CN106760575A - The construction method and winter brooder of a kind of desert area winter brooder - Google Patents

The construction method and winter brooder of a kind of desert area winter brooder Download PDF

Info

Publication number
CN106760575A
CN106760575A CN201611088378.7A CN201611088378A CN106760575A CN 106760575 A CN106760575 A CN 106760575A CN 201611088378 A CN201611088378 A CN 201611088378A CN 106760575 A CN106760575 A CN 106760575A
Authority
CN
China
Prior art keywords
cross bar
brooder
bar
scaffold
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611088378.7A
Other languages
Chinese (zh)
Inventor
杨立军
庞继勇
邵国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201611088378.7A priority Critical patent/CN106760575A/en
Publication of CN106760575A publication Critical patent/CN106760575A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Catching Or Destruction (AREA)

Abstract

The present invention relates to the construction method and winter brooder of a kind of desert area winter brooder, belong to power engineering construction correlative technology field.Key step includes A, unwrapping wire;B, put and laterally sweep the floor bar;C, the vertical vertical rod of embedment, then buckle vertical vertical rod with bar of laterally sweeping the floor;D, put longitudinal direction and sweep the floor bar, and will longitudinally sweep the floor bar with laterally sweep the floor bar or vertical vertical rod is buckled;E, second layer cross bar is installed in vertical vertical rod, every layer of cross bar includes longitudinal cross bar and horizontal cross bar;F, from bottom to top installation third layer to n-th layer cross bar, every layer of cross bar include longitudinal cross bar and horizontal cross bar;G, other vertical rods of continuation installation in vertical vertical rod;H, alternately step G and step H, complete brooder scaffold construction;I, descend drawing steel stranded wire laterally from top cross bar, and fixed steel strand wires lower end;J, brooder scaffold is connected with building full hall scaffold;K, brooder scaffold top install steel strand wires;L, carry out tarpaulin installation.

Description

The construction method and winter brooder of a kind of desert area winter brooder
Technical field
It is to be related to a kind of desert area Warm Winter specifically the present invention relates to power engineering construction correlative technology field The construction method and winter brooder of canopy.
Background technology
Because desert area winter temperature is relatively low, concrete is difficult to conserve after pouring, therefore carries out engineering in desert area Need to build winter brooder drafting construction area periphery before construction.
Traditional winter brooder construction is constructed using concrete comprehensive thermos method and mixing applied force method, underground structure of mainly constructing Part, brooder can just carry out the relatively low frame structure of the decorative engineering of building body, the number of plies and fragmentary concrete construction after closing, So it is low to there is long construction period, efficiency, the drawbacks of increase engineering cost.
Meanwhile, traditional brooder is used for the infrastructure stage, and brooder uses fixed form, and working space is small, speed of application Slowly, cost is high.Warmed oneself not environmentally with coke oven charcoal inside brooder, increase disaster hidden-trouble, can not meet main body armored concrete knot The winter construction requirement of structure.
The content of the invention
The purpose of the present invention is to overcome above-mentioned the deficiencies in the prior art, there is provided a kind of erection of desert area winter brooder Method.By utilizing scaffold building brooder outside building body, solving construction industry cannot protect the present invention in season severe winter Demonstrate,prove the problem of concrete structure construction quality.
In order to reach above-mentioned purpose, the present invention is adopted the following technical scheme that:
A kind of construction method of desert area winter brooder, comprises the following steps:
A, draft construction building basis on the outside of carry out double-pole scaffold vertical rod touchdown point unwrapping wire;
B, put according to unwrapping wire and laterally swept the floor bar, the adjacent distance between tie rods 90cm that sweeps the floor;
C, on unwrapping wire vertical vertical rod is imbedded to underground, the bottom and transverse direction that vertical vertical rod is then exposed to earth's surface are swept the floor Bar is buckled;
Preferably, bar ground clearance of sweeping the floor is for 30cm;
D, put longitudinal direction and sweep the floor bar, and will longitudinally sweep the floor bar with laterally sweep the floor bar or vertical vertical rod is buckled, complete ground layer Cross bar is assembled;
E, second layer cross bar is installed in vertical vertical rod, every layer of cross bar includes longitudinal cross bar and horizontal cross bar;
F, from bottom to top installation third layer to n-th layer cross bar, every layer of cross bar include longitudinal cross bar and horizontal cross bar;
G, other vertical rods of continuation installation in vertical vertical rod;
H, alternately step G and step H, complete brooder scaffold construction;
I, descend drawing steel stranded wire laterally from top cross bar, then make earth anchor, fixed steel strand wires lower end;
J, the brooder scaffold of completion of having constructed is connected with building full hall scaffold by support rail;
K, brooder scaffold top install steel strand wires;
L, the installation for carrying out surrounding tarpaulin and top tarpaulin.
In the above method, it is preferred that after completing step H, bridging is added on brooder scaffold, then carry out step I.
In the above method, it is preferred that after completing step H, diagonal brace is added on brooder scaffold, then carry out step I.
In the above method, it is preferred that in step C, the vertical buried depth of cross bar is at least 2 meters.
In the above method, it is preferred that brooder scaffold is the low opposite side in side incline structure high.
In the above method, it is preferred that in the step M, multiple concretings mouthful are reserved with the tarpaulin of top.
In the above method, it is preferred that after completing step E, interim hound is set up on second layer cross bar, then walked Rapid G.
In the above method, it is preferred that in step C, vertical vertical rod is exposed to the bottom of earth's surface and bar fastening of laterally sweeping the floor Afterwards, small cross bar is added, ground floor double-pole scaffold is formed.
While above-mentioned construction method is provided, present invention also offers a kind of winter brooder, the winter brooder is to be based on What the above method was set up.
The beneficial effects of the invention are as follows:
(1) it is incubated by brooder, building pouring construction is carried out inside brooder, is solved in the desert area severe cold winter Season the difficult problem of architecture construction.
(2) brooder overall structure includes scaffold, tarpaulin, support bar and steel strand wires, and each several part connector is existing dress Put, efficiency of construction is high, difficulty is low.
(3) scaffold, tarpaulin, support bar and steel strand wires can be dismantled after architecture construction is completed or temperature is raised, Can reuse, not waste substantially.
Specific embodiment
The present invention is described in detail below.
Embodiment 1:A kind of construction method of desert area winter brooder, comprises the following steps:
Brooder scaffold is set up on the outside of building main body first.
Brooder scaffold uses design of coupler scaffold, and 2 meters of underground of framed bent vertical rod embedment is deep, and 1.5 meters of vertical rod advance, vertical rod is horizontal Away from 1.2 meters, 1.8 meters of scaffold step pitch;
Every 6 meters are earthward drawn the steel strand wires of Φ 6 from top layer cross bar on the outside of framed bent, and with ground into 45 degree of angles, earth anchor is used Frame pipe, oblique cutting enters underground, and embedment underground is not less than 1 meter;
Framed bent inner side is connected with structure full hall scaffold, and vertical every three step pitches connection is once, horizontal every 4 mid-spans one Secondary, all double-pole scaffold vertical rods must link together by step pitch;
Row's vertical rod a to top is connected with steel strand wires from the middle of structure full hall scaffold, the tarpaulin for supporting ceiling;
Tarpaulin outside steel strand wires are downwardly fixed at the earth anchor of bottom framed bent side from top cross bar, for fixing side paulin Cloth, increases steel strand reinforced simultaneously on top tarpaulin top, prevents that desert area dust storm is bigger to start tarpaulin, blows into yellow sand shadow Ring construction quality.
Framed bent is set up after finishing, and starts fixed top steel strand wires, according to 600mm spacing from ceiling cross bar and the connection of vertical rod Place is fixed with wire line shoe, and is tensed with spanner, and two-way installation steel strand wires reticulate structure.
The selection less weather of wind-force starts to hang tarpaulin toward on framed bent, and the hawser reserved from tarpaulin is fixed on the horizontal stroke on framed bent top On bar, tarpaulin bottom frame pipe is fixed, and wearing frame pipe from tarpaulin bottom hole is connected at the earth anchor of framed bent root.Tarpaulin hangs one Tarpaulin outside is in a row stood on frame pipe long at once behind face, in depth lower 1 meter and is coupled together vertical rod on the outside of tarpaulin with cross bar, and Drawing steel stranded wire, with earth anchorage, prevents brooder from not completing preceding because wind senior general's tarpaulin is started to ground under top cross bar.
After the tarpaulin installation of four sides, start to add a cover brooder top tarpaulin.Top tarpaulin is divided into polylith according to field condition Install, the installation of every piece of ceiling is tried one's best and constructed when selecting calm or less wind-force.The tarpaulin that will be spooled with crane first It is placed on the cross bar of top side high, after all lifting is in place, when calm or smaller wind-force, manually spreads tarpaulin out, uses Steel strand wires are pulled to the other end, and complete drawout after top tarpaulin is all launched, is added every 1 meter on ceiling and led to together Steel strand wires long, prevent wind senior general's tarpaulin from starting or tearing.
Brooder reserves at least four 1 meters * 1 meter of ventilating opening at top, and stove chimney stretches out outdoor, can prevent from being applied in brooder There are CO poisonings in work.
Meanwhile, according to field condition, it is considered to which pump truck plays bar height and concrete structure framework sets up the height of framed bent, brooder Scaffolding height is higher by 2 meters than fabric structure height highest point, and termination of pumping car side is lower than offside 2 meters, brooder top is had the gradient, prevents Only accumulated snow causes brooder to collapse.Brooder sets up outer axis of the width with building per side and outwards expands 8 meters, reaches work needed for construction Industry area.
Embodiment 2:A kind of winter brooder, the winter brooder is set up based on the methods described of embodiment 1.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or uses the present invention. Various modifications to embodiment will be apparent for those skilled in the art, as defined herein general Principle can in other embodiments be realized, is not described in detail without departing from the spirit or scope of the present invention The part presented with partial enlargement, is prior art, is not repeated herein.Therefore, the present invention is not intended to be limited to herein These shown embodiments, and it is to fit to the most wide scope consistent with principles disclosed herein and feature.

Claims (8)

1. a kind of construction method of desert area winter brooder, it is characterised in that comprise the following steps:
A, draft construction building basis on the outside of carry out unwrapping wire;
B, put according to unwrapping wire and laterally swept the floor bar;
C, on unwrapping wire vertical vertical rod is imbedded to underground, vertical vertical rod is then exposed to the bottom of earth's surface and bar button of laterally sweeping the floor Tightly;
D, put longitudinal direction and sweep the floor bar, and will longitudinally sweep the floor bar with laterally sweep the floor bar or vertical vertical rod is buckled, complete ground layer cross bar Assembling;
E, second layer cross bar is installed in vertical vertical rod, every layer of cross bar includes longitudinal cross bar and horizontal cross bar;
F, from bottom to top installation third layer to n-th layer cross bar, every layer of cross bar include longitudinal cross bar and horizontal cross bar;
G, other vertical rods of continuation installation in vertical vertical rod;
H, alternately step G and step H, complete brooder scaffold construction;
I, descend drawing steel stranded wire laterally from top cross bar, then make earth anchor, fixed steel strand wires lower end;
J, the brooder scaffold of completion of having constructed is connected with building full hall scaffold by support rail;
K, brooder scaffold top install steel strand wires;
L, the installation for carrying out surrounding tarpaulin and top tarpaulin.
2. construction method according to claim 1, it is characterised in that after completing step I, added on brooder scaffold and cut Knife is supportted, then carries out step I.
3. construction method according to claim 1, it is characterised in that after completing step I, adds tiltedly on brooder scaffold Support, then carry out step I.
4. construction method according to claim 1, it is characterised in that after completing step I, the vertical buried depth of cross bar is at least It is 2 meters.
5. construction method according to claim 1, it is characterised in that after completing step I, brooder scaffold is low another side Side incline structure high.
6. construction method according to claim 1, it is characterised in that after completing step I, in the step M, top tarpaulin On be reserved with multiple concretings mouthful.
7. construction method according to claim 1, it is characterised in that after completing step I, after completing step E, in the second layer Interim hound is set up on cross bar, then carries out step G.
8. a kind of winter brooder, it is characterised in that the winter brooder is based on the construction method described in claim any one of 1-6 Set up.
CN201611088378.7A 2016-11-30 2016-11-30 The construction method and winter brooder of a kind of desert area winter brooder Pending CN106760575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611088378.7A CN106760575A (en) 2016-11-30 2016-11-30 The construction method and winter brooder of a kind of desert area winter brooder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611088378.7A CN106760575A (en) 2016-11-30 2016-11-30 The construction method and winter brooder of a kind of desert area winter brooder

Publications (1)

Publication Number Publication Date
CN106760575A true CN106760575A (en) 2017-05-31

Family

ID=58915286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611088378.7A Pending CN106760575A (en) 2016-11-30 2016-11-30 The construction method and winter brooder of a kind of desert area winter brooder

Country Status (1)

Country Link
CN (1) CN106760575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE846994A (en) * 1975-10-10 1977-01-31 SUPPORT FRAME FOR A SHELTER OR BARAQUEMENT,
CN201581652U (en) * 2010-01-19 2010-09-15 荆学 Building safety protective shed
CN104032986A (en) * 2014-05-14 2014-09-10 西安长庆科技工程有限责任公司 Protective shed for equipment assembly
CN204435948U (en) * 2015-01-05 2015-07-01 江苏建筑职业技术学院 Fixing facility protection canopy
CN204850505U (en) * 2015-07-20 2015-12-09 中国建筑第八工程局有限公司 Concrete heat preservation maintenance brooder
CN204960354U (en) * 2015-09-01 2016-01-13 山东电力建设第一工程公司 A heat preservation brooder for among severe cold district concrete construction
CN205382702U (en) * 2015-11-16 2016-07-13 上海市建筑装饰工程集团有限公司 Scaffold prevents dust, prevents dry, printing opacity heat preservation safety cover

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE846994A (en) * 1975-10-10 1977-01-31 SUPPORT FRAME FOR A SHELTER OR BARAQUEMENT,
CN201581652U (en) * 2010-01-19 2010-09-15 荆学 Building safety protective shed
CN104032986A (en) * 2014-05-14 2014-09-10 西安长庆科技工程有限责任公司 Protective shed for equipment assembly
CN204435948U (en) * 2015-01-05 2015-07-01 江苏建筑职业技术学院 Fixing facility protection canopy
CN204850505U (en) * 2015-07-20 2015-12-09 中国建筑第八工程局有限公司 Concrete heat preservation maintenance brooder
CN204960354U (en) * 2015-09-01 2016-01-13 山东电力建设第一工程公司 A heat preservation brooder for among severe cold district concrete construction
CN205382702U (en) * 2015-11-16 2016-07-13 上海市建筑装饰工程集团有限公司 Scaffold prevents dust, prevents dry, printing opacity heat preservation safety cover

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张南: "《桥梁结构质量控制技术与工程实例》", 31 March 2011, 中国电力出版社 *
祝英林等: "《暖棚搭设施工》", 《中国新技术新产品》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678400A (en) * 2018-06-11 2018-10-19 中建局集团建设发展有限公司 Automatic climbing brooder system in extremely frigid zones building structure and its construction method
CN108678400B (en) * 2018-06-11 2023-12-01 中建一局集团建设发展有限公司 Automatic climbing greenhouse system on building structure in alpine region and construction method thereof

Similar Documents

Publication Publication Date Title
CN104563288A (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN206844659U (en) Basement barricade single side formwork system
CN207160629U (en) Spliced type constructor walking system
CN205046926U (en) Join in marriage net overhead line and prevent wind draw off mechanism
CN205314519U (en) High altitude operation platform based on truss
CN106760575A (en) The construction method and winter brooder of a kind of desert area winter brooder
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN103726604B (en) Building element
CN110424762B (en) Cave dwelling reinforcing system
CN2926365Y (en) Embedded brick with built-in fitting and externally thermal-insulating structure of external wall
CN103835369A (en) Extensible high-altitude conjoined steel structure
CN205743207U (en) The typhoon protection ruggedized construction built is faced in a kind of construction
CN213204136U (en) Foundation pit protection shed
CN212642195U (en) Foundation ditch canopy that prevents dust
CN210987319U (en) Novel constant-vegetable non-Xinjiang heat storage module sunlight greenhouse
CN112227770B (en) Construction process of stone-built appearance steel structure framework rest pavilion
CN205206162U (en) Cornice structure
CN114033171A (en) Clamp type triangular support system of overhanging roof panel and construction method thereof
CN108412033B (en) External vertical forest overhanging balcony structure of building and construction method thereof
CN206987720U (en) A kind of double shield cage cat ladders
CN103015696B (en) Hanging basket outer protective layer for super high-rise building
CN206800625U (en) Novel light energy-saving environmental-protection hollow pre-fabricated panels frame structure
KR20070105950A (en) Floting land by wire
CN205134785U (en) Prevent structure that cornices that ftractures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531