CN110821133B - Externally-hung operation steel platform and construction method thereof - Google Patents

Externally-hung operation steel platform and construction method thereof Download PDF

Info

Publication number
CN110821133B
CN110821133B CN201911073957.8A CN201911073957A CN110821133B CN 110821133 B CN110821133 B CN 110821133B CN 201911073957 A CN201911073957 A CN 201911073957A CN 110821133 B CN110821133 B CN 110821133B
Authority
CN
China
Prior art keywords
main hanging
longitudinal beam
externally
hung
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911073957.8A
Other languages
Chinese (zh)
Other versions
CN110821133A (en
Inventor
王吉庆
潘宇华
方思倩
柏宇翔
班洪侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Original Assignee
Shanghai Construction No 7 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 7 Group Co Ltd filed Critical Shanghai Construction No 7 Group Co Ltd
Priority to CN201911073957.8A priority Critical patent/CN110821133B/en
Publication of CN110821133A publication Critical patent/CN110821133A/en
Application granted granted Critical
Publication of CN110821133B publication Critical patent/CN110821133B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/145Toe boards therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/16Struts or stiffening rods, e.g. diagonal rods

Abstract

The invention provides an externally hung operation steel platform and a construction method thereof, which are used for constructing a middle externally hung prefabricated wall between two prefabricated side walls, wherein the steel platform adopts square frames with U-shaped cross sections, which are hung on the two sides of the prefabricated side walls, the top of each square frame comprises a long main hanging longitudinal beam and two short main hanging longitudinal beams, each short main hanging longitudinal beam is connected with the long main hanging longitudinal beam through two transverse connecting rods, the long main hanging longitudinal beam and the short main hanging longitudinal beams are respectively outwards extended after the outer transverse connecting rods are connected, and the lengths of the outwards extending parts of the long main hanging longitudinal beams and the short main hanging longitudinal beams are at least 5 cm longer than the widths of the prefabricated side walls, so that the externally hung operation steel platform is stably hung on the prefabricated side walls on the two sides, the externally hung operation steel platform can replace the externally hung prefabricated wall of the traditional scaffold, and the problems that the installation of two inclined struts is difficult after the middle externally hung prefabricated wall is hung in place and the traditional scaffold is excessively high in cost are solved.

Description

Externally-hung operation steel platform and construction method thereof
Technical Field
The invention belongs to the technical field of building construction, and relates to an externally-hung operation steel platform and a construction method thereof.
Background
In the current prefabricated wallboard construction process, the middle part between two prefabricated side walls is outwards chosen to be prefabricated wall, namely, the prefabricated wall is hoisted in place on the outer cantilever plate, and then two inclined struts are installed for construction, the type of cantilever scaffold can be adopted in a general construction site, the traditional construction of the cantilever scaffold is adopted, the workload is large, the working hour is long, the danger is high, a new cantilever steel operating platform appears, and the cost can be saved by adopting a shaping steel operating platform.
Therefore, how to provide a more simple, convenient and economical externally-hung operation steel platform can greatly save the economic cost generated by erecting a scaffold, reduce the safety risk in the operation process, and the externally-hung operation steel platform is convenient and quick to construct, can accelerate the construction speed, and becomes a technical problem that the construction industry needs to further perfect and optimize.
Disclosure of Invention
The invention aims to provide an externally-hung operation steel platform and a construction method thereof, which are used for solving the problems that construction operation is difficult and scaffold erection cost is overlarge when two diagonal braces are installed after a middle externally-hung prefabricated wall between two prefabricated side walls is hoisted in place.
In order to solve the technical problems, the invention provides the following technical scheme:
the utility model provides an externally hung operation steel platform for the construction is located the middle part between two prefabricated side walls and is outwards chosen prefabricated wall, including both sides hang respectively locate the square frame of prefabricated side wall's transversal personally submitting "U" type, square frame's "U" type recess can supply the middle part to outwards choose prefabricated wall to pass through, square frame's top includes a long main longeron, two short main longerons of hanging, two short main longerons set up in one side of long main longeron, every be connected through two transverse connection bars between short main longeron and the long main longeron of hanging, the transverse connection bar respectively with short main longeron is connected with long main longeron perpendicularly, wherein inboard transverse connection bar connect in between the inboard end of short main longeron and the long main longeron of hanging, make long main longeron and short main longeron outwards extend respectively behind the short main longeron of hanging, long main longeron and the length of the outside extension of short main longeron is the width of prefabricated side wall add 5 centimetres, is equipped with the longitudinal connection bar between the transverse connection bar of two inboard, the transverse connection bar is equipped with a transverse connection bar and is connected with the bottom of a vertical connection bar and the bottom is connected with the bottom of a vertical region, the bottom is connected with the bottom is equipped with the cross bar in the bottom of the side region.
Preferably, in the above-mentioned externally hung operation steel platform, a sealing plate is provided at a middle lower part between the vertical connecting rods connecting the main hanging longitudinal beams.
Preferably, in the above externally hung operation steel platform, the device further comprises four spacing steel bars, wherein the spacing steel bars are vertically fixed on the tops of the corresponding prefabricated side walls, are positioned on the inner sides of the long main hanging longitudinal beams or the short main hanging longitudinal beams, and are positioned on the outer sides of the corresponding transverse connecting rods.
Preferably, in the externally hung operating steel platform, the externally hung operating steel platform further comprises limiting bolts, through holes for the limiting bolts to pass through are respectively formed in the positions, close to the long main hanging longitudinal beams, of the transverse connecting rods located on the outer sides, and the limiting bolts respectively prop against the side faces of the corresponding prefabricated side walls after passing through the corresponding through holes.
Preferably, in the above-mentioned externally hung operation steel platform, further including two vertical rods, two horizontal wire ropes and two slant wire ropes that set up respectively in the short main longitudinal beam outside of hanging, the vertical rods is fixed to be set up on the floor of corresponding floor, the middle part of the corresponding vertical connecting rod of the long main longitudinal beam of hanging is connected to the one end of horizontal wire rope, the other end level of horizontal wire rope is connected on the vertical rod, the lower extreme of the corresponding vertical connecting rod of the long main longitudinal beam of hanging is connected to the one end of slant wire rope, the other end level of horizontal wire rope is connected in the junction of horizontal wire rope and vertical rod.
Preferably, in the externally hung operating steel platform, metal pull rings are arranged at the joints of the transverse steel wire ropes and the inclined steel wire ropes and the vertical connecting rods and at the joints of the transverse steel wire ropes and the inclined steel wire ropes and the vertical connecting rods.
Preferably, in the externally hung operation steel platform, two round steels for mounting and enclosing are arranged at the top of the long main hanging longitudinal beam.
Preferably, in the externally hung operation steel platform, a pedal cross rod for a constructor to walk up and down is arranged between two vertical connecting rods connected with one short main hanging longitudinal beam at equal intervals.
Preferably, in the externally hung operation steel platform, a scissor brace is arranged between the long main hanging longitudinal beam and the bottom of the platform, an oblique support is arranged between the lateral connecting rod on the outer side and the bottom of the platform, and the middle parts of the two vertical connecting rods connected with the two ends of the lateral connecting rod on the outer side are provided with lateral middle connecting rods.
The invention also discloses a construction method of the externally hung operation steel platform, which comprises the following steps:
working condition one: hoisting the prefabricated side walls on two sides of the prefabricated wall outwards from the middle part into position and completing grouting;
working condition II: when grouting mortar of the prefabricated side walls on two sides reaches design strength, finishing the installation of the externally hung operation steel platform, so that the long main hanging longitudinal beam and the short main hanging longitudinal beam are respectively hung on the corresponding prefabricated side walls;
and (3) working condition III: hoisting the middle externally-raised prefabricated wall in place, grouting, standing on an externally-hung operation steel platform by constructors, installing diagonal braces, wherein the upper ends of the diagonal braces are connected to the side surfaces of the middle externally-raised prefabricated wall, and the lower ends of the diagonal braces are connected to the side surfaces of the prefabricated side walls;
and (4) working condition four: and when the grouting mortar strength of the prefabricated wall with the outwards-raised middle part reaches the design strength, dismantling the diagonal bracing, and finally dismantling the externally-hung operation steel platform.
Compared with the prior art, the technical scheme disclosed by the invention has the following beneficial effects:
according to the externally hung operation steel platform, the square frames with the U-shaped cross sections are hung on the two sides of the prefabricated side walls respectively, the U-shaped grooves of the square frames can be used for the middle externally hung prefabricated wall to penetrate, the tops of the square frames comprise the long main hanging longitudinal beams and the two short main hanging longitudinal beams, the two short main hanging longitudinal beams are arranged on one side of the long main hanging longitudinal beams, each short main hanging longitudinal beam is connected with the long main hanging longitudinal beams through the two transverse connecting rods, the transverse connecting rods are respectively connected with the short main hanging longitudinal beams and the long main hanging longitudinal beams vertically, the transverse connecting rods on the inner side are connected between the inner side ends of the short main hanging longitudinal beams and the long main hanging longitudinal beams, the long main hanging longitudinal beams and the short main hanging longitudinal beams respectively extend outwards after the transverse connecting rods on the outer side are connected with the long main hanging longitudinal beams, the lengths of the outward extending parts of the long main hanging longitudinal beams and the short main hanging longitudinal beams are at least 5 cm, and accordingly the externally hung operation steel platform is hung on the prefabricated side of the two sides, the externally hung operation steel platform is stably hung on the prefabricated scaffold side, and the middle of the prefabricated scaffold is difficult to install in place after the middle of the prefabricated scaffold is erected on the middle of the prefabricated scaffold.
According to the construction method of the externally-hung operation steel platform, the prefabricated side walls on two sides of the prefabricated wall are lifted in place through the middle externally-hung operation steel platform, and grouting is completed; when grouting mortar of the prefabricated side walls on two sides reaches design strength, finishing the installation of the externally hung operation steel platform, so that the long main hanging longitudinal beam and the short main hanging longitudinal beam are respectively hung on the corresponding prefabricated side walls; the middle externally-raised prefabricated wall is hoisted in place and grouted, constructors stand on an externally-hung operation steel platform to install diagonal braces, the upper ends of the diagonal braces are connected to the side faces of the middle externally-raised prefabricated wall, and the lower ends of the diagonal braces are connected to the side faces of the prefabricated side walls, so that the installation difficulty of the middle externally-raised prefabricated wall and the diagonal braces is effectively reduced, meanwhile, the necessity of on-site scaffold is avoided, and a large amount of manpower and material resources are saved; and finally, when the grouting mortar strength of the prefabricated wall with the middle outwards-lifted part reaches the design strength, dismantling the diagonal bracing, and finally dismantling the externally-hung operation steel platform.
Drawings
FIG. 1 is a schematic view of a plug-in operating steel platform according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating a usage state of a plug-in operating steel platform according to an embodiment of the present invention;
FIG. 3 is a cross-sectional view taken along the direction A-A of FIG. 2 in accordance with one embodiment of the present invention;
FIG. 4 is a detailed view of the resting points of an externally hung operating steel platform according to one embodiment of the present invention;
fig. 5 to 8 are flowcharts of a construction method and a process for externally hanging an operating steel platform according to an embodiment of the present invention.
In the figure: 1-prefabricated side walls, 2-middle outwards-raised prefabricated walls, 3-long main hanging longitudinal beams, 4-short main hanging longitudinal beams, 5-transverse connecting rods, 6-outwards extending parts, 7-longitudinal connecting rods, 8-vertical connecting rods, 9-bottom outer connecting rods, 10-bottom inner connecting rods, 11-steel plates, 12-sealing plates 12, 13-limit reinforcing steel bars, 14-limit bolts, 15-vertical rods, 16-transverse steel wire ropes, 17-oblique steel wire ropes, 18-floor slabs, 19-metal pull rings, 20-round steel, 21-pedal cross rods, 22-scissor supports, 23-oblique supports, 24-transverse middle connecting rods, 25-middle hanging beams, 26-skirting lines and 27-diagonal braces.
Detailed Description
The invention is described in further detail below with reference to the drawings and the specific examples. The technical contents and features of the present invention will be described in detail below with reference to the attached drawings by way of the illustrated embodiments. It should be further noted that the drawings are in a very simplified form and are all to a non-precise scale, merely for convenience and clarity in aiding in the description of embodiments of the invention. For convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the drawings, but this should not be construed as a limitation of the technical scheme of the present invention.
Referring to fig. 1 to 4, this embodiment discloses an externally hung operation steel platform for constructing a middle externally hung prefabricated wall 2 between two prefabricated side walls 1, which comprises a square frame with two sides respectively hung on the prefabricated side walls 1 and a cross section of which is U-shaped, wherein the U-shaped groove of the square frame can be used for the middle externally hung prefabricated wall 2 to pass through, the top of the square frame comprises a long main hanging longitudinal beam 3 and two short main hanging longitudinal beams 4, the two short main hanging longitudinal beams 4 are arranged on one side of the long main hanging longitudinal beam 3, each short main hanging longitudinal beam 4 is connected with the long main hanging longitudinal beam 3 through two transverse connecting rods 5, the transverse connecting rods 5 are respectively connected with the short main hanging longitudinal beam 4 and the long main hanging longitudinal beam 3 vertically, wherein the inner transverse connecting rods 5 are connected between the inner side ends of the short main hanging longitudinal beams 4 and the long main hanging longitudinal beam 3, the outer transverse connecting rods 5 are respectively connected with the inner side walls 7 and the bottom of the longitudinal hanging longitudinal beams 4, the outer transverse connecting rods 5 are respectively arranged at the bottom ends of the bottom of the two transverse connecting rods 9, the bottom of the longitudinal connecting rods 5 are respectively arranged at the bottom of the two transverse connecting rods 5 at the positions of the bottom of the connecting rods 9, the bottom of the connecting rods 5 are respectively connected with the bottom of the longitudinal connecting rods 5 at the bottom of the side walls 7, the bottom outside connecting rod 9 and the bottom inside connecting rod 10 form a U-shaped area, and a steel plate 11 is paved on the U-shaped area.
According to the externally hung operation steel platform provided by the invention, the square frames with the cross sections of U-shaped are hung on the two sides of the prefabricated side wall 1 respectively, the U-shaped grooves of the square frames can be used for the middle externally hung prefabricated wall 2 to penetrate, the tops of the square frames comprise the long main hanging longitudinal beam 3 and two short main hanging longitudinal beams 4, the two short main hanging longitudinal beams 4 are arranged on one side of the long main hanging longitudinal beam 3, each short main hanging longitudinal beam 4 and the long main hanging longitudinal beam 3 are connected through the two transverse connecting rods 5, the transverse connecting rods 5 are respectively connected with the short main hanging longitudinal beam 4 and the long main hanging longitudinal beam 3 vertically, the transverse connecting rods 5 on the inner side are connected between the inner ends of the short main hanging longitudinal beam 4 and the long main hanging longitudinal beam 3, the long main hanging longitudinal beam 3 and the short main hanging longitudinal beam 4 are respectively extended outwards, the lengths of the outward extending parts 6 of the long main hanging longitudinal beam 3 and the short main hanging longitudinal beam 4 are at least the width 5 of the prefabricated side wall 1, and the two outer side walls are stably arranged on the two sides of the prefabricated scaffold side wall, and the externally hung operation steel platform is difficult to install in place, and the prefabricated scaffold is difficult to install in place on the middle of the prefabricated side wall 2.
Preferably, in the above-mentioned externally hung operation steel platform, a sealing plate 12 is arranged at the middle lower part between the vertical connecting rods 8 connected with the main hanging longitudinal beam, so as to reduce the falling risk of constructors.
Preferably, in the above-mentioned externally hung operation steel platform, four spacing steel bars 13 are further included, the spacing steel bars 13 are vertically fixed on the top of the corresponding prefabricated side wall 1, and are located on the inner side of the long main hanging longitudinal beam 3 or the short main hanging longitudinal beam 4, and are located on the outer side of the corresponding transverse connecting rod 5. Through setting up four spacing reinforcing bars 13, can prevent that the externally hung operation steel platform from moving laterally, improve the construction security.
Preferably, in the above externally hung operating steel platform, the externally hung operating steel platform further comprises a limit bolt 14, wherein the transverse connecting rod 5 positioned at the outer side is close to the long main hanging longitudinal beam 3 and is respectively provided with a through hole for the limit bolt 14 to pass through, and the limit bolts 14 respectively prop against the side surfaces of the corresponding prefabricated side walls 1 after passing through the corresponding through holes. By arranging the limit bolts 14, the lateral movement and the longitudinal movement of the externally hung operation steel platform can be prevented, and the construction safety is improved
Preferably, in the above-mentioned externally hung operating steel platform, the externally hung operating steel platform further comprises two vertical rods 15, two transverse steel wire ropes 16 and two oblique steel wire ropes 17, wherein the two vertical rods 15 are respectively arranged at the outer sides of the short main hanging longitudinal beams 4, the vertical rods 15 are fixedly arranged on a floor slab 18 corresponding to floors, one ends of the transverse steel wire ropes 16 are connected with the middle parts of the corresponding vertical connecting rods 8 of the long main hanging longitudinal beams 3, the other ends of the transverse steel wire ropes 16 are horizontally connected with the vertical rods 15, one ends of the oblique steel wire ropes 17 are connected with the lower ends of the corresponding vertical connecting rods 8 of the long main hanging longitudinal beams 3, and the other ends of the transverse steel wire ropes 16 are horizontally connected with the connecting parts of the transverse steel wire ropes 16 and the vertical rods 15. By arranging the transverse steel wire rope 16 and the oblique steel wire rope 17, the externally hung operation steel platform is fixed on the fixed part of the vertical rod 15 through the transverse steel wire rope 16 and the oblique steel wire rope 17, so that the safety of the externally hung operation steel platform can be further improved.
Preferably, in the above externally hung operating steel platform, the connection parts of the transverse steel wire rope 16, the oblique steel wire rope 17 and the vertical connecting rod 8 and the connection parts of the transverse steel wire rope 16, the oblique steel wire rope 17 and the vertical rod 15 are provided with metal pull rings 19. By arranging the metal pull ring 19, the transverse steel wire rope 16 and the oblique steel wire rope 17 can be conveniently fixed on one hand, and the transverse steel wire rope 16 and the oblique steel wire rope 17 can be protected on the other hand.
Preferably, in the above externally hung operating steel platform, two round steels 20 for mounting and enclosing are arranged at the top of the long main hanging longitudinal beam 3, and an enclosure is arranged between the two round steels 20, so as to reduce falling risk of constructors.
In order to ensure that constructors safely and conveniently pass in and out of the externally hung operation steel platform, a pedal cross rod 21 for the constructors to walk up and down is preferably arranged between two vertical connecting rods 8 connected with one short main hanging longitudinal beam 4 at equal intervals.
Preferably, in the above-mentioned externally hung operating steel platform, a scissor support 22 is arranged between the long main hanging longitudinal beam 3 and the bottom of the platform, an oblique support 23 is arranged between the lateral connecting rod 5 on the outer side and the bottom of the platform, and a lateral middle connecting rod 24 is arranged in the middle of the two vertical connecting rods 8 connected with the two ends of the lateral connecting rod 5 on the outer side. By arranging the scissor braces 22, the inclined supports 23 and the transverse middle connecting rods 24, the overall strength of the externally hung operation steel platform can be enhanced, and the construction safety is improved.
Preferably, in the above-mentioned externally hung operation steel platform, the device further comprises a middle hanging beam 25, the middle hanging beam 25 and the short main hanging longitudinal beam 4 have the same length and are arranged at the middle position of the transverse connecting rod 5, so as to increase the contact area between the externally hung operation steel platform and the prefabricated side wall 1, make the load of the externally hung operation steel platform distributed on the prefabricated side wall 1 more uniformly, and improve the construction safety.
Preferably, in the above-mentioned externally hung operation steel platform, the device further comprises a skirting line 26, wherein the skirting line 26 is disposed at the bottom side of the inside of the externally hung operation steel platform, so as to prevent constructors from stepping on the device to improve construction safety.
With continued reference to fig. 1 to 8, the invention also discloses a construction method (using method) of the externally hung operation steel platform, namely a method for constructing the externally hung prefabricated wall 2 in the middle between the two prefabricated side walls 1, comprising the following steps:
working condition one: referring to fig. 5, the prefabricated side walls 1 on two sides of the prefabricated wall 2 are lifted in place and grouting is completed;
working condition II: referring to fig. 6, when grouting mortar of the prefabricated side walls 1 on two sides reaches design strength, the externally hung operation steel platform is installed, so that the long main hanging longitudinal beam 3 and the short main hanging longitudinal beam 4 are respectively hung on the corresponding prefabricated side walls 1;
and (3) working condition III: referring to fig. 7, a middle outwards-raised prefabricated wall 2 is hoisted in place and grouted, constructors stand on an externally-hung operation steel platform to install diagonal braces 27, the upper ends of the diagonal braces 27 are connected to the side surfaces of the middle outwards-raised prefabricated wall 2, and the lower ends of the diagonal braces 27 are connected to the side surfaces of the prefabricated side walls 1;
and (4) working condition four: referring to fig. 8, when the grouting mortar strength of the prefabricated wall 2 with the middle overhanging reaches the design strength, the diagonal brace 27 is removed, and finally the externally hung operation steel platform is removed.
According to the construction method of the externally hung operation steel platform, the prefabricated side walls 1 on two sides of the prefabricated wall 2 are lifted in place through the middle externally hung operation steel platform, and grouting is completed; when grouting mortar of the prefabricated side walls 1 at two sides reaches design strength, finishing the installation of the externally hung operation steel platform, so that the long main hanging longitudinal beam 3 and the short main hanging longitudinal beam 4 are respectively hung on the corresponding prefabricated side walls 1; the middle externally-raised prefabricated wall 2 is hoisted in place and grouted, constructors stand on an externally-hung operation steel platform to install diagonal braces 27, the upper ends of the diagonal braces 27 are connected to the side faces of the middle externally-raised prefabricated wall 2, and the lower ends of the diagonal braces 27 are connected to the side faces of the prefabricated side walls 1, so that the installation difficulty of the middle externally-raised prefabricated wall 2 and the diagonal braces 27 is effectively reduced, meanwhile, the need of a site scaffold is avoided, and a large amount of manpower and material resources are saved; finally, when the grouting mortar strength of the middle externally-raised prefabricated wall 2 reaches the design strength, dismantling the diagonal braces 27, and finally dismantling the externally-hung operation steel platform.
The above description is only illustrative of the preferred embodiments of the present invention and is not intended to limit the scope of the present invention, and any alterations and modifications made by those skilled in the art based on the above disclosure shall fall within the scope of the appended claims.

Claims (10)

1. An externally hung operation steel platform is used for constructing a middle externally hung prefabricated wall between two prefabricated side walls, and is characterized by comprising square frames with U-shaped cross sections, wherein the square frames are hung on two sides of the prefabricated side walls respectively, the U-shaped grooves of the square frames can be used for the middle externally hung prefabricated wall to pass through, the top of each square frame comprises a long main hanging longitudinal beam and two short main hanging longitudinal beams, the two short main hanging longitudinal beams are arranged on one side of the long main hanging longitudinal beam, each short main hanging longitudinal beam is connected with the long main hanging longitudinal beam through two transverse connecting rods, the transverse connecting rods are respectively and vertically connected with the short main hanging longitudinal beams and the long main hanging longitudinal beams, the inner transverse connecting rods are connected between the inner ends of the short main hanging longitudinal beams and the long main hanging longitudinal beams, the long main longitudinal beam and the short main longitudinal beam are hung after being connected by the transverse connecting rod in the outer side, the long main longitudinal beam and the short main longitudinal beam are hung respectively and extend outwards, the length of the outward extending part of the long main longitudinal beam and the short main longitudinal beam is at least 5 cm greater than the width of the prefabricated side wall, a longitudinal connecting rod is arranged between the transverse connecting rods in the two inner sides, the connection part of the transverse connecting rod and the short main longitudinal beam and the connection part of the transverse connecting rod in the outer side and the long main longitudinal beam are respectively fixedly connected with the upper end of a vertical connecting rod, the lower end of the vertical connecting rod is connected through a bottom outer connecting rod, a bottom inner connecting rod is arranged between the bottom outer connecting rods, and a U-shaped area are formed by the bottom outer connecting rod and the bottom inner connecting rod and are paved with steel plates.
2. The externally hung operating steel platform of claim 1 in which a closing plate is provided at a mid-lower portion between the vertical connecting rods connecting the primary hanger stringers.
3. The externally hung operating steel platform of claim 1 further comprising four spacing bars vertically fixed to the tops of the corresponding prefabricated side walls and located inboard of the long or short primary hanging stringers and outboard of the corresponding transverse connecting rods.
4. The externally hung operation steel platform according to claim 1, further comprising limit bolts, wherein through holes for the limit bolts to pass through are respectively formed in the positions, close to the long main hanging longitudinal beams, of the lateral connecting rods on the outer sides, and the limit bolts respectively prop against the side surfaces of the corresponding prefabricated side walls after passing through the corresponding through holes.
5. The externally hung operation steel platform according to claim 1, further comprising two vertical rods, two transverse steel wire ropes and two oblique steel wire ropes, wherein the two vertical rods are respectively arranged on the outer sides of the short main hanging longitudinal beam, the vertical rods are fixedly arranged on the floor slab of the corresponding floor, one end of each transverse steel wire rope is connected with the middle part of the corresponding vertical connecting rod of the upper extension main hanging longitudinal beam, the other end of each transverse steel wire rope is horizontally connected with the vertical rod, one end of each oblique steel wire rope is connected with the lower end of the corresponding vertical connecting rod of the upper extension main hanging longitudinal beam, and the other end of each transverse steel wire rope is horizontally connected with the connecting part of each transverse steel wire rope and the corresponding vertical connecting rod.
6. The externally hung operating steel platform according to claim 5, wherein metal pull rings are arranged at the joints of the transverse steel wire ropes, the inclined steel wire ropes and the vertical connecting rods and at the joints of the transverse steel wire ropes, the inclined steel wire ropes and the vertical connecting rods.
7. The externally hung operating steel platform of claim 1 wherein the long main hanging stringers are provided with two round steels for mounting enclosures at the top.
8. The externally hung operating steel platform according to claim 1, wherein pedal cross bars for constructors to walk up and down are arranged between two vertical connecting rods connected with one short main hanging longitudinal beam at equal intervals.
9. The externally hung operation steel platform according to claim 1, wherein a scissor brace is arranged between the long main hanging longitudinal beam and the bottom of the platform, an inclined support is arranged between the lateral connecting rod on the outer side and the bottom of the platform, and the middle parts of the two vertical connecting rods on the two ends of the lateral connecting rod on the upper side are provided with lateral middle connecting rods.
10. A method of constructing a plug-in operating steel platform as claimed in any one of claims 1 to 9, comprising the steps of:
working condition one: hoisting the prefabricated side walls on two sides of the prefabricated wall outwards from the middle part into position and completing grouting;
working condition II: when grouting mortar of the prefabricated side walls on two sides reaches design strength, finishing the installation of the externally hung operation steel platform, so that the long main hanging longitudinal beam and the short main hanging longitudinal beam are respectively hung on the corresponding prefabricated side walls;
and (3) working condition III: hoisting the middle externally-raised prefabricated wall in place, grouting, standing on an externally-hung operation steel platform by constructors, installing diagonal braces, wherein the upper ends of the diagonal braces are connected to the side surfaces of the middle externally-raised prefabricated wall, and the lower ends of the diagonal braces are connected to the side surfaces of the prefabricated side walls;
and (4) working condition four: and when the grouting mortar strength of the prefabricated wall with the outwards-raised middle part reaches the design strength, dismantling the diagonal bracing, and finally dismantling the externally-hung operation steel platform.
CN201911073957.8A 2019-11-06 2019-11-06 Externally-hung operation steel platform and construction method thereof Active CN110821133B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911073957.8A CN110821133B (en) 2019-11-06 2019-11-06 Externally-hung operation steel platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911073957.8A CN110821133B (en) 2019-11-06 2019-11-06 Externally-hung operation steel platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN110821133A CN110821133A (en) 2020-02-21
CN110821133B true CN110821133B (en) 2023-11-10

Family

ID=69552753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911073957.8A Active CN110821133B (en) 2019-11-06 2019-11-06 Externally-hung operation steel platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN110821133B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2101067U (en) * 1991-03-27 1992-04-08 江苏省南通市第四建筑安装工程公司 Outside hanging lifting scaffold
CN103321399A (en) * 2013-06-25 2013-09-25 北京金港机场建设有限责任公司 Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof
CN105442839A (en) * 2015-09-06 2016-03-30 上海建工七建集团有限公司 Erecting method of cantilever structure formwork bent
CN106381815A (en) * 2016-08-31 2017-02-08 中铁四局集团第四工程有限公司 Movable externally-hung basket trolley used for T beam transverse reinforcing and construction method thereof
CN205935659U (en) * 2016-08-24 2017-02-08 仇国辉 Cast in situ concrete eave are chosen outward and are hung movable formwork device
CN206346473U (en) * 2016-10-31 2017-07-21 中国一冶集团有限公司 A kind of high-altitude overhanging gutter support tripod
CN206418755U (en) * 2016-12-20 2017-08-18 上海建工七建集团有限公司 A kind of steel platform
CN107165401A (en) * 2017-05-31 2017-09-15 中国冶集团有限公司 Cantilever Beams bottom wall construction method
CN208039066U (en) * 2018-03-30 2018-11-02 中建一局集团安装工程有限公司 A kind of movable type bridge side construction operation platform
CN211873772U (en) * 2019-11-06 2020-11-06 上海建工七建集团有限公司 Externally-hung operating steel platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160083968A1 (en) * 2014-09-19 2016-03-24 John Brough Safety platform scaffold apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2101067U (en) * 1991-03-27 1992-04-08 江苏省南通市第四建筑安装工程公司 Outside hanging lifting scaffold
CN103321399A (en) * 2013-06-25 2013-09-25 北京金港机场建设有限责任公司 Suspension scaffold at gable at sloping roof eaves of high-rise building, and construction method thereof
CN105442839A (en) * 2015-09-06 2016-03-30 上海建工七建集团有限公司 Erecting method of cantilever structure formwork bent
CN205935659U (en) * 2016-08-24 2017-02-08 仇国辉 Cast in situ concrete eave are chosen outward and are hung movable formwork device
CN106381815A (en) * 2016-08-31 2017-02-08 中铁四局集团第四工程有限公司 Movable externally-hung basket trolley used for T beam transverse reinforcing and construction method thereof
CN206346473U (en) * 2016-10-31 2017-07-21 中国一冶集团有限公司 A kind of high-altitude overhanging gutter support tripod
CN206418755U (en) * 2016-12-20 2017-08-18 上海建工七建集团有限公司 A kind of steel platform
CN107165401A (en) * 2017-05-31 2017-09-15 中国冶集团有限公司 Cantilever Beams bottom wall construction method
CN208039066U (en) * 2018-03-30 2018-11-02 中建一局集团安装工程有限公司 A kind of movable type bridge side construction operation platform
CN211873772U (en) * 2019-11-06 2020-11-06 上海建工七建集团有限公司 Externally-hung operating steel platform

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Huaizhong Xing ; Jiqing Wang ; Xiaofeng Xu ; Yu Shi.The effect of single-ion anisotropy on the specific heat of a spin-one Heisenberg antiferromagnetic chain in an applied magnetic field.2007,75(5),全文. *
高层建筑外墙施工中悬挑式脚手架的应用探讨;郭琛豫;;低碳世界(31);全文 *
高速公路桥梁柱式墩和桩基钢筋胎架法施工;王吉庆;余辉;肖钦;;中国公路(17);全文 *

Also Published As

Publication number Publication date
CN110821133A (en) 2020-02-21

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN217517371U (en) Concrete box type arch bridge cantilever is pour with falling triangle and is hung basket
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN206581577U (en) Using housing construction builder's jack
CN215484539U (en) Hanging frame type construction operation platform capable of being circularly turned over
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN206956979U (en) A kind of Linear shear wall with fore-set
CN212507296U (en) High formwork system
CN211173007U (en) Novel tripod of encorbelmenting
CN211873772U (en) Externally-hung operating steel platform
CN110821133B (en) Externally-hung operation steel platform and construction method thereof
CN201158932Y (en) Self-chucking platform especially for high-rise building elevator shaft formwork supports
CN214996139U (en) Safe operation platform for overhead large-span steel reinforced concrete beam suspension formwork construction
CN211473320U (en) Tool type external hanging rack for corridor
CN220336411U (en) Protection platform lifting point truss for building construction
CN112854702A (en) Large-span silo roof construction platform and erection method
CN112502475A (en) Supporting bearing capacity conversion device and using method thereof
CN112502473A (en) Support bearing capacity conversion device and method for dismantling large steel framework by using same
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN214302864U (en) Well operation combination steel platform
CN215167934U (en) Large-span silo roofing construction platform bottom pillar
CN216476314U (en) Assembly type formwork system of cast-in-place plate of steel structure building
CN218786776U (en) Supporting operation platform of overhanging type steel mould that can have enough to meet need
CN215331380U (en) Rail type suspension platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant