CN207879008U - Diameter Silo structure roof support system - Google Patents

Diameter Silo structure roof support system Download PDF

Info

Publication number
CN207879008U
CN207879008U CN201721905042.5U CN201721905042U CN207879008U CN 207879008 U CN207879008 U CN 207879008U CN 201721905042 U CN201721905042 U CN 201721905042U CN 207879008 U CN207879008 U CN 207879008U
Authority
CN
China
Prior art keywords
strut
bracket
silo
main joist
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721905042.5U
Other languages
Chinese (zh)
Inventor
秦龙海
江涌波
林君伟
林沛钿
陈嘉威
邹毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Original Assignee
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU FOURTH CONSTRUCTION Co Ltd filed Critical GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority to CN201721905042.5U priority Critical patent/CN207879008U/en
Application granted granted Critical
Publication of CN207879008U publication Critical patent/CN207879008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Storage Of Harvested Produce (AREA)

Abstract

The utility model discloses a kind of diameter Silo structure roof support systems, inbuilt bracket at the top of silo, the hole of silo buries Bailey bracket, girder is connected in Bailey bracket, the bracket connects main joist, skeleton frame horizontal direction sets several secondary joists, and main joist vertical direction installs strut, and strut is connect with Bailey bracket and girder.Due to the main joist connection bracket and installation strut of support system, the hole for being on the one hand conducive to silo buries Bailey bracket, and a direction strut can support Bailey bracket and girder, stability is made to improve, and pour roofing safety higher.

Description

Diameter Silo structure roof support system
Technical field
The utility model belongs to architecture construction, more particularly to a kind of adaptation Large-size rebar concrete tube chamber structure roofing The support system of construction.
Background technology
Silo is built, for example, the buildings such as silo, coal bunker, as the socio-economic development silo structure scale of construction is increasing, Silo diameter and height also become larger, this puts forward higher requirements construction technology, the silo structure for major diameter of how constructing Roofing is that have technical barrier to be solved.
The existing construction technology to silo structure roofing mainly has:1) all round victory scaffold formwork construction silo roofing, i.e., Full hall scaffold is set up from ground, formwork pours silo structure roofing, but the technology scaffold building amount is larger, material, artificial Costly, particularly with diameter Silo roofing construction, economy is poor;2) beam type platform construction silo roofing, the technology In silo wall work progress, pre-buried embedded part at the top of silo wall, the welded steel beam on embedded part, forms well subrack, then exists later Scaffold formwork construction silo roofing is set up in well subrack, although the technology economy increases, which generally uses I-steel does girder, constructs for diameter Silo, does girder platform for making using I-steel, safety is relatively low, to operator The personal safety of member is unfavorable;3) truss platform construction barrel hovel face, the technology make high-altitude truss after silo wall of having constructed Platform, on truss platform upper berth, template pours silo roofing, and the Technical Economy is preferable, but there are personal height operation peaces The complete not high problem of property, the safety of operating personnel only have one of defence line, safety or unfavorable.
Utility model content
In order to solve defect of the existing technology, the purpose of this utility model is that major diameter barrel structure roofing is suitble to apply The support system of work.
The utility model realize above-mentioned purpose the technical solution adopted is that:A kind of diameter Silo structure roof support body The hole of inbuilt bracket at the top of system, including silo, silo buries Bailey bracket, and girder, the bracket connection are connected in Bailey bracket Main joist, skeleton frame horizontal direction set several secondary joists, and main joist vertical direction installs strut, strut and Bailey bracket and master Beam connects.
Further, the main joist support connection support for shuttering.
The strut includes end plate on strut, end plate, support under screw rod and strut under screw rod, strut shaft, strut on strut The both ends of club body are threadedly coupled on strut screw rod under screw rod and strut respectively, end plate on screw rod flexible connection strut on strut, End plate under screw rod flexible connection strut under strut;End plate is connect with main joist on the strut of the strut.
Implement technical solutions of the utility model, due to the main joist connection bracket and installation strut of support system, on the one hand The hole for being conducive to silo buries Bailey bracket, and a direction strut can support Bailey bracket and girder, so that stability is improved, pour room Face safety higher.
Description of the drawings
Fig. 1 is diameter Silo structure roofing construction facade working condition chart.
Fig. 2 is the structural schematic diagram of operating platform.
Fig. 3 is main spine arrangement schematic diagram.
Fig. 4 is secondary joist arrangement schematic diagram.
Fig. 5 is that roofing pours support system schematic diagram.
Fig. 6 is the stereogram of strut.
Fig. 7 is main joist and secondary joist node schematic diagram.
Fig. 8 is main joist and silo wall connection diagram.
Fig. 9 is hoisting frame schematic diagram.
Figure 10 is bracket schematic diagram.
In figure:1- roofings, 2- silo walls, 3- Bailey brackets, 4- main joists, 4.1- bottom bolts, 4.2- connection bolts, 5- supports Bar, end plate on 5.1- struts, 5.2- strut upper end holes, screw rod on 5.3- struts, 5.4- strut shafts, screw rod under 5.5- struts, End plate under 5.6- struts, 6- platform girders, 7- support for shuttering, 8- hoisting frames, 8.1- top booms, 8.2- upper connecting rods, 8.3- diagonal control arms, 8.4- lower booms, 8.5- lower links, 9- platform panels, 10- secondary joists, 11- bolts, 12- silo wall reserving holes, 13- are electronic Machine, 14- bolts, 15- steel wire ropes, 16- external scaffoldings, 17- templates, 18- brackets, 18.1- stringer boards, 18.2- transverse slats, 18.3- are flat Plate, 18.4- engaging lugs, 18.5- ear snails hole, 18.6- bracket muscle.
Specific implementation mode
In conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, the method for diameter Silo structure roofing construction is:With silo wall 2 Construction, external scaffolding 16 are set up therewith, and when constructing to silo 2 top of wall, pre-buried hoisting frame 8 reserves the cylinder for placing Bailey bracket 3 Bulkhead reserving hole 12, and bracket 18 is buried at 2 top of silo wall, after the completion of silo wall 2 constructs and completes and conserve, utilize The good Bailey bracket 3 of installation on ground is promoted to silo wall top position by hoisting frame 8, and has been placed in silo wall reserving hole 2 Pre-buried Bailey bracket docking, the Bailey bracket system 3 eventually formed, both ends are directly placed into silo wall reserving hole 2.Later in shellfish thunder Holding plane girder 6 on frame, plane girder 6 is welded to connect integrally with 3 top of Bailey bracket, after the completion of plane girder 6 is placed, Its top mounting platform panel 9, platform panel 9 can guarantee 6 Out-of-plane Stability of plane girder, and in platform panel 9, installation is complete Afterwards, that is, entire aerial work platform is formed, which is the important defence line of guarantee personnel's life security.Aerial work platform is constructed After the completion, the roofing that operation installation is made of main joist 4, strut 5, secondary joist 10, bolt 11 on platform pours support system, Wherein, 4 bottom of main joist is connect with pre-buried good bracket 18, and 5 bottom of strut connects with Bailey bracket 3 and the welding of platform girder 6 It is connected together, ensures 5 force stability of strut.Higher position or the more irregular position of shape at the top of diameter Silo roofing It sets, support for shuttering 7 can be used is supported and pour, 4 top of main joist must be positioned over 7 top of support for shuttering, and guarantee between the two may be used By connecting stress.After support for shuttering 7, main joist 4, strut 5, secondary joist 10, the installation of bolt 11 complete, taken on secondary joist 10 If template 17, assembling reinforcement finally pours and completes entire diameter Silo roofing.Pour complete entire diameter Silo roofing with Afterwards, the component and fittings such as form removal 17, secondary joist 10, main joist 4, strut 5, support for shuttering 7 are to Bailey bracket operating platform, then unload to Ground.Then platform panel 9, platform girder 6 to ground are removed, 3 both ends of Bailey bracket is removed, is hung Bailey bracket 3 using hoisting frame 8 To ground, hoisting frame 8 is finally removed, personnel are by external scaffolding 16 down toward ground.Entire work progress is without expending big foot-measuring Hand cradle, the dismounting installation of Bailey bracket finished product is quick, crane handling construction component and fitting can not be utilized still suitable narrow construction site With work progress safety is higher.
As shown in fig. 6, strut 5 is by screw rod 5.3, strut shaft on end plate on strut 5.1, strut upper end hole 5.2, strut 5.4, end plate 5.6 forms under screw rod 5.5 and strut under strut.End plate 5.1 is welded to connect with 4 both sides of main joist on strut, strut There is sphere in 5.1 lower end of upper end plate, and for the sphere in strut upper end hole 5.2, end plate 5.1 on strut can be achieved in construction setting Flexible rotating, screw rod 5.5 is also connect using the principle with end plate under strut 5.6 under strut, spiral shell under screw rod 5.3 and strut on strut Bar 5.5 is both provided with external screw thread, and screw rod 5.5 can screw in strut shaft under screw rod 5.3, strut on strut.
As shown in Figure 7 and Figure 8, bottom bolts 4.1 are equipped in 4 bottom of main joist, which may pass through main joist 4 are reliably connected with ear snail hole 18.5, realization 4 bottom of main joist with bracket 18, and main joist 4 uses spiral shell with several secondary joists 10 Bolt 11 is connected as one.Connecting screw hole 4.2 is additionally provided on main joist 4, bolt 11 passes through secondary joist 10 and connecting screw hole 4.2, Main joist 4 and secondary joist 10 are connected as one.
As shown in figure 9, hoisting frame 8 is by top boom 8.1, upper connecting rod 8.2, diagonal control arm 8.3, lower boom 8.4 and lower link group At 8.5.In top boom 8.1,8.4 one end of lower boom embedment silo wall 2.8 top of hoisting frame is additionally provided with two motors 13, electronic Machine 13 and hoisting frame 8 are linked together using bolt 14, and the output shaft of motor 13 hangs down steel wire rope 15, and steel wire cross 15 is freely End 3 end of connection Bailey bracket, top is promoted to by Bailey bracket 3.Hoisting frame is arranged in the circle of silo wall periphery one.
As shown in Figure 10, bracket 18 includes stringer board 18.1, transverse slat 18.2, tablet 18.3, engaging lug 18.4, ear snail hole 18.5 With bracket muscle 18.6, all component and fittings form entire bracket 18, and bracket muscle 18.6 anchors into silo wall 2.

Claims (3)

1. the hole of inbuilt bracket at the top of a kind of diameter Silo structure roof support system, including silo, silo buries shellfish Thunder frame connects girder in Bailey bracket, it is characterised in that:The bracket connects main joist, and skeleton frame horizontal direction sets several Secondary joist, main joist vertical direction install strut, and strut is connect with Bailey bracket and girder.
2. diameter Silo structure roof support system according to claim 1, which is characterized in that the main joist support connects Connect support for shuttering.
3. diameter Silo structure roof support system according to claim 2, which is characterized in that the strut includes strut End plate under screw rod and strut under screw rod, strut shaft, strut on upper end plate, strut, the both ends of strut shaft are threadedly coupled respectively Screw rod under screw rod and strut on strut, end plate on screw rod flexible connection strut on strut, under strut under screw rod flexible connection strut End plate;End plate is connect with main joist on the strut of the strut.
CN201721905042.5U 2017-12-29 2017-12-29 Diameter Silo structure roof support system Active CN207879008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721905042.5U CN207879008U (en) 2017-12-29 2017-12-29 Diameter Silo structure roof support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721905042.5U CN207879008U (en) 2017-12-29 2017-12-29 Diameter Silo structure roof support system

Publications (1)

Publication Number Publication Date
CN207879008U true CN207879008U (en) 2018-09-18

Family

ID=63504798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721905042.5U Active CN207879008U (en) 2017-12-29 2017-12-29 Diameter Silo structure roof support system

Country Status (1)

Country Link
CN (1) CN207879008U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685483A (en) * 2019-09-06 2020-01-14 中国电建集团河北工程有限公司 Large-scale coal storage bin top plate prefabricating and assembling method
CN112360148A (en) * 2020-10-30 2021-02-12 中国一冶集团有限公司 Supporting structure for construction of large-diameter silo conical roof
CN113107188A (en) * 2021-04-15 2021-07-13 中信国安建工集团有限公司 Large-diameter spherical concrete roof construction and construction supporting template and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685483A (en) * 2019-09-06 2020-01-14 中国电建集团河北工程有限公司 Large-scale coal storage bin top plate prefabricating and assembling method
CN112360148A (en) * 2020-10-30 2021-02-12 中国一冶集团有限公司 Supporting structure for construction of large-diameter silo conical roof
CN112360148B (en) * 2020-10-30 2022-05-10 中国一冶集团有限公司 Supporting structure for construction of large-diameter silo conical roof
CN113107188A (en) * 2021-04-15 2021-07-13 中信国安建工集团有限公司 Large-diameter spherical concrete roof construction and construction supporting template and construction method thereof

Similar Documents

Publication Publication Date Title
CN102444203B (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN206219086U (en) A kind of attachment structure of tower crane and attached wall
CN207879008U (en) Diameter Silo structure roof support system
CN102535845A (en) Construction method of bearing frame of corridor structure
CN104712143A (en) Reversed mould construction method for circular reinforced concrete chimney wall
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN104847102B (en) Attachment type raise scaffold is received attached wall method and the device thereof of section in external wall
CN207268073U (en) Novel flexible formwork bearing frame
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN115030046A (en) Hydraulic creeping formwork for hollow thin-wall pier and construction method thereof
CN114215170A (en) Method for lifting super-altitude giant hanging multi-layer connected structure
CN102392532B (en) Construction method for built-in hanging scaffold of high-rise building
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN107514145A (en) A kind of removable steel roofing liner installation construction device and method
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN107965193A (en) Diameter Silo structure roof construction method
CN207878927U (en) Shellfish thunder hoisting frame at the top of diameter Silo
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure
CN211775988U (en) Steel construction high-rise tower high altitude protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant