CN109958063A - A kind of support frame erection method - Google Patents

A kind of support frame erection method Download PDF

Info

Publication number
CN109958063A
CN109958063A CN201910296008.XA CN201910296008A CN109958063A CN 109958063 A CN109958063 A CN 109958063A CN 201910296008 A CN201910296008 A CN 201910296008A CN 109958063 A CN109958063 A CN 109958063A
Authority
CN
China
Prior art keywords
bar
support
support frame
frame
upright bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910296008.XA
Other languages
Chinese (zh)
Inventor
卢长炯
杨伏川
杨立
吕耕
齐鸿燕
张海波
林雪冰
司风光
陆钢
路长春
夏林
张春晖
张东旭
吕文滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Beijing No 6 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Beijing No 6 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd, Beijing No 6 Municipal Construction Engineering Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201910296008.XA priority Critical patent/CN109958063A/en
Publication of CN109958063A publication Critical patent/CN109958063A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of support frame erection methods, are related to technical field of building construction, mainly solve the problems, such as that support frame sets up shakiness, steps are as follows: S1, carrying out full hall frame after pier stud first time concreting and set up;S2, bracket are set up;S3, set up before setting-out go out bracket and set up range;Bar of vertically and horizontally sweeping the floor is arranged in S4, frame bottom;The adjusting screw that S5, rod end are equipped with;S6, setting wall-connecting piece;Vertical hound should be arranged in frame body periphery, internal vertical and horizontal in S7, formwork-support;Layer, vertically arranged horizontal bracing bar is arranged in frame body top layer horizon bar in S8, formwork-support;S9, support frame are using steel tube fastener bridging as hound;S10, the Dense mesh screen suspension covering on the inside of support frame most outlet stand;Operation of the present invention method is simple, and support frame is set up securely, greatly accelerates construction speed, and security performance is high, avoids worker injuries in work progress.

Description

A kind of support frame erection method
Technical field
The present invention relates to technical field of building construction, specifically a kind of support frame erection method.
Background technique
Form bracing system is by top-plate template support combination structure, framed column template support combinations structure, shear wall formwork Three series compositions of support combinations structure, three sets of system in combination are flexible, vertebration, can require according to the difference of each engineering of client It is designed configuration.
There is steel plate support frame energy conservation, section material, section to take, ensure construction quality, improve the advantages such as construction efficiency, " with steel generation More than 300 more than 70 yuan of save the cost of , Mei ㎡ are recycled in wood ", and intensity is big, and concrete casting quality is good, guarantee wall verticality, Flatness can achieve the effect that clear-water concrete without secondary plastering, thoroughly solve conventional mould support system and perplex me Many problems of state's building trade many years, have implemented the fundamental state policy of energy-saving and emission-reduction.
In existing pier stud construction technology, need to set up support frame, and support frame erection method it is excessively complicated and It is insecure, seriously affect construction speed.
Summary of the invention
The purpose of the present invention is to provide a kind of support frame erection methods, to solve mentioned above in the background art ask Topic.
To achieve the above object, the invention provides the following technical scheme:
A kind of support frame erection method, steps are as follows:
S1, support frame use bowl buckle frame, and full hall frame is carried out after pier stud first time concreting and is set up, full hall frame is used Place 10# channel steel inside support pier stud arch ring above section concrete pouring construction, support frame jacking, 10# channel steel directly with The contact of set shaped steel formwork back cord;
S2, bracket are set up;
S3, set up before setting-out go out bracket and set up range, identified using snap the line, it is ensured that bracket, which sets up width and meets construction, to be wanted It asks;
Bar of vertically and horizontally sweeping the floor is arranged in S4, frame bottom, and bar of longitudinally sweeping the floor should be fixed on distance steel tube bottom using right-angle coupler No more than in the upright bar at 200mm, bar of laterally sweeping the floor is fixed on the upright bar below longitudinal bar of sweeping the floor using right-angle coupler at end On;
The length that the adjusting screw that S5, rod end are equipped with stretches out top layer horizon bar is not greater than 0.65m, and adjusting screw is inserted The length for entering upright bar cannot be less than 150mm, and the length for stretching out upright bar is not greater than 300mm, adjusting screw and upright bar steel when installation Pipe is concentric up and down, and the gap of adjusting screw outer diameter and pole steel tube internal diameter is not more than 3mm;
When S6, formwork-support are around pier stud, wall-connecting piece is set;
S7, the formwork-support that security level is I grade should respectively be set in frame body periphery, internal vertical and horizontal every 4m-6m Set vertical hound together;
In frame body top layer horizon bar layer is arranged, vertically every no more than 8m one layer of horizontal bracing of setting in S8, formwork-support Bar;
S9, support frame using steel tube fastener bridging as vertical, horizontal bracing bar, formwork-support frame body periphery, Internal vertical and horizontal are every being respectively arranged one of vertical steel pipe fastener bridging no more than 6m;
S10, the suspension covering of green safe Dense mesh screen is used on the inside of support frame most outlet stand, Dense mesh screen, which must not overlap, to be adopted It is connected with reinforced bar binding wire, Ying Caiyong uses rope connection instead, and stent outer surrounding operating platform completely spreads scaffold board, and under scaffold board Portion is revealed all the details using safety net, should be closed below using safety net at interval of 10 meters.
As a further solution of the present invention: in step S2, the method is as follows:
S21, snap the line positioning, by first upright bar rear transverse rod, setting up for brace is sequentially successively carried out again respectively, and should be with basic frame Body unit by row, successively extension set up integral support frame system, every layer of scaffolding height is not more than 3m;Backing plate is properly placed on In position line, backing plate answer it is smooth, without warpage, must not be using the backing plate of cracking, rack rod bottom must be not less than using thickness 5cm, width be not less than 20cm plank support pad, monolithic backing plate length must not less than 2 across;
S22, formwork-support are set up to be matched with template construction, adjusts bed die absolute altitude, but top of support using adjustable jack The screw rod protruded length of support and pedestal is not greater than the 2/3 of screw rod total length, and the reinforcing members such as frame body hound, bridging are with frame body Progress, which synchronizes, to be set up, and installation must not be lagged;
It is required when S23, bracket assembly outside cross bar level check at any time and upright bar verticality, at any time the right angle of attention level frame Degree does not cause support frame partial twist, guarantees that the perpendicularity deviation of bracket overall height should be less than the 1/600 of frame body scaffolding height, and must not Greater than 35mm, the height difference of adjacent level bar should not exceed 5mm;
Assembled every 3 step of S24, bracket checks whether every bottom of upright rod floats or vacantly, otherwise pad using tagger, 3 step of bracket assembly head, every step theodolite, level meter, line fall the verticality of upright bar and the level of every layer of cross bar check at any time, with When check adjust at any time;
When S25, support frame set up top, organizational technology, safety, construction personnel comprehensively examine entire frame structure It looks into and checks and accepts, solve existing fault of construction in time;
When S26, support frame are set up, 10# channel steel girder connector is required on one kind poles jacking, does not allow to overhang, It requires not allow to occur overhanging or come to nothing on horizontal steel tube top when template assembly.
As a further solution of the present invention: in step S3, this bracket uses Q235 grades of steel pipes, and upright bar and horizon bar are pressed 0.6 meter of modulus setting.
As a further solution of the present invention: in step S6, formwork-support height ratio is less than or equal to 3;Upright bar uses Q235 grades of material steel pipes, step pitch 0.6m, upright bar spacing 0.6m;Adjustable support is arranged in the top of every upright bar of formwork-support, Change adjustment frame body height with arch ring radian when construction, adds horizon bar using upright bar bowl buckle node potential difference, and cooperate adjustable Support is adjusted.
As a further solution of the present invention: in step S8, every layer of horizontal bracing bar should be interior on the periphery of frame body horizontal plane Portion's vertical, horizontal is every no more than 8m setting, together, horizon bar should the stripped continuous setting between adjacent upright bar.
As a further solution of the present invention: in step S9, in the top layer horizon bar setting layer, perpendicular of formwork-support frame body To every 5 step pitches, one of horizontal cross brace is set;Bridging is continuously arranged, and width 6m-9m, horizontal cross brace should be in level With vertically and horizontally horizon bar -60 ° of angles at 45 ° on face, vertical bridging and ground elevation are preferably between 45 ° -60 °.
Compared with prior art, the beneficial effects of the present invention are: operation of the present invention method is simple, support frame is set up securely, Construction speed is greatly accelerated, security performance is high, avoids worker injuries in work progress.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
In figure: 1- upright bar, 2- adjusting screw, 3- horizon bar.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of support frame erection method, steps are as follows in the embodiment of the present invention:
S1, support frame use bowl buckle frame, and full hall frame is carried out after pier stud first time concreting and is set up, full hall frame is used Place 10# channel steel inside support pier stud arch ring above section concrete pouring construction, support frame jacking, 10# channel steel directly with The contact of set shaped steel formwork back cord;
S2, bracket set up requirement;
S21, snap the line positioning, by first upright bar rear transverse rod, setting up for brace is sequentially successively carried out again respectively, and should be with basic frame Body unit by row, successively extension set up integral support frame system, every layer of scaffolding height is not more than 3m;Backing plate is properly placed on In position line, backing plate answer it is smooth, without warpage, must not be using the backing plate of cracking, rack rod bottom must be not less than using thickness 5cm, width are not less than the plank support pad of 20cm, and monolithic backing plate length must not be less than 2 across (when no concrete foundation);
S22, formwork-support are set up to be matched with template construction, adjusts bed die absolute altitude, but top of support using adjustable jack The screw rod protruded length of support and pedestal is not greater than the 2/3 of screw rod total length, and the reinforcing members such as frame body hound, bridging are with frame body Progress, which synchronizes, to be set up, and installation must not be lagged;
It is required when S23, bracket assembly outside cross bar level check at any time and upright bar verticality, at any time the right angle of attention level frame Degree does not cause support frame partial twist, guarantees that the perpendicularity deviation of bracket overall height should be less than the 1/600 of frame body scaffolding height, and must not Greater than 35mm, the height difference of adjacent level bar should not exceed 5mm;
Assembled every 3 step of S24, bracket checks whether every bottom of upright rod floats or vacantly, otherwise pad using tagger, 3 step of bracket assembly head, every step theodolite, level meter, line fall the verticality of upright bar and the level of every layer of cross bar check at any time, with When check adjust at any time;
When S25, support frame set up top, organizational technology, safety, construction personnel comprehensively examine entire frame structure It looks into and checks and accepts, solve existing fault of construction in time;
When S26, support frame are set up, 10# channel steel girder connector is required on one kind poles jacking, does not allow to overhang, It requires not allow to occur overhanging or come to nothing on horizontal steel tube top when template assembly;
S3, go out bracket before setting up by floor plan setting-out and set up range, identified using snap the line, it is ensured that bracket sets up width Meet construction requirement, this bracket uses Q235 grades of steel pipes, upright bar and horizon bar by 0.6 meter of modulus setting;
Bar of vertically and horizontally sweeping the floor is arranged in S4, frame bottom, and bar of longitudinally sweeping the floor should be fixed on distance steel tube bottom using right-angle coupler No more than in the upright bar at 200mm, bar of laterally sweeping the floor is fixed on the upright bar below longitudinal bar of sweeping the floor using right-angle coupler at end On;
The length that the adjusting screw 2 that S5,1 top of upright bar are equipped with stretches out top layer horizon bar is not greater than 0.65m, adjusting screw The length of 2 insertion upright bars 1 cannot be less than 150mm, and the length for stretching out upright bar 1 is not greater than 300mm, when installation adjusting screw 2 with 1 steel pipe of upright bar is concentric up and down, and the gap of 2 outer diameter of adjusting screw and 1 pipe diameter of upright bar is not more than 3mm;
When S6, formwork-support are around pier stud, wall-connecting piece is set;Formwork-support height ratio is less than or equal to 3;Upright bar Using Q235 grades of material steel pipes, step pitch 0.6m, upright bar spacing 0.6m;Adjustable support is arranged in the top of every upright bar of formwork-support Support changes adjustment frame body height with arch ring radian when construction, adds horizon bar using upright bar bowl buckle node potential difference, and cooperating can Support is adjusted to be adjusted;
S7, the formwork-support that security level is I grade should respectively be set in frame body periphery, internal vertical and horizontal every 4m-6m Set vertical hound together;
In frame body top layer horizon bar layer is arranged, vertically every no more than 8m one layer of horizontal bracing of setting in S8, formwork-support Bar;Every layer of horizontal bracing bar should be on the periphery of frame body horizontal plane, and internal vertical, horizontal is every no more than one of 8m setting, horizon bar It should the stripped continuous setting between adjacent upright bar;
S9, this support frame are using steel tube fastener bridging as vertical, horizontal bracing bar, and formwork-support is in frame body week Side, internal vertical and horizontal are every being respectively arranged one of vertical steel pipe fastener bridging no more than 6m, in formwork-support frame body Layer is arranged, vertically every 5 step pitches one of horizontal cross braces of setting in top layer horizon bar;Bridging is continuously arranged, width 6m- 9m, horizontal cross brace should preferably exist with vertically and horizontally horizon bar -60 ° of angles at 45 °, vertical bridging and ground elevation in the horizontal plane Between 45 ° -60 °;
S10, the suspension covering of green safe Dense mesh screen is used on the inside of support frame most outlet stand, Dense mesh screen, which must not overlap, to be adopted It is connected with reinforced bar binding wire, Ying Caiyong uses rope connection instead, and stent outer surrounding operating platform completely spreads scaffold board, and under scaffold board Portion is revealed all the details using safety net, should be closed below using safety net at interval of 10 meters.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of support frame erection method, which is characterized in that steps are as follows:
S1, support frame use bowl buckle frame, and full hall frame is carried out after pier stud first time concreting and is set up, full hall frame is for branch Support pier stud arch ring above section concrete pouring construction, place 10# channel steel inside support frame jacking, 10# channel steel directly with sizing The contact of steel form back cord;
S2, bracket are set up;
S3, set up before setting-out go out bracket and set up range, identified using snap the line, it is ensured that bracket sets up width and meets construction requirement;
Bar of vertically and horizontally sweeping the floor is arranged in S4, frame bottom, and it is little that bar of longitudinally sweeping the floor uses right-angle coupler to be fixed on distance steel tube bottom end In upright bar at the 200mm, bar of laterally sweeping the floor is fixed in the upright bar below longitudinal bar of sweeping the floor using right-angle coupler;
The length that the adjusting screw (2) that S5, upright bar (1) top are equipped with stretches out top layer horizon bar is not greater than 0.65m, adjusting screw (2) length for being inserted into upright bar (1) cannot be less than 150mm, and the length for stretching out upright bar (1) is not greater than 300mm, when installation is adjustable spiral shell Bar (2) and upright bar (1) steel pipe are concentric up and down, and the gap of adjusting screw (2) outer diameter and upright bar (1) pipe diameter is not more than 3mm;
When S6, formwork-support are around pier stud, wall-connecting piece is set;
S7, the formwork-support that security level is I grade are respectively arranged together in frame body periphery, internal vertical and horizontal every 4m-6m Vertical hound;
In frame body top layer horizon bar layer is arranged, vertically every no more than 8m one layer of horizontal bracing bar of setting in S8, formwork-support;
S9, support frame are using steel tube fastener bridging as vertical, horizontal bracing bar, and formwork-support is on frame body periphery, inside Vertical and horizontal are every being respectively arranged one of vertical steel pipe fastener bridging no more than 6m;
S10, the suspension covering of green safe Dense mesh screen is used on the inside of support frame most outlet stand, Dense mesh screen must not overlap using steel Muscle binds silk connection, and using rope connection is used instead, stent outer surrounding operating platform completely spreads scaffold board, and uses in scaffold board lower part Safety net is revealed all the details, and is closed below at interval of 10 meters using safety net.
2. support frame erection method according to claim 1, which is characterized in that in step S2,
S21, snap the line positioning, by first upright bar rear transverse rod, setting up for brace is sequentially successively carried out again respectively, and with basic frame body unit By row, integral support frame system is set up in successively extension, and every layer of scaffolding height is not more than 3m;Backing plate is placed in position line, pad Plate is smooth, without warpage, and rack rod bottom is not less than the plank support pad of 20cm, monolithic backing plate using thickness not less than 5cm, width Length must not less than 2 across;
S22, formwork-support are set up to be matched with template construction, adjusts bed die absolute altitude, holder jacking and bottom using adjustable jack The screw rod protruded length of seat is not greater than the 2/3 of screw rod total length, and frame body hound, bridging reinforcing member are synchronous with frame body progress It sets up, installation must not be lagged;
It is required when S23, bracket assembly outside cross bar level check at any time and upright bar verticality, at any time the squareness of attention level frame, Do not cause support frame partial twist, guarantees that the perpendicularity deviation of bracket overall height is less than the 1/600 of frame body scaffolding height, and be not greater than The height difference of 35mm, adjacent level bar are not more than 5mm;
Assembled every 3 step of S24, bracket checks whether every bottom of upright rod floats or vacantly, otherwise padded with tagger, spells in bracket 3 step of head is filled, every step theodolite, level meter, line fall the verticality of upright bar and the level of every layer of cross bar check at any time, check at any time It adjusts at any time;
When S25, support frame set up top, entire frame structure is comprehensively checked and checked and accepted;
When S26, support frame are set up, 10# channel steel girder connector is required on one kind poles jacking, does not allow to overhang, template In the assembly of horizontal steel tube top.
3. support frame erection method according to claim 2, which is characterized in that in step S3, this bracket uses Q235 grades Steel pipe, upright bar and horizon bar are by 0.6 meter of modulus setting.
4. support frame erection method according to claim 3, which is characterized in that in step S6, formwork-support height ratio Less than or equal to 3;Upright bar uses Q235 grades of material steel pipes, step pitch 0.6m, upright bar spacing 0.6m;Every upright bar of formwork-support Top adjustable support is set, change adjustment frame body height with arch ring radian when construction, added using upright bar bowl buckle node potential difference Horizon bar, and adjustable support is cooperated to be adjusted.
5. support frame erection method according to claim 4, which is characterized in that in step S8, every layer of horizontal bracing bar exists The periphery of frame body horizontal plane, internal vertical, horizontal is every no more than one of 8m setting, horizon bar stripped company between adjacent upright bar Continuous setting.
6. support frame erection method according to claim 5, which is characterized in that in step S9, in formwork-support frame body Top layer horizon bar setting layer, every 5 step pitches one of horizontal cross brace vertically is set;Bridging is continuously arranged, width 6m- 9m, horizontal cross brace preferably exist with vertically and horizontally horizon bar -60 ° of angles at 45 °, vertical bridging and ground elevation in the horizontal plane Between 45 ° -60 °.
7. application of the support frame erection method as described in claim 1-6 is any in road construction.
CN201910296008.XA 2019-04-12 2019-04-12 A kind of support frame erection method Pending CN109958063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296008.XA CN109958063A (en) 2019-04-12 2019-04-12 A kind of support frame erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910296008.XA CN109958063A (en) 2019-04-12 2019-04-12 A kind of support frame erection method

Publications (1)

Publication Number Publication Date
CN109958063A true CN109958063A (en) 2019-07-02

Family

ID=67026102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910296008.XA Pending CN109958063A (en) 2019-04-12 2019-04-12 A kind of support frame erection method

Country Status (1)

Country Link
CN (1) CN109958063A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982634A (en) * 2021-12-11 2022-01-28 汕尾市广投建设工程有限公司 Lining reinforcing frame and method for remedying hidden danger of existing civil air defense tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722614U (en) * 2010-05-26 2011-01-26 中铁一局集团有限公司 Bridge beam construction support combining military beam support with cuplock scaffold
CN202247687U (en) * 2011-09-19 2012-05-30 曹新恒 Universal cast-in-situ trestle for bridge
CN202688885U (en) * 2012-07-16 2013-01-23 宁波交通工程建设集团有限公司 High-stability fastener type full space support
JP2013217069A (en) * 2012-04-06 2013-10-24 Nippon Steel Topy Bridge Co Ltd Suspended scaffold unit and erection method of scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722614U (en) * 2010-05-26 2011-01-26 中铁一局集团有限公司 Bridge beam construction support combining military beam support with cuplock scaffold
CN202247687U (en) * 2011-09-19 2012-05-30 曹新恒 Universal cast-in-situ trestle for bridge
JP2013217069A (en) * 2012-04-06 2013-10-24 Nippon Steel Topy Bridge Co Ltd Suspended scaffold unit and erection method of scaffold
CN202688885U (en) * 2012-07-16 2013-01-23 宁波交通工程建设集团有限公司 High-stability fastener type full space support

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国住房和城乡建设部: "《建筑施工碗扣式钢管脚手架安全技术规范》", 15 November 2016 *
叶刚: "《架子工实用技术手册》", 31 January 2016, 金盾出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982634A (en) * 2021-12-11 2022-01-28 汕尾市广投建设工程有限公司 Lining reinforcing frame and method for remedying hidden danger of existing civil air defense tunnel

Similar Documents

Publication Publication Date Title
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN103967277B (en) Super High Core Walls Structure tilts the construction method of shear wall
CN106245678B (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN106760529A (en) Roof system steel truss slipping and assembling operation platform and installation method
CN107227814B (en) Sectional construction method for large cantilever concrete structure
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN106284988A (en) Oblique circular cylinder template and construction method thereof
CN102888979A (en) Joint processing and constructing method of overhanging scaffold at large cantilever balcony
CN207513156U (en) Telescopic frame body for building
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN102518148A (en) Architecture related to triangular bracing structure of underground open cut station and construction method thereof
CN213953189U (en) Supporting device for ensuring smooth surface of lower cone shell of prefabricated water tank
CN109958063A (en) A kind of support frame erection method
CN109555313A (en) A kind of adjustable gib truss for assembled floor
CN203487767U (en) Cross plate scaffold
CN110593309B (en) Construction method of full-hall scaffold supporting system with slope comprehensive pipe gallery
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN114033171B (en) Clamp type triangular support system of cantilever roof panel and construction method thereof
CN105781159B (en) A kind of power plant main power house armored concrete coal hopper construction technology
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN103669834A (en) Support structure for formworks with oblique planes
CN104563515B (en) The formwork erection structure of superelevation shear wall and construction method
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN107419670A (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190702