CN105781159A - Construction process for reinforced concrete coal hopper of power plant main building - Google Patents

Construction process for reinforced concrete coal hopper of power plant main building Download PDF

Info

Publication number
CN105781159A
CN105781159A CN201610135335.3A CN201610135335A CN105781159A CN 105781159 A CN105781159 A CN 105781159A CN 201610135335 A CN201610135335 A CN 201610135335A CN 105781159 A CN105781159 A CN 105781159A
Authority
CN
China
Prior art keywords
steel platform
steel
hopper
construction
coal hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610135335.3A
Other languages
Chinese (zh)
Other versions
CN105781159B (en
Inventor
唐英俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201610135335.3A priority Critical patent/CN105781159B/en
Publication of CN105781159A publication Critical patent/CN105781159A/en
Application granted granted Critical
Publication of CN105781159B publication Critical patent/CN105781159B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction process for a reinforced concrete coal hopper of a power plant main building. The problems that construction of an existing coal hopper is complex, and manpower is wasted are solved. The construction process comprises the following steps that (1) large beams on the four sides of the top of the hopper are formed through pouring, and steel plates are pre-embedded into the large beams correspondingly; (2) a steel platform is lifted by pull rods, and the tops of the pull rods are fixed to the steel plates correspondingly; (3) a template support is installed on the steel platform; (4) concrete is poured layer by layer by one time from the lower portion of a hopper opening to the upper portion until poured to the lower portions of the surrounding large beams and combined with the lower portions of the large beams tightly; (5) a support template is arranged at the top of a hopper top floor, and concrete is poured for the hopper top floor; and (6) the template support, the support template, the steel platform and the pull rods are removed. According to the construction process, the steel platform is adopted for supporting, and the weight of the reinforced concrete coal hopper and construction loads are all borne by the steel platform and are not borne by any floor board under the hopper, so that construction is convenient, operation is easy, and usage of manpower is reduced.

Description

A kind of power plant main power house armored concrete coal hopper construction technology
Technical field
The present invention relates to a kind of power plant main power house armored concrete coal hopper construction technology.
Background technology
Armored concrete coal hopper on power plant main power house frame structure frame, it is arranged on main building frame structure frame top higher position, commonly reach more than absolute altitude 20m, owing to armored concrete coal hopper weight is too big, during construction, each floor can not undertake armored concrete coal hopper weight and construction loads under it, tradition formwork construction mode, it is successively set up bracing frame from one layer of ground, each floor below reinforced steel concrete coal hopper, thus at armored concrete coal hopper lower floor place as support for shuttering platform, carrying out formwork construction.This tradition formwork construction mode is complicated, waste of manpower.
Summary of the invention
In order to improve the problems referred to above, it is an object of the invention to provide a kind of power plant main power house armored concrete coal hopper construction technology.
To achieve these goals, the technical solution used in the present invention is as follows:
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1) build four limit crossbeams of funnel, and in crossbeam pre-embedded steel slab;
(2) a steel platform is lifted with pull bar, and by the top of pull bar and Interal fixation;
(3) installation form bracing frame on steel platform, is used for supporting funnel template;
(4) from bell mouth lower to upper part successively primary concreting concrete, build to surrounding crossbeam bottom, and be combined tightly with crossbeam bottom;
(5) at funnel storey setting support shuttering, and funnel floor concreting is carried out;
(6) form removal bracing frame, support shuttering, steel platform and pull bar.
Further, described crossbeam both sides are pre-buried two groups of steel plates respectively, and pull bar is four, is fixed with a block plate respectively.
Yet further, described steel platform is square structure, and four pull bars are connected to four angles of steel platform.
It addition, described formwork-support is the scaffold set up by steel pipe.
The present invention adopts three construction sections to build, and the first construction section is first constructed the surrounding crossbeam of funnel, the second construction section construction funnel, the top floor plate of the 3rd construction section construction funnel;Such sequence of construction adds upper connecting rod, steel platform etc. so that all reinforced concrete soil hopper weight and construction loads are by steel platform bearer, and each floor plates under funnel does not carry funnel weight and construction loads;So that construction is quick more smoothly, also greatly reduce manpower simultaneously.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described, and embodiments of the present invention include but not limited to the following example.
Embodiment
A kind of power plant main power house armored concrete coal hopper construction technology, comprises the following steps:
(1) build four limit crossbeams of funnel, and in crossbeam pre-embedded steel slab;
(2) a steel platform is lifted with pull bar, and by the top of pull bar and Interal fixation;
(3) installation form bracing frame on steel platform, is used for supporting funnel template;
(4) from bell mouth lower to upper part successively primary concreting concrete, build to surrounding crossbeam bottom, and be combined tightly with crossbeam bottom;
(5) at funnel storey setting support shuttering, and funnel floor concreting is carried out;
(6) form removal bracing frame, support shuttering, steel platform and pull bar.
The present invention is built by three construction sections, successively sets up bracing frame thus avoiding from one layer of ground, each floor below reinforced steel concrete funnel so that construction process becomes simple, and it is also very convenient to construct, and improves efficiency of construction.
Specifically, described crossbeam both sides are pre-buried two groups of steel plates respectively, and pull bar is four, is fixed with a block plate respectively.By four groups of steel plates and four pull bars, it is possible to that is fixed by steel platform is more firm, it is also possible to carry more construction loads, it is ensured that the safety of work progress.
In order to ensure the stability of steel platform, described steel platform is square structure, and four pull bars are connected to four angles of steel platform.By being arranged on four angles of steel platform, it is possible to reserve mid portion for installing funnel template, convenient operation, and it is positioned at four angles, it is possible to the uniform steel plate construction loads that steel platform bears being transferred in crossbeam.
For the ease of installation and removal formwork-support, described formwork-support is the scaffold set up by steel pipe.When practice of construction, it is possible to according to practical situation, it is possible to set up satisfactory formwork-support, thus convenient is supported, simultaneously because set up by steel pipe, dismounting, install all very convenient, improve efficiency of construction.
What deserves to be explained is, the present invention adopts steel platform to be supported, and whole reinforced concrete soil hopper weight and construction loads, by steel platform bearer, each floor plates under funnel do not carry funnel weight and construction loads so that easy construction, simple to operate, decrease manpower.
According to above-described embodiment, the present invention just can be realized well.What deserves to be explained is; under premise based on said structure design, for solving same technical problem, even if some making in the present invention are without substantial change or polishing; the essence of the technical scheme adopted is still the same with the present invention, therefore it should also be as in protection scope of the present invention.

Claims (4)

1. a power plant main power house armored concrete coal hopper construction technology, it is characterised in that comprise the following steps:
(1) build four limit crossbeams of funnel, and in crossbeam pre-embedded steel slab;
(2) a steel platform is lifted with pull bar, and by the top of pull bar and Interal fixation;
(3) installation form bracing frame on steel platform, is used for supporting funnel template;
(4) from bell mouth lower to upper part successively primary concreting concrete, build to surrounding crossbeam bottom, and be combined tightly with crossbeam bottom;
(5) at funnel storey setting support shuttering, and funnel floor concreting is carried out;
(6) form removal bracing frame, support shuttering, steel platform and pull bar.
2. a kind of power plant main power house armored concrete coal hopper construction technology according to claim 1, it is characterised in that described crossbeam both sides are pre-buried two groups of steel plates respectively, and pull bar is four, is fixed with a block plate respectively.
3. a kind of power plant main power house armored concrete coal hopper construction technology according to claim 2, it is characterised in that described steel platform is square structure, and four pull bars are connected to four angles of steel platform.
4. a kind of power plant main power house armored concrete coal hopper construction technology according to claim 3, it is characterised in that described formwork-support is the scaffold set up by steel pipe.
CN201610135335.3A 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology Active CN105781159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610135335.3A CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610135335.3A CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Publications (2)

Publication Number Publication Date
CN105781159A true CN105781159A (en) 2016-07-20
CN105781159B CN105781159B (en) 2018-04-27

Family

ID=56388385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610135335.3A Active CN105781159B (en) 2016-03-10 2016-03-10 A kind of power plant main power house armored concrete coal hopper construction technology

Country Status (1)

Country Link
CN (1) CN105781159B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047426A (en) * 2021-05-18 2021-06-29 中国十九冶集团有限公司 Method for setting steel bars of large concrete funnel opening
CN114197894A (en) * 2021-12-31 2022-03-18 中国二十二冶集团有限公司 Construction method of large concrete funnel
CN114961382A (en) * 2022-05-27 2022-08-30 中国三冶集团有限公司 Construction method of cast-in-place concrete raw material bin

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303397A (en) * 1998-04-22 1999-11-02 Fujita Corp Construction method of reinforced concrete building
CN202370233U (en) * 2011-08-15 2012-08-08 成都市第六建筑工程公司 Pull rod type external wall cantilever discharging platform setting-up structure
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN103572966A (en) * 2013-11-22 2014-02-12 中国华冶科工集团有限公司 Construction method for silo funnel liner
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo
CN205046884U (en) * 2015-08-20 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303397A (en) * 1998-04-22 1999-11-02 Fujita Corp Construction method of reinforced concrete building
CN202370233U (en) * 2011-08-15 2012-08-08 成都市第六建筑工程公司 Pull rod type external wall cantilever discharging platform setting-up structure
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form
CN103572966A (en) * 2013-11-22 2014-02-12 中国华冶科工集团有限公司 Construction method for silo funnel liner
CN104100122A (en) * 2014-08-01 2014-10-15 中国化学工程第三建设有限公司 Construction method of cone-shaped top structure of large silo
CN205046884U (en) * 2015-08-20 2016-02-24 中国能源建设集团广东省电力设计研究院有限公司 Big -and -middle -sized thermal power factory overlength steel construction main building jointless structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047426A (en) * 2021-05-18 2021-06-29 中国十九冶集团有限公司 Method for setting steel bars of large concrete funnel opening
CN113047426B (en) * 2021-05-18 2022-08-09 中国十九冶集团有限公司 Steel bar setting method for large concrete funnel opening
CN114197894A (en) * 2021-12-31 2022-03-18 中国二十二冶集团有限公司 Construction method of large concrete funnel
CN114961382A (en) * 2022-05-27 2022-08-30 中国三冶集团有限公司 Construction method of cast-in-place concrete raw material bin

Also Published As

Publication number Publication date
CN105781159B (en) 2018-04-27

Similar Documents

Publication Publication Date Title
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN105952060A (en) Precast beam reinforcement cage component and assembling method thereof
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN105781159A (en) Construction process for reinforced concrete coal hopper of power plant main building
CN103276894A (en) Support system of large-cross-section girder transfer floor of hollow floor system and construction technology
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN213953189U (en) Supporting device for ensuring smooth surface of lower cone shell of prefabricated water tank
CN106168036B (en) A kind of contrary sequence method drop modular system and drop mould method
CN202865996U (en) Room modular structure for nuclear power plant
CN202220435U (en) Reverse construction underground concrete structure formwork descending equipment
CN211850804U (en) Shear force wall settlement joint steel wood combines template to prop up establishes device
CN105113542B (en) Underground station construction overhanging system and underground station construction method
CN105781200A (en) Subsection formwork pouring construction process for building reinforced concrete coal hopper of main power plant
CN115726462A (en) Super high-rise core tube and steel structure flat layer construction method and temporary support frame
CN115095153A (en) Concrete chimney construction method without internal mold
CN209799320U (en) Integral steel platform for multi-cylinder steel plate shear wall
CN105735648B (en) A kind of house reinforced concrete of main factory of power plant sooty coal funnel multistage formwork pouring construction process
CN204960308U (en) Exempt from hollow post template of scaffold construction
CN104018860A (en) Supporting device of loading chamber
CN105569070B (en) The method for pouring large-size concrete beam column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant