CN208136705U - A kind of make-shift bridge device - Google Patents

A kind of make-shift bridge device Download PDF

Info

Publication number
CN208136705U
CN208136705U CN201720571620.XU CN201720571620U CN208136705U CN 208136705 U CN208136705 U CN 208136705U CN 201720571620 U CN201720571620 U CN 201720571620U CN 208136705 U CN208136705 U CN 208136705U
Authority
CN
China
Prior art keywords
bridge
bailey
bailey beam
bridge pier
road surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720571620.XU
Other languages
Chinese (zh)
Inventor
罗九林
程慧林
王治斌
杨永强
梁志新
罗红春
郭亚娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201720571620.XU priority Critical patent/CN208136705U/en
Application granted granted Critical
Publication of CN208136705U publication Critical patent/CN208136705U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of make-shift bridge devices, Simple bridge for temporary erection, the Bailey beam (8) across space under bridge including multiple vertical runway longitudinal gap arrangements, Bailey beam (8) is laid with the road surface distribution beam (9) of I-steel above, bamboo slab rubber (10) are laid in road surface distribution beam (9), cast-in-place concrete floorings (11) constitute road surface on bamboo slab rubber (10);The interior embedded U-shaped bolt (16) of concrete slab (11) is connected with Bailey beam (8);Each Bailey beam (8) both ends are equipped with end bridge pier, and centre is equipped with middle bridge pier, end bridge pier and middle bridge pier support Bailey beam (8).Entire lane is arranged in above river, and more traditional girder is reasonable to arrangement form along bridge, takes full advantage of space on river, avoids largely taking over the land for use, and effective protection two sides are afforested.The quantity of Yokogawa road arrangement reduced in korneforos pile foundation simultaneously, reduces difficulty of construction simultaneously, can effectively reduce current obstruction area.

Description

A kind of make-shift bridge device
Technical field
The utility model relates to mechanical structure and traffic engineering technical field more particularly to a kind of make-shift bridge devices.
Background technique
Make-shift bridge is the Simple bridge of temporary erection.The bridge set up in order to facilitate construction, can for construction machinery It is smoothly convenient current, sometimes for heavy construction such as subway station etc. is built, needs to relieve traffic congestion and major trunk roads driving is changed its course.Especially It is may to build interim sidewalk without sufficient space in city, and friendship is dredged using make-shift bridge structure is built on river Logical, general construction requirement is tight.Major urban arterial highway lane is more, and vehicle flow is big.How to accomplish economical, safe and easy for construction, is Design a major issue of required consideration when make-shift bridge.
Traditional temporary construction steel suspension bridge does not use beams of concrete to come as make-shift bridge substantially also with regard to 4~8m wide.In addition Traditional steel suspension bridge is longitudinally arranged using Bailey beam, i.e., Bailey beam is identical with road arrangement direction.In Urban Metro Construction, especially Subway station is built under major trunk roads, discongests the general left and right 30m wide of engineering make-shift bridge.Urban Bridge volume of traffic is big, right simultaneously Noise pollution requires strictly, especially to pass through school, hospital, resident living area.Traditional steel suspension bridge arrangement form, which is difficult to meet, to be wanted It asks, it is inevitable to influence the practical cross-section of river in river, followed by noise.According to permanent concrete bridge structure, investment At high cost, speed of application is slow, removal cost is higher.And it can not reuse.
Bailey beam is composed frame structure by Bei Leixiao by Bailey bracket and horizontal-associate frame, and Bailey bracket and shellfish thunder pin are standards Commodity fittings, can with it splice be assembled into many components, equipment.As shown in Figure 1, being Bailey bracket structure, such as Fig. 2 and Fig. 3 For shellfish thunder latch structure.
Bailey bridge is also referred to as " assembly type steel bridge on highway ", and original name is " 321 " highway steel bridge.It is the combat readiness highway steel in China Bridge.Bailey bridge is to be widely used in the world, a kind of the most popular bridge, it has structure simple, convenient transportation, is set up fast Speed decomposes easy feature.It is provided simultaneously with large carrying capacity, the advantages that structural rigidity is strong, and fatigue life is long.It can be according to reality The different across footpaths composition various types needed and temporary bridge for various purposes, meet an urgent need bridge and fixed bridge, have component few, weight Gently, feature at low cost.
Summary of the invention
The purpose of the utility model is to provide a kind of make-shift bridge devices, and design is reasonable, easy construction, can be effectively reduced and apply Work investment shortens the activity duration, and can make full use of the interim construction suspension bridge in river space.
The purpose of this utility model is achieved through the following technical solutions:
A kind of make-shift bridge device, for the Simple bridge of temporary erection, including multiple vertical runway longitudinal gap cloth The Bailey beam across space under bridge set, the Bailey beam laterally include the sub- roof beam structure that multiple groups pass through mutually shellfish thunder pin connection, Every sub- roof beam structure is constituted by three pieces Bailey bracket is arranged in parallel, is connected between three pieces Bailey bracket by horizontal-associate frame;
It is laid with the road surface distribution beam of I-steel above Bailey beam, bamboo slab rubber, scene on bamboo slab rubber are laid in the distribution beam of road surface It is poured concrete slab and constitutes road surface;Embedded U-shaped bolt is connected with Bailey beam in concrete slab;
Each Bailey beam both ends are equipped with end bridge pier, and centre is equipped with middle bridge pier, and end bridge pier and middle bridge pier support Bailey beam.
The top mark that the top mark height of the middle bridge pier is higher than end bridge pier is high, and both ends, slope are higher than in the middle part of the Bailey beam of support Spend %
The end bridge pier includes holding bored concrete pile and the crown beam for being set to end bored concrete pile upper end, and crown beam supports Bailey beam end.
The middle bridge pier includes middle bored concrete pile, casing, cover board, ribbed stiffener and fashioned iron distribution beam;Casing is placed in middle perfusion Stake top portion pours casing top welded cover plate after middle bored concrete pile, welds fashioned iron distribution beam on cover board, and ribbed stiffener is arranged.
The road surface side of the temporary bridge device pontic is arranged anticollision barrier, and the other side is mated formation pavement, on the inside of pavement If kerbstone, people's row railing is arranged in outside.
Described temporary bridge device end of the bridge entrance road surface one end is equipped with top cap, parados, ear wall and attachment strap;
Top cap is installed on above the bridge pier of end, and parados and ear wall are installed in top cap, and attachment strap is set on ear wall, is mated formation on attachment strap Paving.
The concrete slab interval distance is arranged multiple transverse expansion joints, in the both ends concrete slab at expansion joint Channel steel and U-shaped steel muscle are reinforced in setting;The U-shaped steel muscle and reinforcement channel steel welding, are embedded in concrete slab.Every certain Transverse expansion joint is arranged in spacing
It is provided by the embodiment of the utility model a kind of interim it can be seen from above-mentioned technical solution provided by the utility model Temporary bridge device, design is reasonable, easy construction, construction investment can be effectively reduced, shorten the activity duration, and can make full use of river The interim construction suspension bridge in space.It avoids largely taking over the land for use, and effective protection two sides are afforested.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the utility model Example, for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Obtain other accompanying drawings.
Fig. 1 is Bailey bracket structural schematic diagram;
In Fig. 1:001:Negative head, 002:Top boom bolt hole, 003:Support frame aperture, 004:Top boom, 005:Male, 006: Lower boom, 007:Crossbeam backing plate, 008:Beam clamp hole, 009, lower boom bolt hole, 010:Window catch hole;
Fig. 2 is shellfish thunder latch structure schematic diagram;
Fig. 3 is the structural schematic diagram of section at the pontic of make-shift bridge device provided by the embodiment of the utility model;
Fig. 4 is the structural representation of section at the end of the bridge entrance of make-shift bridge device provided by the embodiment of the utility model Figure;
Fig. 5 is the vertical structure schematic diagram of make-shift bridge device provided by the embodiment of the utility model.
Specific embodiment
Below with reference to the attached drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out clear Chu is fully described by, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work The every other embodiment obtained, belongs to the protection scope of the utility model.
The utility model embodiment is described in further detail below in conjunction with attached drawing.
Embodiment one
As shown in Fig. 3, Fig. 4 and Fig. 5, a kind of make-shift bridge device for the Simple bridge of temporary erection, including multiple hangs down The Bailey beam 8 across space under bridge of Through Lane longitudinal gap arrangement, space under bridge may be road or river, the shellfish Thunder beam 8 laterally includes the sub- roof beam structure that multiple groups pass through mutually the connection of shellfish thunder pin 17, as shown in figure 5, every sub- roof beam structure is by three pieces shellfish thunder Frame composition arranged in parallel is connected by horizontal-associate frame 20 between three pieces Bailey bracket;Upper and lower chord member is connected by shellfish thunder pin 17 between Bailey beam 8 It connects, specifically uses Bailey bracket, one group of three pieces, spacing 2X45cm, arrangement spacing is 90cm between longitudinal each group.Bailey beam is vertical Runway arrangement, runway are arranged along river.Bailey beam top is laid with I-steel distribution beam, floorings are cast-in-place concrete bridge floor Plate.Bamboo slab rubber is arranged between floorings and distribution beam, the template as casting concrete.Embedded U-shaped bolt in cast-in-place floorings It is connected with Bailey beam top boom.
Bailey beam 8 is laid with the road surface distribution beam 9 of I-steel above, is laid with bamboo slab rubber 10, bamboo slab rubber 10 in road surface distribution beam 9 As the template of casting concrete, cast-in-place concrete floorings 11 constitute road surface on bamboo slab rubber 10;Concrete slab 11 Interior embedded U-shaped bolt 16 is connected with Bailey beam 8;U-bolt is specifically connect with Bailey beam top boom, top boom i.e. shellfish thunder Rod piece above beam, the rod piece below corresponding lower boom i.e. Bailey beam;11 interval distance of concrete slab is set Multiple transverse expansion joints are set, transverse expansion joint, setting in the both ends floorings 11 at expansion joint are specifically set at spacing intervals Reinforce channel steel 18 and U-shaped steel muscle 19.The U-shaped steel muscle 19 is welded with channel steel 18 is reinforced, and is embedded in floorings 11.
8 both ends of Bailey beam are equipped with end bridge pier, and centre is equipped with middle bridge pier, and end bridge pier and middle bridge pier support Bailey beam 8, and hold bridge Stake and setting laminated rubber bearing 21 on middle bridge pier, support Bailey beam 8.The top mark height of the middle bridge pier is higher than the top of end bridge pier Absolute altitude is higher than both ends, the gradient 1% or so in the middle part of the Bailey beam 8 of support.Specific method is the corresponding Bailey beam of bridge pier in releasing The shellfish thunder pin 17 of 8 top boom junction.By raising jackshaft stake top absolute altitude, while 8 lower edge of jackshaft pile top position Bailey beam Bar junction is connected with shellfish thunder pin 17, and top boom junction does not install shellfish thunder pin 17, raising jackshaft stake top absolute altitude, making two sides shellfish Thunder beam 8 can be freely rotated around korneforos bridge pier top, form the 1% transverse drainage gradient.
The end bridge pier includes holding bored concrete pile 1 and the crown beam 2 for being set to end 1 upper end of bored concrete pile, and crown beam 2 supports Bailey beam 8 End.The middle bridge pier includes middle bored concrete pile 3, casing 4, cover board 5, ribbed stiffener 6 and fashioned iron distribution beam 7;Casing 4 is placed in middle filling 3 top of stake is infused, 4 top welded cover plate 5 of casing after middle bored concrete pile 3 is poured, fashioned iron distribution beam 7 is welded on cover board 5, and be arranged and put more energy into Rib 6.
As shown in Figure 1, anticollision barrier 12 is arranged in the road surface side of the temporary bridge device pontic, the other side is mated formation pavement 15, kerbstone 14 is set on the inside of pavement 15, people's row railing 13 is arranged in outside.
As shown in Fig. 2, described temporary bridge device end of the bridge entrance road surface one end is equipped with top cap 22, parados 23, ear wall 24 With attachment strap 25;Top cap 22 is installed on above the bridge pier of end, and parados 23 and ear wall 24 are installed in top cap 22, and attachment strap 25 is set to ear wall 24 On, paving 26 of mating formation on attachment strap 25.
For the utility model due to using 8 lateral arrangement of Bailey beam, horizontal span can achieve 15m or more large span.? Make-shift bridge is built along river on the river of 27m, only three campsheds need to be set, wherein a campshed base is arranged in korneforos, and in addition two sides are respectively set Set a campshed.Korneforos pier arrangement of pile foundation quantity is substantially reduced, current obstruction area is effectively reduced.Traditional Bailey beam indulges bridge to cloth It sets, at bridge floor wider (reaching 30m), direction across bridge pile foundation is arranged by 5m spacing, stake diameter 1m, at least 7 campsheds, and 5 rank in korneforos, Current obstruction area is 5 times of Bailey beam lateral arrangement.
In addition cross fall is set using korneforos pier top absolute altitude mode is raised, avoids using to arrangement using Bailey beam cross 8 Cross fall is arranged in traditional increase in-situ layer thickness, can effectively reduce in-situ layer concrete works amount, to reduce Dead load.
The Bailey beam bridge lateral arrangement is used simultaneously, and vehicle enters and leaves bridge section abutment connection and reasonable arrangement, more to 8 stress of Bailey beam It is advantageous.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art can readily occur in the technical scope that the utility model discloses Change or replacement, should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should Subject to the scope of protection of the claims.

Claims (6)

1. a kind of make-shift bridge device, the Simple bridge for temporary erection, which is characterized in that vertical including multiple vertical runways To the spaced apart Bailey beam (8) across space under bridge, the Bailey beam (8) laterally includes that multiple groups pass through mutually Bei Leixiao (17) the sub- roof beam structure connected, every sub- roof beam structure are constituted by three pieces Bailey bracket is arranged in parallel, pass through horizontal-associate frame between three pieces Bailey bracket (20) it connects;
Bailey beam (8) is laid with the road surface distribution beam (9) of I-steel above, is laid with bamboo slab rubber (10) in road surface distribution beam (9), bamboo glue Cast-in-place concrete floorings (11) constitute road surface on plate (10);The interior embedded U-shaped bolt (16) of concrete slab (11) with Bailey beam (8) is connected;
Each Bailey beam (8) both ends are equipped with end bridge pier, and centre is equipped with middle bridge pier, end bridge pier and middle bridge pier support Bailey beam (8).
2. make-shift bridge device according to claim 1, which is characterized in that the top mark height of the middle bridge pier is higher than end bridge The top mark of stake is high, and both ends, the gradient 1% are higher than in the middle part of the Bailey beam (8) of support.
3. make-shift bridge device according to claim 1 or 2, which is characterized in that the end bridge pier includes end bored concrete pile (1) and set on the crown beam (2) for holding bored concrete pile (1) upper end, crown beam (2) supports Bailey beam (8) end.
4. make-shift bridge device according to claim 1 or 2, which is characterized in that the road surface of the temporary bridge device pontic Anticollision barrier (12) are arranged in side, and pavement (15) are mated formation in the other side, set kerbstone (14) on the inside of pavement (15), outside setting People's row railing (13).
5. make-shift bridge device according to claim 1 or 2, which is characterized in that the temporary bridge device end of the bridge entrance Road surface one end is equipped with top cap (22), parados (23), ear wall (24) and attachment strap (25);
Top cap (22) is installed on above the bridge pier of end, and parados (23) and ear wall (24) are installed on top cap (22), and attachment strap (25) is set to On ear wall (24), mat formation on attachment strap (25) paving (26).
6. make-shift bridge device according to claim 1 or 2, which is characterized in that between the concrete slab (11) Every multiple transverse expansion joints are arranged, channel steel (18) and U-shaped steel muscle are reinforced in setting in the concrete slab (11) at expansion joint both ends (19);The U-shaped steel muscle (19) and reinforcement channel steel (18) welding, are embedded in concrete slab (11).
CN201720571620.XU 2017-05-22 2017-05-22 A kind of make-shift bridge device Active CN208136705U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720571620.XU CN208136705U (en) 2017-05-22 2017-05-22 A kind of make-shift bridge device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720571620.XU CN208136705U (en) 2017-05-22 2017-05-22 A kind of make-shift bridge device

Publications (1)

Publication Number Publication Date
CN208136705U true CN208136705U (en) 2018-11-23

Family

ID=64283257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720571620.XU Active CN208136705U (en) 2017-05-22 2017-05-22 A kind of make-shift bridge device

Country Status (1)

Country Link
CN (1) CN208136705U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188275A (en) * 2020-01-16 2020-05-22 中交二航局第三工程有限公司 Method for quickly erecting steel-concrete combined temporary bridge spanning existing tunnel U-shaped groove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188275A (en) * 2020-01-16 2020-05-22 中交二航局第三工程有限公司 Method for quickly erecting steel-concrete combined temporary bridge spanning existing tunnel U-shaped groove

Similar Documents

Publication Publication Date Title
CN106978777B (en) A kind of make-shift bridge device
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN207828770U (en) A kind of support construction for preventing bumping at bridge-head
CN108374319A (en) A kind of through tied arch bridge structural unit and arch bridge structure and its construction method
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN106480818B (en) Simply supported girder bridge composite joint plate structure and its construction method
CN108505405A (en) A kind of suspension type monorail and highway bridge build structure jointly
CN106223183A (en) Assembled concrete-filled rectangular steel tube combination truss bridge and construction method
CN206090275U (en) Assembled rectangular concrete -filled steel tube makes up truss bridge
CN209836778U (en) Light bridge abutment
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN107905084B (en) RPC steel truss combined bridge deck and continuous beam bridge
CN208136705U (en) A kind of make-shift bridge device
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN208472473U (en) A kind of suspension type monorail and highway bridge build structure jointly
CN207110599U (en) A kind of under(-)chassis of up-down cross sliding type multi-storied garage
CN110219250A (en) The continuous combined overhead beam of multilayer
CN202081383U (en) Temporary support used in construction striding over existing line bridge
CN110219235A (en) A kind of full precast assembly structural bridge and its construction method suitable for grassland wetland
CN214005282U (en) Waterproof anti-settlement highway subgrade structure
CN102677563A (en) Modularized direct-moving fast channel system for crossroads of urban main road and construction method
CN210737262U (en) Road plate and assembled road
CN208072458U (en) A kind of pier sheet-pile engaging portion structure
CN206667292U (en) It is a kind of to justify pile foundation counterfort wall station road structure close to bridge pier