CN103321399A - Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof - Google Patents

Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof Download PDF

Info

Publication number
CN103321399A
CN103321399A CN2013102537257A CN201310253725A CN103321399A CN 103321399 A CN103321399 A CN 103321399A CN 2013102537257 A CN2013102537257 A CN 2013102537257A CN 201310253725 A CN201310253725 A CN 201310253725A CN 103321399 A CN103321399 A CN 103321399A
Authority
CN
China
Prior art keywords
exterior wall
rods
outside
leger
horizon bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102537257A
Other languages
Chinese (zh)
Other versions
CN103321399B (en
Inventor
黄文恒
刘瑞明
李钦
焦连庆
黄臣
王宽亮
钟兴龙
庄绪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
BEIJING JINGOLD AIRPORT CONSTRUCTION Co Ltd
Original Assignee
BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
BEIJING JINGOLD AIRPORT CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd, BEIJING JINGOLD AIRPORT CONSTRUCTION Co Ltd filed Critical BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
Priority to CN201310253725.7A priority Critical patent/CN103321399B/en
Publication of CN103321399A publication Critical patent/CN103321399A/en
Application granted granted Critical
Publication of CN103321399B publication Critical patent/CN103321399B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)
  • Movable Scaffolding (AREA)

Abstract

Disclosed are a suspension scaffold at a gable at a sloping roof eaves of a high-rise building, and a construction method thereof. The suspension scaffold comprises overhang horizontal rods, inner rods, large transverse rods, vertical rods, small transverse rods, scaffold boards, a horizontal safety mesh, a facade safety mesh, facade large meshes, and wire ropes. The overhang horizontal rods include an upper row and a lower row. The inner ends of the overhang horizontal rods pass through exterior wall water-drill boreholes to be firmly locked to the inner rods. The large transverse rods and the vertical rods are erected in an inner row and an outer row outside an exterior wall. The lower large transverse rods are erected on the upper and lower rows of overhang horizontal rods. The lower portions of the vertical rods are firmly locked to the large transverse rods. The small transverse rods are connected between the inner and outer rows of vertical rods. The scaffold boards are laid on the lower row of overhang horizontal rods. The suspension scaffold and the construction method thereof have the advantages that construction safety, fast construction, easily guaranteed quality and low comprehensive cost are guaranteed; the problems in construction and protection of eaves of sloping-proof high-rise buildings are solved well; construction is safe, economical and fast, and construction quality is easily guaranteed.

Description

The outer eaves gable place of the oblique roofing of highrise building encorbelment frame and job practices thereof
Technical field
The present invention relates to a kind of building scaffold, particularly the outer eaves construction of a kind of highrise building pitched roof and defensive frame and the job practices thereof of encorbelmenting.
Background technology
The selection of the outer eaves form of construction work of highrise building is often determining outer eaves construction safety, speed of application, construction quality and integrated cost.Adopt traditional console mode single (two) row's steel pipe scaffold or shaped steel overhanging scaffold to carry out outer eaves when constructing, need to remove while constructing from top to bottom scaffold, scaffold take the cycle long, comprehensive cost is higher, and the eaves construction stage is carried out shutoff and the metope processing at various holes outside, speed of application is slower, and construction quality is difficult for guaranteeing.Adopt the hanging basket mode to carry out outer eaves when constructing, just carried out shutoff and the metope at various holes handles in structure scaffold teardown phase, therefore speed of application is very fast, quality is good, but for oblique roofing highrise building, the hanging basket mode can't be carried out the outer eaves construction of oblique roofing part, and the security protection of roofing is difficult for solving.
Summary of the invention
The invention provides the outer eaves gable place of the oblique roofing of a kind of highrise building encorbelment frame and job practices thereof, solve existing outer eaves construction with scaffold take the cycle long, speed of application is slow, construction quality is difficult for assurance, technical problem of poor safety.
The technical solution adopted for the present invention to solve the technical problems is:
The outer eaves gable place of the oblique roofing of this highrise building frame of encorbelmenting comprises outer choose horizon bar, interior side lever, leger, vertical rod, little cross bar, scaffold floor, horizontal safety net, horizontal large-mesh, facade safety net, facade large-mesh and wire rope;
Describedly outer choose horizon bar two rows arranged, two rows choose outward horizon bar the inner pass exterior wall water bore perforate and with inboard lever lock jail;
Described leger and vertical rod are erected with inside and outside two rows in the exterior wall outside, the leger of bottom is erected on two rows and chooses on the horizon bar outward, described vertical rod and leger lock jail, described little cross bar is connected between inside and outside two row's vertical rods, described scaffold floor is layed in down exclusive choosing on the horizon bar, horizontal safety net and horizontal large-mesh hang on the scaffold floor below, and facade safety net and facade large-mesh hang on and efflux the vertical rod outside;
Described wire rope one end is fixed by HOOK BOLTS and exterior wall, and the other end is connected on the leger of support body bottom outside.
The internal orifice that described exterior wall water bores perforate is higher than collar extension.
Described two rows are chosen outward and also are connected with outside diagonal member arranged in a crossed manner between the horizon bar.
Described HOOK BOLTS is fixed by double nut and exterior wall, is lined with pad between double nut and the exterior wall.
Side lever is inboard vertical rod or inboard rail in described.
In described side lever outside wall water bore between tapping and the exterior wall and be lined with flitch.
Row's vertical rod is bored between tapping and the exterior wall at exterior wall water and is lined with flitch in described.
The encorbelment job practices of frame of the outer eaves gable place of the oblique roofing of this highrise building, construction sequence is as follows:
Step 1 at first at the inner side of outer wall snap the line, is determined position of opening, carries out exterior wall water and bores perforate;
Step 2 is chosen horizon bar outward and is set up, with two rows choose outward horizon bar the inner pass exterior wall water bore perforate and with inboard lever lock jail;
Step 3, set up outside double-pole scaffold, outside two rows, choose earlier the leger that horizon bar is set up the bottom, with vertical rod and leger lock jail, the leger that connects middle part and top again, and the little cross bar between inside and outside two row's vertical rods are laid scaffold floor at the following exclusive horizon bar of choosing then, support body below scaffold floor hangs horizontal safety net and horizontal large-mesh, side mounting facade safety net and facade large-mesh outside effluxing vertical rod;
Step 4 is drawn the wire rope off-load, and wire rope one end is fixed by HOOK BOLTS and exterior wall, and the other end is connected on the leger of support body bottom outside.
Characteristics of the present invention are as follows:
Utilization of the present invention is encorbelmented horizon bar as encorbelmenting the braced structures of frame, set up members such as vertical rod, cross bar, diagonal member thereon, make it to form continuous, stable structure, lay scaffold then, hang safety net, final formation for outer eaves constructed and the defensive closed platform of roofing.The various loads that the unitary construction of the diameter of horizon bar and encorbelment length, the frame of encorbelmenting of encorbelmenting produced according to when construction are determined with design as calculated.Encorbelment frame by linking member and agent structure is fixed, and frame is stable, safety, reliable to guarantee to encorbelment.During construction, various vertical and horizontal loads and pass to by the horizon bar of encorbelmenting and to link member on the frame of encorbelmenting, and finally pass to agent structure.Material required for the present invention is conventional steel pipe and circulation materials commonly used such as buckle, U holder, wooden scaffold floor, Dense mesh screen and big eye net.
Advantage of the present invention is as follows:
1, encorbelments and to guarantee operator's safety when frame is set up and removed.
The workman operated protection safety when 2, outer eaves was constructed.
3, provide good roofing protection.
4, compare with traditional console mode single (two) row's steel pipe scaffold or shaped steel overhanging scaffold, the framework of encorbelmenting is made simply, easy construction, and required steel pipe and buckle, U hold in the palm negligible amounts, therefore reduce comprehensive cost greatly.
5, solve the oblique roofing part of oblique roofing highrise building construction problem, can carry out crossed construction, guaranteed the whole duration.Frame does not take the roofing part owing to encorbelment, and therefore outer eaves construction can be carried out simultaneously with roofing construction, is independent of each other, does not restrict mutually.
The present invention can guarantee construction safety, speed of application is fast, quality easily guarantees, comprehensive cost is low, solve the outer eaves construction of oblique roofing highrise building and protection question preferably, reached safety, economy, fast, the easy technique effect that guarantees of construction quality of speed of application.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is structural representation of the present invention.
Reference numeral: 1-exterior wall water bores perforate, 2-chooses side lever in horizon bar, the 3-, 4-flitch, 5-leger, 6-outside diagonal member, 7-vertical rod, the little cross bar of 8-, 9-HOOK BOLTS, 10-wire rope, 11-scaffold floor, 12-horizontal safety net, 13-facade safety net, 14-facade large-mesh, the horizontal large-mesh of 15-, 16-double nut, 17-pad, 18-exterior wall outward.
The specific embodiment
Embodiment is referring to shown in Figure 1, the outer eaves gable place of the oblique roofing of this highrise building frame of encorbelmenting, comprise outer choose horizon bar 2, interior side lever 3, leger 5, vertical rod 7, little cross bar 8, scaffold floor 11, horizontal safety net 12, horizontal large-mesh 15, facade safety net 13, facade large-mesh 14 and wire rope 10.
Choosing horizon bar 2 outside described has two rows, and two rows are chosen horizon bar 2 the inners outward and passed exterior wall water brill perforate 1 and firm with interior side lever 3 locks.The internal orifice that described exterior wall water bores perforate 1 is higher than collar extension.Side lever 3 be inboard rail or inboard vertical rod in described, and interior side lever is lined with flitch 4 between wall water brill perforate 1 place and the exterior wall 18 outside.
Described leger 5 and vertical rod 7 are erected with inside and outside two rows in exterior wall 18 outsides, and the leger 5 of bottom is erected on two rows and chooses outward on the horizon bar 2, and two rows are chosen outward and also are connected with outside diagonal member 6 arranged in a crossed manner between the horizon bar 2.Vertical rod 7 and leger 5 lock jails, interior row's vertical rod 7 is bored between perforate 1 place and the exterior wall 18 at exterior wall water and is lined with flitch 4.Little cross bar 8 is connected between inside and outside two row's vertical rods 7, and scaffold floor 11 is layed in down exclusive choosing on the horizon bar 2, and horizontal safety net 12 and horizontal large-mesh 15 hang on scaffold floor 11 belows, and facade safety net 13 and facade large-mesh 14 hang on and efflux vertical rod 7 outsides.
Described wire rope 10 1 ends are fixing with exterior wall 18 by HOOK BOLTS 9, and the other end is connected on the leger 5 of support body bottom outside.Described HOOK BOLTS 9 is fixing with exterior wall 18 by double nut 16, is lined with pad 17 between double nut and the exterior wall.
Construction sequence of the present invention is as follows:
Step 1 at first at the inner side of outer wall snap the line, is determined position of opening, carries out exterior wall water with No. 50 water drill bits of circle and bores perforate, and internal orifice is high slightly, prevents that summer exterior wall rainwater is to indoor seepage;
Step 2 is chosen horizon bar 2 outward and is set up, and two rows is chosen horizon bar 2 the inners outward pass exterior wall water brill perforate 1 and firm with interior side lever 3 locks; Two rows are chosen outward between the horizon bar 2 and are fixed into whole stressed primary structural component with outside diagonal member 6;
Step 3, set up outside double-pole scaffold, outside two rows, choose earlier horizon bar 2 and set up 2 meters of the leger 5(leger joint lengths of bottom, adopt overlap joint to connect, be convenient to partial dismantling), with vertical rod 7 and leger 5 lock jail (1.20 meters of vertical rod advances, 1.05 meters of transfers), the leger 5 that connects middle part and top again, and 1.50 meters of the little cross bar step pitch of little cross bar 8(of inside and outside two rows between the vertical rods 7), lay scaffold floors 11 at the following exclusive horizon bar 2 of choosing then, the support body below scaffold floor 11 hangs horizontal safety net 12 and horizontal large-mesh 15, side mounting facade safety net 13 and facade large-mesh 14 outside effluxing vertical rod 7;
Step 4 is drawn the wire rope off-load, and wire rope 10 1 ends are fixing with exterior wall 18 by HOOK BOLTS 9, and the other end is connected on the leger 5 of support body bottom outside.
The frame of encorbelmenting goes out roofing protection height must not be less than 2000mm.
Outer eaves hanging basket cantilever steel girder after setting up and finish, the frame of encorbelmenting is installed, and installation room hanging basket outward successively.

Claims (8)

1. the outer eaves gable place of the oblique roofing of the highrise building frame of encorbelmenting, it is characterized in that: comprise outer choose horizon bar (2), interior side lever (3), leger (5), vertical rod (7), little cross bar (8), scaffold floor (11), horizontal safety net (12), horizontal large-mesh (15), facade safety net (13), facade large-mesh (14) and wire rope (10);
Choosing horizon bar (2) outside described has two rows, and two rows are chosen horizon bar (2) the inner outward and passed exterior wall water brill perforate (1) and firm with interior side lever (3) lock;
Described leger (5) and vertical rod (7) are erected with inside and outside two rows in exterior wall (18) outside, the leger of bottom (5) is erected on two rows and chooses outward on the horizon bar (2), described vertical rod (7) and leger (5) lock jail, described little cross bar (8) is connected between inside and outside two row's vertical rods (7), described scaffold floor (11) is layed in down exclusive choosing on the horizon bar (2), horizontal safety net (12) and horizontal large-mesh (15) hang on scaffold floor (11) below, and facade safety net (13) and facade large-mesh (14) hang on and efflux vertical rod (7) outside;
Described wire rope (10) one ends are fixing by HOOK BOLTS (9) and exterior wall (18), and the other end is connected on the leger (5) of support body bottom outside.
2. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting, it is characterized in that: the internal orifice that described exterior wall water bores perforate (1) is higher than collar extension.
3. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting, it is characterized in that: described two rows are chosen outward and also are connected with outside diagonal member (6) arranged in a crossed manner between the horizon bar (2).
4. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting, it is characterized in that: described HOOK BOLTS (9) is fixing by double nut (16) and exterior wall (18), is lined with pad (17) between double nut and the exterior wall.
5. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting, it is characterized in that: side lever (3) is inboard vertical rod or inboard rail in described.
6. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting is characterized in that: in described side lever (3) exterior wall water bore that perforate (1) is located and exterior wall (18) between be lined with flitch (4).
7. the outer eaves gable place of the oblique roofing of the highrise building according to claim 1 frame of encorbelmenting is characterized in that: in described row's vertical rod (7) exterior wall water bore that perforate (1) is located and exterior wall (18) between be lined with flitch (4).
8. one kind as the encorbelment job practices of frame of the outer eaves gable place of any oblique roofing of described highrise building of claim 1~7, it is characterized in that construction sequence is as follows:
Step 1 at first at the inner side of outer wall snap the line, is determined position of opening, carries out exterior wall water and bores perforate;
Step 2 is chosen horizon bar (2) outward and is set up, and two rows is chosen horizon bar (2) the inner outward pass exterior wall water brill perforate (1) and firm with interior side lever (3) lock;
Step 3, set up outside double-pole scaffold, outside two rows, choose earlier the leger (5) that horizon bar (2) is set up the bottom, with vertical rod (7) and leger (5) lock jail, the leger (5) that connects middle part and top again, and the little cross bar (8) between inside and outside two row's vertical rods (7), lay scaffold floor (11) at the following exclusive horizon bar (2) of choosing then, support body in scaffold floor (11) below hangs horizontal safety net (12) and horizontal large-mesh (15), side mounting facade safety net (13) and facade large-mesh (14) outside effluxing vertical rod (7);
Step 4 is drawn the wire rope off-load, and wire rope (10) one ends are fixing by HOOK BOLTS (9) and exterior wall (18), and the other end is connected on the leger (5) of support body bottom outside.
CN201310253725.7A 2013-06-25 2013-06-25 The outer eaves gable place's suspension scaffold of highrise building Sloping roof and construction method thereof Active CN103321399B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310253725.7A CN103321399B (en) 2013-06-25 2013-06-25 The outer eaves gable place's suspension scaffold of highrise building Sloping roof and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310253725.7A CN103321399B (en) 2013-06-25 2013-06-25 The outer eaves gable place's suspension scaffold of highrise building Sloping roof and construction method thereof

Publications (2)

Publication Number Publication Date
CN103321399A true CN103321399A (en) 2013-09-25
CN103321399B CN103321399B (en) 2015-12-16

Family

ID=49190421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310253725.7A Active CN103321399B (en) 2013-06-25 2013-06-25 The outer eaves gable place's suspension scaffold of highrise building Sloping roof and construction method thereof

Country Status (1)

Country Link
CN (1) CN103321399B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485524A (en) * 2013-10-11 2014-01-01 四川省第四建筑工程公司 Bracket type overhanging scaffold and construction method thereof at erection time
CN104131688A (en) * 2014-08-21 2014-11-05 长沙远大住宅工业集团有限公司 Externally-mounted work platform for fabricated building and method for operating externally-mounted work platform for fabricated building
CN109911106A (en) * 2019-03-14 2019-06-21 上海江南长兴造船有限责任公司 A kind of apparatus for work and method for the installation of container ship positioning pin
CN110821133A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Externally hung operating steel platform and construction method thereof
CN113047592A (en) * 2021-03-30 2021-06-29 浙江泛华工程咨询有限公司 High-rise building engineering construction protector
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101538896A (en) * 2009-04-03 2009-09-23 标力建设集团有限公司 Construction method for jettied structure at high attitude of high-rise building
JP2010150756A (en) * 2008-12-24 2010-07-08 Shimizu Corp Temporary scaffold apparatus
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding
CN102561689A (en) * 2012-02-22 2012-07-11 中国二十二冶集团有限公司 Construction method for cantilever lifting scaffold
CN202324571U (en) * 2011-11-01 2012-07-11 江苏瑞峰建设集团有限公司 Overhanging type double-row scaffold
CN203320920U (en) * 2013-06-25 2013-12-04 北京金港机场建设有限责任公司 Cantilever frame for high-rise building sloping roof outer eave construction and protection at gable

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010150756A (en) * 2008-12-24 2010-07-08 Shimizu Corp Temporary scaffold apparatus
CN101538896A (en) * 2009-04-03 2009-09-23 标力建设集团有限公司 Construction method for jettied structure at high attitude of high-rise building
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding
CN202324571U (en) * 2011-11-01 2012-07-11 江苏瑞峰建设集团有限公司 Overhanging type double-row scaffold
CN102561689A (en) * 2012-02-22 2012-07-11 中国二十二冶集团有限公司 Construction method for cantilever lifting scaffold
CN203320920U (en) * 2013-06-25 2013-12-04 北京金港机场建设有限责任公司 Cantilever frame for high-rise building sloping roof outer eave construction and protection at gable

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485524A (en) * 2013-10-11 2014-01-01 四川省第四建筑工程公司 Bracket type overhanging scaffold and construction method thereof at erection time
CN103485524B (en) * 2013-10-11 2016-03-23 四川省第四建筑工程公司 Corbel type builder's jack and construction when setting up thereof
CN104131688A (en) * 2014-08-21 2014-11-05 长沙远大住宅工业集团有限公司 Externally-mounted work platform for fabricated building and method for operating externally-mounted work platform for fabricated building
CN109911106A (en) * 2019-03-14 2019-06-21 上海江南长兴造船有限责任公司 A kind of apparatus for work and method for the installation of container ship positioning pin
CN109911106B (en) * 2019-03-14 2021-09-24 上海江南长兴造船有限责任公司 Operation device and method for installing positioning pin of container ship
CN110821133A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Externally hung operating steel platform and construction method thereof
CN110821133B (en) * 2019-11-06 2023-11-10 上海建工七建集团有限公司 Externally-hung operation steel platform and construction method thereof
CN113047592A (en) * 2021-03-30 2021-06-29 浙江泛华工程咨询有限公司 High-rise building engineering construction protector
CN113550550A (en) * 2021-06-30 2021-10-26 重庆建工第三建设有限责任公司 Overhanging unit type scaffold convenient to assemble and disassemble

Also Published As

Publication number Publication date
CN103321399B (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN103276886B (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN103321399A (en) Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof
CN202324571U (en) Overhanging type double-row scaffold
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN107761961A (en) A kind of electronic climbing frame monolithic construction method of high-rise building
CN105178584A (en) Assembled house out-hung scaffold system and construction method
CN103993666A (en) Improved supporting system construction method suitable for large overhung outer floating plate roof
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN203320920U (en) Cantilever frame for high-rise building sloping roof outer eave construction and protection at gable
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN207879008U (en) Diameter Silo structure roof support system
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN201908447U (en) Lift-type horizontal safety net
CN201714051U (en) High altitude operation hanging frame
CN102061810A (en) Construction method of safe flat net positioned on periphery of building
CN114033171B (en) Clamp type triangular support system of cantilever roof panel and construction method thereof
CN109653484A (en) A kind of roofing superelevation faces the plug-in hanging basket mounting structure of sky curtain wall engineering
CN204282788U (en) Shaping type scaffold can be assembled
CN203320921U (en) Cantilever frame for high-rise building sloping roof outer eave construction and protection at window

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100071 Fengtai District 52 Beijing Feng 1 hospital

Applicant after: BEIJING JINGOLD CONSTRUCTION CO., LTD.

Applicant after: Beijing Jingold Field Road Engineering Construction Co., Ltd.

Address before: 100071 Fengtai District 52 Beijing Feng 1 hospital

Applicant before: Beijing Jingold Airport Construction Co., Ltd.

Applicant before: Beijing Jingold Field Road Engineering Construction Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: BEIJING JINGOLD AIRPORT CONSTRUCTION LLC TO: BEIJING JINGOLD AIRPORT CONSTRUCTION CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant