CN106160219A - The monitoring method of remote forced monitoring system for transformer station switching operation - Google Patents

The monitoring method of remote forced monitoring system for transformer station switching operation Download PDF

Info

Publication number
CN106160219A
CN106160219A CN201610555553.2A CN201610555553A CN106160219A CN 106160219 A CN106160219 A CN 106160219A CN 201610555553 A CN201610555553 A CN 201610555553A CN 106160219 A CN106160219 A CN 106160219A
Authority
CN
China
Prior art keywords
transformer station
guardian
monitoring
operated
computer key
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610555553.2A
Other languages
Chinese (zh)
Other versions
CN106160219B (en
Inventor
王修庞
曾历
王晓红
徐恩甫
李中渊
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201610555553.2A priority Critical patent/CN106160219B/en
Publication of CN106160219A publication Critical patent/CN106160219A/en
Application granted granted Critical
Publication of CN106160219B publication Critical patent/CN106160219B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0013
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses the monitoring method of a kind of remote forced monitoring system for transformer station switching operation, make out an invoice through simulation preview in transformer station, in incoming for the sequence of operation of operation order computer key, in the client computer of transformer station, the nominal value form according to standard shows operation order;Personnel to be operated are to after device context, computer key is sent short messages and notifies care provider, care provider carries out authorization by radio communication to on-the-spot computer key in the client of transformer station, after the solution lock key of operator receives the unblock instruction that transformer station guardian sends, current operating procedure could be carried out on-the-spot unlocking operation, automatically operating result is passed back transformer station after having operated, wait that the guardian of transformer station confirms;Through guardian confirm errorless after, send next step operational order, execute-in-place people just can carry out next step operation, so circulates, until whole operation order terminates;After having operated, using in incoming for the operating result of computer key system as storage of history data P, thus ensure that every single stepping of execute-in-place people is all carried out under centralized control center guardian authorizes monitoring.

Description

The monitoring method of remote forced monitoring system for transformer station switching operation
Technical field
The invention belongs to automation of transformation substations operating technology field, be specifically related to a kind of Substation Switch Changing Operation long distance forced The monitoring method of monitor system.
Background technology
Along with electrical network develops rapidly, transformer station's quantity and converting equipment are multiplied, transformer station's attended mode the most progressively by Someone is on duty is excessively unattended or few people on duty, and the pattern of single station administration is the most gradually transformed into concentrator station management mode.Electricity Net unattended collection control operation just to be changed to the management mode of " District integrated control " by the management mode of " with big with little ", centralized control center Also by original operation monitoring, patrol and examine operation unification the pattern that arranges pattern into the two separate setting is altered in steps.Electrically Equipment by running, the operation of any state standby, maintenance the process that is changed into another state be referred to as grid switching operation.Electrical network scale Increasing, the workload of grid switching operation is the most increasing, and misoperation may cause equipment breakdown, even jeopardizes power system Safe operation.
Substation Operating remote monitoring system grows up on the basis of computer technology and the network communications technology. External in the eighties in 20th century, domestic until the most in succession occurring in that at the beginning of 21 century that Wireless microwave loads video information, remotely counts The long distance monitoring means such as word video information.But these monitoring tool, are all for research field, and in reality, application has all Many problems:
1, cost is the highest: the most each infield of its system is hundreds thousand of, and external equipment is too many, later maintenance amount Greatly;
2, cost performance is low: remote monitoring system in early days, and image is unstable, and video summarization face is smaller;
3, performance is single: can not realize the mandatory blocking function of grid switching operation, and can only carry out the station of single transformer station District's internal electronic monitoring, for the big collection control construction of current power transformation operation, the operation of few people on duty and unattended substation has the biggest Limitation;
4, poor reliability: some one-man work remote image monitoring systems, carries out long distance monitoring by phonetic image, unstable Fixed, affected by the factors such as environmental condition, emotion, personnel's randomness is bigger, after failure, it is impossible to implement online prison Measure human users's situation.
Summary of the invention
It is an object of the invention to avoid above-mentioned weak point of the prior art, and a kind of Substation Switch Changing Operation is provided , there is power grid accident, far in the monitoring method of the remote forced monitoring system for transformer station switching operation of monitoring in grid switching operation in real time Side guardian can terminate operation immediately, improves working security, it is ensured that every single stepping of execute-in-place people is all in centralized control center Guardian authorizes and carries out under monitoring, improves work efficiency, saves production cost.
Realize the purpose of the present invention and be the technical scheme is that a kind of remote forced monitoring system for transformer station switching operation Monitoring method, including following flow process: transformer station through simulation preview make out an invoice, incoming for the sequence of operation of operation order computer key In Shi, in the client computer of transformer station, the nominal value form according to standard shows operation order;Personnel to be operated are existing to equipment After Chang, sending short messages and notify care provider on computer key, care provider passes through radio communication to existing in the client of transformer station The computer key of field carries out authorization, after the solution lock key of operator receives the unblock instruction that transformer station guardian sends, Current operating procedure could be carried out on-the-spot unlocking operation, after having operated, automatically operating result be passed back transformer station, wait The guardian of transformer station confirms;Through guardian confirm errorless after, send next step operational order, under execute-in-place people just can be carried out Single stepping, so circulates, until whole operation order terminates;After having operated, incoming for the operating result of computer key system Middle as storage of history data P, when operation identifies code-locked, by note by the code value of operated equipment lockset or device numbering It is sent to centralized control center, operator's computer key is positioned.
Described system supports single multitask monitoring, multiuser-multitasking monitoring.
This invention has the benefit that
1, solve without tutorial one man operation's problem and arbitrarily operate accidents caused without guardian permit operation people Problem;
2, realize the logic blocking between difference station and station, solve interconnection and stop the operational coordination between power transmission and sending end And operational coordination between receiving end;
3, the positioning function of operator is realized;
4, a guardian can guard multiple operation task, improves work efficiency, saves production cost;
5, same guardian can effectively control electrical network, particularly interconnection operation rhythm, increases regulation and control personnel couple The control ability of electrical network;
6, occurring power grid accident during grid switching operation, distant place guardian can terminate operation immediately, and increase accident is quick Respond, grasps electric grid operating situation in real time for regulation and control one platform construction in the future and regulation and control personnel and provides support;
7, can effectively alleviate electrical network to develop rapidly and the contradiction of operator's wretched insufficiency, for power grid accident in the case of few people Fast quick-recovery be provided with barrier of trying hard to keep.
Accompanying drawing explanation
Fig. 1 is the structure chart of the present invention.
Fig. 2 is the software flow pattern of the present invention.
Detailed description of the invention
The monitoring method of the remote forced monitoring system for transformer station switching operation of the present invention, on the basis of lot of experiments, no Disconnected summing up experience, science enforcement, scientific design, Exact Analysis, thus draw native system, further below by specific embodiment Native system is described.
Embodiment one
Make out an invoice through simulation preview in centralized control center, in incoming for the sequence of operation of operation order computer key, in collection control In the client computer of the heart, the nominal value form according to standard shows operation order.Personnel to be operated are to after device context, and phone leads to Knowing the care provider of centralized control center, on-the-spot computer key is entered by care provider's client in centralized control center by radio communication Row authorization, after the solution lock key of operator receives the unblock instruction that centralized control center guardian sends, could be to current Operating procedure carries out on-the-spot unlocking operation, automatically operating result is passed back centralized control center after having operated, and waits centralized control center Guardian confirms.Through guardian confirm errorless after, send next step operational order, execute-in-place people just can carry out next step behaviour Make, so circulate, until whole operation order terminates.After having operated, using in incoming for the operating result of computer key system as Storage of history data P.
Embodiment two
Make out an invoice, in incoming for the sequence of operation of operation order computer key, in transformer station through simulation preview in transformer station In client computer, the nominal value form according to standard shows operation order.Personnel to be operated are to after device context, at computer key On send short messages and notify care provider, on-the-spot computer key is carried out by radio communication by care provider in the client of transformer station Authorization, after the solution lock key of operator receives the unblock instruction that transformer station guardian sends, could be to current operation Step carries out on-the-spot unlocking operation, automatically operating result is passed back transformer station after having operated, and waits that the guardian of transformer station is true Recognize.Through guardian confirm errorless after, send next step operational order, execute-in-place people just can carry out next step operation, so follow Ring, until whole operation order terminates.After having operated, using incoming for the operating result of computer key system is protected as historical data Deposit.
The present invention utilizes in transformer station's temperature survey by c omputer, the uniqueness of RFID code, when operation identifies code-locked, by short Believe and code value or the device numbering of operated equipment lockset are sent to centralized control center, thus realize operator's computer key location Function, namely gives correct verification equipment to be operated, and meets the front first checking apparatus numbering of operation in grid switching operation Requirement.
System combines the real-time monitoring carrying out operation screen with transformer station mobile video business, it is possible to achieve some are attached Add function, be not required to additionally increase external equipment and estimated expenditure.
Centralized control center disposes radio communication (CDMA or GPRS) center, can carry out channel radio with multiple computer keys simultaneously Letter, the relation that the system of centralized control center can be explained and distinguish between operation order and computer key, and the mandate between them are closed System.When line communication goes wrong, computer key can depart from the monitoring of centralized control center, through password authorization, carries out independent unblock Operation.

Claims (2)

1. the monitoring method of a remote forced monitoring system for transformer station switching operation, it is characterised in that: include following flow process: Transformer station makes out an invoice through simulation preview, and in incoming for the sequence of operation of operation order computer key, the client in transformer station calculates In machine, the nominal value form according to standard shows operation order;Personnel to be operated, to after device context, send short messages logical on computer key Knowing care provider, care provider carries out authorization by radio communication to on-the-spot computer key in the client of transformer station, After the solution lock key of operator receives the unblock instruction that transformer station guardian sends, current operating procedure could be carried out existing Field unlocking operation, passes transformer station back operating result after having operated automatically, waits that the guardian of transformer station confirms;Through guardian Confirm errorless after, send next step operational order, execute-in-place people just can carry out next step operation, so circulates, until whole Operation order terminates;After having operated, using in incoming for the operating result of computer key system as storage of history data P, know in operation During other code-locked, by note, code value or the device numbering of operated equipment lockset are sent to centralized control center, to operator's electricity Brain key positioner.
2. the monitoring method of remote forced monitoring system for transformer station switching operation as claimed in claim 1, it is characterised in that: institute System of stating supports single multitask monitoring, multiuser-multitasking monitoring.
CN201610555553.2A 2011-09-23 2011-09-23 The monitoring method of remote forced monitoring system for transformer station switching operation Active CN106160219B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610555553.2A CN106160219B (en) 2011-09-23 2011-09-23 The monitoring method of remote forced monitoring system for transformer station switching operation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610555553.2A CN106160219B (en) 2011-09-23 2011-09-23 The monitoring method of remote forced monitoring system for transformer station switching operation
CN201110285913.9A CN102340180B (en) 2011-09-23 2011-09-23 Remote forced monitoring system for transformer station switching operation

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201110285913.9A Division CN102340180B (en) 2011-09-23 2011-09-23 Remote forced monitoring system for transformer station switching operation

Publications (2)

Publication Number Publication Date
CN106160219A true CN106160219A (en) 2016-11-23
CN106160219B CN106160219B (en) 2018-11-09

Family

ID=45515751

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610555553.2A Active CN106160219B (en) 2011-09-23 2011-09-23 The monitoring method of remote forced monitoring system for transformer station switching operation
CN201110285913.9A Active CN102340180B (en) 2011-09-23 2011-09-23 Remote forced monitoring system for transformer station switching operation

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201110285913.9A Active CN102340180B (en) 2011-09-23 2011-09-23 Remote forced monitoring system for transformer station switching operation

Country Status (1)

Country Link
CN (2) CN106160219B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069967A (en) * 2017-04-24 2017-08-18 国网浙江省电力公司台州供电公司 For the NMS between transformer station and transformer station
CN112531885A (en) * 2020-09-18 2021-03-19 国网浙江省电力有限公司杭州供电公司 Construction method of transformer substation switching operation on-line modeling and actual operation guidance system
CN113794754A (en) * 2021-08-25 2021-12-14 国网福建省电力有限公司 Electronic operation ticket control system and method based on mobile application

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103632407A (en) * 2013-12-01 2014-03-12 国网河南省电力公司安阳供电公司 Handheld equipment terminal inspection system for transformer substation
CN104008465B (en) * 2014-06-17 2017-07-07 国家电网公司 Grid switching operation bill safety implemented systems
CN104392333A (en) * 2014-12-12 2015-03-04 广西电网有限责任公司 Electronic arrival reporting method based on network commanding
CN104777808B (en) * 2015-03-27 2017-07-14 国家电网公司 A kind of record and read method of power station running status debugging
CN105243717B (en) * 2015-10-30 2019-01-22 国家电网公司 Phone permitting work ticket managing and control system and method
CN106372786A (en) * 2016-08-29 2017-02-01 长园共创电力安全技术股份有限公司 "Two ticket" operation safety management and control system and method
CN107121606B (en) * 2017-04-24 2020-06-30 国网浙江省电力公司台州供电公司 Intelligent terminal for transformer substation operation and patrol
CN108039772B (en) * 2017-11-20 2020-07-14 神华集团有限责任公司 Method, device, medium and system for electric interval switching operation of transformer substation
CN109636138A (en) * 2018-11-23 2019-04-16 北京南凯自动化系统工程有限公司 A kind of intelligent dispatching system for railway contact line power supply management

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002233059A (en) * 2001-01-29 2002-08-16 Toshiba Corp Transformer station remote monitoring control protection system
CN201218916Y (en) * 2008-06-30 2009-04-08 珠海优特电力科技股份有限公司 Electric power hand-held apparatus
CN201315256Y (en) * 2008-12-03 2009-09-23 山东鲁能奥特科技有限公司 Anti-misoperation system of wireless communication microcomputer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002233059A (en) * 2001-01-29 2002-08-16 Toshiba Corp Transformer station remote monitoring control protection system
CN201218916Y (en) * 2008-06-30 2009-04-08 珠海优特电力科技股份有限公司 Electric power hand-held apparatus
CN201315256Y (en) * 2008-12-03 2009-09-23 山东鲁能奥特科技有限公司 Anti-misoperation system of wireless communication microcomputer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107069967A (en) * 2017-04-24 2017-08-18 国网浙江省电力公司台州供电公司 For the NMS between transformer station and transformer station
CN112531885A (en) * 2020-09-18 2021-03-19 国网浙江省电力有限公司杭州供电公司 Construction method of transformer substation switching operation on-line modeling and actual operation guidance system
CN112531885B (en) * 2020-09-18 2023-02-17 国网浙江省电力有限公司杭州供电公司 Construction method of transformer substation switching operation on-line modeling and actual operation guidance system
CN113794754A (en) * 2021-08-25 2021-12-14 国网福建省电力有限公司 Electronic operation ticket control system and method based on mobile application

Also Published As

Publication number Publication date
CN102340180A (en) 2012-02-01
CN102340180B (en) 2016-07-13
CN106160219B (en) 2018-11-09

Similar Documents

Publication Publication Date Title
CN102340180B (en) Remote forced monitoring system for transformer station switching operation
CN105449867B (en) A kind of visualized operation process monitoring anti-error system and control method
CN102521905B (en) Intelligent access control system of transformer substation and control method thereof
CN106251452A (en) A kind of unattended operation transformer station enters the station long-range Licensing Methods and execution system
CN202362855U (en) Intelligent access control system for transformer substation
CN107171293A (en) The system and method for relay protection O&M information multidimensional issue is realized in intelligent grid
CN109377603B (en) Distributed whole-network access control system
CN106877508A (en) A kind of grid switching operation monitor in real time anti-error system and its control method
CN101256906A (en) Electric operating ticket synthetic anti-mistaken closedown system and operation method
CN102325309B (en) Visualization switching operation management method
CN101458502A (en) Electrical power system standardized work intelligent control method and special equipment
CN214154147U (en) Intelligent anti-misoperation system for switching operation
CN104050529A (en) Power grid dispatching intelligent maintenance order and operation order system
CN112054599B (en) Wind farm safety management system and method
CN105262227A (en) Fool-proof lockout system
CN103985169A (en) System utilizing handheld terminal and USB interface to lock/unlock door lock and controlling method thereof
CN105469478A (en) Access control system based on power line communication and two-dimensional code
CN212627319U (en) System for wind-powered electricity generation field safety control
CN104377835A (en) Anti-misoperation intelligent terminal for power distribution
CN102064609B (en) 500kV unmanned transformer station-based remote control method for protective soft pressing plate
CN104158294A (en) Dispatching anti-misoperation control method
CN104284153A (en) Distribution room safety and synchronous operation monitoring intercom system and operation method thereof
CN105611247B (en) Visualized operation whole process supervision method
CN104574573A (en) Safe handling method for intelligent lock and intelligent lock
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant