CN208039066U - A kind of movable type bridge side construction operation platform - Google Patents

A kind of movable type bridge side construction operation platform Download PDF

Info

Publication number
CN208039066U
CN208039066U CN201820461187.9U CN201820461187U CN208039066U CN 208039066 U CN208039066 U CN 208039066U CN 201820461187 U CN201820461187 U CN 201820461187U CN 208039066 U CN208039066 U CN 208039066U
Authority
CN
China
Prior art keywords
frame
operation platform
movable type
upright bar
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820461187.9U
Other languages
Chinese (zh)
Inventor
马腾
张雷
马瑞
张东东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group Installation Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201820461187.9U priority Critical patent/CN208039066U/en
Application granted granted Critical
Publication of CN208039066U publication Critical patent/CN208039066U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of movable type bridge side construction operation platforms, including frame body mechanism and plug-in operation platform;Frame body mechanism includes the main body frame, traveling wheel and clump weight being arranged on bridge floor, main body frame includes top frame, under(-)chassis, the first bracing piece, supporting rod and the first upright bar, it is additionally provided at least first bracing piece between two root long bars of top frame, the supporting rod for placing clump weight is arranged at intervals between two root long bars of under(-)chassis;Plug-in operation platform includes vertical climbing frame, diagonal brace, two horizontal bars, steel sleeve, steel sleeve limiting device and hanging baskets disposed in parallel, the end cap of choosing of horizontal bars is connected to steel sleeve and is provided with steel sleeve limiting device choosing end tail portion, and the other end of horizontal bars extends to bridge medial surface and is fixedly connected with top frame.Operating platform reasonable stress, operation is flexible, and what is more important device work progress and anti-collision wall and railing are contactless, can preferably protect finished product.

Description

A kind of movable type bridge side construction operation platform
Technical field
The utility model relates to construction ancillary equipment field, and especially a kind of movable type bridge side constructing operation is flat Platform.
Background technology
Current bridge divides by type the diversified forms such as municipal road bridge, viaduct, bridge spanning the river, in the construction process, when There are quality problems and need repairing in the anti-collision wall and ground cloth-wrapper of bridge, or when pontic side carries out decoration lighting engineering construction, need It sets up scaffold or uses tool car etc. and provide operating platform for construction personnel.
Scaffold building mode is more and time-consuming in the presence of heavy workload, consumptive material is set up, and is tended not to along pontic after the completion of setting up Vertical disconnected direction movement, when construction, are relatively complicated.Use and maintenance vehicle is constructed, although easy, maintenance cost is higher.Work as bridge There is traffic by situation under the higher or bridge of height, aforesaid way construction risk coefficient is greatly increased and passed through under entail dangers to bridge The safety of vehicle and pedestrian, if bridge spanning the river, scaffold building and tool car are even more inconvenient application.
Utility model content
The purpose of this utility model is to provide a kind of movable type bridge side construction operation platform, to solve traditional hanging basket Hanging apparatus and hanging basket do not form integration, and mobile difficult, technology construction adaptability is weaker, and being used in turn need to be dismounted, It is time-consuming and laborious, the technical problems such as inconvenient for use.
To achieve the above object, the utility model adopts the following technical solution:
The utility model provides a kind of movable type bridge side construction operation platform, including frame body mechanism and plug-in construction are put down Platform;The frame body mechanism includes the main body frame, traveling wheel and clump weight being arranged on bridge floor, and the main body frame is cuboid Frame structure, including top frame, under(-)chassis, the first bracing piece, supporting rod and the first upright bar, top frame and under(-)chassis Surrounded by two quarter butts and two root long bars;
Be additionally provided at least first bracing piece between two root long bars of top frame, two root long bars of under(-)chassis it Between be arranged at intervals with supporting rod for placing clump weight;By being arranged in four corners between top frame and under(-)chassis First upright bar is fixedly connected,
Traveling wheel is arranged in under(-)chassis four corners;
Plug-in operation platform includes vertical climbing frame, diagonal brace, two horizontal bars disposed in parallel, steel sleeve, steel sleeve limit Position device and hanging basket,
The end cap of choosing of horizontal bars is connected to steel sleeve and is provided with steel sleeve limiting device choosing end tail portion, horizontal The other end of rod piece extends to bridge medial surface and is fixedly connected with top frame;
Vertical climbing frame includes two the second upright bars and is arranged at intervals on marking time between two second upright bars, two second upright bars Top be fixedly connected respectively with steel sleeve;The angle in the second upright bar and horizontal bars is arranged in the diagonal brace;
The hanging basket is arranged in the middle part of vertical climbing frame, close to the side of bridge.
Further, main body frame further includes two second bracing pieces, and the second bracing piece is arranged in parallel in under(-)chassis stock Its both ends of surface are fixedly connected with the quarter butt of under(-)chassis.
Further, main body frame further includes two third upright bars, and the long side in cuboid framework structure is arranged in third upright bar In the middle part of the side at place, between two first upright bars.
Further, the top of third upright bar is fixedly connected with the connecting node of bracing piece and top frame;Third upright bar Lower part is fixedly connected with the connecting node of supporting rod and the second bracing piece.
Further, clump weight is concrete precast block or the rectangular slab of stone.
Further, it is welded and fixed or is connected by fastener between top frame and upright bar.
Further, traveling wheel is universal wheel;Locking device is provided on universal wheel.
Further, hanging basket includes stepping on sole, side rail and baffle, and side rail is vertically installed at the surrounding edge for stepping on sole On, baffle fitting is arranged in side rail lower part.
Further, side rail lateral surface is provided at least two crotches, and hanging basket is articulated in by crotch on vertical climbing frame.
Further, the first bracing piece, supporting rod, the first upright bar and third upright bar are round steel pipe.
The beneficial effects of the utility model are embodied in:
1, the utility model provides a kind of movable type bridge side construction operation platform, and reasonable for structure, safety and stability uses Convenient, single unit system peace is torn open simply, saves labour, and operation is flexible, and movement is convenient, and can be used in turn.
2, the utility model provides a kind of movable type bridge side construction operation platform, and concrete is provided on under(-)chassis The clump weight of prefabricated section or the rectangular slab of stone so that device entirety reasonable stress, stable structure are not easy to topple.The lower part setting of frame body mechanism There is traveling wheel that worker is facilitated to elapse equipment on bridge floor, when equipment is shifted onto up to specified construction location, locking device can be started. Equipment locks or unlocks state conversion conveniently, can meet actual movement or limit demand.
3, the utility model provides a kind of movable type bridge side construction operation platform, not only may be implemented to bridge construction Demand, and rapid and convenient, have saved construction cost and duration.Encountering the feelings that can not set up frame body platform and use and maintenance vehicle Shape has apparent advantage, and height, or mobile bridge floor frame body are affiliated to by adjusting steel sleeve and limiting device and hanging basket, can The relative position of flexible modulation operating personnel and operation side.Whole device work progress and anti-collision wall and railing are without connecing simultaneously It touches, has preferably accomplished finished product protection.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification It becomes apparent, or is understood by implementing the utility model.The main purpose and further advantage of the utility model can lead to Specifically noted scheme in specification, claims is crossed to realize and obtain.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is vertical climbing frame front view.
Fig. 3 is vertical climbing frame side view.
Reference numeral:1- main body frames, the first bracing pieces of 11-, 12- supporting rods, the first upright bars of 13-, the upright bar of 14- thirds, The plug-in operation platform of 2- traveling wheels, 3-, the vertical climbing frames of 31-, 32- diagonal braces, 33- horizontal bars, 34- hanging baskets, the second upright bars of 35-.
Specific implementation mode
As shown in Figure 1, the utility model provide a kind of movable type bridge side construction operation platform, including frame body mechanism and Plug-in operation platform 3;The frame body mechanism includes the main body frame 1, traveling wheel 2 and clump weight being arranged on bridge floor, the master Body frame 1 is cuboid framework structure, including top frame, under(-)chassis, the first bracing piece 11, supporting rod 12 and the first upright bar 13, top frame and under(-)chassis are fixed made of enclosing by fastener by two quarter butts and two root long bars;Top frame Two root long bars between be additionally provided at least first bracing piece 11, be arranged at intervals with use between two root long bars of under(-)chassis In the supporting rod 12 for placing clump weight;It is solid by the way that the first upright bar 13 in four corners is arranged between top frame and under(-)chassis Fixed connection.Due to being provided with the clump weight of concrete precast block or the rectangular slab of stone on under(-)chassis so that device entirety reasonable stress, Stable structure is not easy to topple.
Universal wheel with locking device is arranged in under(-)chassis four corners.Frame body mechanism lower part is provided with universal wheel can To facilitate worker to elapse equipment on bridge floor, make equipment that there is preferable mobility;It, can when equipment shifts specified construction location onto To start locking device.Equipment locks or unlocks state conversion conveniently, can meet actual movement or limit demand.
Plug-in operation platform 3 includes vertical climbing frame 31, the horizontal bars 33 disposed in parallel of diagonal brace 32, two, round steel control At steel sleeve, steel sleeve limiting device and hanging basket 34, horizontal bars 33 choose end cap be connected to steel sleeve and choosing end Tail portion welding is provided with steel sleeve limiting device, and the other end of horizontal bars 33 extends to bridge medial surface and and top frame It is welded and fixed.
Together refering to Fig. 2 and Fig. 3, vertical climbing frame 31 includes that two the second upright bars 35 and interval are welded on two second upright bars The top of marking time between 35, two second upright bars 35 is welded and fixed with steel sleeve respectively;The diagonal brace 32 is arranged in the second upright bar 35 with the angles of horizontal bars 33.Hanging basket 34 is vertical including stepping on sole, side rail and the baffle for anti-falling stop object, side rail In the surrounding edge for stepping on sole, baffle fitting is arranged in side rail lower part.Wherein, it can be plank that hanging basket 34, which steps on sole, Or steel plate.There are at least two connection types between hanging basket 34 and vertical climbing frame 31, first, it can be arranged by welding At 31 middle part of vertical climbing frame, close to the side of bridge;Second, the side rail lateral surface of hanging basket 34 is also provided at least two The crotch that band steel makes, is articulated in by crotch on vertical climbing frame 31.
In the present embodiment, main body frame 1 can also include two second bracing pieces, and the second bracing piece is arranged in parallel in bottom Its both ends is fixedly connected with the quarter butt of under(-)chassis right over portion's frame stock.
In the present embodiment, main body frame 1 can also include two third upright bars 14, and third upright bar 14 is arranged in cuboid In the middle part of side where the long side of frame structure, between two first upright bars 13.The top of third upright bar 14 and bracing piece and top The connecting node of portion's frame is fixedly connected;The lower part of third upright bar 14 and the connecting node of supporting rod 12 and the second bracing piece are fixed Connection.Wherein, the first bracing piece 11, supporting rod 12, the first upright bar 13 and third upright bar 14 are round steel pipe.
Operating platform provided by the utility model, simple in structure, reasonable stress, safety and stability is easy to use, single unit system Peace tears simple, saving labour open, and flexibly, movement is convenient, and can be used in turn for operation.What is more important device was constructed Journey and anti-collision wall and railing are contactless, have preferably accomplished finished product protection.
The foregoing is merely the preferable specific implementation mode of the utility model, but the scope of protection of the utility model not office Be limited to this, variation that any one skilled in the art is expected within the technical scope disclosed by the utility model or It replaces, should be covered within the scope of the utility model.

Claims (10)

1. a kind of movable type bridge side construction operation platform, it is characterised in that:Including frame body mechanism and plug-in operation platform (3);The frame body mechanism includes the main body frame being arranged on bridge floor(1), traveling wheel(2)And clump weight, the main body frame (1)For cuboid framework structure, including top frame, under(-)chassis, the first bracing piece(11), supporting rod(12)With the first upright bar (13), top frame and under(-)chassis are surrounded by two quarter butts and two root long bars;
At least first bracing piece is additionally provided between two root long bars of top frame(11), two root long bars of under(-)chassis it Between be arranged at intervals with supporting rod for placing clump weight(12);By being arranged at four angles between top frame and under(-)chassis First upright bar in portion(13)It is fixedly connected, traveling wheel(2)It is arranged in under(-)chassis four corners;
Plug-in operation platform(3)Including vertical climbing frame(31), diagonal brace(32), two pieces horizontal bars disposed in parallel(33), steel bushing Pipe, steel sleeve limiting device and hanging basket(34),
Horizontal bars(33)End cap of choosing be connected to steel sleeve and be provided with steel sleeve limiting device choosing end tail portion, it is horizontal Rod piece(33)The other end to bridge medial surface extend and be fixedly connected with top frame;
Vertical climbing frame(31)Including two the second upright bars(35)Be arranged at intervals on two second upright bars(35)Between mark time, two Second upright bar(35)Top be fixedly connected respectively with steel sleeve;The diagonal brace(32)It is arranged in the second upright bar(35)With horizon bar Part(33)Angle;
The hanging basket(34)It is arranged in vertical climbing frame(31)Middle part, the side close to bridge.
2. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that main body frame(1)Also wrap Two second bracing pieces are included, the second bracing piece is arranged in parallel in the short of under(-)chassis stock surface, its both ends and under(-)chassis Bar is fixedly connected.
3. movable type bridge side as claimed in claim 2 construction operation platform, which is characterized in that main body frame(1)Also wrap Include two third upright bars(14), third upright bar(14)It is arranged in the middle part of the side where the long side of cuboid framework structure, two First upright bar(13)Between.
4. movable type bridge side as claimed in claim 3 construction operation platform, which is characterized in that third upright bar(14)It is upper Portion is fixedly connected with the connecting node of bracing piece and top frame;Third upright bar(14)Lower part and supporting rod(12)Add with second The connecting node of strong bar is fixedly connected.
5. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that clump weight is that concrete is pre- Clamp dog or the rectangular slab of stone.
6. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that top frame and upright bar it Between be welded and fixed or connected by fastener.
7. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that traveling wheel(2)It is universal Wheel;Locking device is provided on universal wheel.
8. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that hanging basket(34)Including stepping on foot Plate, side rail and baffle, side rail are vertically installed in the surrounding edge for stepping on sole, and baffle fitting is arranged in side rail lower part.
9. movable type bridge side as claimed in claim 8 construction operation platform, which is characterized in that side rail lateral surface is arranged There are at least two crotches, hanging basket(34)It is articulated in vertical climbing frame by crotch(31)On.
10. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that the first bracing piece(11), Supporting rod(12), the first upright bar(13)With third upright bar(14)It is round steel pipe.
CN201820461187.9U 2018-03-30 2018-03-30 A kind of movable type bridge side construction operation platform Expired - Fee Related CN208039066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820461187.9U CN208039066U (en) 2018-03-30 2018-03-30 A kind of movable type bridge side construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820461187.9U CN208039066U (en) 2018-03-30 2018-03-30 A kind of movable type bridge side construction operation platform

Publications (1)

Publication Number Publication Date
CN208039066U true CN208039066U (en) 2018-11-02

Family

ID=63945556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820461187.9U Expired - Fee Related CN208039066U (en) 2018-03-30 2018-03-30 A kind of movable type bridge side construction operation platform

Country Status (1)

Country Link
CN (1) CN208039066U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821133A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Externally hung operating steel platform and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821133A (en) * 2019-11-06 2020-02-21 上海建工七建集团有限公司 Externally hung operating steel platform and construction method thereof
CN110821133B (en) * 2019-11-06 2023-11-10 上海建工七建集团有限公司 Externally-hung operation steel platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN106677211A (en) Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system
CN103015325B (en) Construction method of cast-in-place concrete crash barrier with eaves
CN206538787U (en) A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN103774561A (en) Streamline operation construction method of precast small box girders for highway in assembling mode
CN202544854U (en) Lining trolley for subway station
CN208039066U (en) A kind of movable type bridge side construction operation platform
CN206512605U (en) A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN205364148U (en) PC track beam mold
CN112160773A (en) Tunnel lining reinforcing steel bar trolley and lining reinforcing steel bar binding construction method
CN206031120U (en) Equal adjustable of height and track prevents smooth right angle tower wagon of preventing inclining
CN210589859U (en) Movable precast beam concrete cloth construction platform
CN216194090U (en) Wet seam attached construction platform of precast box girder
CN110080299A (en) A kind of shallow embedding mountain tunnel open-cut engineering method
CN211498488U (en) Highway and railway dual-purpose bridge movable railway hard protection platform
CN211257755U (en) Bearing frame for building
CN211639872U (en) Multi-specification PC component placing frame
CN203855897U (en) Crossing type multifunctional cantilever outer anti-collision wall mounting and moving device
CN203769283U (en) Adaptive angle self-climbing construction platform
CN209040527U (en) A kind of scaffold cradle structure
CN207044363U (en) A kind of new precast beam protection and operating platform
CN207727997U (en) Concrete floor slab placement construction frame body platform structure for building construction
CN202359509U (en) Bridge wet joint operation vehicle
CN112593495A (en) Construction equipment for concrete wall with sound barrier foundation and high and large thin plate structure
CN218643186U (en) Simple trolley for plate girder bar planting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

CF01 Termination of patent right due to non-payment of annual fee