Prior art keywords
girder
column
middle plate
fixing piece
underground station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510600528.7A
Other languages
Chinese (zh)
Other versions
CN105113542A (en
Inventor
周庙林
郑华军
徐玉成
吴泉峰
王志全
杨江坤
张威
刘琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201510600528.7A priority Critical patent/CN105113542B/en
Publication of CN105113542A publication Critical patent/CN105113542A/en
Application granted granted Critical
Publication of CN105113542B publication Critical patent/CN105113542B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of underground station construction overhanging system and underground station construction methods, belong to the realm of building construction, overhanging system includes column and middle plate-girder, middle plate-girder is laterally set, column is vertically provided on bottom plate, the upper end of column is supported in the lower surface of middle plate-girder, fixing piece is provided on middle plate-girder, fixing piece includes the first fixing piece and the second fixing piece, the lower end of first fixing piece is set to the end of middle plate-girder, upper end is fixedly installed lateral stent, and the lower end of the second fixing piece is corresponding with column, and upper end is fixedly connected with stent.Underground station construction overhanging system and construction method provided by the invention use overhanging type structure, after the completion of undermost middle plate-beam construction, pass through column load-bearing, during the middle plate-beam construction of top, it will be on the column of force of gravity to lower section by fixing piece and stent, undermost support for shuttering and template, that is, dismountable, the support for shuttering and template number for applying man-hour requirement in underground station can be largely saved in this way, it is cost-effective.

Description

Underground station construction overhanging system and underground station construction method
Technical field
The present invention relates to the realm of building construction, in particular to a kind of underground station construction overhanging system and underground Station construction method.
Background technology
As China's underground space Construction Technology continues to develop, the scale of subway work will be increasing, the number of plies It also can be more and more.And in subway plate-girder and stent during top board construction, template will be in construction cost greatly.
Underground station form of construction work of the prior art is bottom plate of first constructing, then sets up plate-girder support for shuttering in lower floor, is poured After complete middle plate-girder, then middle plate-girder upper bracket is set up, plate-girder in negative one layer of then constructing.Top plate lower carriage is set up again, then pours top Board concrete, construction is until station main structure construction is completed from the bottom up.This method the problem is that:Due to middle plate Beam clear stipulaties load is not more than 800kg/m2.After the completion of needing top layer's top board construction, then from it is upper gradually remove support for shuttering engineering. This clearly results in lowest level steel pipe support, template, lumps of wood etc. need to keep the state that cannot be removed in entire work progress, make material Material and equipment cannot be fully used, also therefore delay the duration, while can increase significantly steel pipe support, template cost.
Invention content
The present invention provides a kind of underground station construction overhanging system and underground station construction methods, it is intended to improve above-mentioned Technical problem.
The invention is realized in this way:
Underground multiple level station construction overhanging system, including column and middle plate-girder, the middle plate-girder is laterally set, described vertical Column is vertically provided on bottom plate, and the upper end of the column is supported in the lower surface of the middle plate-girder;
It is provided with fixing piece on the middle plate-girder, the fixing piece includes the first fixing piece and the second fixing piece, and described the The lower end of one fixing piece is set to the end of the middle plate-girder, and upper end is fixedly installed stent, and the stent is laterally set, described The lower end of second fixing piece is correspondingly arranged with the column, and upper end is fixedly connected with the stent.
During construction, after foundation pit is dug in underground station, then bottom plate of first constructing builds support for shuttering and template on bottom plate, Middle plate-girder is constructed in template, and the lower end of column is fixed on bottom plate, and middle plate-girder is withstood in upper end, after the completion of middle plate-beam construction, in Plate-girder carries out load-bearing, support for shuttering and template, that is, dismountable recycling by column, for the construction of plate-girder in top.
Setting fixing piece and stent above middle plate-girder, and the position of fixing piece be provided in position corresponding with column and in At the corner of plate-girder, lower section remove support for shuttering be reset on stent, in this way top construct when support for shuttering weight with And the weight in the construction of top during plate-girder is passed directly to through stent and fixing piece on the column of lower section, it will not be to completion of having constructed Situations such as middle plate-girder impacts, and plate-girder is broken in will not more occurring.
It is constructed by the overhanging system in the technical program, construction formwork mode compared with the prior art is required The support for shuttering and template number wanted largely reduce, and can save great amount of cost.And in lowest level after the completion of plate-beam construction, branch Mould bases has just been removed, and the construction equipments such as more convenient shield machine enter station and start to construct.
Further, the column is two row, and the two row columns are arranged at intervals, and two arrange the columns along the middle plate The central axes of beam are symmetrical arranged.
The set-up mode of column has a major impact for entirely overhanging the load-bearing of system, and two row columns are mutually parallel, It is in symmetrical position that two row columns, which are arranged below middle plate-girder, and the supporting power of two row columns is suitable.
Further, the spacing between the two row columns is equal to 1/3rd of the span of the middle plate-girder.
Two row columns are located at the trisection posistion of middle plate-girder span respectively, the load-bearing of the weight of plate-girder middle in this way on column Distribution is more uniform.
Further, the fixing piece includes junction steel plate and two blocks of I-steel, and vertically fixation is set two blocks of I-steel It puts on the middle plate-girder, the junction steel plate is laterally set, and the both ends of the junction steel plate connect two pieces of I-shapeds respectively The upper end of steel.
First fixing piece and the second fixing piece using same construction, are made using I-steel, and junction steel plate is by work The upper surface of word steel connects, and is more convenient stent setting.
Further, the stent is made of the polylith steel being laid on the fixing piece.
Stent is provided on fixing piece, and in the technical program, stent is equally made of steel, can be I-steel Can be the steel of other forms.A plane is being laid into fixing piece, is facilitating setting support for shuttering.
It should be noted that stent can also use the materials such as sleeper, the lumps of wood to be made.
Further, the lower end of the column is provided with pedestal, and the pedestal is evenly arranged with screw hole along its circumferential direction, described The pedestal is fixed on ground by setting expansion bolt, the expansion bolt in screw hole.
Pedestal can increase the stress surface that column is connect with bottom plate, reduce the pressure to bottom plate, while more convenient dispersion is vertical The pressure of column.
Further, 16 screw holes are provided on the pedestal.
A kind of underground station construction method, includes the following steps:
A, support for shuttering is set up on undermost bottom plate, installation form erects column;
B, plate-girder in being poured in template, maintenance make middle plate-girder intensity reach 100%;
C, support for shuttering and template are removed, fixing piece and stent are set gradually on middle plate-girder;
D, support for shuttering and installation form are reset on stent, erects column again on middle plate-girder or stent, is repeated B, step c, until completing all middle plate-beam constructions by the underground station number of plies of design.
In the prior art, the number of plies of underground station gradually increases, and difficulty of construction also gradually increases, and is carried out by this method Underground station is constructed, plate-girder in successively constructing from bottom to up, after the completion of plate-beam construction in one layer, support for shuttering below The middle plate-beam construction on upper strata is removed and is used for, avoiding needs in the work progress of prior art multilayer underground station using a large amount of The situation of support for shuttering and template.
Wherein middle plate-girder intensity reaches 100% and refers to that the concrete strength for pouring middle plate-girder reaches the 100% of design value, Design strength is exactly fully achieved.
Further, in step d, the column of last layer is identical with next layer of column quantity and position is corresponding.
In work progress, the position of each layer of column is corresponding with next layer of stud, in this way in top The weight of plate-girder and support for shuttering successively can be transferred to bottom plate by column completely, and can't be to the middle plate-girder for completion of having constructed It causes to damage.
Further, it after the intensity of all middle plate-girders reaches 100%, is successively removed down since top layer vertical Column.
The beneficial effects of the invention are as follows:Underground station construction overhanging system and underground station construction party provided by the invention Method uses overhanging type structure, after the completion of undermost middle plate-beam construction, by column load-bearing, and during the middle plate-beam construction of top, Bottom plate, undermost support for shuttering and template on the column of force of gravity to lower section and will be transferred to by fixing piece and stent It removes, can largely save the support for shuttering and template number for applying man-hour requirement in underground station in this way, it is cost-effective.
Description of the drawings
It in order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range, for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structure diagram of construction overhanging system in underground station provided in an embodiment of the present invention;
Fig. 2 is the structure diagram of underground station construction overhanging system central post provided in an embodiment of the present invention;
Fig. 3 is the structure diagram of fixing piece in construction overhanging system in underground station provided in an embodiment of the present invention.
Figure acceptance of the bid, which is remembered, is respectively:
Bottom plate 101;Middle plate-girder 102;First fixing piece 103;Second fixing piece 104;Stent 105;Junction steel plate 106;It is vertical Column 110;Pedestal 111.
Specific embodiment
As China's underground space Construction Technology continues to develop, the scale of subway work will be increasing, the number of plies It also can be more and more.And in subway plate-girder and stent during top board construction, template will be in construction cost greatly.
Underground station form of construction work of the prior art is bottom plate of first constructing, then sets up plate-girder support for shuttering in lower floor, is poured After complete middle plate-girder, then middle plate-girder upper bracket is set up, plate-girder in negative one layer of then constructing.Top plate lower carriage is set up again, then pours top Board concrete, construction is until station main structure construction is completed from the bottom up.This method the problem is that:Due to middle plate Beam clear stipulaties load is not more than 800kg/m2.After the completion of needing top layer's top board construction, then from it is upper gradually remove support for shuttering engineering. This clearly results in lowest level steel pipe support, template, lumps of wood etc. need to keep the state that cannot be removed in entire work progress, make material Material and equipment cannot be fully used, also therefore delay the duration, while can increase significantly steel pipe support, template cost.
Those skilled in the art are seeking a kind of tool or method for improving the problem always for a long time.
Purpose, technical scheme and advantage to make the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art All other embodiments obtained without creative efforts shall fall within the protection scope of the present invention.Therefore, The detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit the model of claimed invention below It encloses, but is merely representative of the selected embodiment of the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need to that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " interior ", " outer " are based on orientation shown in the drawings or position relationship or are somebody's turn to do Invention product using when the orientation usually put or position relationship, be for only for ease of the description present invention and simplify description, without It is instruction or implies that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage It solves to indicate or implying relative importance.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or one Connect to body;Can be mechanical connection or electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Embodiment please refers to
As shown in Figure 1 to Figure 3, a kind of underground station construction overhanging system is present embodiments provided, Fig. 1 shows that this is outstanding The structure of system is chosen, including column 110 and middle plate-girder 102, laterally setting, the column 110 are vertically arranged for the middle plate-girder 102 And bottom plate 101 is supported in, the upper end of the column 110 is supported in the lower surface of the middle plate-girder 102.
As shown in Fig. 2, column 110 is made of I-steel that strengthening, lower end is provided with pedestal 111, and pedestal 111 is circle Plate-like, pedestal 111 are evenly arranged with 16 screw holes along its circumferential direction, expansion bolt are set in the screw hole, and the expansion bolt will The pedestal 111 is fixed on ground.
Pedestal 111 can increase the stress surface that column 110 is connect with bottom plate 101, reduce the pressure to bottom plate 101, simultaneously The pressure of more convenient dispersion column 110.
Column 110 is two groups, and the set-up mode of column 110 has a major impact for entirely overhanging the load-bearing of system, two row Column 110 is mutually parallel, and two row columns 110 are arranged on middle 102 lower section of plate-girder in symmetrical position, two row columns 110 Supporting power it is suitable.
Specifically, in the present embodiment, two row columns 110 are located at the trisection posistion of middle 102 span of plate-girder respectively, also It is 1/3rd of spacing equal to the span of the middle plate-girder 102 said between the two row column 110, plate-girder 102 middle in this way Load-bearing distribution of the weight on column 110 is more uniform.
Station space is formed between middle plate-girder 102 and bottom plate 101, middle plate-girder 102 is configured by pouring construction, It is fixed with the vertical beam in station or wall connecting.
Fixing piece is provided on the middle plate-girder 102, the fixing piece includes the first fixing piece 103 and the second fixing piece 104, the lower end of first fixing piece 103 is set to the end of the middle plate-girder 102, specifically, the first fixing piece 103 At the corner of middle plate-girder 102 and station inner wall.
The lower end position of second fixing piece 104 and the position of the column 110 are correspondingly arranged, as shown in Figure 1, two groups The position of second fixing piece 104 is overlapped with the installation position of lower end column 110 on vertical, is convenient in this way by the middle plate-girder of top 102nd, the weight of support for shuttering etc. is transferred directly on the column 110 of lower section.
First fixing piece 103 and the second fixing piece 104 using same construction, are made using I-steel, it is specific and Speech, as shown in figure 3, the first fixing piece 103 and the second fixing piece 104 include junction steel plate 106 and two blocks of I-steel, two pieces of institutes It states I-steel to be vertically fixedly installed, during setting, I-steel is supported in I-shaped on middle plate-girder 102, among two blocks of I-steel With certain intervals, junction steel plate 106 tiles, and the both ends of junction steel plate 106 are connected on I-steel.
The upper end of fixing piece is fixedly installed stent 105, and the stent 105 laterally setting, the stent 105 is by being laid in Polylith steel on the fixing piece are formed, and can be the steel that I-steel can also be other forms.Polylith steel are laid into One plane facilitates setting support for shuttering.
Using above-mentioned overhanging system, the present embodiment also provides a kind of construction method of underground station:
It excavates the working foundation pit in underground station first, and constructs bottom plate 101 in bottom of foundation ditch, thereafter in bottom plate 101 On set up support for shuttering, the then installation form on support for shuttering, and column 110 is erected on bottom plate 101, by chassis by column 110 are firmly fixed and keep column 110 in vertical state.
In the present embodiment, support for shuttering is built by materials such as the lumps of wood and sleepers, when support for shuttering and template have been built Cheng Hou, plate-girder 102 in being poured in template, after the completion of middle plate-girder pours, is conserved, the intensity of plate-girder 102 in waiting Reach 100%.
At this point, the support for shuttering of 102 lower section of middle plate-girder and form removable can be kept column 110 in upright state and right Middle plate-girder 102 forms support, and fixing piece and stent 105 are set gradually on middle plate-girder 102, during setting, should ensure the as possible The position of two fixing pieces 104 is perfectly aligned with the position of column 110, and during the position of the first fixing piece 103 is then arranged on At the upper armpit angle of plate-girder 102.
Steel are directly laid on fixing piece and form a plane by stent 105.The branch that lower section can be removed at this time Mould bases and template are built on stent 105 again, while column 110 is once again set up on stent 105, likewise, newly setting The column 110 put is corresponding with 110 position of column of lower section.
After support for shuttering, template and column 110 are once again set up, the middle plate-girder 102 of underground layer second from the bottom is poured again. It constructs in the same way, until all middle plate-girders 102 are constructed completion.After the completion of construction, it is according to design alternative It is no to remove column 110.
Preferred embodiment is, when removing column 110, successively to remove column 110 down since top layer, be Ensure safety, wait the intensity of all middle plate-girders 102 that could be removed after reaching 100%.
It constructs according to above-mentioned construction method, no matter underground station needs that how many layer built, only needs a set of support for shuttering It can complete to construct with template, this greatly reduces the use cost of support for shuttering and template.
Underground station construction overhanging system and underground station construction method provided in this embodiment use overhanging type structure, After the completion of undermost middle plate-girder 102 is constructed, by 110 load-bearing of column, when the middle plate-girder 102 of top is constructed, pass through fixation Part and stent 105 on the column 110 of force of gravity to lower section and will be transferred to bottom plate 101, and undermost support for shuttering and template are It is dismountable, the support for shuttering and template number for applying man-hour requirement in underground station can be largely saved in this way, meanwhile, the plate in lowest level After the completion of beam 102 is constructed, support for shuttering has just been removed, and the construction equipments such as more convenient shield machine enter station and start to construct.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, that is made any repaiies Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (9)

1. underground station construction overhanging system, which is characterized in that including column and middle plate-girder, the middle plate-girder is laterally set, The column is vertically provided on bottom plate, and the upper end of the column is supported in the lower surface of the middle plate-girder;
Fixing piece is provided on the middle plate-girder, the fixing piece includes the first fixing piece and the second fixing piece, and described first is solid The lower end for determining part is set to the end of the middle plate-girder, and upper end is fixedly installed stent, and the stent is laterally set, and described second The lower end of fixing piece is correspondingly arranged with the column, and upper end is fixedly connected with the stent;
First fixing piece and second fixing piece include junction steel plate and two blocks of I-steel, and two blocks of I-steel erect To being fixed on the middle plate-girder, the junction steel plate is laterally set, and the both ends of the junction steel plate connect two pieces respectively The upper end of the I-steel.
2. construction overhanging system in underground station according to claim 1, which is characterized in that the column is arranged for two, and two It arranges the column to be arranged at intervals, and the two row columns are symmetrical arranged along the central axes of the middle plate-girder.
3. construction overhanging system in underground station according to claim 2, which is characterized in that between the two row columns 1/3rd away from the span equal to the middle plate-girder.
4. construction overhanging system in underground station according to claim 1, which is characterized in that the stent is by being laid in The polylith steel stated on fixing piece are formed.
5. construction overhanging system in underground station according to claim 1, which is characterized in that the lower end setting of the column There is a pedestal, the pedestal is evenly arranged with screw hole along its circumferential direction, setting expansion bolt in the screw hole, and the expansion bolt is by institute It states pedestal and is fixed on ground.
6. construction overhanging system in underground station according to claim 5, which is characterized in that be provided with 16 on the pedestal A screw hole.
7. it carries out underground station with overhanging system using the underground station construction as described in any one in claim 1 to 6 to apply The method of work, which is characterized in that include the following steps:
A, support for shuttering is set up on undermost bottom plate, installation form erects column;
B, plate-girder in being poured in template, maintenance make middle plate-girder intensity reach 100%;
C, support for shuttering and template are removed, fixing piece and stent are set gradually on middle plate-girder;
D, support for shuttering and installation form are reset on stent, erects column again on middle plate-girder or stent, repeats b, c step Suddenly, until completing all middle plate-beam constructions by the underground station number of plies of design.
8. the method according to claim 7 for carrying out underground station construction with overhanging system using underground station construction, It is characterized in that, in step d, the column of last layer is identical with next layer of column quantity and position is corresponding.
9. the method according to claim 8 for carrying out underground station construction with overhanging system using underground station construction, It is characterized in that, after the intensity of all middle plate-girders reaches 100%, successively removes column down since top layer.
CN201510600528.7A 2015-09-21 2015-09-21 Underground station construction overhanging system and underground station construction method Active CN105113542B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510600528.7A CN105113542B (en) 2015-09-21 2015-09-21 Underground station construction overhanging system and underground station construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510600528.7A CN105113542B (en) 2015-09-21 2015-09-21 Underground station construction overhanging system and underground station construction method

Publications (2)

Publication Number Publication Date
CN105113542A CN105113542A (en) 2015-12-02
CN105113542B true CN105113542B (en) 2018-06-29

Family

ID=54661634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510600528.7A Active CN105113542B (en) 2015-09-21 2015-09-21 Underground station construction overhanging system and underground station construction method

Country Status (1)

Country Link
CN (1) CN105113542B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525629A (en) * 2016-01-20 2016-04-27 中铁上海工程局集团有限公司 Construction method and device of subway station
CN111379438A (en) * 2020-03-10 2020-07-07 中国铁路设计集团有限公司 Vertical temporary supporting system for underground structure and using method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3327191B2 (en) * 1997-11-19 2002-09-24 鹿島建設株式会社 Underground structure and its construction method
CN101886468B (en) * 2010-03-29 2011-08-24 南京大地建设集团有限责任公司 Construction method of suspension type template support in high-position conjoined structure
CN102691411A (en) * 2012-06-21 2012-09-26 中国建筑第五工程局有限公司 Beam plate post-cast strip template support system and construction method thereof
CN203625872U (en) * 2013-12-24 2014-06-04 葛洲坝集团第五工程有限公司 Pile foundation construction platform
CN204919608U (en) * 2015-09-21 2015-12-30 中铁上海工程局有限公司 Underground station construction is with system of encorbelmenting

Also Published As

Publication number Publication date
CN105113542A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN102587659A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN103924520B (en) Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN106013781A (en) Slab supporting construction method and construction device by reversely suspending template
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN205636496U (en) A interim strutting arrangement that is used for support frame bridge crane and whole hole case roof beam
CN105972313A (en) Overhang method and overhang structure for engineering pipeline stretching across foundation pit
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN107687254A (en) A kind of concrete disjunctor group storehouse slip form construction device and construction method
CN105113542B (en) Underground station construction overhanging system and underground station construction method
CN106400686A (en) Embedded part suspension bracket and construction method thereof
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN103031892A (en) Steel truss brace and manufacturing method for steel truss platform
CN105781159B (en) A kind of power plant main power house armored concrete coal hopper construction technology
CN204919608U (en) Underground station construction is with system of encorbelmenting
CN206346116U (en) A kind of skewback embedded anchor bar alignment system
CN110748155B (en) Support device for large-diameter silo conical hopper concrete construction template and construction method thereof
CN115058977A (en) Construction method for prefabricated pier stud of urban bridge
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN105525629A (en) Construction method and device of subway station
KR101288831B1 (en) Remodeling construction method using micropile and truss in a surrounding structure and the places that it is adjacent to
CN111058381A (en) Construction method for side-span cast-in-place section of continuous rigid frame bridge
CN205382428U (en) Whole cast -in -place roof beam formwork support frame of falling triangle in hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 200436, No. 10, No. 272.278, No. 272.278, JIANGCHANG three, Shanghai

Applicant after: Shanghai Civil Engineering Co., Ltd. of Crec

Applicant after: THE FIRST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI GROUP

Address before: 200436, No. 10, No. 272.278, No. 272.278, JIANGCHANG three, Shanghai

Applicant before: Shanghai Civil Engineering Co., Ltd. of CREC

Applicant before: THE FIRST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI GROUP