 Artificial intelligence technology optimized scheduling switching operation system
CN111968009A (en) * 2020-07-29 2020-11-20 国网山东省电力公司德州市陵城区供电公司 PDPC-based power grid intelligent operation instruction ticket booking method and system
CN112348475A (en) * 2020-11-11 2021-02-09 国网浙江省电力有限公司检修分公司 Operation task generation method and device of power system
CN112508384A (en) * 2020-12-03 2021-03-16 广东电网有限责任公司 Visual automatic monitoring equipment and method for power dispatching operation ticket
CN112990765A (en) * 2021-04-16 2021-06-18 广东电网有限责任公司 Power grid dispatching operation ticket management system
CN113765100A (en) * 2021-09-10 2021-12-07 国网上海市电力公司 Power grid fault processing system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893867A (en) * 2010-07-27 2010-11-24 广东电网公司中山供电局 Operation ticket management system and method
CN103023152A (en) * 2012-12-21 2013-04-03 上海市电力公司 N-1 Cut-off scanning on-line computing system capable of considering autotomy cooperation
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN103729734A (en) * 2013-12-19 2014-04-16 国家电网公司 Distribution network intelligent operation ticket issuing system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101893867A (en) * 2010-07-27 2010-11-24 广东电网公司中山供电局 Operation ticket management system and method
CN103023152A (en) * 2012-12-21 2013-04-03 上海市电力公司 N-1 Cut-off scanning on-line computing system capable of considering autotomy cooperation
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN103729734A (en) * 2013-12-19 2014-04-16 国家电网公司 Distribution network intelligent operation ticket issuing system

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105611247B (en) * 2015-12-25 2018-09-25 国网浙江省电力公司丽水供电公司 Visualized operation whole process supervision method
CN105611247A (en) * 2015-12-25 2016-05-25 国网浙江省电力公司丽水供电公司 Visual operation full-process monitoring method
CN106157167A (en) * 2016-07-06 2016-11-23 北京四方继保自动化股份有限公司 A kind of secondary device remote manipulation bill system and the implementation method of secondary device remote operation ticket
CN106157167B (en) * 2016-07-06 2020-02-14 北京四方继保自动化股份有限公司 Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN106296467A (en) * 2016-08-31 2017-01-04 金现代信息产业股份有限公司 A kind of method generating operation order
CN106296467B (en) * 2016-08-31 2019-04-09 金现代信息产业股份有限公司 A method of generating operation order
CN106787195B (en) * 2016-12-23 2019-11-15 国网浙江省电力有限公司衢州供电公司 A kind of regulation one operation ticket system and its method unblocking lock module with safety
CN106787195A (en) * 2016-12-23 2017-05-31 国网浙江省电力公司衢州供电公司 A kind of regulation and control one operation ticket system that lock module is unblocked with safety
CN109978301A (en) * 2017-12-28 2019-07-05 广东电网有限责任公司电力调度控制中心 A kind of Dispatching anti-misoperation method
CN108921724A (en) * 2018-06-04 2018-11-30 国网浙江省电力有限公司温州供电公司 A kind of distribution grid operation ticket management method
CN109740837A (en) * 2018-11-20 2019-05-10 海南电网有限责任公司 Based on regulating and controlling integrated power grid and save ground network to issue an order and safe related function method
CN109740837B (en) * 2018-11-20 2023-07-07 海南电网有限责任公司 Power grid province and land network command and safety error prevention method based on regulation and control integration
CN110086251A (en) * 2019-03-29 2019-08-02 国网山东省电力公司邹城市供电公司 A kind of monitoring method and system improving electric grid operating safety
CN110930066A (en) * 2019-12-09 2020-03-27 泰豪软件股份有限公司 Artificial intelligence technology optimized scheduling switching operation system
CN111968009A (en) * 2020-07-29 2020-11-20 国网山东省电力公司德州市陵城区供电公司 PDPC-based power grid intelligent operation instruction ticket booking method and system
CN111968009B (en) * 2020-07-29 2021-05-18 国网山东省电力公司德州市陵城区供电公司 PDPC-based power grid intelligent operation instruction ticket booking method and system
CN112348475A (en) * 2020-11-11 2021-02-09 国网浙江省电力有限公司检修分公司 Operation task generation method and device of power system
CN112508384A (en) * 2020-12-03 2021-03-16 广东电网有限责任公司 Visual automatic monitoring equipment and method for power dispatching operation ticket
CN112990765A (en) * 2021-04-16 2021-06-18 广东电网有限责任公司 Power grid dispatching operation ticket management system
CN112990765B (en) * 2021-04-16 2022-10-21 广东电网有限责任公司 Power grid dispatching operation order management system
CN113765100A (en) * 2021-09-10 2021-12-07 国网上海市电力公司 Power grid fault processing system and method

Similar Documents

Publication Publication Date Title
CN104933535A (en) An intelligent monitoring operation ticket management method and a system thereof
CN109740837B (en) Power grid province and land network command and safety error prevention method based on regulation and control integration
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN106953918B (en) Master-slave station programmed control system and method based on universal service protocol
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN110956357A (en) Intelligent regulation and control networked interaction system applied to power company
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
CN110676931A (en) Switching operation whole-network whole-process anti-misoperation locking method
CN104036348A (en) Electronic mobile operation order system
CN105894172A (en) Joint outage judging method based on marketing and distribution fusion
CN110336375A (en) A kind of processing method and system of power system monitor warning information
CN109634243A (en) A kind of scheduler program operating system based on intelligent robot
CN104915750A (en) Intelligent operation ticket management method and system for achieving integration with an EMS and an OMS
CN102255389B (en) Method for implementing intensive intelligent substation based on intelligent power grid system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN108233536A (en) A kind of intelligent program remote handling system
CN102957205A (en) Method and system for establishing distribution network model
CN105119237B (en) The method that relay protection operation is checked
CN111047143A (en) Power grid OMS-based regional and county team index management system
CN110728424A (en) Cloud five-prevention intelligent scheduling system
CN109659936A (en) A kind of smart grid Dispatching Control System failure method of disposal and system
CN104407577A (en) Intelligent check anti-maloperation method based on real-time trend
CN106646100B (en) A kind of Fault Locating Method of incomplete observing and controlling power distribution network
CN104881726A (en) Method for realizing integration of regulation-control operation order and on-line combined calculation
CN106570775A (en) Power grid fault countermeasure plan combining compilation method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Yang Zhigang

Inventor after: Zhang Yu

Inventor after: Zhang Rui

Inventor after: Hao Dongsheng

Inventor after: Yao Dong

Inventor after: Liu Xiaopeng

Inventor after: Liu Ranjie

Inventor after: He Hongliang

Inventor after: Wang Guannan

Inventor after: Ji Zhen

Inventor after: Lou Lingjun

Inventor after: Liu Xiaomin

Inventor after: Chen Lan

Inventor after: Jiang Chenlin

Inventor after: Kang Wei

Inventor after: Dai Yang

Inventor after: Yan Hequn

Inventor after: Zhang Hao

Inventor after: Song Qingchang

Inventor after: Chen Dawei

Inventor after: Xie Liang

Inventor after: Li Gang

Inventor after: Li Pengyuan

Inventor after: Zhao Kun

Inventor after: Jia Wenzhao

Inventor after: Di Bingxu

Inventor after: Min Rui

Inventor after: Deng Jingchao

Inventor after: Wang Xinze

Inventor after: Fu Wei

Inventor after: Li Jing

Inventor after: Wang Dongli

Inventor after: Liu Jianqiang

Inventor after: Li Guotong

Inventor after: Xu Wenqiang

Inventor after: Wang Xiaofeng

Inventor before: Yang Zhigang

Inventor before: Yan Hequn

Inventor before: Zhang Hao

Inventor before: Song Qingchang

Inventor before: Xie Liang

Inventor before: Chen Dawei

Inventor before: Li Gang

Inventor before: Zhao Kun

Inventor before: Jia Wenzhao

Inventor before: Min Rui

Inventor before: Deng Jingchao

Inventor before: Liu Xiaomin

Inventor before: Wang Xinze

Inventor before: Lou Lingjun

Inventor before: Xu Wenqiang

Inventor before: Wang Xiaofeng

Inventor before: Zhang Yu

Inventor before: Zhang Rui

Inventor before: Hao Dongsheng

Inventor before: Yao Dong

Inventor before: Liu Xiaopeng

Inventor before: Liu Ranjie

Inventor before: Li Pengyuan

Inventor before: He Hongliang

Inventor before: Wang Guannan

Inventor before: Ji Zhen

Inventor before: Chen Lan

Inventor before: Jiang Chenlin

Inventor before: Fu Wei

Inventor before: Wang Dongli

Inventor before: Liu Jianqiang

Inventor before: Li Guotong

Inventor before: Kang Wei

Inventor before: Dai Yang

Inventor before: Li Jing

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150923

RJ01 Rejection of invention patent application after publication