CN109911106B - Operation device and method for installing positioning pin of container ship - Google Patents

Operation device and method for installing positioning pin of container ship Download PDF

Info

Publication number
CN109911106B
CN109911106B CN201910193550.2A CN201910193550A CN109911106B CN 109911106 B CN109911106 B CN 109911106B CN 201910193550 A CN201910193550 A CN 201910193550A CN 109911106 B CN109911106 B CN 109911106B
Authority
CN
China
Prior art keywords
protection
positioning block
plate
lug
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910193550.2A
Other languages
Chinese (zh)
Other versions
CN109911106A (en
Inventor
邓庆彪
陆荣
李冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Shipbuilding Co Ltd filed Critical Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority to CN201910193550.2A priority Critical patent/CN109911106B/en
Publication of CN109911106A publication Critical patent/CN109911106A/en
Application granted granted Critical
Publication of CN109911106B publication Critical patent/CN109911106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an operation device for installing a positioning pin of a container ship, which comprises: the manned structure comprises a bottom frame and a manned platform plate, wherein the bottom of the frame is provided with a lightering hole; the quick positioning structure comprises a multifunctional lifting lug, a support frame and a quick mounting positioning block, wherein the multifunctional lifting lug is provided with a lifting hole and a quick mounting groove, the multifunctional lifting lug is mounted at the middle position in the height direction of the operation device, the support frame is connected with the manned structure at the lower part, the quick mounting positioning block is a detachable part, and the quick mounting positioning block is fixed on the top plate of the diaphragm cabin and is close to the edge of the diaphragm cabin wall plate; the invention also discloses a positioning pin mounting method for the container ship diaphragm cabin wall plate. The container ship positioning pin installing device has the advantages that the container ship positioning pin is installed without hands, the workload of erecting and disassembling hands in the positioning pin area is avoided, the working efficiency is improved, the safety of construction operation is improved, and the production cost of a shipyard is reduced.

Description

Operation device and method for installing positioning pin of container ship
Technical Field
The invention belongs to the technical field of ship construction, and particularly relates to an operation device and method for installing a container ship positioning pin.
Background
When a large ship is built, a positioning pin device is an essential part of a container ship and is usually installed at the later stage of the ship building, and due to the structural characteristics of the container ship, the positioning pin is usually arranged in a cargo hold area below the bottom of a transverse bulkhead, is high in position and cannot be arranged with necessary installation protection measures.
In the prior art, a temporary scaffold is usually erected, and the temporary scaffold is detached after the construction of a pin to be positioned is finished. The installation operation of the positioning pin by adopting the mode has the following defects:
firstly, the position is higher, which belongs to high-altitude edge operation, and potential safety hazards exist in the process of erecting the scaffold by scaffold erecting personnel;
secondly, the number of temporary scaffold movable connecting parts is large, the scaffold setting quality is influenced by a large number of factors of scaffold setting personnel, and potential safety hazards exist in the using process;
thirdly, the number of the positioning pins is large, the workload of setting and removing the temporary scaffold is large, the setting period is relatively long, and the efficiency is low;
in view of the above, there is a need for a safe, quick, reusable device that addresses the above-mentioned problems.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides the operation device and the operation method for installing the container ship positioning pin, which can solve the problems in the prior art, have firm structure and convenient installation and disassembly and can be repeatedly used.
In order to achieve the purpose, the invention adopts the following technical scheme:
a working device for locating pin installation of a container ship, the working device comprising:
the manned structure comprises a bottom frame and a manned platform plate, wherein the bottom of the frame is provided with a lightering hole; the transfer hole is used for conveniently carrying the operation device;
the rapid positioning structure comprises a multifunctional lifting lug, a support frame and a rapid mounting positioning block, wherein the multifunctional lifting lug is provided with a lifting hole and a rapid mounting groove, the multifunctional lifting lug is mounted at the middle position in the height direction of the operation device, the support frame is connected with the manned structure at the lower part, the rapid mounting positioning block is a detachable part, the rapid mounting positioning block is fixed on the top plate of the diaphragm cabin and close to the edge of the diaphragm cabin wall plate, a screw hole is formed in the rapid mounting positioning block, and the rapid mounting positioning block is connected with the rapid mounting groove in a matched manner;
the safety protection structure comprises a guardrail, fastening bolts and nuts, the fastening bolts are matched with the nuts, the nuts are fixedly connected in the quick mounting grooves, and the fastening bolts are matched with the screw holes.
The safety protection structure further comprises a protection lug plate and a protection chain, wherein the protection lug plate is installed at the lower end of the middle part of the multifunctional lifting lug, one end of the protection chain is fixedly connected to the binding bridge, and the other end of the protection chain is fixedly connected to the protection lug plate.
The thickness of the quick mounting positioning block is smaller than or equal to the opening distance of the quick mounting groove.
The operation device is in vertical state, the preceding terminal surface of support frame with quick mounting groove rear end face is in same vertical plane.
The safety protection structure further comprises a protection lug plate and a steel wire rope, wherein the protection lug plate is installed at the lower end of the middle part of the multifunctional lifting lug, one end of the steel wire rope is fixedly connected to the binding bridge, and the other end of the steel wire rope is fixedly connected to the protection lug plate.
The multifunctional lifting lug is provided with the hoisting holes at the front end and the rear end of the upper part of the multifunctional lifting lug respectively.
The guardrail include horizontal railing, horizontal railing uses as upper and lower staircase, horizontal railing possesses the guard action simultaneously.
The invention also provides a positioning pin mounting method for the container ship diaphragm cabin wall plate, which comprises the following steps
S1, fixing the quick mounting positioning block at the edge of the transverse bulkhead top plate close to the transverse bulkhead wall plate according to the distance between the multifunctional lifting lugs at the two sides of the operation device;
s2, hoisting the operation device to an operation position by using a crane, and clamping the quick installation groove of the multifunctional lifting lug on the quick installation positioning block;
s3, tightening the fastening bolt to fix the quick positioning block in the quick mounting groove;
s4, the protection ear plates are firmly connected with the ship body by using protection chains;
s5 mounting a positioning pin on the bulkhead plate.
The ship body is a lashing bridge in the process of firmly connecting the protection ear plates and the ship body by using the protection chains.
Compared with the prior art, the invention has the beneficial effects that:
1. the workload of installing and detaching the scaffold is reduced, the construction waiting time is reduced, and the working efficiency is improved;
2. the mounting risk in the processes of erecting and disassembling the scaffold is avoided, and the use risk in the process of using the temporary scaffold is avoided;
3. the safety protection structure of having improved material utilization, having reduced the manufacturing cost of shipyard guarantees the personnel's safety in the work progress through this device, through the quick location structure of this device, improves the installation of this device, demolishs efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a side view of the overall structure of the present invention.
Fig. 2 is a front view of the overall structure of the present invention.
Fig. 3 is a schematic diagram of the application of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention.
As shown in fig. 1 to 3, the present embodiment provides a working device for dowel installation of a container ship, including:
the manned structure comprises a bottom frame 11 and a manned platform plate 12, wherein a lightering hole 13 is formed in the bottom of the frame;
the rapid positioning structure comprises a multifunctional lifting lug 21, a support frame 22 and a rapid mounting positioning block 23, wherein the multifunctional lifting lug 21 is provided with a lifting hole 211 and a rapid mounting groove, the multifunctional lifting lug 21 is mounted in the middle position in the height direction of the operation device, the support frame 22 is connected with the manned structure at the lower part, the rapid mounting positioning block 23 is a detachable part, the rapid mounting positioning block 23 is fixed on the top plate 4 of the transverse bulkhead and is close to the edge of the wall plate 5 of the transverse bulkhead, the rapid mounting positioning block 23 is provided with a screw hole, and the rapid mounting positioning block 23 is matched and connected with the rapid mounting groove;
safety protection structure, safety protection structure includes guardrail 31, fastening bolt 33, nut 32, fastening bolt 33 cooperation nut 32 connection fixation is in the quick mounting groove, fastening bolt 33 with the screw hole cooperatees.
The edge of the transverse bulkhead top plate 4 close to the transverse bulkhead wall plate 5 is provided with a positioning pin, and positioning blocks are symmetrically and rapidly arranged at two ends of the positioning pin.
Preferably, the safety protection structure of the present embodiment further includes a protection ear plate 34 and a protection chain 35, wherein the protection ear plate 34 is installed at the lower end of the middle portion of the multifunctional lifting lug 21, one end of the protection chain 35 is fixedly connected to the binding bridge 6, and the other end of the protection chain 35 is fixedly connected to the protection ear plate 34. The protective lifting lug 34 and the binding bridge are connected and fixed by using a protective chain, so that the purpose of secondary protection is achieved.
Preferably, the thickness of the quick mounting positioning block 23 is smaller than or equal to the opening distance of the quick mounting groove.
Preferably, in the working device of the present embodiment, in an upright state, the front end surface of the support frame 22 and the rear end surface of the quick-mounting groove are in the same vertical plane.
As a further preference, the safety protection structure of the present embodiment further includes a protection ear plate 34 and a steel wire rope, the protection ear plate 34 is installed at the lower end of the middle portion of the multifunctional lifting lug 21, one end of the steel wire rope is fixedly connected to the binding bridge 6, and the other end of the steel wire rope is fixedly connected to the protection ear plate 34.
Preferably, the multifunctional lifting lug 21 of the present embodiment is provided with the lifting holes 211 at the front end and the rear end of the upper portion thereof.
More preferably, the guard rail 31 according to the embodiment includes a transverse rail 311, the transverse rail 311 is used as an escalator, and the transverse rail 311 has a shielding function at the same time.
The embodiment also provides a positioning pin mounting method for the container ship diaphragm cabin wall plate, which comprises the following steps
S1, fixing the quick mounting and positioning block 23 on the edge of the bulkhead top plate 4 close to the bulkhead plate 5 according to the distance between the multifunctional lifting lugs 21 on the two sides of the operation device;
s2, hoisting the operation device to an operation position by using a crane, and clamping the quick installation groove of the multifunctional lifting lug 21 on the quick installation positioning block 23;
s3, tightening the fastening bolt 33 to fix the quick positioning block in the quick mounting groove;
s4, the protection ear plates 34 are firmly connected with the ship body by using the protection chains 35;
s5 is a method of installing a positioning pin on the bulkhead plate 5.
After the operation is finished, the protective chain and the fastening bolt are loosened, and the operation device is lifted by a crane
And hoisting to the next operation site to complete the installation operation process of the positioning pin.
As a further preference, in the present embodiment, the hull is the lashing bridge 6, and the protection ear plates 34 are firmly connected with the hull by using the protection chains 35.
Although the present invention has been described in detail with respect to the above embodiments, it will be understood by those skilled in the art that modifications or improvements based on the disclosure of the present invention may be made without departing from the spirit and scope of the invention, and these modifications and improvements are within the spirit and scope of the invention.

Claims (1)

1. A working device for installing a container ship positioning pin, comprising:
the manned structure comprises a bottom frame (11) and a manned platform plate (12), wherein a lightering hole (13) is formed in the bottom of the frame;
the rapid positioning structure comprises a multifunctional lifting lug (21), a support frame (22) and a rapid installation positioning block (23), wherein a lifting hole (211) and a rapid installation groove are formed in the multifunctional lifting lug (21), the multifunctional lifting lug (21) is installed in the middle of the operation device in the height direction, the support frame (22) is connected with the manned structure at the lower part, the rapid installation positioning block (23) is a detachable part, the rapid installation positioning block (23) is fixed on the transverse bulkhead top plate (4) at the edge close to the transverse bulkhead wall plate (5), a screw hole is formed in the rapid installation positioning block (23), and the rapid installation positioning block (23) is matched and connected with the rapid installation groove;
the safety protection structure comprises a guardrail (31), a fastening bolt (33) and a nut (32), the fastening bolt (33) is matched with the nut (32) to be connected and fixed in the quick mounting groove, and the fastening bolt (33) is matched with the screw hole;
the safety protection structure further comprises a protection lug plate (34) and a protection chain (35), wherein the protection lug plate (34) is installed at the lower end of the middle part of the multifunctional lifting lug (21), one end of the protection chain (35) is fixedly connected to the binding bridge (6), and the other end of the protection chain (35) is fixedly connected to the protection lug plate (34);
the thickness of the quick mounting positioning block (23) is less than or equal to the opening distance of the quick mounting groove;
when the operation device is in a vertical state, the front end surface of the support frame (22) and the rear end surface of the quick mounting groove are in the same vertical plane;
the safety protection structure further comprises a protection lug plate (34) and a steel wire rope, wherein the protection lug plate (34) is installed at the lower end of the middle part of the multifunctional lifting lug (21), one end of the steel wire rope is fixedly connected to the binding bridge (6), and the other end of the steel wire rope is fixedly connected to the protection lug plate (34);
the front end and the rear end of the upper part of the multifunctional lifting lug (21) are respectively provided with the lifting hole (211);
the guardrail (31) comprises a transverse railing (311), the transverse railing (311) is used as an escalator, and the transverse railing (311) has a protection function;
the method for installing the positioning pin for the transverse bulkhead plate of the container ship comprises the following steps:
s1, fixing the quick mounting positioning block (23) at the edge of the transverse bulkhead top plate (4) close to the transverse bulkhead wall plate (5) according to the distance between the multifunctional lifting lugs (21) at the two sides of the operation device;
s2, hoisting the operation device to an operation position by using a crane, and clamping the quick installation groove of the multifunctional lifting lug (21) on the quick installation positioning block (23);
s3, tightening the fastening bolt (33) to fix the quick positioning block in the quick mounting groove;
s4, the protection ear plates (34) are firmly connected with the ship body by using the protection chains (35);
s5, installing a positioning pin on the transverse bulkhead plate (5);
the ship body is a lashing bridge (6) in the process of firmly connecting the protection lug plates (34) with the ship body by using the protection chains (35).
CN201910193550.2A 2019-03-14 2019-03-14 Operation device and method for installing positioning pin of container ship Active CN109911106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910193550.2A CN109911106B (en) 2019-03-14 2019-03-14 Operation device and method for installing positioning pin of container ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910193550.2A CN109911106B (en) 2019-03-14 2019-03-14 Operation device and method for installing positioning pin of container ship

Publications (2)

Publication Number Publication Date
CN109911106A CN109911106A (en) 2019-06-21
CN109911106B true CN109911106B (en) 2021-09-24

Family

ID=66964800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910193550.2A Active CN109911106B (en) 2019-03-14 2019-03-14 Operation device and method for installing positioning pin of container ship

Country Status (1)

Country Link
CN (1) CN109911106B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111929017B (en) * 2020-07-29 2021-04-27 上海交通大学 Method for testing mechanical behavior of binding bridge structure of ultra-large container ship
CN115140271B (en) * 2022-08-11 2023-12-22 上海外高桥造船有限公司 Special hanging cage for ship mounting glass

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2292857Y (en) * 1996-07-10 1998-09-30 王辉 Anti-overturning and anti-falling integrally lifting scaffold
CN201587521U (en) * 2009-12-11 2010-09-22 大连船舶重工集团有限公司 Broadside suspended type platform device for holding welding machine during ship building
CN101891010A (en) * 2009-05-18 2010-11-24 张楚 Mobile operation platform device for ship
CN102061801A (en) * 2009-11-18 2011-05-18 西安孔明电子科技有限公司 Window wall fixing-based outdoor mounting operational platform and application method thereof
CN202807040U (en) * 2012-07-10 2013-03-20 南京海世机电设备有限公司 Suspension device for ship bull facade
CN103321399A (en) * 2013-06-25 2013-09-25 北京金港机场建设有限责任公司 Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof
CN204212390U (en) * 2014-09-29 2015-03-18 中国化学工程第十四建设有限公司 A kind of Construction of Steel Structure Worker carrying basket
CN204384817U (en) * 2014-12-29 2015-06-10 房延来 Hanger rail lifting table
CN105730613A (en) * 2014-12-12 2016-07-06 无锡吊蓝机械制造有限公司 Nacelle suspension bracket for ship
CN205589412U (en) * 2016-04-20 2016-09-21 中船黄埔文冲船舶有限公司 Build in supplementary anti - attitude of boats and ships to segment to stand up to hoist to link up with and use simple and easy stores pylon
CN207208374U (en) * 2017-08-15 2018-04-10 舟山长宏国际船舶修造有限公司 Gunnel workbench is used in a kind of container ship construction
CN109019290A (en) * 2018-07-24 2018-12-18 上海江南长兴造船有限责任公司 A kind of dedicated hanging row lifting container guide rail bracket

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060163001A1 (en) * 2005-01-24 2006-07-27 Pozell Charles A Wall hanging scaffold
CN204775829U (en) * 2015-05-28 2015-11-18 沪东中华造船(集团)有限公司 A protect apart from roof beam for container ship transverse bulkhead carries on fast

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2292857Y (en) * 1996-07-10 1998-09-30 王辉 Anti-overturning and anti-falling integrally lifting scaffold
CN101891010A (en) * 2009-05-18 2010-11-24 张楚 Mobile operation platform device for ship
CN102061801A (en) * 2009-11-18 2011-05-18 西安孔明电子科技有限公司 Window wall fixing-based outdoor mounting operational platform and application method thereof
CN201587521U (en) * 2009-12-11 2010-09-22 大连船舶重工集团有限公司 Broadside suspended type platform device for holding welding machine during ship building
CN202807040U (en) * 2012-07-10 2013-03-20 南京海世机电设备有限公司 Suspension device for ship bull facade
CN103321399A (en) * 2013-06-25 2013-09-25 北京金港机场建设有限责任公司 Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof
CN204212390U (en) * 2014-09-29 2015-03-18 中国化学工程第十四建设有限公司 A kind of Construction of Steel Structure Worker carrying basket
CN105730613A (en) * 2014-12-12 2016-07-06 无锡吊蓝机械制造有限公司 Nacelle suspension bracket for ship
CN204384817U (en) * 2014-12-29 2015-06-10 房延来 Hanger rail lifting table
CN205589412U (en) * 2016-04-20 2016-09-21 中船黄埔文冲船舶有限公司 Build in supplementary anti - attitude of boats and ships to segment to stand up to hoist to link up with and use simple and easy stores pylon
CN207208374U (en) * 2017-08-15 2018-04-10 舟山长宏国际船舶修造有限公司 Gunnel workbench is used in a kind of container ship construction
CN109019290A (en) * 2018-07-24 2018-12-18 上海江南长兴造船有限责任公司 A kind of dedicated hanging row lifting container guide rail bracket

Also Published As

Publication number Publication date
CN109911106A (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN109911106B (en) Operation device and method for installing positioning pin of container ship
KR20140002354U (en) Scaffold fixing apparatus for ship
CN110901851A (en) Ship large-scale equipment broadside installation device
CN113338170A (en) Construction method of template system for construction creeping formwork of large-inclination tower
CN201272657Y (en) Special apparatus for anode framework assembly and swinging of revolving furnace flue gas cleaning equipment
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN216690368U (en) Handrail cup mouth template assembly convenient for rapid installation on construction site
CN213173791U (en) Assembled landing stage pile cap
CN211524150U (en) Steel beam edge protection device
CN112124521A (en) Installation method of transverse ring insulation module of liquid cargo tank of LNG ship
CN216305332U (en) Guide rail upright post for building construction
CN212406078U (en) Double-screw wall-attached support
CN219238665U (en) Ship unloader funnel assembly jig frame
CN209493212U (en) Unit plates of curtain wall lifts auxiliary tool
CN216739308U (en) Steel truss bottom diverting pulley fixing device
CN213661169U (en) Cable tunnel fire prevention riser fixed establishment that can install and remove fast
CN217399424U (en) A protection architecture for case roof beam hoist and mount bottom plate
CN214364898U (en) Reusable ocean platform tower and splicing module thereof
CN220201170U (en) Adjustable steel structure hoisting tool
CN220100663U (en) Small space template mounting device
CN217438686U (en) Portable landing stage panel connection structure
CN217631366U (en) Accurate hoist device of prefabricated superimposed sheet
CN211569856U (en) Fixing structure for hoisting large plate beam
CN211568249U (en) Auxiliary tool for cabin operation
CN220868786U (en) Plastic formwork outer wall post outside template reinforcing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant