CN207160629U - A kind of spliced workmen's running gear - Google Patents

A kind of spliced workmen's running gear Download PDF

Info

Publication number
CN207160629U
CN207160629U CN201721115132.4U CN201721115132U CN207160629U CN 207160629 U CN207160629 U CN 207160629U CN 201721115132 U CN201721115132 U CN 201721115132U CN 207160629 U CN207160629 U CN 207160629U
Authority
CN
China
Prior art keywords
stair
connection frame
level link
workmen
spliced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721115132.4U
Other languages
Chinese (zh)
Inventor
邰冶
乔会丹
闫冲冲
陈友胜
陈熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201721115132.4U priority Critical patent/CN207160629U/en
Application granted granted Critical
Publication of CN207160629U publication Critical patent/CN207160629U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of spliced workmen's running gear, it includes:Foundation ditch tie-beam and walking unit;Walking unit is vertically connected with successively, and the walking unit positioned at top is connected with foundation ditch tie-beam;Foundation ditch tie-beam is fixedly connected on the top of foundation ditch;Walking unit includes first level link, four root posts, the second horizontal connection frame and connects stair with interlayer;First level link and the second horizontal connection frame include support body, the connection sleeve pipe positioned at four corner positions of support body and the landing slab being fixed on support body of rectangular configuration;The connection sleeve pipe of one end insertion first level link of column, the other end insert the connection sleeve pipe of the second horizontal connection frame;The landing slab of one end connection first level link of interlayer connection stair, the other end connect the landing slab of the second horizontal connection frame.The composition component of this running gear is prefabricated in the factory processing, Assembling, time-saving and efficiency, can progressively be removed, can be repeatedly used in turn according to story height after installation.

Description

A kind of spliced workmen's running gear
Technical field
The utility model belongs to foundation pit construction technical field of auxiliary equipment, more particularly to a kind of spliced workmen's row Walking system.
Background technology
With the development of urban construction, skyscraper and municipal works emerge in multitude.Limited urban ground space is not The needs of the growing work of people and life can be met, then people start to seek development space to high-altitude and underground.Ground Lower requirement of engineering carries out extensive underground excavation, necessarily causes substantial amounts of base pit engineering to produce.In deep foundation pit construction, constructor Member must be constructed by lower channel into foundation ditch.Stair packway used in job site is typically using steel pipe scaffold scene Set up, stair step be used as vertical, horizontal force framework, wooden a tree, used in making timber for boats, template by steel pipe, take tear open be disposably, it is time-consuming to take Work.
Utility model content
The purpose of this utility model is to provide a kind of spliced workmen's running gear, to solve steel pipe scaffold construction Time is grown, and takes and tears the problem of time-consuming open.
The technical scheme that the utility model solves above-mentioned technical problem is as follows:A kind of spliced workmen's running gear, It includes:Foundation ditch tie-beam and walking unit;The walking unit is vertically connected with successively, walking unit and foundation ditch positioned at top Tie-beam connects;Foundation ditch tie-beam is fixedly connected on the top of foundation ditch;
The walking unit includes first level link, four root posts, the second horizontal connection frame and connects stair with interlayer; The first level link and the second horizontal connection frame include the support body of rectangular configuration, positioned at four corner positions of support body Connection sleeve pipe and the landing slab being fixed on support body;The connection sleeve pipe of one end insertion first level link of the column, separately The connection sleeve pipe of the second horizontal connection frame is inserted in one end, and first level link and the second horizontal connection frame are linked as one by column Body;The landing slab of one end connection first level link of interlayer connection stair, the other end connect the flat of the second horizontal connection frame Platen.
The utility model spliced workmen's running gear as described above, further, the support body include first successively The first side lever, the second side lever, the 3rd side lever and the 4th side lever of tail connection;The landing slab of first level link is fixed on first First side lever of the support body of horizontal connection frame, the landing slab of the second horizontal connection frame are fixed on the support body of the second horizontal connection frame 3rd side lever.
The utility model spliced workmen's running gear as described above, further, the connection sleeve pipe is provided with Bolt hole, post end set bolt hole;After column insertion connection sleeve pipe using bolt pass through corresponding bolt hole by column with Connection sleeve pipe is fixedly connected.
The utility model spliced workmen's running gear as described above, further, the interlayer connect stair bag Include stair vertical rod, stair brace, mark time framework and staircase boards;The framework of marking time is connected to the landing slab of first level link Between the landing slab of the second horizontal connection frame;Staircase boards are connected to mark time on framework from high to low;Erect one end of stair vertical rod Direct-connected to connect framework of marking time, stair brace is connected between adjacent stair vertical rod.
The utility model spliced workmen's running gear as described above, further, the walking unit also includes Expanded metal lath guard rail, the expanded metal lath guard rail include guard rail framework and protection network;First level link and the second level Also include connection otic placode with holes on the support body of link;Guard rail framework is bolted the connection otic placode, is arranged on The side of first level link and the second horizontal connection frame.
The utility model spliced workmen's running gear as described above, further, the walking unit also includes Square tube diagonal brace, the square tube diagonal brace are the decussate texture intersected, and square tube diagonal brace is connected to four drift angles of guard rail framework.
The utility model spliced workmen's running gear as described above, further, in addition to rain-proof shelter, it is described anti- Awning is mounted in the walking unit of the top.
The beneficial effects of the utility model are:
The advantages of system spliced design, is that without the concern for packway Design Orientation the packway can be according to each height of foundation ditch Degree is designed, and walking unit is removed from bottom to top with structure construction progress.Due between foundation ditch tie-beam and walking unit Connect, and the connector inside walking unit building block is bolt connection, convenient disassembly is revolving strong.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, of the present utility model above-mentioned and/or otherwise advantage will Becoming more apparent upon and be easier to understand, these accompanying drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is a kind of walking unit schematic diagram of embodiment of the utility model;
Fig. 2 is Fig. 1 Section A-A schematic diagram;
Fig. 3 is a kind of expanded metal lath guard rail schematic diagram of embodiment of the utility model;
Fig. 4 is stair vertical rod and the stair brace schematic diagram of a kind of embodiment of the utility model;
Fig. 5 is a kind of spliced workmen's running gear schematic diagram of embodiment of the utility model.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, foundation ditch tie-beam, 2, walking unit, 3, foundation ditch, 4, first level link, 5, column, the 6, second horizontal connection Frame, 7, interlayer connection stair, 8, expanded metal lath guard rail, 40, support body, the 41, first side lever, the 42, second side lever, the 43, the 3rd side lever, 44th, the 4th side lever, 45, connection sleeve pipe, 46, landing slab, the 47, first support angle steel, the 48, second support angle steel, 71, stair stand Bar, 72, stair brace, 73, framework of marking time, 74, staircase boards, 75, bolt hole, 81, guard rail framework, 82, protection network, 83, side Pipe diagonal brace, 84, connection otic placode.
Embodiment
Hereinafter, the embodiment of spliced workmen's running gear of the present utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is specific embodiment of the present utility model, of the present utility model for illustrating Design, is explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public The content opened includes doing using the embodiment to recording herein using obvious other technical schemes, these technical schemes Go out the technical scheme of any obvious substitutions and modifications.
The accompanying drawing of this specification is schematic diagram, aids in illustrating design of the present utility model, it is schematically indicated each several part Shape and its correlation.It note that for the ease of clearly showing the structure of each part of the utility model embodiment, respectively Do not drawn between accompanying drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 5 shows a kind of spliced workmen's running gear of embodiment of the utility model, and it includes:Foundation ditch tie-beam 1 and walking unit 2;Walking unit 2 is vertically connected with successively, and the walking unit 2 positioned at top is connected with foundation ditch tie-beam 1;Foundation ditch Tie-beam 1 is fixedly connected on the top of foundation ditch 3;
As depicted in figs. 1 and 2, walking unit 2 includes:First level link 4, four root posts 5, the second horizontal connection frame 6 connect stair 7 with interlayer;
The horizontal connection frame 6 of first level link 4 and second includes:The support body 40 of rectangular configuration, positioned at support body 40 4 The connection sleeve pipe 45 of individual corner position and the landing slab 46 being fixed on support body 40;
The connection sleeve pipe 45 of one end insertion first level link 4 of column 5, the other end insert the second horizontal connection frame 6 Connection sleeve pipe 45, first level link 4 and the second horizontal connection frame 6 be connected as a single entity by column 5;Using connection sleeve pipe and stand Post composition walking unit can easily realize that the repetition of walking unit is built and dismantled.
The landing slab 46 of one end connection first level link 4 of interlayer connection stair 7, other end connection second are horizontal even Connect the landing slab 46 of frame 6.
In spliced workmen's running gear of above-described embodiment, according to the depth needs of actual foundation ditch, increase row Needs of the workmen by eminence walking to lower construction can be achieved in the quantity for walking unit.The advantages of system spliced design It is without the concern for packway Design Orientation, the packway respectively can be highly designed according to foundation ditch, with structure construction progress under Walking unit is removed upwards.Inside the connection between foundation ditch tie-beam and walking unit, and walking unit building block Connector be bolt connection, convenient disassembly is revolving strong.
In further improved spliced workmen's running gear, as shown in figure 1, support body 40 includes from beginning to end connecting successively The first side lever 41, the second side lever 42, the 3rd side lever 43 and the 4th side lever 44 connect;The landing slab 46 of first level link 4 is solid The first side lever 41 of the support body 40 of first level link 4 is scheduled on, the landing slab 46 of the second horizontal connection frame 6 is fixed on the second water 3rd side lever 43 of the support body 40 of flushconnection frame 6.In embodiment as illustrated in FIG. 1, support body 40 also includes the first strut angle The support angle steel 48 of steel 47 and second, the second support angle steel 48 are fixedly connected between the second side lever 42 and the 4th side lever 44;First Support angle steel 47 is fixedly connected between the 3rd side lever 43 and the second support angle steel 48, for support platform plate 46, prevents from constructing Personnel stand, and depression problem occurs in landing slab 46, improves working security.
In further improved spliced workmen's running gear, as shown in Fig. 2 connection sleeve pipe 45 is provided with bolt Hole 75, the end set bolt hole 75 of column 5;Column 5 is inserted after connection sleeve pipe 45 passes through corresponding bolt hole 75 will using bolt Column 5 is fixedly connected with connection sleeve pipe 45.In this preferred embodiment, the setting of bolt hole and bolt can be improved further The stability of running gear, prevent from causing column to be disconnected sleeve pipe due to the reason such as rocking, in turn result in danger of collapsing.
In further improved spliced workmen's running gear, as shown in Figures 2 and 3, interlayer connection stair 7 wrap Include stair vertical rod 71, stair brace 72, mark time framework 73 and staircase boards 74;Framework 73 of marking time is connected to first level link 4 The horizontal connection frame 6 of landing slab 46 and second landing slab 46 between;Staircase boards 74 are connected to from high to low marks time on framework 73; One end of stair vertical rod 71 connects framework 73 of marking time vertically, and stair brace 72 is connected between adjacent stair vertical rod 71.
In further improved spliced workmen's running gear, as shown in figure 4, walking unit 2 also includes steel plate Net guard rail 8, expanded metal lath guard rail 8 include guard rail framework 81 and protection network 82;First level link 4 and second is horizontal even Connecing also includes connection otic placode 84 with holes on the support body 40 of frame 6;Guard rail framework 81 is bolted connection otic placode 84, installation In the side of the horizontal connection frame 6 of first level link 4 and second.Expanded metal lath guard rail 8 is connected by dismountable mode first Support body is connected to, is easy to implement modular installation and removal, secondly, expanded metal lath guard rail 8 can prevent that personnel from falling or miscellaneous Thing, which is fallen, pounds people.
In further improved spliced workmen's running gear, as shown in figure 4, walking unit 2 also includes square tube Diagonal brace 83, square tube diagonal brace 83 are the decussate texture intersected, and square tube diagonal brace 83 is connected to four drift angles of guard rail framework 81.Side Pipe diagonal brace 83 can improve walking unit lateral stability, improve the ability of its resistance to deformation.
In further improved spliced workmen's running gear, in order to prevent influence of the precipitation to construction, and Damage of the precipitation to running gear parts, in the further improvement system based on above-described embodiment, in addition to rain-proof shelter, prevent Awning is mounted in the walking unit 2 of the top.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and further feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, are defined by the purpose for realizing the utility model.

Claims (8)

  1. A kind of 1. spliced workmen's running gear, it is characterised in that including:Foundation ditch tie-beam and walking unit;The row Walk unit to be vertically connected with successively, the walking unit positioned at top is connected with foundation ditch tie-beam;Foundation ditch tie-beam is fixedly connected on base The top in hole;
    The walking unit includes first level link, four root posts, the second horizontal connection frame and connects stair with interlayer;It is described First level link and the second horizontal connection frame support body including rectangular configuration, the connection positioned at four corner positions of support body Sleeve pipe and the landing slab being fixed on support body;The connection sleeve pipe of one end insertion first level link of the column, the other end The connection sleeve pipe of the second horizontal connection frame is inserted, first level link and the second horizontal connection frame are connected as a single entity by column;Layer Between connect stair one end connection first level link landing slab, the other end connect the second horizontal connection frame landing slab.
  2. 2. spliced workmen's running gear according to claim 1, it is characterised in that the support body includes first successively The first side lever, the second side lever, the 3rd side lever and the 4th side lever of tail connection;The landing slab of first level link is fixed on first First side lever of the support body of horizontal connection frame, the landing slab of the second horizontal connection frame are fixed on the support body of the second horizontal connection frame 3rd side lever.
  3. 3. spliced workmen's running gear according to claim 1, it is characterised in that the connection sleeve pipe is provided with Bolt hole, post end set bolt hole;After column insertion connection sleeve pipe using bolt pass through corresponding bolt hole by column with Connection sleeve pipe is fixedly connected.
  4. 4. spliced workmen's running gear according to claim 1, it is characterised in that the interlayer connects stair bag Include stair vertical rod, stair brace, mark time framework and staircase boards;The framework of marking time is connected to the landing slab of first level link Between the landing slab of the second horizontal connection frame;Staircase boards are connected to mark time on framework from high to low;Erect one end of stair vertical rod Direct-connected to connect framework of marking time, stair brace is connected between adjacent stair vertical rod.
  5. 5. spliced workmen's running gear according to claim any one of 1-4, it is characterised in that the walking is single Member also includes expanded metal lath guard rail, and the expanded metal lath guard rail includes guard rail framework and protection network;First level link and Also include connection otic placode with holes on the support body of second horizontal connection frame;Guard rail framework is bolted the engaging lug Plate, installed in the side of first level link and the second horizontal connection frame.
  6. 6. spliced workmen's running gear according to claim 1, it is characterised in that the walking unit also includes Square tube diagonal brace, the square tube diagonal brace are the decussate texture intersected, and square tube diagonal brace is connected to four drift angles of guard rail framework.
  7. 7. spliced workmen's running gear according to claim 1, it is characterised in that described also including rain-proof shelter Rain-proof shelter is mounted in the walking unit of the top.
  8. 8. spliced workmen's running gear according to claim 6 or 7, it is characterised in that the interlayer connects building Ladder includes stair vertical rod, stair brace, mark time framework and staircase boards;The framework of marking time is connected to the flat of first level link Between the landing slab of platen and the second horizontal connection frame;Staircase boards are connected to mark time on framework from high to low;The one of stair vertical rod End is vertical to connect framework of marking time, and stair brace is connected between adjacent stair vertical rod.
CN201721115132.4U 2017-09-01 2017-09-01 A kind of spliced workmen's running gear Expired - Fee Related CN207160629U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721115132.4U CN207160629U (en) 2017-09-01 2017-09-01 A kind of spliced workmen's running gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721115132.4U CN207160629U (en) 2017-09-01 2017-09-01 A kind of spliced workmen's running gear

Publications (1)

Publication Number Publication Date
CN207160629U true CN207160629U (en) 2018-03-30

Family

ID=61720023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721115132.4U Expired - Fee Related CN207160629U (en) 2017-09-01 2017-09-01 A kind of spliced workmen's running gear

Country Status (1)

Country Link
CN (1) CN207160629U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457488A (en) * 2018-06-26 2018-08-28 北京城建集团有限责任公司 A kind of standardization vertical shaft walks up and down with assembled ladder cage and its construction method
CN109138498A (en) * 2018-10-25 2019-01-04 中铁建工集团有限公司 A kind of deep basal pit nacelle 102 ladder
CN110080115A (en) * 2019-05-29 2019-08-02 中交一公局集团有限公司 Assembled pier construction guard system
WO2023226198A1 (en) * 2022-05-24 2023-11-30 中国建筑第二工程局有限公司 Assembly type person access passage having reusable steel structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457488A (en) * 2018-06-26 2018-08-28 北京城建集团有限责任公司 A kind of standardization vertical shaft walks up and down with assembled ladder cage and its construction method
CN109138498A (en) * 2018-10-25 2019-01-04 中铁建工集团有限公司 A kind of deep basal pit nacelle 102 ladder
CN110080115A (en) * 2019-05-29 2019-08-02 中交一公局集团有限公司 Assembled pier construction guard system
CN110080115B (en) * 2019-05-29 2024-05-10 中交一公局集团有限公司 Assembled pier construction protection system
WO2023226198A1 (en) * 2022-05-24 2023-11-30 中国建筑第二工程局有限公司 Assembly type person access passage having reusable steel structure

Similar Documents

Publication Publication Date Title
CN207160629U (en) A kind of spliced workmen's running gear
CN111779248A (en) High formwork system and construction method thereof
CN105256812A (en) Prefabricated assembly type concrete supporting structure for foundation pit and construction method of prefabricated assembly type concrete supporting structure
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN111622126B (en) Construction method of high-altitude vertical manned channel in high mountain rock area
CN210032732U (en) Combined type ladder way pedal for upper and lower foundation pits and standard section thereof
CN109958134B (en) Suspension type deep basal pit stairs up and down
CN212507296U (en) High formwork system
CN104164889B (en) Demountable tower crane foundation
CN110735525B (en) Prefabricated assembled self-supporting steel pipe scaffold system
CN110318559B (en) Rescue reinforcement device and method for cultural relics and buildings
CN110863641A (en) Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof
CN114263187B (en) Foundation pit bottom plate force transmission structure and construction method thereof
CN110552519A (en) Deep foundation pit assembled type safe passage construction method
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN212405472U (en) Cross node connection structure of assembled frame structure
CN210686000U (en) Tunnel construction operation trolley
CN210766867U (en) A template system for retaining wall
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN114263349B (en) Construction method of wall-attached-free combined scaffold
CN110080235A (en) Foundation pit support construction slab column operation platform
CN221053295U (en) Convenient construction stair
CN217949119U (en) Reinforced concrete frame lattice formula tower crane basis
CN211229426U (en) Self-supporting steel pipe scaffold system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20180901

CF01 Termination of patent right due to non-payment of annual fee