CN103015696B - A kind of outer protection layer of hanging basket for super high-rise building - Google Patents
A kind of outer protection layer of hanging basket for super high-rise building Download PDFInfo
- Publication number
- CN103015696B CN103015696B CN201210493914.7A CN201210493914A CN103015696B CN 103015696 B CN103015696 B CN 103015696B CN 201210493914 A CN201210493914 A CN 201210493914A CN 103015696 B CN103015696 B CN 103015696B
- Authority
- CN
- China
- Prior art keywords
- super high
- rod
- rise building
- vertical
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Fencing (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种超高层建筑用吊篮外防护层,属于建筑工程技术领域。 The invention relates to an outer protective layer of a hanging basket for a super high-rise building, which belongs to the technical field of construction engineering.
背景技术 Background technique
随着经济迅猛增长、城市人口的快速成长,城市建设用地的日益减少的矛盾更加凸出,超高层建筑由于用地少、城市基础设施费用低,可提高城市面貌等优点得到了迅速发展,而随着现代工程项目超高层建筑越来越多,施工技术难度与质量的要求不断在提高,施工技术管理的复杂程度和难度也越来越高,安全防护是建筑工程中的一项重要管理内容,尤其是进行外装饰时由于受地理位置、建筑施工场地的限制,安全防护已成为超高层建筑的一大难题,目前国内超高层建筑工程一般采用吊蓝式外装饰施工,该方法至今尚没有安全防范规范可参考,而超、高层建筑大多处在城市中心区,常成为一个地区的标志性建筑,为此,施工过程中无论发生何种安全事故,都将超成严重不良的社会影响,因此如何保证超高层建筑施工过程尤其是在外装饰施工时的安全已成为超高层建筑施工中的一个亟需攻克的课题。 With the rapid economic growth and the rapid growth of urban population, the contradiction of decreasing urban construction land becomes more and more prominent. Super high-rise buildings have developed rapidly due to the advantages of less land, low cost of urban infrastructure, and can improve the appearance of the city. With more and more super high-rise buildings in modern engineering projects, the difficulty and quality requirements of construction technology are constantly increasing, and the complexity and difficulty of construction technology management are also increasing. Safety protection is an important management content in construction projects. Especially when carrying out exterior decoration, due to the limitation of geographical location and construction site, safety protection has become a major problem for super high-rise buildings. At present, domestic super high-rise construction projects generally use hanging blue exterior decoration construction. Precautionary regulations can be referred to, but most of the super and high-rise buildings are located in the central area of the city, and often become a landmark building in a region. Therefore, no matter what kind of safety accidents occur during the construction process, it will cause serious adverse social impacts. Therefore, How to ensure the safety of the construction process of super high-rise buildings, especially during the construction of exterior decoration, has become an urgent problem in the construction of super high-rise buildings.
发明内容 Contents of the invention
本发明为了解决超高层建筑外装饰施工过程中的安全问题,提供了一种安装、拆卸方便、使用安全、能实施有效防护的超高层建筑用吊篮外防护层。 In order to solve the safety problem in the construction process of super high-rise building exterior decoration, the present invention provides a super high-rise building hanging basket outer protective layer which is convenient to install and disassemble, safe to use and capable of effective protection.
为了达到上述目的,本发明的技术方案如下: In order to achieve the above object, the technical scheme of the present invention is as follows:
一种超高层建筑用吊篮外防护层,包括安全网、钢丝绳和至少处于同一高度的两个支承架,所述支承架安装在超高层建筑的相邻的上下楼层形成的空间内,支承架前端伸出楼层檐墙外面,所述安全网经钢丝绳竖直悬挂于支承架前端;所述支承架由固定支座、型钢支撑架和若干加固杆连接而成,所述固定支座为三维支座,包括一组矩阵状排列的竖杆、一组纵杆和一组横杆,所述竖杆两端分别固定在所述的相邻的上下楼层上,所述纵杆的最上一层和最下一层的每根杆的两端分别固定于安装于楼层檐墙的骑墙夹架及与楼层檐墙所对应的墙面上,所述竖杆、纵杆和横杆相交处通过搭扣牢固扣接;所述型钢支撑架包括两根工字钢和两根支承角钢,所述两根工字钢水平并排间隔放置,前端伸出楼层檐墙外面,两根工字钢位于相邻的上下楼层形成的空间内的部分及尾端固定于固定支座的横杆上,在两根工字钢上表面加压一组横杆,两根工字钢的前端上表面通过两根支承角钢连接,两根支承角钢背向间隔放置,钢丝绳端部固定于两根支承角钢的中部间隙处;每根工字钢的前端与该工字钢相交的竖杆的中上部连接加固斜杆,所述工字钢与横杆相交处、工字钢与加固斜杆相交处、加固斜杆与竖杆相交处通过搭扣牢固扣接。 An outer protective layer of a hanging basket for a super high-rise building, comprising a safety net, a steel wire rope and at least two support frames at the same height, the support frames are installed in the space formed by the adjacent upper and lower floors of the super high-rise building, the support frame The front end protrudes outside the eaves wall of the floor, and the safety net is vertically suspended at the front end of the support frame through a steel wire rope; seat, including a set of vertical bars arranged in a matrix, a set of vertical bars and a set of horizontal bars, the two ends of the vertical bars are respectively fixed on the adjacent upper and lower floors, the uppermost layer of the vertical bars and the The two ends of each rod on the lowest floor are respectively fixed on the wall-riding clamp installed on the eaves wall of the floor and on the wall corresponding to the eaves wall of the floor. Firm buckle connection; the steel support frame includes two I-beams and two support angle steels, the two I-beams are placed horizontally side by side and spaced apart, the front end protrudes outside the eaves wall of the floor, and the two I-beams are located on the adjacent The part and the end of the space formed by the upper and lower floors are fixed on the cross bar of the fixed support, and a group of cross bars are pressed on the upper surface of the two I-beams, and the upper surfaces of the front ends of the two I-beams pass through two supporting angle steels. connection, the two supporting angle steels are placed at intervals with their backs facing each other, and the ends of the steel wire ropes are fixed at the middle gap between the two supporting angle steels; The intersection of the I-beam and the horizontal bar, the intersection of the I-beam and the reinforced slanting bar, and the intersection of the reinforced slanting bar and the vertical bar are firmly fastened by buckles.
所述骑墙夹架由一根主杆、两根立杆构成,所述主杆与纵杆平行固定于对应的竖杆与横杆上,主杆前端伸出楼层檐墙外面至少能固定立杆的一段距离,主杆后端与位于中间位置的纵杆后端一致;所述两根立杆分别固定于位于楼层檐墙内、外面处的主杆上,两根立杆的下端固定于楼层檐墙的内、外面上;所述纵杆的最上一层和最下一层的每根杆的前端固定于位于楼层檐墙内面立杆上,所述主杆与竖杆、横杆与立杆及立杆与纵杆通过搭扣牢固扣接。 The wall-riding clamp frame is composed of a main pole and two vertical poles. The main pole and the longitudinal pole are fixed on the corresponding vertical pole and the horizontal pole in parallel. A certain distance, the rear end of the main rod is consistent with the rear end of the longitudinal rod in the middle position; the two vertical rods are respectively fixed on the main rods located inside and outside the eaves wall of the floor, and the lower ends of the two vertical rods are fixed on the eaves wall of the floor Inside and outside; the front end of each rod on the uppermost layer and the lowermost layer of the vertical rod is fixed on the vertical rod on the inner surface of the eaves wall of the floor, the main rod and the vertical rod, the horizontal rod and the vertical rod and the vertical rod The rod and the longitudinal rod are securely fastened through buckles.
所述加固斜杆与该工字钢相交的竖杆采用加固拉杆连接;两根工字钢的加固斜杆和加固拉杆交接处用一加固横杆连接;所加固斜杆与加固拉杆、加固拉杆与竖杆、加固横杆与加固斜杆、竖杆与加固拉杆通过搭扣牢固扣接。 The vertical bar intersected by the reinforced diagonal bar and the I-beam is connected by a reinforced tie rod; the junction of the reinforced diagonal bar and the reinforced tie rod of the two I-beams is connected by a reinforced cross bar; the reinforced diagonal bar is connected with the reinforced tie rod and the reinforced tie rod The vertical rod, the reinforced horizontal rod and the reinforced oblique rod, the vertical rod and the reinforced pull rod are firmly fastened through buckles.
所述支承架的型钢支撑架的前端伸出楼层檐墙外面的长度为2200㎜,后端与楼层檐墙外面的距离为1600㎜,所述型钢支撑架的两工字钢的间隔距离为600㎜,所述型钢支撑架的两支承角钢的间隔距离为20㎜;所述一组矩阵状排列的竖杆为3×3的矩阵,相邻两排竖杆的间距为1000㎜,距型钢支撑架前端最近的一排竖杆与超高层建筑的外墙面的间距为800㎜,所述一组纵杆为3×3排列的纵杆,相邻两排纵杆的间距至少为600㎜;所述处于同一高度的相邻两个支承架的距离不超过5米;所述型钢支撑架的两根支承角钢中部间隙处固定有防滑环,所述钢丝绳端部用轧头固定于防滑环中。 The length of the front end of the shaped steel supporting frame of the support frame protruding from the outside of the floor eaves wall is 2200mm, the distance between the rear end and the outside of the floor eaves wall is 1600mm, and the distance between the two I-beams of the shaped steel supporting frame is 600mm ㎜, the distance between the two supporting angles of the steel support frame is 20㎜; the set of vertical bars arranged in a matrix is a 3×3 matrix, and the distance between two adjacent rows of vertical bars is 1000㎜, the distance between the steel support The distance between the nearest row of vertical bars at the front end of the frame and the outer wall of the super high-rise building is 800mm, the set of vertical bars is a 3×3 arrangement of vertical bars, and the distance between two adjacent rows of vertical bars is at least 600mm; The distance between the two adjacent supporting frames at the same height is not more than 5 meters; the gap between the two supporting angle steels of the steel supporting frame is fixed with an anti-slip ring, and the end of the steel wire rope is fixed in the anti-slip ring with a rolling head .
所述的一种超高层建筑外防护层,还包括防风钢支撑架,所述防风钢支撑架固定于超高层建筑的外墙面上。 The outer protective layer of a super high-rise building further includes a windproof steel support frame, and the windproof steel support frame is fixed on the outer wall of the super high-rise building.
所述防风钢支撑架为三角形型钢架,所述三角形型钢架的相邻边通过焊接连接,所述三角形型钢架的一边固定在超高层建筑的外墙面上,三角形型钢架的另两边之间设置两根加强筋,三角形型钢架的另两边交接处设有半开口环;所述加强筋与固定在超高层建筑的外墙面上的边平行,所述三角形型钢架呈竖直状态固定于超高层建筑的外墙面上。 The windproof steel support frame is a triangular steel frame, the adjacent sides of the triangular steel frame are connected by welding, one side of the triangular steel frame is fixed on the outer wall of a super high-rise building, and the triangular steel frame Two reinforcing ribs are arranged between the other two sides, and a semi-split ring is provided at the junction of the other two sides of the triangular-shaped steel frame; It is fixed on the outer wall of a super high-rise building in a vertical state.
所述三角形型钢架为直角三角形型钢架,所述直角三角形型钢架的长直角边长度为2200㎜,直角三角形型钢架的短直角边长度为1000㎜,直角三角形型钢架的短直角边竖直固定于超高层建筑的外墙面上,两根加强筋与短直角边的距离分别为800㎜和1600㎜;所述直角三角形型钢架的边和加强筋为∠50×50×5的固定角钢;所述钢丝绳下端用轧头固定于防风钢支撑架的半开口环中。 The triangular-shaped steel frame is a right-angled triangle-shaped steel frame, the length of the long right-angled side of the right-angled triangle-shaped steel frame is 2200 mm, the length of the short right-angled side of the right-angled triangle-shaped steel frame is 1000 mm, and the short The right-angled side is vertically fixed on the outer wall of a super high-rise building, and the distances between the two reinforcing ribs and the short right-angled side are 800mm and 1600mm respectively; the sides and reinforcing ribs of the right-angled triangle steel frame are ∠50×50 ×5 fixed angle steel; the lower end of the steel wire rope is fixed in the half split ring of the windproof steel support frame with a rolling head.
所述钢丝绳上每隔12米设置一道防风钢支撑架;所述防风钢支撑架相邻距离不超过5米;所述安全网为阻燃性密目网。 A windproof steel support frame is arranged every 12 meters on the steel wire rope; the adjacent distance between the windproof steel support frames is no more than 5 meters; the safety net is a flame-retardant dense mesh.
本发明的有益效果是: The beneficial effects of the present invention are:
(1)在使用吊蓝进行外装饰施工时,采用阻燃性密目网垂挂防护技术,可起到提高安全作业条件,美化建筑物外部形象的双重作用; (1) When using hanging baskets for exterior decoration construction, the use of flame-retardant dense mesh hanging protection technology can play a dual role in improving safe working conditions and beautifying the external image of buildings;
(2)连续垂挂的墨绿色安全网张挂后,可以有效地防止杂物外窜的现象发生,同时也给建筑物增添一种美感,特别是对操作者提供了良好的作业环境,消除了高空作业的恐惧心理; (2) After the continuously hanging dark green safety net is hung, it can effectively prevent the phenomenon of debris from escaping, and at the same time add a sense of beauty to the building, especially providing a good working environment for the operator, eliminating the need for high-altitude fear of homework;
(3)在施工进度安排上,分段设置的防护网套,有利于交叉作业安排,主体结构施工时即可利用吊蓝自下而上分段提前进行装饰施工准备,还可组织平行施工,有力地促进了施工进度,保障了安全生产。 (3) In terms of construction progress arrangement, the protective nets arranged in sections are conducive to the arrangement of cross operations. During the construction of the main structure, the hanging blue can be used to prepare for decoration construction in advance in sections from bottom to top, and parallel construction can also be organized. It has effectively promoted the construction progress and guaranteed safe production.
本发明解决了超高层建筑外装饰施工过程中的安全问题,实现了超高层建筑外装饰分段施工,流水作业,加快了外装修施工进度,在保证安全的前提下提高了工程经济效益,也为我国超高层建筑安全施工工法的制定提供了依据。 The invention solves the safety problem in the construction process of super high-rise building exterior decoration, realizes segmental construction of super high-rise building exterior decoration, flow operation, speeds up the construction progress of exterior decoration, improves the economic benefit of the project under the premise of ensuring safety, and also It provides a basis for the formulation of safe construction methods for super high-rise buildings in my country.
附图说明 Description of drawings
图1是本发明的局部右视图; Figure 1 is a partial right view of the present invention;
图2是本发明的的局部正视图; Figure 2 is a partial front view of the present invention;
图3是本发明的防风钢支撑架的右视图; Figure 3 is a right view of the windproof steel support frame of the present invention;
图4是262米高超高层建筑安装防护层的示意图。 Figure 4 is a schematic diagram of the installation of a protective layer in a 262-meter-high super high-rise building.
图1-3中,支承架1,固定支座11,型钢支撑架12,加固杆13,纵杆111,横杆112,竖杆113,工字钢121,角钢122,加固斜杆131,加固拉杆132,加固横杆133,骑墙夹架14,主杆141,立杆142,钢丝绳2、安全网3、防风钢支撑架4,防风钢支撑架固定边41,防风钢支撑架上边42,防风钢支撑架下边43,防风钢支撑架加强筋44。 Among Fig. 1-3, support frame 1, fixed support 11, shaped steel support frame 12, reinforcement bar 13, longitudinal bar 111, cross bar 112, vertical bar 113, I-beam 121, angle steel 122, reinforcement oblique bar 131, reinforcement Tie rod 132, reinforced cross bar 133, wall-riding clip frame 14, main rod 141, vertical rod 142, steel wire rope 2, safety net 3, windproof steel support frame 4, windproof steel support frame fixed side 41, windproof steel support frame upper side 42, windproof Steel bracing frame bottom 43, windproof steel bracing frame stiffener 44.
具体实施方式 Detailed ways
下面结合图1-3以制作一座262米高的超高层建筑的吊篮外防护层为例对本发明作进一步的描述。 Below in conjunction with Fig. 1-3, the present invention will be further described as an example by making the outer protective layer of the hanging basket of a 262-meter-high super high-rise building.
图1-3所示,一种超高层建筑用吊篮外防护层包括安全网3、钢丝绳2和至少处于同一高度的两个支承架1,支承架1安装在超高层建筑的相邻的上下楼层形成的空间内,支承架1前端伸出楼层檐墙外面,3安全网经钢丝绳2竖直悬挂于支承架1前端。支承架1由固定支座11、型钢支撑架12和若干加固杆13连接而成,固定支座11为三维支座,包括一组矩阵状排列的竖杆113、一组纵杆111和一组横杆112,竖杆113两端分别固定在所述的相邻的上下楼层上,最上一层和最下一层的纵杆111的两端分别固定于安装于楼层檐墙的骑墙夹架14及与楼层檐墙所对应的墙面上,竖杆113、纵杆111和横杆112相交处通过搭扣牢固扣接;型钢支撑架12包括两根工字钢121和两根支承角钢122,两根工字钢121水平并排间隔放置,前端伸出楼层檐墙外面,两根工字钢122位于相邻的上下楼层形成的空间内的部分及尾端固定于固定支座11的横杆112上,在两根工字钢121上表面加压一组横杆112,两根工字钢121的前端上表面通过两根支承角钢122连接,两根支承角钢122背向间隔放置,钢丝绳2端部固定于两根支承角钢122的中部间隙处;每根工字钢121的前端与该工字钢121相交的竖杆113的中上部连接加固斜杆131,加固斜杆131与工字钢121相交的竖杆113采用加固拉杆132连接;两根工字钢121的加固斜杆131和加固拉杆132交接处用一加固横杆133连接,加固斜杆131与加固拉杆132、加固拉杆132与竖杆113、加固横杆133与加固斜杆131和竖杆113与加固拉杆132通过搭扣牢固扣接,工字钢121与横杆112、工字钢121与加固斜杆131及加固斜杆131与竖杆113相交处通过搭扣牢固扣接;最上一层和最下一层的纵杆111两端分别固定于安装于楼层檐墙的骑墙夹架14及与楼层檐墙所对应的墙面上;骑墙夹架14由一根主杆141、两根立杆142构成,1421主杆与纵杆111平行固定于对应的竖杆113与横杆112上,主杆142前端伸出楼层檐墙外面至少能固定立杆的一段距离,主杆142后端与位于中间位置的纵杆后端一致;两根立杆142分别固定于位于楼层檐墙内、外面处的主杆141上,两根立杆142的下端固定于楼层檐墙的内、外面上;最上一层和最下一层的纵杆111前端固定于位于楼层檐墙内面立杆142上,141主杆与竖杆113、横杆112与立杆142及立杆142与纵杆111通过搭扣牢固扣接。防风钢支撑架,所述防风钢支撑架固定于超高层建筑的外墙面上。三角形型钢架防风钢支撑架4的相邻边通过焊接连接,三角形型钢架的固定边41固定在超高层建筑的外墙面上,三角形型钢架的上边42和下边43之间设置两根加强筋44,三角形型钢架的另两边交接处设有半开口环;加强筋与固定在超高层建筑的外墙面上的边平行,三角形型钢架呈竖直状态固定于超高层建筑的外墙面上。 As shown in Fig. 1-3, a kind of outer protection layer of the hanging basket for super high-rise building includes safety net 3, steel wire rope 2 and two support frames 1 at least at the same height, support frame 1 is installed on the adjacent upper and lower sides of super high-rise building In the space formed by the floor, the front end of the support frame 1 stretches out of the eaves wall of the floor, and the 3 safety nets are vertically suspended on the front end of the support frame 1 through the steel wire rope 2. The support frame 1 is connected by a fixed support 11, a steel support frame 12 and a number of reinforcing rods 13. The fixed support 11 is a three-dimensional support, including a set of vertical bars 113 arranged in a matrix, a set of vertical bars 111 and a set of The two ends of the horizontal bar 112 and the vertical bar 113 are respectively fixed on the adjacent upper and lower floors, and the two ends of the vertical bar 111 on the uppermost floor and the lowermost floor are respectively fixed on the wall-riding clamps 14 installed on the eaves of the floors. And on the wall corresponding to the eaves wall of the floor, the intersections of the vertical bar 113, the longitudinal bar 111 and the cross bar 112 are firmly buckled by buckles; the steel support frame 12 includes two I-beams 121 and two supporting angle steels 122, Two I-beams 121 are placed horizontally side by side and spaced apart, the front end protrudes outside the eaves wall of the floor, and the part and tail end of the two I-beams 122 located in the space formed by the adjacent upper and lower floors are fixed to the cross bar 112 of the fixed support 11 On the upper surface of the two I-beams 121, a group of cross bars 112 is pressed, and the upper surfaces of the front ends of the two I-beams 121 are connected by two supporting angle steels 122, and the two supporting angle steels 122 are placed at intervals on the back, and the two ends of the wire rope The upper part of the vertical bar 113 intersected with the front end of each I-beam 121 and the I-beam 121 is connected to the reinforcement oblique rod 131, and the reinforcement oblique rod 131 is connected to the I-beam 121 The intersecting vertical bars 113 are connected by reinforcement rods 132; the junctions of the reinforced oblique rods 131 and the reinforced rods 132 of the two I-beams 121 are connected with a reinforced cross bar 133, and the reinforced oblique rods 131 are connected with the reinforced rods 132, and the reinforced rods 132 are connected with the vertical rods. Rod 113, reinforced cross bar 133 and reinforced oblique rod 131, and vertical rod 113 and reinforced tie rod 132 are firmly fastened through buckles, and I-beam 121 and cross bar 112, I-beam 121 and reinforced oblique rod 131 and reinforced oblique rod 131 The intersection with the vertical bar 113 is firmly fastened by a buckle; the two ends of the vertical bar 111 on the uppermost and lower floors are respectively fixed on the wall-riding clamp 14 installed on the eaves wall of the floor and the wall corresponding to the eaves wall of the floor Above; the wall-riding clip frame 14 is composed of a main rod 141 and two vertical rods 142. The main rod 1421 and the longitudinal rod 111 are fixed on the corresponding vertical rod 113 and the horizontal rod 112 in parallel. The front end of the main rod 142 protrudes outside the eaves wall of the floor At least a certain distance of the vertical rod can be fixed, the rear end of the main rod 142 is consistent with the rear end of the longitudinal rod in the middle position; the two vertical rods 142 are respectively fixed on the main rod 141 located inside and outside the eaves wall of the floor, and the two vertical rods 142 The lower end of the lower end is fixed on the inside and outside of the eaves wall of the floor; the front ends of the vertical rods 111 on the uppermost and lower floors are fixed on the vertical rod 142 on the inner surface of the eaves wall of the floor, and the main rod 141 is connected to the vertical rod 113, and the horizontal rod 112 is connected to the The upright rod 142 and the upright rod 142 are firmly fastened with the vertical rod 111 through a buckle. A windproof steel support frame, the windproof steel support frame is fixed on the outer wall of a super high-rise building. The adjacent sides of the triangular-shaped steel frame windproof steel support frame 4 are connected by welding, and the fixed side 41 of the triangular-shaped steel frame is fixed on the outer wall of a super high-rise building. Root reinforcing rib 44, the other two sides junction of triangular shaped steel frame is provided with semi-split ring; The stiffening rib is parallel to the edge fixed on the outer wall surface of super high-rise building, and triangular shaped steel frame is vertically fixed on super high-rise building on the exterior wall.
本防护层的安装方法为: The installation method of this protective layer is as follows:
(1)安装支承架 (1) Install the support frame
在图4所示的超高层建筑的顶楼及高度分别为62米和162米的楼屋的室内沿建筑周围安装支承架1,具体步骤是: The top floor of the super high-rise building shown in Fig. 4 and the height are respectively 62 meters and 162 meters of buildings in the interior of the building along which support frame 1 is installed around the building, and the concrete steps are:
①制作固定支座 ① Make a fixed support
在顶楼及高度分别为62米和162米的楼屋的朝向楼外的室内制作固定支座11,先将九根竖杆113的两端分别固定在上述各层楼室的上、下楼层上,九根竖杆113在室内呈3×3矩阵排列,与楼层檐墙平行的相邻两排竖杆的间距为1000㎜,距楼层檐墙最近的一排竖杆与檐墙外墙面的距离为800㎜,与上述各层楼室两侧面墙平行的相邻两列竖杆的距离为600㎜,在上述竖杆113上用搭扣扣接九根与上述各层楼室两侧面墙平行的纵杆111,纵杆111分上、中、下3排、每排3根排列,纵杆111的最上一排和最下一排的每根杆的两端分别固定于位于上述各层楼室的檐墙的骑墙夹架14及所对应的墙面上,每个骑墙夹架14由一根主杆141、两根立杆142构成,主杆141与纵杆111方向一致,并用搭扣扣接于对应的竖杆113上,主杆141前端伸出上述各层楼室的檐墙外墙面300㎜,主杆141后端与位于上、下两排纵杆中间的一排纵杆后端一致,两根立杆142分别用搭扣扣接于位于上述各层楼室的檐墙内、外墙面处的主杆141上,两根立杆142的下端固定于上述各层楼室的檐墙的内、外墙面上;纵杆111的最上一层和最下一层的每根杆的前端用搭扣扣接于位于上述各层楼室的檐墙内墙面的立杆142上,在上述竖杆113与纵杆111的交接处用搭扣扣接九根横杆112,横杆112的两端分别固定于上述各层楼室的两侧面墙上,即制成一个结构稳固的固定支座11; On the top floor and the building with a height of 62 meters and 162 meters, the fixed support 11 is made in the room facing the outside of the building, and the two ends of the nine vertical bars 113 are respectively fixed on the upper and lower floors of the above-mentioned floors. , the nine vertical rods 113 are arranged in a 3×3 matrix indoors, the distance between two adjacent rows of vertical rods parallel to the floor eaves wall is 1000 mm, and the distance between the row of vertical rods closest to the floor eaves wall and the outer wall of the eaves wall The distance is 800mm, and the distance between two adjacent vertical bars parallel to the two side walls of the above-mentioned floors is 600mm. Nine vertical bars 113 are fastened with buckles on the above-mentioned two-story walls. Parallel longitudinal rods 111, the longitudinal rods 111 are divided into upper, middle and lower rows, and each row is arranged with 3 rods. The two ends of each rod in the uppermost row and the lowermost row of the longitudinal rods 111 are respectively fixed on the On the wall-riding clip frame 14 and the corresponding wall of the eaves wall of the building, each wall-riding clip frame 14 is composed of a main rod 141 and two vertical rods 142. Fastened to the corresponding vertical rod 113, the front end of the main rod 141 protrudes 300mm from the outer wall of the eaves wall of the above-mentioned floors. The rear ends are consistent, and the two vertical rods 142 are fastened to the main rods 141 at the inner and outer walls of the eaves walls of the above-mentioned floors with buckles respectively. On the inner and outer walls of the eaves; the front end of each bar on the uppermost and lowermost floors of the vertical bars 111 is fastened to the vertical bars 142 on the inner walls of the eaves of the above-mentioned floors. On the intersection of the above-mentioned vertical bar 113 and the longitudinal bar 111, nine cross-bars 112 are fastened with buckles, and the two ends of the cross-bars 112 are respectively fixed on the two side walls of the above-mentioned floors of the building, that is, a structure is made. Stable fixed support 11;
②型钢支撑架的制作及安装 ② Manufacture and installation of steel support frame
将两根16#工字钢121分别用搭扣扣接于上述固定支座11的底层横杆112上,使两根工字钢的后端并齐,前端伸出上述各层楼室的檐墙外墙面2200㎜,两根工字钢121的外侧边分别与固定支座11的与两侧面墙靠近的两列竖杆113紧帖并用搭扣牢固扣接,在两根工字钢121的前端上表面用两根角钢122垂直连接,两根角钢122背向间隔焊接于工字钢上,间距为20㎜,在两根角钢122的中部间隙处焊接防滑环; Connect two 16# I-beams 121 to the bottom cross bar 112 of the above-mentioned fixed support 11 with buckles respectively, so that the rear ends of the two I-beams are aligned, and the front ends protrude from the eaves of the above-mentioned floors. The outer wall surface of the wall is 2200㎜. The outer sides of the two I-beams 121 are tightly attached to the two columns of vertical bars 113 of the fixed support 11 that are close to the two side walls and are firmly buckled with buckles. The upper surface of the front end of 121 is vertically connected with two angle steels 122, and the two angle steels 122 are welded to the I-beam at intervals with a distance of 20 mm, and a non-slip ring is welded at the middle gap between the two angle steels 122;
(2)悬挂钢丝绳 (2) Hanging wire rope
将钢丝绳2穿过支承架1的型钢支撑座12前端的防滑环后用轧头固定,固定钢丝绳的轧头三个一组,两个轧头为受力紧固轧头,一个轧头作为观察用,钢丝绳2的长度在屋面量准并下料,下挂的钢丝绳2头部系一根塑料绳作为导向绳,钢丝绳下挂时受导向绳控制,防止钢丝绳2在空中摆动而难以捕捉,钢丝绳2每通过一个支承架用轧头固定一次,钢丝绳2下挂至裙楼屋面后通过地牛进行张拉固定,从而完成下挂钢丝绳2的全部固定工作; Pass the steel wire rope 2 through the anti-slip ring at the front end of the steel support seat 12 of the support frame 1 and fix it with a rolling head. The rolling heads for fixing the steel wire rope are in groups of three. Use, the length of the steel wire rope 2 is measured on the roof and the material is cut. A plastic rope is tied to the head of the hanging steel wire rope 2 as a guide rope. When the steel wire rope is hung down, it is controlled by the guide rope to prevent the steel 2 Each time a supporting frame is fixed with a rolling head, the steel wire rope 2 is hung down to the roof of the podium and then stretched and fixed through the ground cow, so as to complete all the fixing work of the down-hanging steel wire rope 2;
(3)制作防风钢支撑架 (3) Make a windproof steel support frame
用∠50×50×6角铁焊接一个直角三角形防风支撑架4,直角三角形的短边为防风钢支撑架固定边41,长度为1000㎜,直角三角形的长直角边为防风钢支撑架上边42,长度为2200㎜,直角三角形的斜边为防风钢支撑架下边43,在防风钢支撑架上边42和下边43之间平行于固定边41焊接两根加强筋44,两根加强筋44距固定边41的距离分别为800㎜和1600㎜,将直角三角形防风支撑架4的上边42与下边43交接的端部制成半开口环; Use ∠50×50×6 angle iron to weld a right triangle windproof support frame 4, the short side of the right triangle is the fixed side 41 of the windproof steel support frame, the length is 1000mm, and the long right angle side of the right triangle is the upper side 42 of the windproof steel support frame , the length is 2200㎜, the hypotenuse of the right triangle is the lower side 43 of the windproof steel support frame, two reinforcing ribs 44 are welded parallel to the fixed side 41 between the upper side 42 and the lower side 43 of the windproof steel supporting frame, and the distance between the two reinforcing ribs 44 is fixed The distances between the sides 41 are 800mm and 1600mm respectively, and the ends where the upper side 42 and the lower side 43 of the right-angled triangular windproof support frame 4 meet are made into semi-split rings;
将直角三角形防风支撑架4的固定边41沿竖直方向固定于超高层建筑的外墙面上, 将下挂的钢丝绳2从防风钢支撑架4的端部开口环内侧穿过,再用轧头轧牢,从而将钢丝绳两端固定,以此类推,完成全高钢丝绳2的下挂与固定工作,防风钢支撑架4每隔12米设一道,每道设防风钢支撑架15个,从而形成防风环带; Fix the fixed edge 41 of the right-angled triangular windproof support frame 4 on the outer wall of a super high-rise building along the vertical direction, pass the steel wire rope 2 hanging down from the inside of the end open ring of the windproof steel support frame 4, and then use a rolling Roll the head firmly, so as to fix the two ends of the steel wire rope, and so on, to complete the hanging and fixing work of the full-height steel wire rope 2. The windproof steel support frame 4 is set up every 12 meters, and each road is equipped with 15 windproof steel support frames. windproof belt;
(4)安全网附着固定 (4) The safety net is attached and fixed
利用吊蓝由上而下将安全网3附着固定在钢丝绳2上,其方法是用小轧头穿过安全网3两端的耳孔,直接固定在钢丝绳2上,安全网接长及中间耳孔的连接可采用16#镀锌铁丝绞丝状搭接绑牢,从而完成整个吊篮外防护层的张挂工作。 Use hanging baskets to attach and fix the safety net 3 on the steel wire rope 2 from top to bottom. The method is to use a small rolling head to pass through the ear holes at both ends of the safety net 3 and directly fix it on the steel wire rope 2. The safety net is extended and the middle ear hole is connected. 16# galvanized iron wire can be used to lap and fasten tightly, so as to complete the hanging work of the outer protective layer of the whole hanging basket.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210493914.7A CN103015696B (en) | 2012-11-28 | 2012-11-28 | A kind of outer protection layer of hanging basket for super high-rise building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210493914.7A CN103015696B (en) | 2012-11-28 | 2012-11-28 | A kind of outer protection layer of hanging basket for super high-rise building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103015696A CN103015696A (en) | 2013-04-03 |
| CN103015696B true CN103015696B (en) | 2014-11-26 |
Family
ID=47964753
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210493914.7A Expired - Fee Related CN103015696B (en) | 2012-11-28 | 2012-11-28 | A kind of outer protection layer of hanging basket for super high-rise building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103015696B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111350346A (en) * | 2020-03-23 | 2020-06-30 | 北京市建筑工程研究院有限责任公司 | Creeping formwork attachment device for doubly-linked beam |
| CN113374236A (en) * | 2021-06-28 | 2021-09-10 | 兴化市永盛电力器材有限公司 | Quick assembly disassembly safety net for building engineering |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3347395A1 (en) * | 1983-12-29 | 1985-07-11 | Wolfgang 7958 Laupheim Baumann | Scaffold element |
| DE202006017661U1 (en) * | 2006-11-17 | 2007-04-26 | Rux Gmbh | Weather protector for construction or work scaffolds has battens constructed as weather strips into which lateral ends of tarpaulin are inserted |
| CN201125525Y (en) * | 2007-11-08 | 2008-10-01 | 吉泰企业股份有限公司 | Sleeve type anti-falling net liftable bracket |
| CN201486125U (en) * | 2009-08-12 | 2010-05-26 | 上海美装外墙工程设备有限公司 | External wall project net protection device with quickly lifting protective net |
| CN202012205U (en) * | 2011-04-02 | 2011-10-19 | 中天建设集团有限公司第五建设公司 | Safe anti-falling net |
| CN202467231U (en) * | 2012-02-27 | 2012-10-03 | 成都嘉泽正达金属制造有限公司 | Closed type vertical-surface protection system special for hanging basket construction |
| CN203008349U (en) * | 2012-11-28 | 2013-06-19 | 泰兴市第一建筑安装工程有限公司 | Basket outer protection layer used for super high-rise building |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4995337B1 (en) * | 2011-09-09 | 2012-08-08 | 博昭 山下 | Handrail advance type scaffold curing system, handrail advance type scaffold using the same, and handrail advance type scaffold curing method |
-
2012
- 2012-11-28 CN CN201210493914.7A patent/CN103015696B/en not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3347395A1 (en) * | 1983-12-29 | 1985-07-11 | Wolfgang 7958 Laupheim Baumann | Scaffold element |
| DE202006017661U1 (en) * | 2006-11-17 | 2007-04-26 | Rux Gmbh | Weather protector for construction or work scaffolds has battens constructed as weather strips into which lateral ends of tarpaulin are inserted |
| CN201125525Y (en) * | 2007-11-08 | 2008-10-01 | 吉泰企业股份有限公司 | Sleeve type anti-falling net liftable bracket |
| CN201486125U (en) * | 2009-08-12 | 2010-05-26 | 上海美装外墙工程设备有限公司 | External wall project net protection device with quickly lifting protective net |
| CN202012205U (en) * | 2011-04-02 | 2011-10-19 | 中天建设集团有限公司第五建设公司 | Safe anti-falling net |
| CN202467231U (en) * | 2012-02-27 | 2012-10-03 | 成都嘉泽正达金属制造有限公司 | Closed type vertical-surface protection system special for hanging basket construction |
| CN203008349U (en) * | 2012-11-28 | 2013-06-19 | 泰兴市第一建筑安装工程有限公司 | Basket outer protection layer used for super high-rise building |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103015696A (en) | 2013-04-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
| CN201428239Y (en) | Supporting system for combined channel steel cantilever bracket template | |
| CN209585718U (en) | A multifunctional foundation pit protection shed | |
| CN206128603U (en) | Curtain mounting structure that leads a wandering life cornices | |
| CN206942245U (en) | Prefabricated case beam tie with reinforcing bar construction frame | |
| CN209780193U (en) | Suspension type scaffold | |
| CN108104460A (en) | A kind of overhanging type framed bent sets up structure and construction method | |
| CN214144714U (en) | Supporting formwork structure of high-altitude cantilever corridor | |
| CN103015696B (en) | A kind of outer protection layer of hanging basket for super high-rise building | |
| CN208056613U (en) | A kind of overhanging type framed bent sets up structure | |
| CN203808249U (en) | Column stirrup cage assembly for beam-column joint core region | |
| CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
| CN203684102U (en) | Prefabricated girder support system erected at the junction span of the ramp bridge and the main line bridge | |
| CN203308109U (en) | External carrying net device | |
| CN202299362U (en) | Erecting structure for suspension type scaffold of pipe rack | |
| CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
| CN203559570U (en) | Operating platform for steel pipe support frame overhung on surrounding columns | |
| CN215718762U (en) | Support structure for synchronous construction of station and shield | |
| CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
| CN104963697B (en) | A kind of portable steel pipe framed bent of concrete construction | |
| CN203008349U (en) | Basket outer protection layer used for super high-rise building | |
| CN109356338A (en) | Steel skeleton parapet wall structure | |
| CN103643790B (en) | It is applicable to the self-crawling type operating platform of colossal column | |
| CN211228141U (en) | A New Type of T-beam Diaphragm Construction Platform Cross Bracing | |
| CN109750830A (en) | The load bearing support structure of high-altitude long-span beam slab concrete blinding |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C53 | Correction of patent of invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Chen Junyi Inventor after: Yao Jianguo Inventor after: Tao Guihua Inventor after: Yin Hui Inventor before: Yao Jianguo Inventor before: Chen Junyi Inventor before: Tao Guihua Inventor before: Yin Hui |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: YAO JIANGUO CHEN JUNYI TAO GUIHUA PRINT HUI TO: CHEN JUNYI YAO JIANGUO TAO GUIHUA PRINT HUI |
|
| CP03 | Change of name, title or address |
Address after: No. 87, Jinchuan Road, Taixing City, Taizhou, Jiangsu Patentee after: TAIXING FIRST CONSTRUCTION GROUP CO.,LTD. Address before: 225400 Daqing East Road, Taixing City, Taizhou, Jiangsu Province, No. 21 Patentee before: TAIXING FIRST CONSTRUCTION INSTALLATION Co.,Ltd. |
|
| CP03 | Change of name, title or address | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 |