CN218643186U - Simple trolley for plate girder bar planting - Google Patents
Simple trolley for plate girder bar planting Download PDFInfo
- Publication number
- CN218643186U CN218643186U CN202222794310.8U CN202222794310U CN218643186U CN 218643186 U CN218643186 U CN 218643186U CN 202222794310 U CN202222794310 U CN 202222794310U CN 218643186 U CN218643186 U CN 218643186U
- Authority
- CN
- China
- Prior art keywords
- platform
- welded
- longitudinal beams
- lower platform
- rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a simple trolley for planting steel bars on a plate girder, which comprises a lower platform, an upper platform and a suspension cage; the bottom of the lower platform is provided with a travelling wheel, one end of the lower platform is provided with a balance weight, the other end of the lower platform is welded with the upright post, the rear end of the upper platform is welded with the upright post, and the front end of the upper platform is welded with the upper end of the suspension cage. During construction, the lower platform moves on the bridge along the bridge direction, the suspension cage is suspended outside the bridge, and constructors enter the suspension cage from the upper platform to plant bars, so that the operation is not limited by the terrain under the bridge, and the construction is convenient.
Description
Technical Field
The utility model belongs to the technical field of the road construction, a highway reconstruction and extension construction is related to, concretely relates to simple and easy dolly that is used for widening existing bridge, at the existing beam slab outside bar planting.
Background
In the construction of reconstruction and extension of highways, for small and medium-sized existing bridges on a reconstruction and extension road section, steel bars are usually planted on the outer sides of beam slabs, and wet joints are poured and widened. At present, the plate girder embedded steel bars are usually constructed under a bridge by adopting a climbing vehicle, so that the cost is higher, the limitation by the terrain is larger, and the movement is inconvenient.
Disclosure of Invention
The utility model aims at the above-mentioned problem, a simple and easy dolly of plate girder bar planting is provided, facilitates for the bar planting.
The technical scheme of the utility model as follows:
the utility model provides a simple and easy dolly of bar is planted to plate girder which characterized in that: comprises a lower platform, an upper platform and a suspension cage; the lower platform comprises a frame beam formed by welding two lower longitudinal beams and two lower cross beams, and a plurality of lower platform pedal rods are welded between the two lower longitudinal beams; the upper platform comprises two upper longitudinal beams and a frame beam formed by welding two upper cross beams, and a plurality of upper platform pedal rods are welded between the two upper longitudinal beams; the suspension cage comprises 4 vertical rods arranged at 4 vertexes of a rectangle, a plurality of cross rods are welded among the 4 vertical rods according to 4 sides of the rectangle, and a grid mesh plate is welded at the lower ends of the 4 vertical rods to form a suspension platform; the bottom parts of two ends of two lower longitudinal beams of the lower platform are respectively provided with a walking wheel, the top surface of one end of the lower platform is provided with a balance weight, the other end of the lower platform is respectively welded on two lower longitudinal beams, the rear ends of two upper longitudinal beams of the upper platform are respectively welded on the upper ends of the two vertical columns, and the front ends of the two upper longitudinal beams are respectively welded with the upper ends of two hanging rods of the cage; a step ladder is welded between the rear end of the upper platform and the lower platform.
The utility model discloses can be on the bridge in the same direction as the bridge to removing, constructor carries out the bar planting operation in the bridge outside through the cage, does not receive the restriction of topography under the bridge, and construction convenience is with low costs.
Drawings
Fig. 1 is a side view schematic structure of the present invention;
FIG. 2 is a schematic plan view of the lower frame beam;
FIG. 3 is a schematic plan view of the upper frame beam;
figure 4 is a front view of the cage.
Detailed Description
As shown in fig. 1, 2, 3 and 4, the present invention comprises a lower platform 1, an upper platform 2 and a suspension cage 3; the lower platform 1 comprises a frame beam formed by welding two lower longitudinal beams 11 and two lower cross beams 12, and a plurality of lower platform pedal rods 13 are welded between the two lower longitudinal beams; the upper platform 2 comprises a frame beam formed by welding two upper longitudinal beams 21 and two upper cross beams 22, and a plurality of upper platform pedal rods 23 are welded between the two upper longitudinal beams; the suspension cage 3 comprises 4 vertical rods 31 arranged at the 4 vertexes of the rectangle, a plurality of cross rods 32 welded among the 4 vertical rods according to the 4 sides of the rectangle, and a grid mesh plate welded at the lower ends of the 4 vertical rods to form a suspension platform; the bottom parts of two ends of two lower longitudinal beams of the lower platform 1 are respectively provided with a travelling wheel 4, the top surface of one end of the lower platform is provided with a balance weight 5, the other end of the lower platform is respectively welded with two upright posts 6 on the two lower longitudinal beams, the rear ends of two upper longitudinal beams 21 of the upper platform 2 are respectively welded at the upper ends of the two upright posts 6, and the front ends of the two upper longitudinal beams 21 are respectively welded with the upper ends of two hanging rods 31 of the suspension cage 3; a step 7 is welded between the rear end of the upper platform 2 and the lower platform 1.
The utility model discloses during the specific implementation, for guaranteeing constructor cage safety from top to bottom, can weld guardrail 8 on two last longerons of upper mounting plate and between two last longeron front ends.
As shown in fig. 1, the utility model is used for during the construction, lower platform 1 is located the beam surface 9 and walks along the beam surface through the walking wheel, and 2 front ends of upper platform extend to the bridge outside from bridge railing top, and cage 3 is just to the bridge outside, and constructor gets into the cage by upper platform 2 and carries out the bar planting operation outside the bridge. After one construction is finished, the trolley is manually pushed to move to the next position.
Claims (2)
1. The utility model provides a simple and easy dolly of bar is planted to plate girder which characterized in that: comprises a lower platform, an upper platform and a suspension cage; the lower platform comprises a frame beam formed by welding two lower longitudinal beams and two lower cross beams, and a plurality of lower platform pedal rods are welded between the two lower longitudinal beams; the upper platform comprises two upper longitudinal beams and a frame beam formed by welding two upper cross beams, and a plurality of upper platform pedal rods are welded between the two upper longitudinal beams; the suspension cage comprises 4 vertical rods arranged at the 4 vertexes of the rectangle, a plurality of cross rods are welded among the 4 vertical rods according to the 4 sides of the rectangle, and a grid mesh plate is welded at the lower ends of the 4 vertical rods to form a suspension platform; the bottom parts of two ends of two lower longitudinal beams of the lower platform are respectively provided with a travelling wheel, the top surface of one end of the lower platform is provided with a balance weight, the other end of the lower platform is respectively welded on two lower longitudinal beams, the rear ends of two upper longitudinal beams of the upper platform are respectively welded at the upper ends of the two vertical columns, and the front ends of the two upper longitudinal beams are respectively welded with the upper ends of two hanging rods of the suspension cage; a step ladder is welded between the rear end of the upper platform and the lower platform.
2. The simple plate girder bar-planting trolley according to claim 1, characterized in that: guardrails are welded on the two upper longitudinal beams of the upper platform and between the front ends of the two upper longitudinal beams.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222794310.8U CN218643186U (en) | 2022-10-23 | 2022-10-23 | Simple trolley for plate girder bar planting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222794310.8U CN218643186U (en) | 2022-10-23 | 2022-10-23 | Simple trolley for plate girder bar planting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218643186U true CN218643186U (en) | 2023-03-17 |
Family
ID=85494399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222794310.8U Active CN218643186U (en) | 2022-10-23 | 2022-10-23 | Simple trolley for plate girder bar planting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218643186U (en) |
-
2022
- 2022-10-23 CN CN202222794310.8U patent/CN218643186U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105386412B (en) | Movable portal used in construction of bent cap of large cantilever and construction method of movable portal | |
CN106978777B (en) | A kind of make-shift bridge device | |
CN109356031B (en) | Rail transit viaduct surface staggered vehicle beam transporting platform and method thereof | |
CN205934735U (en) | A operation platform for stretch -draw of cantilever bent cap | |
CN203248170U (en) | Lining trolley for secondary lining construction of pedestrian crosswalk | |
CN215210544U (en) | Bridge curtain board construction protection device for existing tramcar crossing highway | |
CN218643186U (en) | Simple trolley for plate girder bar planting | |
CN207498835U (en) | Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system | |
CN112726411A (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
CN203668857U (en) | Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates | |
CN205188823U (en) | Construction of light rail prestressing force bent cap and end -blocking work platform | |
CN210589859U (en) | Movable precast beam concrete cloth construction platform | |
CN208039066U (en) | A kind of movable type bridge side construction operation platform | |
CN211113119U (en) | Temporary bridge device | |
CN211498488U (en) | Highway and railway dual-purpose bridge movable railway hard protection platform | |
CN113481871A (en) | Method for gradually crossing holes of small-curve-radius and large-span continuous I-shaped reinforced concrete combined bridge girder erection machine | |
CN209276999U (en) | A kind of urban viaduct cantilever is set a roof beam in place support system | |
CN219953369U (en) | Construction trolley for grouting of tunnel arch roof | |
CN207646620U (en) | The movable construction platform of prefabricated wide cut beam slab | |
CN208136705U (en) | A kind of make-shift bridge device | |
CN211285270U (en) | Precast beam bridge floor cantilever slab concrete construction trolley | |
CN218147873U (en) | Trolley for repairing concrete guardrail of bridge | |
CN216786825U (en) | Reinforced concrete guardrail construction device | |
CN215252384U (en) | Double bridge concrete barrier construction trolley | |
CN215631463U (en) | T roof beam reinforcement binding that regularization can have enough to meet need use pours platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |