CN104158294A - Dispatching anti-misoperation control method - Google Patents

Dispatching anti-misoperation control method Download PDF

Info

Publication number
CN104158294A
CN104158294A CN201410427171.2A CN201410427171A CN104158294A CN 104158294 A CN104158294 A CN 104158294A CN 201410427171 A CN201410427171 A CN 201410427171A CN 104158294 A CN104158294 A CN 104158294A
Authority
CN
China
Prior art keywords
error
misoperation
dispatching
scheduling
service module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410427171.2A
Other languages
Chinese (zh)
Other versions
CN104158294B (en
Inventor
龙家焕
石祖昌
方赟
蒋朝阳
蒋友权
邹贤兵
高卫华
宋朝晟
王成武
曹俊
程健
徐璟
郭建
葛欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Kaili power supply bureau
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kaili power supply bureau, Nari Technology Co Ltd filed Critical Kaili power supply bureau
Priority to CN201410427171.2A priority Critical patent/CN104158294B/en
Publication of CN104158294A publication Critical patent/CN104158294A/en
Application granted granted Critical
Publication of CN104158294B publication Critical patent/CN104158294B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Abstract

The invention discloses a dispatching anti-misoperation control method, and a three-level anti-misoperation system including a dispatching system, a transformer substation and an on-site closing and locking unit is built. The dispatching system sends a remote-control unlocking request to a dispatching anti-misoperation service module when carrying out remote-control operation; the dispatching anti-misoperation service module sends an unlocking instruction to a transformer substation anti-misoperation server after checking the remote-control unlocking request; the transformer substation anti-misoperation server unlocks the closing and locking unit of corresponding equipment after receiving the unlocking request sent by the dispatching anti-misoperation service module; the on-site equipment closing and locking unit is unlocked, and dispatching remote-control operation is executed. The dispatching anti-misoperation control method guarantees smooth execution of a dispatching remote-control operation request and guarantees safety of dispatching remote-control operation to the maximum extent.

Description

A kind of scheduling anti-misoperation control method
Technical field
The invention belongs to electrical network control technique field, particularly a kind of scheduling anti-misoperation control method.
Background technology
Dispatching of power netwoks and plant stand are monitored the development trend that integrated integration is operation of power networks and control within the scope of our times.All the time, scheduling misoperation fault is all one of major hidden danger of power grid security, stable operation.Along with increasing plant stand operation regulates and controls centralized telecontrol by electrical network, carry out, the anti-error technology of scheduling handling safety is had higher requirement.
Summary of the invention
The invention provides a kind of scheduling anti-misoperation control method, set up scheduling, transformer station, three grades of anti-error systems of on-the-spot locking unit.
The technical solution adopted in the present invention is as follows:
A kind of scheduling anti-misoperation control method, comprises the following steps:
(1) dispatching patcher is carried out before certain straighforward operation, sends remote controlled unlocking request to dispatching anti-error service module;
(2) dispatch anti-error service module and carry out anti-error check;
(3) anti-error check issues unlocking request to the anti-error server of transformer station by dispatching anti-error service module; Otherwise, return to quiescing message to dispatching patcher;
(4) the anti-error server of transformer station sends unlocking request to on-the-spot anti-misoperation locking unit, the on-the-spot anti-misoperation locking of release unit;
(5), after the locking unit release of field apparatus success, dispatching patcher issues guidance command to monitoring system of electric substation, transformer station measurement and control device outlet, and field apparatus is carried out to straighforward operation; Otherwise the anti-error server of transformer station sends the unit release of on-the-spot anti-misoperation locking and unsuccessfully replys to the anti-error service module of scheduling, EO;
(6) dispatch anti-error service module according to the displacement signal of field apparatus, confirm whether field apparatus operates successfully, if there is displacement in operated field apparatus, the locking unit of locking field apparatus; If there is not displacement in operated field apparatus, the overtime rear automatic blocking in on-the-spot anti-misoperation locking unit.
The anti-error service module of aforesaid scheduling is the module hanging on the service bus of dispatching patcher, by the release message of messaging bus receiving scheduling system.
The anti-error service module of aforesaid scheduling is an independently system, by communication interface, and the release message of receiving scheduling system.
In aforesaid step (2), dispatch the anti-error check criterion that anti-error service module carries out anti-error check and comprise transformer station's proofing rules and the anti-error rule of network topology; The anti-error rule of described network topology comprises closes grounding switch or earth connection rule, closes isolating switch rule; Describedly close grounding switch or earth connection rule refers to while closing grounding switch or earth connection, the all directions search that requirement is extended along earth point topology, if there is the charging equipment in closing position in searching route, close so grounding switch or earth connection attendant exclusion, the isolating switch pulling open as run into or circuit breaker, or the charging equipment in closing position, the search of this direction finishes; The described isolating switch rule of closing refers to while closing isolating switch, requirement is along the topological bearing of trend search at isolating switch two ends, if there is grounding switch or the earth connection in closing position in searching route, closing so isolator operation forbids, the isolating switch pulling open as run into or circuit breaker, the search of this direction finishes.
Aforesaid step (3) is dispatched link layer transmission between the anti-error server of anti-error service module and transformer station and is realized by bottom-layer network ICP/IP protocol subset RFC2200, to dispatch anti-error service module as service end, using the anti-error server of transformer station as client, through power dispatch data network, realize the transmission of link layer.
The port numbers that aforesaid TCP connects is configurable, and the anti-error server of Yi Ge transformer station is only used a port numbers.
The IP address of the anti-error server of aforesaid all transformer stations is distributed unitedly by dispatching patcher, and the anti-error server of transformer station is provided by the data network unit of management/department to the route of different dispatching patchers.
In aforesaid step (4) between the anti-error server of transformer station and field apparatus locking unit in Substation Station data network, employing udp protocol communicates, the anti-error server of transformer station sends unlock command in the mode of broadcast, and field apparatus locking unit receives that the unlock command of this locking unit removes this locking unit.
The present invention, when guaranteeing that dispatching remote control operation requests is able to carry out smoothly, can ensure the fail safe of dispatching remote control operation to the full extent.
Accompanying drawing explanation
Fig. 1 is anti-error architectural schematic of the present invention;
Fig. 2 is that method flow diagram is controlled in scheduling anti-misoperation of the present invention.
Embodiment
Now describe the present invention in detail with embodiment by reference to the accompanying drawings.
As shown in Figure 1, the present invention has set up scheduling, transformer station, the anti-error system in three grades of on-the-spot anti-misoperation locking unit, dispatch anti-error service module and provide anti-error check service for dispatching patcher, that dispatching remote control operation is separated, the policymaker of locking, dispatching patcher is dispatched anti-error service module at straighforward operation forward direction and is sent unlocking request, dispatches anti-error service module and returns to release and reply; The anti-error server of transformer station is the bridge between the anti-error service module of scheduling and on-the-spot anti-misoperation locking unit, be responsible for the unlocking request of dispatching patcher to be issued to on-the-spot anti-misoperation locking unit, the release of on-the-spot anti-misoperation locking unit replied, unblocked on state and deliver to the anti-error service module of scheduling; On-the-spot anti-misoperation locking unit is that dispatching remote control operation is separated, the executor of locking, and the controllable device of being responsible for keeping the scene intact, prevents mistake control.During on-the-spot anti-misoperation locking unit release, on-the-spot controllable device can remote control, and during the locking of on-the-spot anti-misoperation locking unit, on-the-spot controllable device cannot remote control.
As described in Figure 2, scheduling anti-misoperation control method of the present invention comprises the following steps:
Step 1, dispatching patcher are carried out before certain straighforward operation, send remote controlled unlocking request to dispatching anti-error service module.For example, in Fig. 2, dispatching patcher carries out, before switch tool straighforward operation control operation, to the anti-error service module of scheduling, sending remote controlled unlocking request.
Wherein, dispatch anti-error service module and can be used as a functional module and hang on the service bus of dispatching patcher, by the release message of messaging bus receiving scheduling system; Or dispatch anti-error service module and can be used as an independently system, by communication interface, the release message of receiving scheduling system.
Step 2, dispatch anti-error service module and carry out anti-error check;
Dispatch anti-error service module and carry out anti-error check according to current operational mode, judge whether this straighforward operation is allowed to.The anti-error check criterion of carrying out anti-error check comprises transformer station's proofing rules and the anti-error rule of network topology.Wherein the anti-error rule of network topology comprises and closes grounding switch or earth connection, closes the general rules such as isolating switch.Closing grounding switch or earth connection rule refers to while closing grounding switch or earth connection, the all directions search that requirement is extended along earth point topology, if there is the charging equipment in closing position in searching route, close so grounding switch or earth connection attendant exclusion, the isolating switch pulling open as run into or circuit breaker or the charging equipment in closing position, the search of this direction finishes; Closing isolating switch rule refers to while closing isolating switch, requirement is along the topological bearing of trend search at isolating switch two ends, if there is grounding switch or the earth connection in closing position in searching route, closing so isolator operation forbids, the isolating switch pulling open as run into or circuit breaker, the search of this direction finishes.
Step 3, anti-error check issue unlocking request to the anti-error server of transformer station by dispatching anti-error service module; Otherwise, return to quiescing message to dispatching patcher;
Dispatching link layer transmission between the anti-error server of anti-error service module and transformer station is realized by bottom-layer network ICP/IP protocol subset (RFC2200), the anti-error service module of scheduling is considered as to service end, the anti-error server of transformer station is considered as to client, through power dispatch data network, realizes the transmission of link layer.The port numbers of using TCP to connect is configurable, and the anti-error server of Yi Ge transformer station is only used a port numbers.The IP address of the anti-error server of all transformer stations is distributed unitedly by dispatching patcher, and the anti-error server of transformer station should be provided by the data network unit of management/department to the route of dispatching patcher.
Step 4, the anti-error server of transformer station send unlocking request to on-the-spot anti-misoperation locking unit, the on-the-spot anti-misoperation locking of release unit.
Between the anti-error server of transformer station and field apparatus locking unit in Substation Station data network, adopt udp protocol to communicate.The anti-error server of transformer station sends unlock command in the mode of broadcast, and field apparatus locking unit receives that the unlock command of this locking unit removes this locking unit.
After the locking unit release success of step 5, field apparatus, dispatching patcher issues guidance command to monitoring system of electric substation, transformer station measurement and control device outlet, and field apparatus is carried out to straighforward operation; In Fig. 2, after release success, dispatching patcher is carried out the preset selection of switch tool remote control and is carried out switch tool straighforward operation.Otherwise the anti-error server of transformer station sends the unit release of on-the-spot anti-misoperation locking and unsuccessfully replys to the anti-error service module of scheduling, EO.
Step 6, dispatch anti-error service module according to the displacement signal of field apparatus, confirm whether field apparatus operates successfully.
If there is displacement in operated field apparatus, dispatch anti-error service module and issue locking request to the anti-error server of transformer station, by the anti-error server of transformer station, issue locking request to on-the-spot anti-misoperation locking unit, the on-the-spot anti-misoperation locking of locking unit; If there is not displacement in operated field apparatus, the overtime rear automatic blocking in on-the-spot anti-misoperation locking unit.
Although content of the present invention has been done detailed introduction by embodiment, will be appreciated that foregoing description should not be considered to limitation of the present invention.Those skilled in the art, read after foregoing, it is all very easy for the part of thinking of the present invention, revising and explain and replace.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (8)

1. a scheduling anti-misoperation control method, is characterized in that, comprises the following steps:
(1) dispatching patcher is carried out before certain straighforward operation, sends remote controlled unlocking request to dispatching anti-error service module;
(2) dispatch anti-error service module and carry out anti-error check;
(3) anti-error check issues unlocking request to the anti-error server of transformer station by dispatching anti-error service module; Otherwise, return to quiescing message to dispatching patcher;
(4) the anti-error server of transformer station sends unlocking request to on-the-spot anti-misoperation locking unit, the on-the-spot anti-misoperation locking of release unit;
(5), after the locking unit release of field apparatus success, dispatching patcher issues guidance command to monitoring system of electric substation, transformer station measurement and control device outlet, and field apparatus is carried out to straighforward operation; Otherwise the anti-error server of transformer station sends the unit release of on-the-spot anti-misoperation locking and unsuccessfully replys to the anti-error service module of scheduling, EO;
(6) dispatch anti-error service module according to the displacement signal of field apparatus, confirm whether field apparatus operates successfully, if there is displacement in operated field apparatus, the locking unit of locking field apparatus; If there is not displacement in operated field apparatus, the overtime rear automatic blocking in on-the-spot anti-misoperation locking unit.
2. a kind of scheduling anti-misoperation control method according to claim 1, is characterized in that, the anti-error service module of described scheduling is the module hanging on the service bus of dispatching patcher, by the release message of messaging bus receiving scheduling system.
3. a kind of scheduling anti-misoperation control method according to claim 1, is characterized in that, the anti-error service module of described scheduling is an independently system, by communication interface, and the release message of receiving scheduling system.
4. a kind of scheduling anti-misoperation control method according to claim 1, is characterized in that, in described step (2), dispatches the anti-error check criterion that anti-error service module carries out anti-error check and comprises transformer station's proofing rules and the anti-error rule of network topology; The anti-error rule of described network topology comprises closes grounding switch or earth connection rule, closes isolating switch rule; Describedly close grounding switch or earth connection rule refers to while closing grounding switch or earth connection, the all directions search that requirement is extended along earth point topology, if there is the charging equipment in closing position in searching route, close so grounding switch or earth connection attendant exclusion, the isolating switch pulling open as run into or circuit breaker, or the charging equipment in closing position, the search of this direction finishes; The described isolating switch rule of closing refers to while closing isolating switch, requirement is along the topological bearing of trend search at isolating switch two ends, if there is grounding switch or the earth connection in closing position in searching route, closing so isolator operation forbids, the isolating switch pulling open as run into or circuit breaker, the search of this direction finishes.
5. a kind of scheduling anti-misoperation control method according to claim 1, it is characterized in that, described step (3) is dispatched link layer transmission between the anti-error server of anti-error service module and transformer station and is realized by bottom-layer network ICP/IP protocol subset RFC2200, to dispatch anti-error service module as service end, using the anti-error server of transformer station as client, through power dispatch data network, realize the transmission of link layer.
6. a kind of scheduling anti-misoperation control method according to claim 5, is characterized in that, the port numbers that described TCP connects is configurable, and the anti-error server of Yi Ge transformer station is only used a port numbers.
7. a kind of scheduling anti-misoperation control method according to claim 5, it is characterized in that, the IP address of the anti-error server of described all transformer stations is distributed unitedly by dispatching patcher, and the anti-error server of transformer station is provided by the data network unit of management/department to the route of different dispatching patchers.
8. a kind of scheduling anti-misoperation control method according to claim 1, it is characterized in that, in described step (4) between the anti-error server of transformer station and field apparatus locking unit in Substation Station data network, employing udp protocol communicates, the anti-error server of transformer station sends unlock command in the mode of broadcast, and field apparatus locking unit receives that the unlock command of this locking unit removes this locking unit.
CN201410427171.2A 2014-08-27 2014-08-27 One kind scheduling anti-misoperation control method Active CN104158294B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410427171.2A CN104158294B (en) 2014-08-27 2014-08-27 One kind scheduling anti-misoperation control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410427171.2A CN104158294B (en) 2014-08-27 2014-08-27 One kind scheduling anti-misoperation control method

Publications (2)

Publication Number Publication Date
CN104158294A true CN104158294A (en) 2014-11-19
CN104158294B CN104158294B (en) 2017-06-20

Family

ID=51883735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410427171.2A Active CN104158294B (en) 2014-08-27 2014-08-27 One kind scheduling anti-misoperation control method

Country Status (1)

Country Link
CN (1) CN104158294B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104467183A (en) * 2014-12-04 2015-03-25 国家电网公司 Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN105373024A (en) * 2015-11-26 2016-03-02 积成电子股份有限公司 Transformer substation monitoring system remote control error prevention mechanism
CN105406603A (en) * 2015-12-31 2016-03-16 国网浙江省电力公司温州供电公司 Power grid adjustment and control end anti-misoperation locking method
CN106059088A (en) * 2016-07-20 2016-10-26 哈尔滨理工大学 Wireless remote control security control system for distribution network transformer area
CN106549493A (en) * 2015-09-23 2017-03-29 珠海优特电力科技股份有限公司 Transformer station's error-unlocking prevention control device and control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951032A (en) * 2010-10-14 2011-01-19 北京四方继保自动化股份有限公司 Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN102738892A (en) * 2011-04-12 2012-10-17 河海大学 Realization method of intelligent anti-error system of transformer substation based on IEC61850
JP5115191B2 (en) * 2007-12-28 2013-01-09 東京電力株式会社 Power equipment misoperation prevention system
CN203312917U (en) * 2013-06-21 2013-11-27 四川省电力公司巴中电业局 Anti-misoperation locking system of centralized control substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5115191B2 (en) * 2007-12-28 2013-01-09 東京電力株式会社 Power equipment misoperation prevention system
CN101951032A (en) * 2010-10-14 2011-01-19 北京四方继保自动化股份有限公司 Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN102738892A (en) * 2011-04-12 2012-10-17 河海大学 Realization method of intelligent anti-error system of transformer substation based on IEC61850
CN203312917U (en) * 2013-06-21 2013-11-27 四川省电力公司巴中电业局 Anti-misoperation locking system of centralized control substation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104467183A (en) * 2014-12-04 2015-03-25 国家电网公司 Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN106549493A (en) * 2015-09-23 2017-03-29 珠海优特电力科技股份有限公司 Transformer station's error-unlocking prevention control device and control method
CN106549493B (en) * 2015-09-23 2020-08-04 珠海优特电力科技股份有限公司 Transformer substation anti-misoperation unlocking control device and control method
CN105373024A (en) * 2015-11-26 2016-03-02 积成电子股份有限公司 Transformer substation monitoring system remote control error prevention mechanism
CN105373024B (en) * 2015-11-26 2018-07-03 积成电子股份有限公司 A kind of monitoring system of electric substation is remotely controlled anti-error mechanism
CN105406603A (en) * 2015-12-31 2016-03-16 国网浙江省电力公司温州供电公司 Power grid adjustment and control end anti-misoperation locking method
CN105406603B (en) * 2015-12-31 2018-04-06 国网浙江省电力公司温州供电公司 A kind of power grid regulation end anti-incorrect manipulation deadlock method
CN106059088A (en) * 2016-07-20 2016-10-26 哈尔滨理工大学 Wireless remote control security control system for distribution network transformer area

Also Published As

Publication number Publication date
CN104158294B (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN104600849B (en) Intelligent grid boss stands Layered Security anti-error system implementation method
CN104158294A (en) Dispatching anti-misoperation control method
CN103679350A (en) Power grid switching operation ticket automatic generating system and method
CN101951032B (en) Method of realizing dynamic error-prevention function of transformer substation by monitoring and controlling unit
CN106204829B (en) Lockset wireless control system and method
CN104467183A (en) Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN101813928B (en) Automated one-machine multiple-station intelligent five-defense system of energy system transformer substation
CN110138092A (en) Transformer substation sequence control system and method with regulation main website Security Checking function
CN201898375U (en) Intelligent, integrated and comprehensive mal-operation preventing system of distribution network
CN105406603A (en) Power grid adjustment and control end anti-misoperation locking method
CN106160219A (en) The monitoring method of remote forced monitoring system for transformer station switching operation
CN104636986A (en) Dispatching remote safety remote control checking method based on service
CN106208372A (en) Based on visualization and the switch remote operation method of anti-error topological analysis comprehensively
CN104580148A (en) Method for simple data interaction between electric power region I and electric power III by using reserve 1bit data of forward direction isolating device
CN101661283B (en) System for completing sequential control by intelligent one-key operation
CN106685085A (en) Remote-programmed operation system in power grid dispatching
CN109728645A (en) A kind of power scheduling method for preventing misoperation and its system
CN105446202B (en) A kind of anti-control system of substation five
CN104954168B (en) A kind of communication failure navigation system based on packet parsing
CN107359702A (en) Intelligent linkage Interlocking Methods based on IES700 systems
CN102064609B (en) 500kV unmanned transformer station-based remote control method for protective soft pressing plate
CN106655484B (en) Error preventing system based on wireless unlocking mode and control method thereof
CN108919770A (en) Substation operation status information centralized monitoring system
CN105449857B (en) The anti-electric gas-tight lock system of ground control and method
CN106549493B (en) Transformer substation anti-misoperation unlocking control device and control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220803

Address after: No.17 Binhe Road, Nanming District, Guiyang City, Guizhou Province

Patentee after: Guizhou Power Grid Co.,Ltd.

Address before: 556000 No.3, Ningbo West Road, Kaili City, Qiandongnan Miao and Dong Autonomous Prefecture, Guizhou Province

Patentee before: KAILI POWER SUPPLY BUREAU

Patentee before: NARI TECHNOLOGY Co.,Ltd.