CN208039066U - A kind of movable type bridge side construction operation platform - Google Patents
A kind of movable type bridge side construction operation platform Download PDFInfo
- Publication number
- CN208039066U CN208039066U CN201820461187.9U CN201820461187U CN208039066U CN 208039066 U CN208039066 U CN 208039066U CN 201820461187 U CN201820461187 U CN 201820461187U CN 208039066 U CN208039066 U CN 208039066U
- Authority
- CN
- China
- Prior art keywords
- frame
- operation platform
- movable type
- upright bar
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 26
- 239000010959 steel Substances 0.000 claims abstract description 26
- 230000009194 climbing Effects 0.000 claims abstract description 17
- 239000004575 stone Substances 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of movable type bridge side construction operation platforms, including frame body mechanism and plug-in operation platform;Frame body mechanism includes the main body frame, traveling wheel and clump weight being arranged on bridge floor, main body frame includes top frame, under(-)chassis, the first bracing piece, supporting rod and the first upright bar, it is additionally provided at least first bracing piece between two root long bars of top frame, the supporting rod for placing clump weight is arranged at intervals between two root long bars of under(-)chassis;Plug-in operation platform includes vertical climbing frame, diagonal brace, two horizontal bars, steel sleeve, steel sleeve limiting device and hanging baskets disposed in parallel, the end cap of choosing of horizontal bars is connected to steel sleeve and is provided with steel sleeve limiting device choosing end tail portion, and the other end of horizontal bars extends to bridge medial surface and is fixedly connected with top frame.Operating platform reasonable stress, operation is flexible, and what is more important device work progress and anti-collision wall and railing are contactless, can preferably protect finished product.
Description
Technical field
The utility model relates to construction ancillary equipment field, and especially a kind of movable type bridge side constructing operation is flat
Platform.
Background technology
Current bridge divides by type the diversified forms such as municipal road bridge, viaduct, bridge spanning the river, in the construction process, when
There are quality problems and need repairing in the anti-collision wall and ground cloth-wrapper of bridge, or when pontic side carries out decoration lighting engineering construction, need
It sets up scaffold or uses tool car etc. and provide operating platform for construction personnel.
Scaffold building mode is more and time-consuming in the presence of heavy workload, consumptive material is set up, and is tended not to along pontic after the completion of setting up
Vertical disconnected direction movement, when construction, are relatively complicated.Use and maintenance vehicle is constructed, although easy, maintenance cost is higher.Work as bridge
There is traffic by situation under the higher or bridge of height, aforesaid way construction risk coefficient is greatly increased and passed through under entail dangers to bridge
The safety of vehicle and pedestrian, if bridge spanning the river, scaffold building and tool car are even more inconvenient application.
Utility model content
The purpose of this utility model is to provide a kind of movable type bridge side construction operation platform, to solve traditional hanging basket
Hanging apparatus and hanging basket do not form integration, and mobile difficult, technology construction adaptability is weaker, and being used in turn need to be dismounted,
It is time-consuming and laborious, the technical problems such as inconvenient for use.
To achieve the above object, the utility model adopts the following technical solution:
The utility model provides a kind of movable type bridge side construction operation platform, including frame body mechanism and plug-in construction are put down
Platform;The frame body mechanism includes the main body frame, traveling wheel and clump weight being arranged on bridge floor, and the main body frame is cuboid
Frame structure, including top frame, under(-)chassis, the first bracing piece, supporting rod and the first upright bar, top frame and under(-)chassis
Surrounded by two quarter butts and two root long bars;
Be additionally provided at least first bracing piece between two root long bars of top frame, two root long bars of under(-)chassis it
Between be arranged at intervals with supporting rod for placing clump weight;By being arranged in four corners between top frame and under(-)chassis
First upright bar is fixedly connected,
Traveling wheel is arranged in under(-)chassis four corners;
Plug-in operation platform includes vertical climbing frame, diagonal brace, two horizontal bars disposed in parallel, steel sleeve, steel sleeve limit
Position device and hanging basket,
The end cap of choosing of horizontal bars is connected to steel sleeve and is provided with steel sleeve limiting device choosing end tail portion, horizontal
The other end of rod piece extends to bridge medial surface and is fixedly connected with top frame;
Vertical climbing frame includes two the second upright bars and is arranged at intervals on marking time between two second upright bars, two second upright bars
Top be fixedly connected respectively with steel sleeve;The angle in the second upright bar and horizontal bars is arranged in the diagonal brace;
The hanging basket is arranged in the middle part of vertical climbing frame, close to the side of bridge.
Further, main body frame further includes two second bracing pieces, and the second bracing piece is arranged in parallel in under(-)chassis stock
Its both ends of surface are fixedly connected with the quarter butt of under(-)chassis.
Further, main body frame further includes two third upright bars, and the long side in cuboid framework structure is arranged in third upright bar
In the middle part of the side at place, between two first upright bars.
Further, the top of third upright bar is fixedly connected with the connecting node of bracing piece and top frame;Third upright bar
Lower part is fixedly connected with the connecting node of supporting rod and the second bracing piece.
Further, clump weight is concrete precast block or the rectangular slab of stone.
Further, it is welded and fixed or is connected by fastener between top frame and upright bar.
Further, traveling wheel is universal wheel;Locking device is provided on universal wheel.
Further, hanging basket includes stepping on sole, side rail and baffle, and side rail is vertically installed at the surrounding edge for stepping on sole
On, baffle fitting is arranged in side rail lower part.
Further, side rail lateral surface is provided at least two crotches, and hanging basket is articulated in by crotch on vertical climbing frame.
Further, the first bracing piece, supporting rod, the first upright bar and third upright bar are round steel pipe.
The beneficial effects of the utility model are embodied in:
1, the utility model provides a kind of movable type bridge side construction operation platform, and reasonable for structure, safety and stability uses
Convenient, single unit system peace is torn open simply, saves labour, and operation is flexible, and movement is convenient, and can be used in turn.
2, the utility model provides a kind of movable type bridge side construction operation platform, and concrete is provided on under(-)chassis
The clump weight of prefabricated section or the rectangular slab of stone so that device entirety reasonable stress, stable structure are not easy to topple.The lower part setting of frame body mechanism
There is traveling wheel that worker is facilitated to elapse equipment on bridge floor, when equipment is shifted onto up to specified construction location, locking device can be started.
Equipment locks or unlocks state conversion conveniently, can meet actual movement or limit demand.
3, the utility model provides a kind of movable type bridge side construction operation platform, not only may be implemented to bridge construction
Demand, and rapid and convenient, have saved construction cost and duration.Encountering the feelings that can not set up frame body platform and use and maintenance vehicle
Shape has apparent advantage, and height, or mobile bridge floor frame body are affiliated to by adjusting steel sleeve and limiting device and hanging basket, can
The relative position of flexible modulation operating personnel and operation side.Whole device work progress and anti-collision wall and railing are without connecing simultaneously
It touches, has preferably accomplished finished product protection.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification
It becomes apparent, or is understood by implementing the utility model.The main purpose and further advantage of the utility model can lead to
Specifically noted scheme in specification, claims is crossed to realize and obtain.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is vertical climbing frame front view.
Fig. 3 is vertical climbing frame side view.
Reference numeral:1- main body frames, the first bracing pieces of 11-, 12- supporting rods, the first upright bars of 13-, the upright bar of 14- thirds,
The plug-in operation platform of 2- traveling wheels, 3-, the vertical climbing frames of 31-, 32- diagonal braces, 33- horizontal bars, 34- hanging baskets, the second upright bars of 35-.
Specific implementation mode
As shown in Figure 1, the utility model provide a kind of movable type bridge side construction operation platform, including frame body mechanism and
Plug-in operation platform 3;The frame body mechanism includes the main body frame 1, traveling wheel 2 and clump weight being arranged on bridge floor, the master
Body frame 1 is cuboid framework structure, including top frame, under(-)chassis, the first bracing piece 11, supporting rod 12 and the first upright bar
13, top frame and under(-)chassis are fixed made of enclosing by fastener by two quarter butts and two root long bars;Top frame
Two root long bars between be additionally provided at least first bracing piece 11, be arranged at intervals with use between two root long bars of under(-)chassis
In the supporting rod 12 for placing clump weight;It is solid by the way that the first upright bar 13 in four corners is arranged between top frame and under(-)chassis
Fixed connection.Due to being provided with the clump weight of concrete precast block or the rectangular slab of stone on under(-)chassis so that device entirety reasonable stress,
Stable structure is not easy to topple.
Universal wheel with locking device is arranged in under(-)chassis four corners.Frame body mechanism lower part is provided with universal wheel can
To facilitate worker to elapse equipment on bridge floor, make equipment that there is preferable mobility;It, can when equipment shifts specified construction location onto
To start locking device.Equipment locks or unlocks state conversion conveniently, can meet actual movement or limit demand.
Plug-in operation platform 3 includes vertical climbing frame 31, the horizontal bars 33 disposed in parallel of diagonal brace 32, two, round steel control
At steel sleeve, steel sleeve limiting device and hanging basket 34, horizontal bars 33 choose end cap be connected to steel sleeve and choosing end
Tail portion welding is provided with steel sleeve limiting device, and the other end of horizontal bars 33 extends to bridge medial surface and and top frame
It is welded and fixed.
Together refering to Fig. 2 and Fig. 3, vertical climbing frame 31 includes that two the second upright bars 35 and interval are welded on two second upright bars
The top of marking time between 35, two second upright bars 35 is welded and fixed with steel sleeve respectively;The diagonal brace 32 is arranged in the second upright bar
35 with the angles of horizontal bars 33.Hanging basket 34 is vertical including stepping on sole, side rail and the baffle for anti-falling stop object, side rail
In the surrounding edge for stepping on sole, baffle fitting is arranged in side rail lower part.Wherein, it can be plank that hanging basket 34, which steps on sole,
Or steel plate.There are at least two connection types between hanging basket 34 and vertical climbing frame 31, first, it can be arranged by welding
At 31 middle part of vertical climbing frame, close to the side of bridge;Second, the side rail lateral surface of hanging basket 34 is also provided at least two
The crotch that band steel makes, is articulated in by crotch on vertical climbing frame 31.
In the present embodiment, main body frame 1 can also include two second bracing pieces, and the second bracing piece is arranged in parallel in bottom
Its both ends is fixedly connected with the quarter butt of under(-)chassis right over portion's frame stock.
In the present embodiment, main body frame 1 can also include two third upright bars 14, and third upright bar 14 is arranged in cuboid
In the middle part of side where the long side of frame structure, between two first upright bars 13.The top of third upright bar 14 and bracing piece and top
The connecting node of portion's frame is fixedly connected;The lower part of third upright bar 14 and the connecting node of supporting rod 12 and the second bracing piece are fixed
Connection.Wherein, the first bracing piece 11, supporting rod 12, the first upright bar 13 and third upright bar 14 are round steel pipe.
Operating platform provided by the utility model, simple in structure, reasonable stress, safety and stability is easy to use, single unit system
Peace tears simple, saving labour open, and flexibly, movement is convenient, and can be used in turn for operation.What is more important device was constructed
Journey and anti-collision wall and railing are contactless, have preferably accomplished finished product protection.
The foregoing is merely the preferable specific implementation mode of the utility model, but the scope of protection of the utility model not office
Be limited to this, variation that any one skilled in the art is expected within the technical scope disclosed by the utility model or
It replaces, should be covered within the scope of the utility model.
Claims (10)
1. a kind of movable type bridge side construction operation platform, it is characterised in that:Including frame body mechanism and plug-in operation platform
(3);The frame body mechanism includes the main body frame being arranged on bridge floor(1), traveling wheel(2)And clump weight, the main body frame
(1)For cuboid framework structure, including top frame, under(-)chassis, the first bracing piece(11), supporting rod(12)With the first upright bar
(13), top frame and under(-)chassis are surrounded by two quarter butts and two root long bars;
At least first bracing piece is additionally provided between two root long bars of top frame(11), two root long bars of under(-)chassis it
Between be arranged at intervals with supporting rod for placing clump weight(12);By being arranged at four angles between top frame and under(-)chassis
First upright bar in portion(13)It is fixedly connected, traveling wheel(2)It is arranged in under(-)chassis four corners;
Plug-in operation platform(3)Including vertical climbing frame(31), diagonal brace(32), two pieces horizontal bars disposed in parallel(33), steel bushing
Pipe, steel sleeve limiting device and hanging basket(34),
Horizontal bars(33)End cap of choosing be connected to steel sleeve and be provided with steel sleeve limiting device choosing end tail portion, it is horizontal
Rod piece(33)The other end to bridge medial surface extend and be fixedly connected with top frame;
Vertical climbing frame(31)Including two the second upright bars(35)Be arranged at intervals on two second upright bars(35)Between mark time, two
Second upright bar(35)Top be fixedly connected respectively with steel sleeve;The diagonal brace(32)It is arranged in the second upright bar(35)With horizon bar
Part(33)Angle;
The hanging basket(34)It is arranged in vertical climbing frame(31)Middle part, the side close to bridge.
2. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that main body frame(1)Also wrap
Two second bracing pieces are included, the second bracing piece is arranged in parallel in the short of under(-)chassis stock surface, its both ends and under(-)chassis
Bar is fixedly connected.
3. movable type bridge side as claimed in claim 2 construction operation platform, which is characterized in that main body frame(1)Also wrap
Include two third upright bars(14), third upright bar(14)It is arranged in the middle part of the side where the long side of cuboid framework structure, two
First upright bar(13)Between.
4. movable type bridge side as claimed in claim 3 construction operation platform, which is characterized in that third upright bar(14)It is upper
Portion is fixedly connected with the connecting node of bracing piece and top frame;Third upright bar(14)Lower part and supporting rod(12)Add with second
The connecting node of strong bar is fixedly connected.
5. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that clump weight is that concrete is pre-
Clamp dog or the rectangular slab of stone.
6. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that top frame and upright bar it
Between be welded and fixed or connected by fastener.
7. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that traveling wheel(2)It is universal
Wheel;Locking device is provided on universal wheel.
8. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that hanging basket(34)Including stepping on foot
Plate, side rail and baffle, side rail are vertically installed in the surrounding edge for stepping on sole, and baffle fitting is arranged in side rail lower part.
9. movable type bridge side as claimed in claim 8 construction operation platform, which is characterized in that side rail lateral surface is arranged
There are at least two crotches, hanging basket(34)It is articulated in vertical climbing frame by crotch(31)On.
10. movable type bridge side as described in claim 1 construction operation platform, which is characterized in that the first bracing piece(11),
Supporting rod(12), the first upright bar(13)With third upright bar(14)It is round steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820461187.9U CN208039066U (en) | 2018-03-30 | 2018-03-30 | A kind of movable type bridge side construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820461187.9U CN208039066U (en) | 2018-03-30 | 2018-03-30 | A kind of movable type bridge side construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208039066U true CN208039066U (en) | 2018-11-02 |
Family
ID=63945556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820461187.9U Expired - Fee Related CN208039066U (en) | 2018-03-30 | 2018-03-30 | A kind of movable type bridge side construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208039066U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821133A (en) * | 2019-11-06 | 2020-02-21 | 上海建工七建集团有限公司 | Externally hung operating steel platform and construction method thereof |
-
2018
- 2018-03-30 CN CN201820461187.9U patent/CN208039066U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821133A (en) * | 2019-11-06 | 2020-02-21 | 上海建工七建集团有限公司 | Externally hung operating steel platform and construction method thereof |
CN110821133B (en) * | 2019-11-06 | 2023-11-10 | 上海建工七建集团有限公司 | Externally-hung operation steel platform and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677211A (en) | Early-dismantling fabricated pipe rack aluminum formwork trolley system capable of integrally pouring walls and top plate and construction method of system | |
CN103015325B (en) | Construction method of cast-in-place concrete crash barrier with eaves | |
CN206538787U (en) | A kind of wall tears assembled piping lane aluminum dipping form chassis system open with the top plate whole morning poured | |
CN107905114B (en) | A kind of construction method of large span Successive interference cancellation | |
CN103774561A (en) | Streamline operation construction method of precast small box girders for highway in assembling mode | |
CN202544854U (en) | Lining trolley for subway station | |
CN208039066U (en) | A kind of movable type bridge side construction operation platform | |
CN206512605U (en) | A kind of overall demolition, installation anticollision wall form and its walking track crane move system | |
CN205364148U (en) | PC track beam mold | |
CN112160773A (en) | Tunnel lining reinforcing steel bar trolley and lining reinforcing steel bar binding construction method | |
CN206031120U (en) | Equal adjustable of height and track prevents smooth right angle tower wagon of preventing inclining | |
CN210589859U (en) | Movable precast beam concrete cloth construction platform | |
CN216194090U (en) | Wet seam attached construction platform of precast box girder | |
CN110080299A (en) | A kind of shallow embedding mountain tunnel open-cut engineering method | |
CN211498488U (en) | Highway and railway dual-purpose bridge movable railway hard protection platform | |
CN211257755U (en) | Bearing frame for building | |
CN211639872U (en) | Multi-specification PC component placing frame | |
CN203855897U (en) | Crossing type multifunctional cantilever outer anti-collision wall mounting and moving device | |
CN203769283U (en) | Adaptive angle self-climbing construction platform | |
CN209040527U (en) | A kind of scaffold cradle structure | |
CN207044363U (en) | A kind of new precast beam protection and operating platform | |
CN207727997U (en) | Concrete floor slab placement construction frame body platform structure for building construction | |
CN202359509U (en) | Bridge wet joint operation vehicle | |
CN112593495A (en) | Construction equipment for concrete wall with sound barrier foundation and high and large thin plate structure | |
CN218643186U (en) | Simple trolley for plate girder bar planting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |