CN114033171B - Clamp type triangular support system of cantilever roof panel and construction method thereof - Google Patents

Clamp type triangular support system of cantilever roof panel and construction method thereof Download PDF

Info

Publication number
CN114033171B
CN114033171B CN202111485160.6A CN202111485160A CN114033171B CN 114033171 B CN114033171 B CN 114033171B CN 202111485160 A CN202111485160 A CN 202111485160A CN 114033171 B CN114033171 B CN 114033171B
Authority
CN
China
Prior art keywords
rod
vertical reinforcing
horizontal
roof panel
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111485160.6A
Other languages
Chinese (zh)
Other versions
CN114033171A (en
Inventor
黄绍甲
欧阳国云
彭永华
罗涤新
许静静
李盛嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202111485160.6A priority Critical patent/CN114033171B/en
Publication of CN114033171A publication Critical patent/CN114033171A/en
Application granted granted Critical
Publication of CN114033171B publication Critical patent/CN114033171B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/066Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for overhangs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a fixture type triangular support system of an overhanging roof panel and a construction method thereof, wherein the fixture type triangular support system is arranged between a shear wall and a climbing frame and is supported below the roof panel, and the fixture type triangular support system comprises: the first vertical reinforcing rods and the second vertical reinforcing rods are respectively attached to the inner side and the outer side of the shear wall and are respectively propped to the roof panel; the diagonal brace is diagonal braced between the second vertical reinforcing rod and the overhanging end of the roof panel; the shear wall is transversely penetrated through the shear wall at intervals and is connected with the first horizontal rod and the second horizontal rod of the first vertical reinforcing rod and the second vertical reinforcing rod in series, and the first horizontal rod and the second horizontal rod extend out of the shear wall and are fixed to the inclined strut. The clamp type triangular support system perfectly solves the problem of reinforcement when the support frame cannot be erected under the roof cornice, and has the advantages of simplicity and convenience in operation, economic cost and strong operability.

Description

Clamp type triangular support system of overhanging roof panel and construction method thereof
Technical Field
The invention relates to the field of building construction, in particular to a fixture type triangular support system of an overhanging roof panel and a construction method thereof.
Background
In the design of commercial and residential buildings, the facade design of the house pursues the beauty of conciseness and modern times. The outstanding color tone and the simple style of the straight rate are natural and harmonious, and the quality and the luxury of the building are reflected. The layout of the point-type tower also avoids the monotonous feeling of 'city walls', and creates rich and variable city interfaces.
The typical simple and square design can overhang a cornice with a length of about 1000mm at a roof top plate, but an outer climbing frame mainly plays a protection role and cannot bear the load of a main structure, and a supporting part is not arranged below the overhanging roof plate (namely the cornice), so that the overhanging roof plate is difficult to pour.
Disclosure of Invention
In order to solve the problems, the invention provides a fixture type triangular support system of an overhanging roof panel and a construction method thereof, which perfectly solve the reinforcing difficulty when a support frame cannot be erected under a roof cornice, and have the advantages of stable support, simple and convenient operation, economic cost and strong operability.
The invention is realized by the following scheme: the utility model provides a roof boarding's anchor clamps formula triangular supports system encorbelments, locates the shear force wall and climbs between the frame and support in the roof boarding below, anchor clamps formula triangular supports system includes:
the first vertical reinforcing rods and the second vertical reinforcing rods are respectively attached to the inner side and the outer side of the shear wall and are respectively propped to the roof panel;
the diagonal brace is diagonally braced between the second vertical reinforcing rod and the overhanging end of the roof panel;
the first horizontal rod and the second horizontal rod penetrate through the shear wall transversely at intervals and are connected with the first vertical reinforcing rod and the second vertical reinforcing rod in series, and the first horizontal rod and the second horizontal rod extend out of the shear wall and are fixed to the inclined strut.
The fixture type triangular support system of the overhanging roof panel is further improved in that two wall-through sleeves for the first horizontal rod and the second horizontal rod to penetrate through are embedded in the shear wall.
The fixture type triangular support system of the overhanging roof panel is further improved in that longitudinal horizontal reinforcing rods are fixed at the joints among the first horizontal rod, the second horizontal rod, the first vertical reinforcing rod, the second vertical reinforcing rod and the diagonal brace.
The fixture type triangular support system of the overhanging roof panel is further improved in that the first vertical reinforcing rods, the second vertical reinforcing rods, the first horizontal rods, the second horizontal rods and the inclined support rods are all fastener type steel pipe fittings.
The invention also provides a construction method of the fixture type triangular support system of the overhanging roof panel, which comprises the following steps:
erecting a climbing frame along a shear wall outside the overhanging end of the roof panel, constructing the shear wall, and reserving two transverse holes at intervals in the shear wall;
erecting a first vertical reinforcing rod and a second vertical reinforcing rod respectively adjacent to the inner side and the outer side of the shear wall, and enabling the first vertical reinforcing rod and the second vertical reinforcing rod to be propped against a roof panel;
fixing an inclined support rod between the second vertical reinforcing rod and the overhanging end of the roof panel;
and a first horizontal rod and a second horizontal rod are respectively arranged in the two transverse holes in a penetrating manner, so that the first horizontal rod is connected with the first vertical reinforcing rod and the second vertical reinforcing rod in series and extends out of the shear wall to be fixed with the diagonal brace, and the second horizontal rod is connected with the first vertical reinforcing rod and the second vertical reinforcing rod in series and extends out of the shear wall to be fixed with the diagonal brace.
The construction method of the fixture type triangular support system of the overhanging roof panel is further improved in that wall bushing for the first horizontal rod and the second horizontal rod to penetrate through is pre-buried in the two transverse holes when the shear wall is constructed.
The construction method of the fixture type triangular support system of the overhanging roof panel is further improved in that after the first horizontal rod and the second horizontal rod are fixed, longitudinal horizontal reinforcing rods are fixed at the joints among the first horizontal rod, the second horizontal rod, the first vertical reinforcing rod, the second vertical reinforcing rod and the diagonal brace.
The construction method of the fixture type triangular support system of the overhanging roof panel is further improved as follows:
when the shear wall is constructed, a diagonal-pulling embedded part is embedded at the joint of the shear wall and the roof panel;
after the construction of the shear wall is finished and before the first vertical reinforcing rod and the second vertical reinforcing rod are erected, the climbing frame is dismantled, the outer vertical rod of the climbing frame is reserved, and the inclined pull rod is utilized to fix the inclined pull embedded part and the top end of the outer vertical rod.
The construction method of the fixture type triangular support system for the cantilever roof panel is further improved in that the inclined pull rod is fixed firstly in the process of dismantling the climbing frame, and then the top walkway plate of the climbing frame is dismantled.
According to the invention, through the arrangement of the first vertical reinforcing rod, the second vertical reinforcing rod, the first horizontal rod, the second horizontal rod and the inclined support rod, a stable triangular support system is formed, the stress of the triangular support system is transmitted through the first horizontal rod and the second horizontal rod, and then the first vertical reinforcing rod and the second vertical reinforcing rod are used for forming a clamp to transmit the force to the shear wall, so that the reinforcing difficulty that a support frame cannot be erected under a roof cornice is perfectly solved, and the support stability is ensured.
Drawings
Fig. 1 shows a large-scale view of a fixture type triangular support system of the overhanging roof panel of the invention.
Detailed Description
In order to solve the problem of reinforcement when a support frame cannot be erected under a roof cornice, the invention provides a fixture type triangular support system of an overhanging roof panel and a construction method thereof, which easily realize support of the overhanging roof panel, are simple and convenient to operate, and have low cost and strong operability.
The following describes the fixture type triangular support system of the overhanging roof panel and the construction method thereof with specific embodiments in combination with the accompanying drawings.
Referring to fig. 1, a roof boarding's anchor clamps formula triangular supports system of encorbelmenting locates shear force wall 1 and climbs between the frame and support in roof boarding 2 below, and this anchor clamps formula triangular supports system includes:
the first vertical reinforcing rods 3 and the second vertical reinforcing rods 4 are respectively attached to the inner side and the outer side of the shear wall 1 and are supported to the roof panel 2;
the diagonal brace 5 is diagonally braced between the second vertical reinforcing rod 4 and the overhanging end of the roof panel 2;
the first horizontal rods 6 and the second horizontal rods 7 transversely penetrate through the shear wall 1 at intervals and are connected with the first vertical reinforcing rods 3 and the second vertical reinforcing rods 4 in series, and the first horizontal rods 6 and the second horizontal rods 7 extend out of the shear wall 1 and are fixed to the inclined support rods 5.
In this embodiment, two wall bushing 8 for the first horizontal rod 6 and the second horizontal rod 7 to penetrate through are embedded in the shear wall 1 at a certain distance below the roof panel 2 (providing an installation space for a pouring template of the roof panel 2) at a vertical interval. The first vertical reinforcing rod 3, the second vertical reinforcing rod 4, the first horizontal rod 6, the second horizontal rod 7 and the inclined supporting rod 5 are all fastener type steel pipe fittings, and connection reliability and convenience in disassembly and assembly are guaranteed. The first vertical reinforcing rods 3, the second vertical reinforcing rods 4, the first horizontal rods 6, the second horizontal rods 7 and the diagonal rods 5 can be arranged according to the safety software calculation, such as the specification and the size of the first horizontal rods 6 and the arrangement space of the second horizontal rods 7.
This embodiment forms stable triangular support system through the setting of first vertical strengthening rod 3, the vertical strengthening rod 4 of second, first horizon bar 6, second horizon bar 7 and diagonal brace 5, and the atress that makes the triangular support system passes through the transmission of first horizon bar 6 and second horizon bar 7, then utilizes first vertical strengthening rod 3 and the vertical strengthening rod 4 of second to form anchor clamps and conduct power to shear force wall 1 on the one hand, and the perfect reinforcing difficult point when can't set up the support frame under the roofing cornice has been solved on the one hand, and on the other hand has guaranteed to support the steadiness.
In a preferred embodiment, longitudinal horizontal reinforcing rods 9 are fixed at the joints among the first horizontal rod 6, the second horizontal rod 7, the first vertical reinforcing rod 3, the second vertical reinforcing rod 4 and the diagonal strut 5. Through the arrangement of the longitudinal horizontal reinforcing rods 9, the supporting stability of the clamp type triangular supporting system is further ensured.
The invention also provides a construction method of the fixture type triangular support system of the cantilever roof panel, which is shown in the figure 1 and comprises the following steps:
step 1, erecting a climbing frame along a shear wall 1 outside the overhanging end of a roof panel 2, constructing the shear wall 1, and reserving two transverse holes at intervals in the shear wall 1. Specifically, a vertical formwork is erected on the shear wall 1 and concrete is poured, and preferably, a wall bushing is fixed in each transverse hole in the pouring process.
And 2, erecting a first vertical reinforcing rod 3 and a second vertical reinforcing rod 4 respectively adjacent to the inner side and the outer side of the shear wall 1, and enabling the first vertical reinforcing rod 3 and the second vertical reinforcing rod 4 to be supported to the roof panel 2. Specifically, since the top walkway plate of the climbing frame is flush with the roof, and the overhanging roof plate is on the same plane with the roof, so that the two conflict with each other, after the shear wall 1 is poured and before the step 2 is performed, the climbing frame is removed, and after the top walkway plate of the climbing frame is removed, the fixture type triangular support system is arranged, and then the upper concrete formwork and the next process are laid.
And 3, fixing an inclined support rod 5 between the second vertical reinforcing rod 4 and the overhanging end of the roof panel 2.
And 4, respectively penetrating a first horizontal rod 6 and a second horizontal rod 7 into the two transverse holes (for the condition that the wall bushing is fixed, the first horizontal rod 6 and the second horizontal rod 7 respectively penetrate the two wall bushings), so that the first horizontal rod 6 is connected in series with the first vertical reinforcing rod 3 and the second vertical reinforcing rod 4, extends out of the shear wall 1 and then is fixed with the inclined strut 5, and the second horizontal rod 7 is connected in series with the first vertical reinforcing rod 3 and the second vertical reinforcing rod 4, extends out of the shear wall 1 and then is fixed with the inclined strut 5. The first vertical reinforcing rods 3, the second vertical reinforcing rods 4, the first horizontal rods 6, the second horizontal rods 7 and the inclined supporting rods 5 form a stable triangular support system together, and are matched with the shear wall 1, so that the stress of the triangular support system is transmitted through the first horizontal rods 6 and the second horizontal rods 7, then the first vertical reinforcing rods 3 and the second vertical reinforcing rods 4 form a clamp to transmit the force to the shear wall 1, the reinforcing difficulty when a supporting frame cannot be erected under the roof cornice is perfectly solved, and the supporting stability is ensured.
And (5) after the step 4 is finished, the fixture type triangular support system is constructed, a cantilever roof panel can be supported, and then concrete pouring is simultaneously carried out on the roof panel and the cantilever end.
As a preferred embodiment, after the first horizontal rod 6 and the second horizontal rod 7 are fixed, longitudinal horizontal reinforcing rods 9 are fixed at the joints among the first horizontal rod 6, the second horizontal rod 7, the first vertical reinforcing rods 3, the second vertical reinforcing rods 4 and the diagonal braces 5. The support stability of the clamp type triangular support system is further ensured.
As a preferred embodiment: when the shear wall 1 is constructed, a diagonal embedded part is embedded at the joint of the shear wall 1 and the roof panel 2; after the construction of the shear wall 1 is completed and before the first vertical reinforcing rod 3 and the second vertical reinforcing rod 4 are erected, the climbing frame is dismantled, the outer vertical rod 11 of the climbing frame is reserved, and the inclined pull embedded part and the top end of the outer vertical rod 11 of the climbing frame are fixed by using an inclined pull rod 10. The construction platform for erecting the overhanging roof boarding is erected by the outer upright rods 11, so that materials are saved, construction steps are simplified, but considering that the single-row outer upright rods 11 are easy to shake and insufficient in stability, the stability of the outer upright rods 11 is guaranteed by the arrangement of the inclined-pulling embedded parts and the connection of the inclined-pulling rods 10, but for safety, the top walkway plate is preferably not detached temporarily when the climbing frame is detached, and the top walkway plate is detached after the inclined-pulling rods 10 are fixed, so that the outer upright rods 11 are prevented from shaking due to the fact that transverse ties are lost. Further, because the lower part of the protection net is fixed on the top walkway plate, and the protection net loses the fixing point after the top walkway plate is removed, the embodiment adopts a mode of fully hanging the safety net 12 to replace the original protection net so as to ensure safe operation and avoid people or objects from falling.
While the present invention has been described in detail and with reference to the embodiments thereof as shown in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments should not be construed as limitations of the invention, except insofar as the following claims are interpreted to cover the invention.

Claims (8)

1. The utility model provides a roof boarding's anchor clamps formula triangular supports system encorbelments, locates the shear force wall and climbs and just support in the roof boarding below between the frame, a serial communication port, anchor clamps formula triangular supports system includes:
the first vertical reinforcing rods and the second vertical reinforcing rods are respectively attached to the inner side and the outer side of the shear wall and are respectively propped to the roof panel;
the diagonal brace is diagonally braced between the second vertical reinforcing rod and the overhanging end of the roof panel;
the first horizontal rods and the second horizontal rods penetrate through the shear wall at intervals in the transverse direction and are connected with the first vertical reinforcing rods and the second vertical reinforcing rods in series, and the first horizontal rods and the second horizontal rods extend out of the shear wall and are fixed to the inclined support rods;
the outer vertical rod is used for erecting a construction platform of the overhanging roof panel, and the outer vertical rod is the outer vertical rod of the climbing frame;
the oblique-pulling embedded part is embedded at the joint of the shear wall and the roof panel;
and the inclined pull rod is used for fixing the top ends of the inclined pull embedded part and the outer vertical rod.
2. The anchor type triangular support system for overhanging roof panels according to claim 1, wherein two wall-penetrating sleeves through which the first horizontal rod and the second horizontal rod are respectively penetrated are pre-buried in the shear wall.
3. The overhanging roof panel of claim 1 wherein longitudinal horizontal stiffeners are affixed to the junctions between the first horizontal bar, the second horizontal bar, the first vertical stiffener, the second vertical stiffener, and the diagonal braces.
4. The clip-type triangular support system for overhanging roof panels according to claim 1, wherein the first vertical reinforcing rods, the second vertical reinforcing rods, the first horizontal rods, the second horizontal rods and the diagonal braces are all fastener-type steel pipe fittings.
5. A construction method of a fixture type triangular support system of an overhanging roof panel is characterized by comprising the following steps:
erecting a climbing frame along a shear wall outside the overhanging end of the roof panel, constructing the shear wall, and reserving two transverse holes at intervals in the shear wall;
erecting a first vertical reinforcing rod and a second vertical reinforcing rod respectively adjacent to the inner side and the outer side of the shear wall, and enabling the first vertical reinforcing rod and the second vertical reinforcing rod to be propped against a roof panel;
fixing an inclined support rod between the second vertical reinforcing rod and the overhanging end of the roof panel;
a first horizontal rod and a second horizontal rod are respectively arranged in the two transverse holes in a penetrating manner, so that the first horizontal rod is connected with the first vertical reinforcing rod and the second vertical reinforcing rod in series and extends out of the shear wall to be fixed with the inclined strut, and the second horizontal rod is connected with the first vertical reinforcing rod and the second vertical reinforcing rod in series and extends out of the shear wall to be fixed with the inclined strut;
when the shear wall is constructed, a diagonal-pulling embedded part is embedded at the joint of the shear wall and the roof panel;
after the construction of the shear wall is finished and before the first vertical reinforcing rod and the second vertical reinforcing rod are erected, the climbing frame is dismantled, the outer vertical rod of the climbing frame is reserved, and the top ends of the inclined pull embedded part and the outer vertical rod are fixed through an inclined pull rod;
and erecting a construction platform of the overhanging roof panel by using the outer upright rods.
6. The construction method of the fixture-type triangular support system for the overhanging roof panel according to claim 5, wherein wall-through sleeves for the first horizontal rod and the second horizontal rod to penetrate through are pre-buried in the two transverse holes during construction of the shear wall.
7. The method of constructing a clip-type triangular support system for an overhanging roof panel according to claim 5, wherein after the first horizontal bar and the second horizontal bar are fixed, longitudinal horizontal reinforcing bars are fixed at the joints among the first horizontal bar, the second horizontal bar, the first vertical reinforcing bar, the second vertical reinforcing bar and the diagonal braces.
8. The method for constructing a jig-type triangular support system for an overhanging roof panel according to claim 5, wherein the diagonal draw bars are fixed and then the top walkway plate of the climbing frame is removed in the process of removing the climbing frame.
CN202111485160.6A 2021-12-07 2021-12-07 Clamp type triangular support system of cantilever roof panel and construction method thereof Active CN114033171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111485160.6A CN114033171B (en) 2021-12-07 2021-12-07 Clamp type triangular support system of cantilever roof panel and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111485160.6A CN114033171B (en) 2021-12-07 2021-12-07 Clamp type triangular support system of cantilever roof panel and construction method thereof

Publications (2)

Publication Number Publication Date
CN114033171A CN114033171A (en) 2022-02-11
CN114033171B true CN114033171B (en) 2023-02-24

Family

ID=80146303

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111485160.6A Active CN114033171B (en) 2021-12-07 2021-12-07 Clamp type triangular support system of cantilever roof panel and construction method thereof

Country Status (1)

Country Link
CN (1) CN114033171B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370119B (en) * 2022-09-30 2023-12-19 河南省工建集团有限责任公司 Construction platform for long cantilever concrete cornice

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2609301A1 (en) * 1987-01-02 1988-07-08 Ricouard Marcel Bracket fastening device for platforms provided with a safety member
CN103821334A (en) * 2014-02-27 2014-05-28 中天建设集团有限公司 Overhung scaffold with detachable triangular supports
CN105019639B (en) * 2015-05-28 2017-07-14 河南国基建设集团有限公司 Overhead cantilever formwork and its construction method
CN206308990U (en) * 2016-11-17 2017-07-07 中建三局第二建设工程有限责任公司 A kind of moveable overhanging type operating platform and construction system
CN208996424U (en) * 2018-10-30 2019-06-18 云南建投第十七建设有限公司 A kind of builder's jack
CN111441579B (en) * 2019-01-17 2022-02-15 倡创(上海)咨询管理事务所 High-rise cantilever structure formwork system and construction method
CN111779248A (en) * 2020-07-01 2020-10-16 上海建工七建集团有限公司 High formwork system and construction method thereof

Also Published As

Publication number Publication date
CN114033171A (en) 2022-02-11

Similar Documents

Publication Publication Date Title
CN109629810B (en) Closed type overhanging scaffold and construction method
CN102220806B (en) Construction method for supporting and reinforcing ultrahigh hanging single-sided vertical formwork
CN102733606A (en) Construction method of high large cantilever structure
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN104405062A (en) Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN105649330B (en) A kind of plug-in formwork system and its application method for making skeleton using steel reinforcement cage
CN107227814B (en) Sectional construction method for large cantilever concrete structure
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN114033171B (en) Clamp type triangular support system of cantilever roof panel and construction method thereof
CN207277541U (en) Prefabricated component and cast-in-place column assembled integral concrete frame structure
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN215253499U (en) Scaffold device
CN114033111A (en) Assembled cornice inclined roof and installation and construction method thereof
CN105672479B (en) One kind assembles detachable building structure and construction technique entirely
CN106193340A (en) Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN216664766U (en) Assembled parapet that cornices
CN207003803U (en) The single through hole precast shear wall of high-rise assembled and its assembling structure
CN114215333B (en) Quick construction method for outer cornices of high-rise buildings
CN207160448U (en) A kind of assembled architecture reinforced concrete stairs structure
CN211447283U (en) Connecting beam of main building and skirt house
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN109958063A (en) A kind of support frame erection method
CN206769198U (en) Separate combination type armored concrete prefabricated section anchored end supporting construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant