- funnel
- steel platform
- steel
- construction
- coal hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of power plant main power house armored concrete coal hopper construction technology, the problem of improving complicated existing coal hopper construction, waste of manpower.The present invention comprises the following steps:(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;(3)The installation form supporting rack in steel platform;(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and combined tightly with crossbeam lower part;(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;(6)Form removal supporting rack, support shuttering, steel platform and pull rod.The present invention is supported using steel platform, and whole reinforced concrete soil hopper weight and construction loads are carried by steel platform, and funnel weight and construction loads are not carried in each floor plates under funnel so that and it is easy for construction, it is easy to operate, reduce manpower.
Description
Technical field
The present invention relates to a kind of power plant main power house armored concrete coal hopper construction technology.
Background technology
Armored concrete coal hopper on power plant main power house frame structure frame, be arranged on main building frame structure frame top compared with
Eminence, commonly reaches more than absolute altitude 20m, and since armored concrete coal hopper weight is too big, each floor cannot be held under it during construction
Armored concrete coal hopper weight and construction loads, traditional formwork construction mode are carried on a shoulder pole, is successively to set up supporting rack for one layer from ground,
Each floor below reinforced steel concrete coal hopper, so as to be put down at armored concrete coal hopper lower floor as support for shuttering
Platform, carries out formwork construction.This tradition formwork construction mode is complicated, waste of manpower.
The content of the invention
In order to improve the above problem, it is an object of the invention to provide a kind of power plant main power house armored concrete coal hopper to apply
Work technique.
To achieve these goals, the technical solution adopted by the present invention is as follows:
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;
(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;
(3)The installation form supporting rack in steel platform, is used to support funnel template;
(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and and crossbeam
Lower part combines tight;
(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;
(6)Form removal supporting rack, support shuttering, steel platform and pull rod.
Further, pre-buried two groups of steel plates are distinguished in the crossbeam both sides, and pull rod is four, is carried out respectively with one block of steel plate
It is fixed.
Yet further, the steel platform is square structure, and four pull rods are connected to four angles of steel platform.
In addition, the formwork-support is the scaffold set up by steel pipe.
The present invention is poured using three construction sections, and the first construction section is first constructed the surrounding crossbeam of funnel, and second constructs
Section construction funnel, the top floor plate of the 3rd construction section construction funnel;Such sequence of construction makes plus pull rod, steel platform etc.
Obtain whole reinforced concrete soil hopper weight and construction loads is carried by steel platform, funnel weight is not carried in each floor plates under funnel
Amount and construction loads;So that construction is more smoothly quick, while also greatly reduce manpower.
Embodiment
With reference to embodiment, the invention will be further described, and embodiments of the present invention include but not limited to following reality
Apply example.
Embodiment
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;
(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;
(3)The installation form supporting rack in steel platform, is used to support funnel template;
(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and and crossbeam
Lower part combines tight;
(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;
(6)Form removal supporting rack, support shuttering, steel platform and pull rod.
The present invention is poured by three construction sections, and supporting rack is successively set up so as to avoid one layer from ground, is reinforced
Each floor below reinforced concrete soil hopper so that construction process becomes simple, and it is also very convenient to construct, and improves construction
Efficiency.
Specifically, pre-buried two groups of steel plates are distinguished in the crossbeam both sides, and pull rod is four, is consolidated respectively with one block of steel plate
It is fixed.By four groups of steel plates and four pull rods, can fix steel platform is more firm, can also carry more construction lotuses
Carry, ensure that the safety of work progress.
In order to ensure the stability of steel platform, the steel platform is square structure, and four pull rods are connected to
Four angles of steel platform.By being arranged on four angles of steel platform, center section can be reserved and be used to funnel template be installed, it is convenient
Operation, and it is located at four angles, the construction loads that uniformly can be born steel platform is transferred to the steel plate in crossbeam.
For the ease of mounting and dismounting formwork-support, the formwork-support is the scaffold set up by steel pipe.In reality
When border is constructed, satisfactory formwork-support can be set up according to actual conditions, so that more convenient prop up
Support, simultaneously because set up by steel pipe, dismounting, installation are very convenient, improve construction efficiency.
What deserves to be explained is the present invention is supported using steel platform, whole reinforced concrete soil hopper weight and construction lotus
Load is carried by steel platform, and funnel weight and construction loads are not carried in each floor plates under funnel so that easy for construction, operation letter
It is single, reduce manpower.
According to above-described embodiment, the present invention can be realized well.What deserves to be explained is before based on said structure design
Put, to solve same technical problem, some made in the present invention are used without substantive change or polishing
Technical solution essence still as the present invention, therefore it should also be as within the scope of the present invention.
Claims (3)
1. a kind of power plant main power house armored concrete coal hopper construction technology, it is characterised in that comprise the following steps:
(1) four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam are poured, pre-buried two groups of steel are distinguished in the crossbeam both sides
Plate;
(2) steel platforms are lifted with four pull rods, and by the top of four pull rods respectively with one piece of Interal fixation;
(3) the installation form supporting rack in steel platform, is used to support funnel template;
(4) from bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and with crossbeam lower part
With reference to tight;
(5) in funnel storey setting support shuttering, and funnel floor concreting is carried out;
(6) form removal supporting rack, support shuttering, steel platform and pull rod.
A kind of 2. power plant main power house armored concrete coal hopper construction technology according to claim 1, it is characterised in that institute
It is square structure to state steel platform, and four pull rods are connected to four angles of steel platform.
A kind of 3. power plant main power house armored concrete coal hopper construction technology according to claim 2, it is characterised in that institute
It is the scaffold set up by steel pipe to state formwork-support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610135335.3A CN105781159B (en) | 2016-03-10 | 2016-03-10 | A kind of power plant main power house armored concrete coal hopper construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610135335.3A CN105781159B (en) | 2016-03-10 | 2016-03-10 | A kind of power plant main power house armored concrete coal hopper construction technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105781159A CN105781159A (en) | 2016-07-20 |
CN105781159B true CN105781159B (en) | 2018-04-27 |
Family
ID=56388385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610135335.3A Active CN105781159B (en) | 2016-03-10 | 2016-03-10 | A kind of power plant main power house armored concrete coal hopper construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105781159B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113047426B (en) * | 2021-05-18 | 2022-08-09 | 中国十九冶集团有限公司 | Steel bar setting method for large concrete funnel opening |
CN114197894A (en) * | 2021-12-31 | 2022-03-18 | 中国二十二冶集团有限公司 | Construction method of large concrete funnel |
CN114961382B (en) * | 2022-05-27 | 2024-06-18 | 中国三冶集团有限公司 | Construction method of cast-in-place concrete raw material bin |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11303397A (en) * | 1998-04-22 | 1999-11-02 | Fujita Corp | Construction method of reinforced concrete building |
CN202370233U (en) * | 2011-08-15 | 2012-08-08 | 成都市第六建筑工程公司 | Pull rod type external wall cantilever discharging platform setting-up structure |
CN103015782A (en) * | 2012-12-14 | 2013-04-03 | 中煤建筑安装工程集团有限公司 | Construction platform and construction method for integrating silo roof and silo wall slip form |
CN103046788A (en) * | 2012-12-12 | 2013-04-17 | 中国五冶集团有限公司 | Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin |
CN103572966A (en) * | 2013-11-22 | 2014-02-12 | 中国华冶科工集团有限公司 | Construction method for silo funnel liner |
CN104100122A (en) * | 2014-08-01 | 2014-10-15 | 中国化学工程第三建设有限公司 | Construction method of cone-shaped top structure of large silo |
CN205046884U (en) * | 2015-08-20 | 2016-02-24 | 中国能源建设集团广东省电力设计研究院有限公司 | Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure |
-
2016
- 2016-03-10 CN CN201610135335.3A patent/CN105781159B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11303397A (en) * | 1998-04-22 | 1999-11-02 | Fujita Corp | Construction method of reinforced concrete building |
CN202370233U (en) * | 2011-08-15 | 2012-08-08 | 成都市第六建筑工程公司 | Pull rod type external wall cantilever discharging platform setting-up structure |
CN103046788A (en) * | 2012-12-12 | 2013-04-17 | 中国五冶集团有限公司 | Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin |
CN103015782A (en) * | 2012-12-14 | 2013-04-03 | 中煤建筑安装工程集团有限公司 | Construction platform and construction method for integrating silo roof and silo wall slip form |
CN103572966A (en) * | 2013-11-22 | 2014-02-12 | 中国华冶科工集团有限公司 | Construction method for silo funnel liner |
CN104100122A (en) * | 2014-08-01 | 2014-10-15 | 中国化学工程第三建设有限公司 | Construction method of cone-shaped top structure of large silo |
CN205046884U (en) * | 2015-08-20 | 2016-02-24 | 中国能源建设集团广东省电力设计研究院有限公司 | Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure |
Also Published As
Publication number | Publication date |
---|---|
CN105781159A (en) | 2016-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101575911B (en) | Top-down decreasing-formwork formwork system and construction method | |
CN108019076A (en) | Large-size rebar concrete silo construction method and the device for conical shell construction | |
CN105908777A (en) | Comprehensive pipe gallery sliding mold and application method thereof | |
CN101818570B (en) | Method for constructing girder structure conversion layer of high-rise building | |
CN104947926B (en) | Hard protection device for upper formwork system of inner barrel of core barrel and construction method of hard protection device | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN106013781A (en) | Slab supporting construction method and construction device by reversely suspending template | |
CN105781159B (en) | A kind of power plant main power house armored concrete coal hopper construction technology | |
CN106760529A (en) | Roof system steel truss slipping and assembling operation platform and installation method | |
CN202810173U (en) | Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant | |
CN104631822A (en) | Construction Method of High-rise Reinforced Concrete Elevator Shaft | |
CN102561690A (en) | Construction method for supporting structures on two sides of post-cast strip by use of brick column | |
CN102587663A (en) | Concrete construction process of steel tube columns of super-high-rise building | |
JP2023546279A (en) | Lifting device for bridge water surface pile tie beam and its construction method | |
CN106065681A (en) | Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN109944435A (en) | A kind of formwork-support and construction method for the construction of silo conical shell | |
CN207714310U (en) | A kind of lowering device for reinforcing cage | |
CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN103276894A (en) | Support system of large-cross-section girder transfer floor of hollow floor system and construction technology | |
CN109457814B (en) | Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure | |
CN107401279A (en) | Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method | |
CN105370027B (en) | The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |