CN103821334A - Overhung scaffold with detachable triangular supports - Google Patents
Overhung scaffold with detachable triangular supports Download PDFInfo
- Publication number
- CN103821334A CN103821334A CN201410068021.7A CN201410068021A CN103821334A CN 103821334 A CN103821334 A CN 103821334A CN 201410068021 A CN201410068021 A CN 201410068021A CN 103821334 A CN103821334 A CN 103821334A
- Authority
- CN
- China
- Prior art keywords
- bar
- wall
- vertical bar
- bolt
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses an overhung scaffold with detachable triangular supports. The overhung scaffold with the detachable triangular supports comprises a main vertical bar, an anchoring vertical bar, a diagonal bar and a horizontal bar. The main vertical bar and the anchoring vertical bar are located on the outer side and the inner side of a wall respectively and connected to the wall through wall penetrating bolts in a tensioning mode. The diagonal bar, the horizontal bar and the main vertical bar are distributed in a right triangle shape and are fixed through bolts. A fixing steel channel is perpendicularly erected on the horizontal bar. A bottom stand bar of the overhung scaffold is supported by the fixing steel channel. Since the overhung scaffold is constructed through the detachable triangular supports, the problems that when the traditional mode that overhanging is conducted directly and holes are formed in a shear wall is adopted, passage of a staircase and blocking of the holes are affected are effectively solved, and the overhung scaffold has the advantages of being convenient to install, flexible, detachable, reusable, high in safety performance and the like.
Description
Technical field
The present invention relates to Construction Technology of Suspension Scaffold.
Background technology
Increasing along with highrise building, the security protection of external scaffolding is most important, and wherein builder's jack application is more.Application compared with multiple-project in, part building body, elevator opening are positioned at structural edge position, large corner shear wall sleeper, reinforcing bar are more, and the suspension scaffold at this position, as adopted traditional directly encorbelmenting and shear wall punching internal, will certainly affect the shutoff at the current and hole of stair.
Summary of the invention
Technical problem to be solved by this invention has just been to provide a kind of removable gusseted builder's jack, effectively solve traditional directly encorbelmenting and the problem of shear wall punching internal, and have advantages of that easy for installation, flexible, detachable, turnover is used, security performance is strong.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: removable gusseted builder's jack, comprise main vertical bar, the vertical bar of anchoring, hound and horizon bar, main vertical bar lays respectively at wall outer side and inner side and is connected tension on body of wall by through-wall bolt with the vertical bar of anchoring, hound and horizon bar and the main rectangular Triangle-Profile of vertical bar and be bolted, on horizon bar, vertically set up holddown groove steel, the bottom supports of builder's jack is supported on fixing channel-section steel.
Preferably, the mounting method of gusseted is first in body of wall inner side, the vertical bar of anchoring to be installed by 1 people, and after through-wall bolt is stretched out outside wall, 1 people installs main vertical bar, after size, verticality have been corrected, and the nut of pretension through-wall bolt; Again hound is inserted in main vertical joint element for bar, passes through bolt tightening; Horizontal support bar is finally installed, horizontal support bar level is inserted in main vertical joint element for bar, by bolt tightening, by junction plate and bolt, horizontal support bar and diagonal brace are connected to each other fixing, all bolt tightenings check errorless after, gusseted installation.
The present invention has adopted removable gusseted to carry out suspension scaffold construction, effectively solve traditional directly encorbelmenting and shear wall punching internal, affect the problem of the shutoff at the current and hole of stair, and there is the advantages such as easy for installation, flexible, detachable, turnover is used, security performance is strong, there is good economic benefit and social benefit, there is good popularizing value.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the invention will be further described:
Fig. 1 is the schematic diagram of the structure of removable gusseted builder's jack.
The specific embodiment
The removable gusseted builder's jack of the present invention construction is applicable to the following suspension scaffold stair stringer of 25m position, elevator shaft exterior wall position, structure rotation angle position.
Below in conjunction with Fig. 1, the technological principle of engineering method of the present invention is made and being illustrated: first according to the support interval of builder's jack upper and lower 2 of the interior pre-buried PVC sleeve pipe of body of wall 2, PVC sleeve pipe is fixed on the reinforcing bar of body of wall; Then concreting starts to install gusseted 1 after concreting completes and reaches intensity; In gusseted, set up subsequently holddown groove steel 3, then carry out setting up of top builder's jack support body 4.
Wherein, PVC casing diameter is than the large 2mm of through-wall bolt diameter, the same wall thickness of casing length, and the horizontal spacing dimension Deviation Control of PVC sleeve pipe is in 10mm, and vertical spacing dimension Deviation Control is in 3mm.
Described gusseted comprises main vertical bar 11, the vertical bar 12 of anchoring, hound 13 and horizon bar 14, main vertical bar lays respectively at wall outer side and inner side and is connected and is strained on body of wall by through-wall bolt 10 with the vertical bar of anchoring, hound and horizon bar and lead the rectangular Triangle-Profile of vertical bar and be bolted.The mounting method of gusseted is first in body of wall inner side, the vertical bar of anchoring to be installed by 1 people, and after through-wall bolt is stretched out outside wall, 1 people installs main vertical bar, after size, verticality have been corrected, and the nut of pretension through-wall bolt; Again hound is inserted in main vertical joint element for bar, passes through bolt tightening; Horizontal support bar is finally installed, horizontal support bar level is inserted in main vertical joint element for bar, by bolt tightening, by junction plate and bolt, horizontal support bar and diagonal brace are connected to each other fixing, all bolt tightenings check errorless after, gusseted installation.The scaffolding height of builder's jack support body is no more than 25 meters, lays off-load wire rope after having set up in hound end.
The advantage of engineering method of the present invention is:
1, removable gusseted is reasonable in design,
This gusseted member is formed by connecting by bolt and junction plate by 4 independent primary structural components, and primary structural component is respectively: hound, horizon bar, main vertical bar, the vertical bar of anchoring, main vertical bar is connected tension with the vertical bar of anchoring by screw rod.
2, processing and fabricating is simple, light, easy for installation,
This support is made up of 70*70*6 square steel, 92*92*6 square steel, ¢ 30mm screw rod, ¢ 22mm bolt, junction plate, 50*50 angle steel, 16# i iron or channel-section steel, add and only hound, horizon bar, main vertical bar, 4 individual members of the vertical bar of anchoring are processed man-hour, each individual member is lightweight, maximum weight is no more than 25KG, when installation, can manually be connected to each other installation to 4 independent primary structural components with bolt.
3, member is flexible, and turnover utilization rate is high,
When dismounting, only need to unclamp nut, separately remove each primary structural component, taking and placing are to stacking place, and turnover recycles, and carries out the antirust processing of support, can improve the number of turnover.
4, security performance is good,
This engineering method stress system is triangle system, and vertical load arrives structure position by transfer truss, stressed rationally clear and definite, meets regulation and stipulation, has effectively guaranteed the safe handling function of suspension scaffold.
Claims (2)
1. removable gusseted builder's jack, it is characterized in that: comprise main vertical bar, the vertical bar of anchoring, hound and horizon bar, main vertical bar lays respectively at wall outer side and inner side and is connected tension on body of wall by through-wall bolt with the vertical bar of anchoring, hound and horizon bar and the main rectangular Triangle-Profile of vertical bar and be bolted, on horizon bar, vertically set up holddown groove steel, the bottom supports of builder's jack is supported on fixing channel-section steel.
2. removable gusseted builder's jack according to claim 1, it is characterized in that: the mounting method of gusseted for first installing the vertical bar of anchoring by 1 people in body of wall inner side, after through-wall bolt is stretched out outside wall, 1 people installs main vertical bar, after size, verticality have been corrected, the nut of pretension through-wall bolt; Again hound is inserted in main vertical joint element for bar, passes through bolt tightening; Horizontal support bar is finally installed, horizontal support bar level is inserted in main vertical joint element for bar, by bolt tightening, by junction plate and bolt, horizontal support bar and diagonal brace are connected to each other fixing, all bolt tightenings check errorless after, gusseted installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410068021.7A CN103821334A (en) | 2014-02-27 | 2014-02-27 | Overhung scaffold with detachable triangular supports |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410068021.7A CN103821334A (en) | 2014-02-27 | 2014-02-27 | Overhung scaffold with detachable triangular supports |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103821334A true CN103821334A (en) | 2014-05-28 |
Family
ID=50756599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410068021.7A Pending CN103821334A (en) | 2014-02-27 | 2014-02-27 | Overhung scaffold with detachable triangular supports |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821334A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790642A (en) * | 2015-04-24 | 2015-07-22 | 中国五冶集团有限公司 | Horizontal supporting structure for building construction and method for installing same |
CN106193566A (en) * | 2016-09-26 | 2016-12-07 | 安徽三建工程有限公司 | A kind of adjustable pylon of assembled integral shear wall structure |
CN107366422A (en) * | 2017-09-14 | 2017-11-21 | 北京城建六建设集团有限公司 | A kind of adjustable suspension bridging piece support frame |
CN109403609A (en) * | 2018-12-19 | 2019-03-01 | 北京城建北方集团有限公司 | Buttress type triangular support bracket |
CN110158935A (en) * | 2019-05-07 | 2019-08-23 | 平煤神马建工集团有限公司 | A kind of tool-type elevator steel operating platform |
CN110565933A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | method for installing passenger-cargo elevator construction platform for building construction |
CN114033171A (en) * | 2021-12-07 | 2022-02-11 | 中国建筑第八工程局有限公司 | Clamp type triangular support system of overhanging roof panel and construction method thereof |
CN115787996A (en) * | 2022-12-05 | 2023-03-14 | 中建八局第二建设有限公司 | Overhung construction method and overhung frame for super-high building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2345622Y (en) * | 1998-12-01 | 1999-10-27 | 黑龙江省第一建筑工程公司 | Outer wall suspending structure scaffold |
CN201176703Y (en) * | 2008-04-25 | 2009-01-07 | 中冶京唐建设有限公司 | Tripod for construction of hyperbola cooling tower cylinder |
US20120247870A1 (en) * | 2011-03-29 | 2012-10-04 | Iturbe Beristain Eneko | Perimetric protection system for buildings undergoing construction |
CN203308068U (en) * | 2013-06-21 | 2013-11-27 | 大连筑成建设集团有限公司 | Wall-attached builder's jack |
CN203403661U (en) * | 2013-08-07 | 2014-01-22 | 中天建设集团有限公司 | Detachable triangular support |
-
2014
- 2014-02-27 CN CN201410068021.7A patent/CN103821334A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2345622Y (en) * | 1998-12-01 | 1999-10-27 | 黑龙江省第一建筑工程公司 | Outer wall suspending structure scaffold |
CN201176703Y (en) * | 2008-04-25 | 2009-01-07 | 中冶京唐建设有限公司 | Tripod for construction of hyperbola cooling tower cylinder |
US20120247870A1 (en) * | 2011-03-29 | 2012-10-04 | Iturbe Beristain Eneko | Perimetric protection system for buildings undergoing construction |
CN203308068U (en) * | 2013-06-21 | 2013-11-27 | 大连筑成建设集团有限公司 | Wall-attached builder's jack |
CN203403661U (en) * | 2013-08-07 | 2014-01-22 | 中天建设集团有限公司 | Detachable triangular support |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790642A (en) * | 2015-04-24 | 2015-07-22 | 中国五冶集团有限公司 | Horizontal supporting structure for building construction and method for installing same |
CN106193566A (en) * | 2016-09-26 | 2016-12-07 | 安徽三建工程有限公司 | A kind of adjustable pylon of assembled integral shear wall structure |
CN107366422A (en) * | 2017-09-14 | 2017-11-21 | 北京城建六建设集团有限公司 | A kind of adjustable suspension bridging piece support frame |
CN109403609A (en) * | 2018-12-19 | 2019-03-01 | 北京城建北方集团有限公司 | Buttress type triangular support bracket |
CN109403609B (en) * | 2018-12-19 | 2024-04-02 | 北京城建北方集团有限公司 | Wall-supporting type triangular support frame |
CN110158935A (en) * | 2019-05-07 | 2019-08-23 | 平煤神马建工集团有限公司 | A kind of tool-type elevator steel operating platform |
CN110565933A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | method for installing passenger-cargo elevator construction platform for building construction |
CN114033171A (en) * | 2021-12-07 | 2022-02-11 | 中国建筑第八工程局有限公司 | Clamp type triangular support system of overhanging roof panel and construction method thereof |
CN115787996A (en) * | 2022-12-05 | 2023-03-14 | 中建八局第二建设有限公司 | Overhung construction method and overhung frame for super-high building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821334A (en) | Overhung scaffold with detachable triangular supports | |
CN103821333A (en) | Construction method for overhung scaffold with detachable triangular supports | |
CN105926916A (en) | Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring | |
CN204040446U (en) | The shaped steel suspension scaffolding structure | |
CN101265748B (en) | Tools type section steel fastener steel tube outer scaffold | |
CN203961276U (en) | High-building construction steel form and handling frame Integral lifting stage apparatus | |
CN211622528U (en) | Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam | |
CN203247565U (en) | Auxiliary riveting stud second-phase embedding part mounting device for vertical ship lift | |
CN105256896B (en) | It is a kind of to be used for Side fascia and the metal connecting piece of agent structure | |
CN203891462U (en) | Form erecting device for fair-faced concrete independent columns | |
CN103470027B (en) | A kind of assembling presets the floor slab formerecting system of anchoring nut | |
CN105347142A (en) | Plate penetrating installing method for installing construction lifting machine on basement top plate | |
CN204024097U (en) | Skin safety net bracing frame | |
CN204571486U (en) | A kind of building operations temporary protection railing lower margin holding clamp | |
CN204126290U (en) | Elevator shaft horizontal protective device | |
JP3189564U (en) | Fall prevention fence for concrete structures | |
CN206971499U (en) | A kind of copper plate curtain wall system for being mounted in parallel plate | |
CN106049849B (en) | A kind of adjustable drawbar attached plate stand apparatus and construction method | |
CN105484509A (en) | Tool type horizontal safety net and implementation method thereof | |
CN206158192U (en) | Concrete pump pipe's simple easily fixable device on concrete face | |
CN204715720U (en) | The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls | |
CN205857677U (en) | A kind of adjustable drawbar attached plate stand apparatus | |
CN205545078U (en) | Novel distributed roof photovoltaic support | |
CN204098518U (en) | A kind of for buildingly face frontier defense and protect fastener | |
CN203603490U (en) | Supporting structure used for erecting formwork truss on prefabricated beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140528 |
|
RJ01 | Rejection of invention patent application after publication |