CN210914945U - Hoisting device for upper structure of aluminum electrolytic cell - Google Patents

Hoisting device for upper structure of aluminum electrolytic cell Download PDF

Info

Publication number
CN210914945U
CN210914945U CN201921433950.8U CN201921433950U CN210914945U CN 210914945 U CN210914945 U CN 210914945U CN 201921433950 U CN201921433950 U CN 201921433950U CN 210914945 U CN210914945 U CN 210914945U
Authority
CN
China
Prior art keywords
workpiece
mounting hole
electrolytic cell
aluminum electrolytic
hoisting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921433950.8U
Other languages
Chinese (zh)
Inventor
许新欢
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201921433950.8U priority Critical patent/CN210914945U/en
Application granted granted Critical
Publication of CN210914945U publication Critical patent/CN210914945U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model relates to a building construction field, especially an aluminium cell superstructure hoist device. A hoisting device for an upper structure of an aluminum electrolytic cell comprises a hoisting tool and a fixture, wherein the hoisting tool is in a long box structure, two ends of the hoisting tool are provided with lifting lugs, and the middle part of the hoisting tool is provided with a pin; the clamp is a split structure consisting of a first workpiece and a second workpiece, wherein the first workpiece is an L-shaped steel plate, the first workpiece is provided with a bolt mounting hole, the second workpiece is an L-shaped steel plate, the second workpiece is provided with a mounting seam matched with a wing plate of a T-shaped beam on the upper part of the aluminum electrolytic cell, and the second workpiece is provided with a clamp mounting hole. The utility model discloses a fixture simple structure, artifical direct installation at T type roof beam can, reduced the installation degree of difficulty, improved work efficiency.

Description

铝电解槽上部结构吊装装置Aluminum electrolytic cell upper structure hoisting device

技术领域technical field

本实用新型设计建筑施工领域,尤其是一种铝电解槽上部结构吊装装置。The utility model is designed in the field of building construction, in particular to a hoisting device for the upper structure of an aluminum electrolytic cell.

背景技术Background technique

在铝电解槽技改和检修施工过程中需要将上部T型梁的整体吊装,并且吊装频率较高。In the process of technical renovation and maintenance of the aluminum electrolytic cell, it is necessary to hoist the upper T-beam as a whole, and the hoisting frequency is high.

目前常用的吊装施工方法需要制作横梁扁担,横梁扁担穿过大梁窗口进行吊装。横梁扁担笨重、转运安装繁琐,安装过程中需要天车配合,需要人力较多。铝电解槽检修一般与甲方生产同时进行,在安装和拆卸横梁扁担时需要等候天车造成人员设备的窝工,影响施工进度。At present, the commonly used hoisting construction method needs to make a cross beam pole, and the cross beam pole is hoisted through the girder window. The cross-beam pole is cumbersome, and the transfer and installation are cumbersome. During the installation process, it requires the cooperation of the crane and requires a lot of manpower. The maintenance of the aluminum electrolytic cell is generally carried out at the same time as Party A's production. When installing and dismantling the beam and pole, it is necessary to wait for the crane to cause the squatting of personnel and equipment, which will affect the construction progress.

寻找一种施工简单不依靠天车配合,施工速度相对较快且相对安全的吊装装置是急需解决的问题。It is an urgent problem to find a hoisting device that is simple in construction and does not rely on the cooperation of the crane, and the construction speed is relatively fast and relatively safe.

实用新型内容Utility model content

为解决上述技术问题,本实用新型提出一种安装方便,操作简单的铝电解槽上部结构吊装装置。In order to solve the above-mentioned technical problems, the utility model proposes a hoisting device for the upper structure of an aluminum electrolytic cell, which is convenient to install and simple to operate.

本实用新型采用如下技术方案:The utility model adopts the following technical solutions:

一种铝电解槽上部结构吊装装置,包括吊具,卡具,吊具为长形箱体结构,吊具的两端设置有吊耳,吊具的中部设置有销子;卡具是由工件一和工件二组成的分体式结构,工件一为L型钢板,工件一上设置有螺栓安装孔,工件二为L型钢板,工件二上设置有与铝电解槽上部T型梁的翼板相配合的安装缝,工件二上设置有卡具安装孔。A hoisting device for the upper structure of an aluminum electrolytic cell, comprising a hoist and a clamp, the hoist is a long box structure, the two ends of the hoist are provided with lifting ears, and the middle of the hoist is provided with a pin; A split structure composed of the first and the second workpiece. The first workpiece is an L-shaped steel plate, and the first workpiece is provided with bolt mounting holes. The second workpiece is an L-shaped steel plate. A fixture installation hole is arranged on the second workpiece for the matching installation seam.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

本实用新型的卡具为组合是单片安装,结构简单,拆装方便,而且能够多次循环利用,卡具的安装不用依靠天车的配合,降低了安装难度;单片式结构有利于保证施工人员的施工安全。The clamp of the utility model is assembled in a single piece, with simple structure, convenient disassembly and assembly, and can be recycled for many times. The installation of the clamp does not depend on the cooperation of the crane, which reduces the difficulty of installation; Construction safety of construction workers.

与现有技术相比,本实用新型采用的优选方案是:Compared with the prior art, the preferred scheme adopted by the present utility model is:

工件二由c部和d部组成,安装缝设置在c部和d部连接位置,c部的一端对应工件一的螺栓安装孔一设置有螺栓安装孔二。The second workpiece is composed of a c part and a d part, the installation seam is arranged at the connection position of the c part and the d part, and one end of the c part corresponds to the bolt installation hole 1 of the workpiece 1, and a second bolt installation hole is arranged.

卡环安装孔内设置有卡环。A snap ring is arranged in the snap ring mounting hole.

一组卡具由两个工件一和一个工件二组成。A set of fixtures consists of two workpieces one and one workpiece two.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为工件一的结构示意图;Fig. 2 is the structural representation of workpiece one;

图3为工件二的结构示意图;Fig. 3 is the structural representation of workpiece two;

图4为工件一和工件二相配合的结构示意图;Fig. 4 is the structural representation that workpiece one and workpiece two are matched;

图中:铝电解槽1;T型梁2;翼板201;吊具3;吊耳4;钢丝绳5;销子6;卡具7;工件一701;工件二702;卡环8;螺栓安装孔一9;螺栓安装孔二10;卡环安装孔11;安装缝12;螺栓13。In the figure: aluminum electrolytic cell 1; T-beam 2; wing plate 201; spreader 3; lifting lug 4; wire rope 5; pin 6; fixture 7; workpiece one 701; workpiece two 702; snap ring 8; Hole one 9; bolt installation hole two 10; snap ring installation hole 11; installation slot 12; bolt 13.

具体实施方式Detailed ways

以下结合附图和具体实施方式对本实用新型进一步说明。The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

参见附图:See attached image:

一种铝电解槽上部结构吊装装置,由吊具3和卡具7组成,吊具3为长形箱体结构,吊具3的两端对称设置有吊耳4,吊具3的中部对称设置有两个销子6。A hoisting device for the upper structure of an aluminum electrolytic cell, which is composed of a spreader 3 and a clamp 7, the spreader 3 is a long box structure, the two ends of the spreader 3 are symmetrically provided with lifting ears 4, and the middle of the spreader 3 is symmetrically arranged There are two pins 6.

一组卡具7由两个工件一701和一个工件二702组成,工件一701为L型钢板,工件一701由a部和b部组成,a部上设置有四个螺栓安装孔一9,两个工件一701之间螺栓13固定连接。A set of fixtures 7 is composed of two workpieces 1 701 and one workpiece 2 702. The workpiece 1 701 is an L-shaped steel plate, and the workpiece 1 701 is composed of a part and a b part. There are four bolt mounting holes 9 on the a part. The bolts 13 are fixedly connected between the two workpieces 701.

工件二702为倒置的L型钢板,工件二702由c部和d部组成,c部和d部的连接处横向开设有一条安装缝12,铝电解槽1上方的T型梁2的翼板201正好顶进安装缝12内,工件二702的上方设置有卡环安装孔11,卡环安装孔11内设置有卡环8,安装缝12的宽度需要根据施工现场T型梁2的翼板201确定。The second workpiece 702 is an inverted L-shaped steel plate. The second workpiece 702 is composed of a c part and a d part. A mounting slot 12 is horizontally opened at the connection of the c part and the d part. The wing plate of the T-beam 2 above the aluminum electrolytic cell 1 201 is just pushed into the installation slot 12, a snap ring mounting hole 11 is arranged above the workpiece 2 702, and a snap ring 8 is arranged in the snap ring mounting hole 11. The width of the mounting slot 12 needs to be based on the construction site T-beam 2 wing plate 201 OK.

工件一701和工件二702在应用时,先将工件二702垂直于翼板201放置,然后将T型梁2内侧翼板201沿安装缝12顶进,使安装缝12与翼板201的上下表面紧密接触,将两个工件一701置于T型梁2的外侧,且两个工件一701分别置于工件二702的两侧并关于工件二702对称设置(如图4所示),然后将两个工件一701b部的承托面分别顶在T型梁2外侧翼板201的下表面上,将工件二702上的螺栓安装孔二10分别与两个工件一701上的螺栓安装孔一9对齐,并通过螺栓13将工件二702和两个工件一701固定连接为一体;将用于吊装的钢丝绳5穿过卡环8,钢丝绳5的两端分别设置有环扣,两个环扣分别挂在吊具3中部的两个销子6上。When the workpiece 1 701 and the workpiece 2 702 are applied, first place the workpiece 2 702 perpendicular to the wing plate 201, and then push the inner wing plate 201 of the T-beam 2 along the installation slot 12, so that the installation slot 12 and the wing plate 201 are up and down. The surfaces are in close contact, and the two workpieces 1 701 are placed on the outside of the T-beam 2, and the two workpieces 1 701 are placed on both sides of the workpiece 2 702 and symmetrically arranged about the workpiece 2 702 (as shown in Figure 4), and then Put the bearing surfaces of the two workpieces 1 701b on the lower surface of the outer wing plate 201 of the T-beam 2 respectively, and connect the bolt mounting holes 10 on the workpiece two 702 to the bolt mounting holes on the two workpieces 701 respectively. One 9 is aligned, and the workpiece two 702 and the two workpiece one 701 are fixedly connected as a whole through the bolt 13; the wire rope 5 used for hoisting is passed through the snap ring 8, and the two ends of the wire rope 5 are respectively provided with loops, two The buckles are respectively hung on two pins 6 in the middle of the spreader 3 .

一种铝电解槽上部结构吊装的施工方法,按如下步骤进行:A construction method for hoisting the upper structure of an aluminum electrolytic cell is carried out according to the following steps:

(1)根据铝电解槽1上方T型梁2的翼板201尺寸制作卡具7和吊具3;(1) According to the size of the wing plate 201 of the T-beam 2 above the aluminum electrolytic cell 1, the fixture 7 and the hanger 3 are made;

(2)将卡具7安装在铝电解槽1上部的翼板201上:工件二702垂直于翼板201放置,然后将T型梁2内侧翼板201沿安装缝5顶进,将两个工件一701置于T型梁2的外侧,且两个工件一701分别置于工件二702的两侧并关于工件二702对称设置,然后将两个工件一701b部的承托面分别顶在T型梁2外侧翼板201的下表面上,将工件二702上的螺栓安装孔二10分别与两个工件一701上的螺栓安装孔一9对齐,并通过螺栓13将工件二702和两个工件一701固定连接为一体。(2) Install the fixture 7 on the wing plate 201 on the upper part of the aluminum electrolytic cell 1: the workpiece 2 702 is placed perpendicular to the wing plate 201, and then the inner wing plate 201 of the T-beam 2 is pushed along the installation seam 5, and the two The workpiece one 701 is placed on the outside of the T-beam 2, and the two workpieces one 701 are placed on both sides of the workpiece two 702 and are symmetrically arranged with respect to the workpiece two 702, and then the supporting surfaces of the two workpiece one 701b parts are respectively placed on the workpiece one 701b. On the lower surface of the outer wing plate 201 of the T-beam 2, align the bolt mounting holes 10 on the workpiece two 702 with the bolt mounting holes 1 9 on the two workpieces one 701 respectively, and use the bolts 13 to connect the two workpieces 702 and two. A workpiece-701 is fixedly connected as a whole.

(3)将卡环8安装至卡环安装孔11内,在卡环8内安装钢丝绳5,等待吊装。(3) Install the snap ring 8 into the snap ring mounting hole 11, install the wire rope 5 in the snap ring 8, and wait for hoisting.

(4)两台天车联动作业,同时将吊具3吊至铝电解槽1上方,将钢丝绳5固定在吊具3的销子6上,开始吊装。(4) The two cranes are linked together, and the spreader 3 is lifted above the aluminum electrolytic cell 1 at the same time, and the wire rope 5 is fixed on the pin 6 of the spreader 3, and the lifting is started.

以上仅为本实用新型的具体实施方式,但对本实用新型的保护并不局限于此,所有涉及本技术领域技术人员提出的对本技术方案技术特征提出的等效的变化或替换,都涵盖在实用新型的保护范围之内。The above are only specific embodiments of the present utility model, but the protection of the present utility model is not limited to this, and all the equivalent changes or replacements proposed by those skilled in the art to the technical features of the technical solution are included in the utility model. within the scope of the new protection.

Claims (4)

1. The utility model provides an aluminium cell superstructure hoist device, includes hoist, fixture, its characterized in that: the lifting appliance is of a long box body structure, lifting lugs are arranged at two ends of the lifting appliance, and a pin is arranged in the middle of the lifting appliance; the clamp is a split structure consisting of a first workpiece and a second workpiece, wherein the first workpiece is an L-shaped steel plate, a bolt mounting hole is formed in the first workpiece, the second workpiece is an L-shaped steel plate, a mounting seam matched with a wing plate of a T-shaped beam on the upper portion of the aluminum electrolytic cell is formed in the second workpiece, and a clamp mounting hole is formed in the second workpiece.
2. The aluminum reduction cell superstructure hoisting device of claim 1, wherein: the second workpiece consists of a part c and a part d, the mounting seam is arranged at the connecting position of the part c and the part d, and one end of the part c is provided with a bolt mounting hole II corresponding to the bolt mounting hole I of the first workpiece.
3. The aluminum reduction cell superstructure hoisting device of claim 1, wherein: the snap ring is arranged in the snap ring mounting hole.
4. The aluminum reduction cell superstructure hoisting device of claim 1, wherein: the group of clamps consists of two workpieces I and one workpiece II.
CN201921433950.8U 2019-08-30 2019-08-30 Hoisting device for upper structure of aluminum electrolytic cell Active CN210914945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921433950.8U CN210914945U (en) 2019-08-30 2019-08-30 Hoisting device for upper structure of aluminum electrolytic cell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921433950.8U CN210914945U (en) 2019-08-30 2019-08-30 Hoisting device for upper structure of aluminum electrolytic cell

Publications (1)

Publication Number Publication Date
CN210914945U true CN210914945U (en) 2020-07-03

Family

ID=71345526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921433950.8U Active CN210914945U (en) 2019-08-30 2019-08-30 Hoisting device for upper structure of aluminum electrolytic cell

Country Status (1)

Country Link
CN (1) CN210914945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110422751A (en) * 2019-08-30 2019-11-08 中国二十二冶集团有限公司 Aluminum electrolytic cell superstructure hoisting device and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110422751A (en) * 2019-08-30 2019-11-08 中国二十二冶集团有限公司 Aluminum electrolytic cell superstructure hoisting device and its construction method

Similar Documents

Publication Publication Date Title
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN219546511U (en) Hydropower station electric hoist track installation dismounting device
WO2022111218A1 (en) Pile casing hoisting arm
CN218371219U (en) PCCP pipeline handling frock
CN216038140U (en) Assembly type house PC hoisting stair structure
CN222273900U (en) A steel plate lifting tool
CN201857209U (en) Special lifting tool provided with wheel hub of diversion cover
CN209507399U (en) Be applied to prefab stable form hoist of sling cart
CN209127874U (en) A kind of concurrent lifting device
CN219603041U (en) Lifting appliance for steel bar truss floor support plate
CN212832351U (en) Hoisting tool for installing reactor supporting beam
CN210457169U (en) Novel lifting appliance suitable for lifting all sections of steel trussed beams of suspension bridge
CN209815490U (en) Hoisting device for rotor magnetic pole in hydraulic generator pit
CN205590168U (en) Overturning lifting device
CN204569127U (en) Steel upright post hoisting jig
CN207276043U (en) A kind of large component lifts positioning auxiliary device
CN211521339U (en) Hoisting device for hanging and releasing steel wire rope
CN210505204U (en) A type of steel lifting device
CN110422751A (en) Aluminum electrolytic cell superstructure hoisting device and its construction method
CN210914967U (en) A reinforced concrete pipe hoisting device
CN203497976U (en) High-altitude installation clamping device for large electric hoists
CN107100369A (en) A kind of interim crossbeam construction method
CN209427982U (en) A kind of large-scale mixed turbine water pilot bearing and main shaft seal special hanger for hoisting
CN203333153U (en) Detachable hoisting appliance for chord member of large-scale truss
CN113417269A (en) Method for mounting rib plate of combined beam structure

Legal Events