CN105781159B - A kind of power plant main power house armored concrete coal hopper construction technology - Google Patents

A kind of power plant main power house armored concrete coal hopper construction technology Download PDF

Info

Publication number
CN105781159B
CN105781159B CN201610135335.3A CN201610135335A CN105781159B CN 105781159 B CN105781159 B CN 105781159B CN 201610135335 A CN201610135335 A CN 201610135335A CN 105781159 B CN105781159 B CN 105781159B
Authority
CN
China
Prior art keywords
funnel
steel platform
steel
construction
coal hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610135335.3A
Other languages
Chinese (zh)
Other versions
CN105781159A (en
Inventor
唐英俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610135335.3A priority Critical patent/CN105781159B/en
Publication of CN105781159A publication Critical patent/CN105781159A/en
Application granted granted Critical
Publication of CN105781159B publication Critical patent/CN105781159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of power plant main power house armored concrete coal hopper construction technology, the problem of improving complicated existing coal hopper construction, waste of manpower.The present invention comprises the following steps:(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;(3)The installation form supporting rack in steel platform;(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and combined tightly with crossbeam lower part;(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;(6)Form removal supporting rack, support shuttering, steel platform and pull rod.The present invention is supported using steel platform, and whole reinforced concrete soil hopper weight and construction loads are carried by steel platform, and funnel weight and construction loads are not carried in each floor plates under funnel so that and it is easy for construction, it is easy to operate, reduce manpower.

Description

A kind of power plant main power house armored concrete coal hopper construction technology
Technical field
The present invention relates to a kind of power plant main power house armored concrete coal hopper construction technology.
Background technology
Armored concrete coal hopper on power plant main power house frame structure frame, be arranged on main building frame structure frame top compared with Eminence, commonly reaches more than absolute altitude 20m, and since armored concrete coal hopper weight is too big, each floor cannot be held under it during construction Armored concrete coal hopper weight and construction loads, traditional formwork construction mode are carried on a shoulder pole, is successively to set up supporting rack for one layer from ground, Each floor below reinforced steel concrete coal hopper, so as to be put down at armored concrete coal hopper lower floor as support for shuttering Platform, carries out formwork construction.This tradition formwork construction mode is complicated, waste of manpower.
The content of the invention
In order to improve the above problem, it is an object of the invention to provide a kind of power plant main power house armored concrete coal hopper to apply Work technique.
To achieve these goals, the technical solution adopted by the present invention is as follows:
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;
(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;
(3)The installation form supporting rack in steel platform, is used to support funnel template;
(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and and crossbeam Lower part combines tight;
(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;
(6)Form removal supporting rack, support shuttering, steel platform and pull rod.
Further, pre-buried two groups of steel plates are distinguished in the crossbeam both sides, and pull rod is four, is carried out respectively with one block of steel plate It is fixed.
Yet further, the steel platform is square structure, and four pull rods are connected to four angles of steel platform.
In addition, the formwork-support is the scaffold set up by steel pipe.
The present invention is poured using three construction sections, and the first construction section is first constructed the surrounding crossbeam of funnel, and second constructs Section construction funnel, the top floor plate of the 3rd construction section construction funnel;Such sequence of construction makes plus pull rod, steel platform etc. Obtain whole reinforced concrete soil hopper weight and construction loads is carried by steel platform, funnel weight is not carried in each floor plates under funnel Amount and construction loads;So that construction is more smoothly quick, while also greatly reduce manpower.
Embodiment
With reference to embodiment, the invention will be further described, and embodiments of the present invention include but not limited to following reality Apply example.
Embodiment
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1)Pour four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam;
(2)A steel platform is lifted with pull rod, and by the top of pull rod and Interal fixation;
(3)The installation form supporting rack in steel platform, is used to support funnel template;
(4)From bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and and crossbeam Lower part combines tight;
(5)In funnel storey setting support shuttering, and carry out funnel floor concreting;
(6)Form removal supporting rack, support shuttering, steel platform and pull rod.
The present invention is poured by three construction sections, and supporting rack is successively set up so as to avoid one layer from ground, is reinforced Each floor below reinforced concrete soil hopper so that construction process becomes simple, and it is also very convenient to construct, and improves construction Efficiency.
Specifically, pre-buried two groups of steel plates are distinguished in the crossbeam both sides, and pull rod is four, is consolidated respectively with one block of steel plate It is fixed.By four groups of steel plates and four pull rods, can fix steel platform is more firm, can also carry more construction lotuses Carry, ensure that the safety of work progress.
In order to ensure the stability of steel platform, the steel platform is square structure, and four pull rods are connected to Four angles of steel platform.By being arranged on four angles of steel platform, center section can be reserved and be used to funnel template be installed, it is convenient Operation, and it is located at four angles, the construction loads that uniformly can be born steel platform is transferred to the steel plate in crossbeam.
For the ease of mounting and dismounting formwork-support, the formwork-support is the scaffold set up by steel pipe.In reality When border is constructed, satisfactory formwork-support can be set up according to actual conditions, so that more convenient prop up Support, simultaneously because set up by steel pipe, dismounting, installation are very convenient, improve construction efficiency.
What deserves to be explained is the present invention is supported using steel platform, whole reinforced concrete soil hopper weight and construction lotus Load is carried by steel platform, and funnel weight and construction loads are not carried in each floor plates under funnel so that easy for construction, operation letter It is single, reduce manpower.
According to above-described embodiment, the present invention can be realized well.What deserves to be explained is before based on said structure design Put, to solve same technical problem, some made in the present invention are used without substantive change or polishing Technical solution essence still as the present invention, therefore it should also be as within the scope of the present invention.

Claims (3)

1. a kind of power plant main power house armored concrete coal hopper construction technology, it is characterised in that comprise the following steps:
(1) four side crossbeams of funnel, and the pre-embedded steel slab in crossbeam are poured, pre-buried two groups of steel are distinguished in the crossbeam both sides Plate;
(2) steel platforms are lifted with four pull rods, and by the top of four pull rods respectively with one piece of Interal fixation;
(3) the installation form supporting rack in steel platform, is used to support funnel template;
(4) from bell mouth lower to upper part successively primary concreting concrete, pour to surrounding crossbeam lower part, and with crossbeam lower part With reference to tight;
(5) in funnel storey setting support shuttering, and funnel floor concreting is carried out;
(6) form removal supporting rack, support shuttering, steel platform and pull rod.
A kind of 2. power plant main power house armored concrete coal hopper construction technology according to claim 1, it is characterised in that institute It is square structure to state steel platform, and four pull rods are connected to four angles of steel platform.
A kind of 3. power plant main power house armored concrete coal hopper construction technology according to claim 2, it is characterised in that institute It is the scaffold set up by steel pipe to state formwork-support.
CN201610135335.3A 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology Active CN105781159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610135335.3A CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610135335.3A CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Publications (2)

Publication Number Publication Date
CN105781159A CN105781159A (en) 2016-07-20
CN105781159B true CN105781159B (en) 2018-04-27

Family

ID=56388385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610135335.3A Active CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Country Status (1)

Country Link
CN (1) CN105781159B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047426B (en) * 2021-05-18 2022-08-09 中国十九冶集团有限公司 Steel bar setting method for large concrete funnel opening
CN114197894A (en) * 2021-12-31 2022-03-18 中国二十二冶集团有限公司 Construction method of large concrete funnel
CN114961382B (en) * 2022-05-27 2024-06-18 中国三冶集团有限公司 Construction method of cast-in-place concrete raw material bin

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303397A (en) * 1998-04-22 1999-11-02 Fujita Corp Construction method of reinforced concrete building
CN202370233U (en) * 2011-08-15 2012-08-08 成都市第六建筑工程公司 Pull rod type external wall cantilever discharging platform setting-up structure
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN103572966A (en) * 2013-11-22 2014-02-12 中国华冶科工集团有限公司 Construction method for silo funnel liner
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo
CN205046884U (en) * 2015-08-20 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303397A (en) * 1998-04-22 1999-11-02 Fujita Corp Construction method of reinforced concrete building
CN202370233U (en) * 2011-08-15 2012-08-08 成都市第六建筑工程公司 Pull rod type external wall cantilever discharging platform setting-up structure
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
CN103572966A (en) * 2013-11-22 2014-02-12 中国华冶科工集团有限公司 Construction method for silo funnel liner
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo
CN205046884U (en) * 2015-08-20 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure

Also Published As

Publication number Publication date
CN105781159A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN105908777A (en) Comprehensive pipe gallery sliding mold and application method thereof
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN104947926B (en) Hard protection device for upper formwork system of inner barrel of core barrel and construction method of hard protection device
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN105781159B (en) A kind of power plant main power house armored concrete coal hopper construction technology
CN106760529A (en) Roof system steel truss slipping and assembling operation platform and installation method
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
CN104631822A (en) Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
JP2023546279A (en) Lifting device for bridge water surface pile tie beam and its construction method
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN109944435A (en) A kind of formwork-support and construction method for the construction of silo conical shell
CN207714310U (en) A kind of lowering device for reinforcing cage
CN206319610U (en) Roof system steel truss slipping and assembling construction platform structure
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant