CN205743207U - The typhoon protection ruggedized construction built is faced in a kind of construction - Google Patents

The typhoon protection ruggedized construction built is faced in a kind of construction Download PDF

Info

Publication number
CN205743207U
CN205743207U CN201620426297.2U CN201620426297U CN205743207U CN 205743207 U CN205743207 U CN 205743207U CN 201620426297 U CN201620426297 U CN 201620426297U CN 205743207 U CN205743207 U CN 205743207U
Authority
CN
China
Prior art keywords
room
vertical rod
construction
bar
described vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620426297.2U
Other languages
Chinese (zh)
Inventor
刘晓敏
张华勇
张少彪
陈存卓
张振禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Bureau Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Bureau Construction Development Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620426297.2U priority Critical patent/CN205743207U/en
Application granted granted Critical
Publication of CN205743207U publication Critical patent/CN205743207U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Greenhouses (AREA)
  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a kind of construction and face the typhoon protection ruggedized construction built, including many vertical rods behind before being arranged on room and room and the roof system that is formed on roofing, described vertical rod fixes on the ground, one_to_one corresponding front and back, all described vertical rod after being positioned at all described vertical rod before room and being positioned at room is linked together by multiple tracks room lower vertical bar respectively, is provided with, outside the facade that described vertical rod is formed with described room lower vertical bar, the bridging being connected with described vertical rod and described room lower vertical bar;Described roof system uses room cross tube and room upper vertical bar to be connected with each other and form, and described room cross tube is connected with the top of described vertical rod, is provided with cable wind rope between the top and ground of described vertical rod.This utility model uses vertical rod, cross bar, vertical pole and bridging to face in construction and builds outside formation cage construction and fix on the ground, being effectively increased construction and facing the anti-typhoon capacity built, thus avoiding casualties and property loss.

Description

The typhoon protection ruggedized construction built is faced in a kind of construction
Technical field
This utility model relates to the ruggedized construction of temporary building, and the typhoon protection ruggedized construction built is faced in a kind of construction.
Background technology
At present, the construction in domestic construction project is faced and is built commonly used movable color steel room, and movable color steel room has peace and tears open Convenience, cost are low, material can have enough to meet the need the features such as use.But, if engineering is located along Haicheng City, due to the Pacific Ocean temperature difference The relation of air-flow, every annual to be affected by 4~5 typhoons, and focuses mostly on 7~JIUYUE.Movable color steel Room is highly prone to typhoon and destroys because of the defect in himself structure, in turn results in the loss of casualties and property.
Summary of the invention
This utility model provides a kind of construction to face the typhoon protection built add consolidation for solving technical problem present in known technology Structure, uses this structural strengthening construction to face to build and be prevented from typhoon and damage construction and face and build.
This utility model is adopted the technical scheme that by solving technical problem present in known technology: a kind of construct to face build Typhoon protection ruggedized construction, including many vertical rods behind before being arranged on room and room and the roof system that is formed on roofing, described Vertical rod fixes on the ground, front and back one_to_one corresponding, all described vertical after being positioned at all described vertical rod before room and being positioned at room Bar is linked together by multiple tracks room lower vertical bar respectively, is provided with outside the facade that described vertical rod and described room lower vertical bar are formed The bridging being connected with described vertical rod and described room lower vertical bar;Described roof system uses room cross tube and room upper vertical bar to be connected with each other Forming, described room cross tube is connected with the top of described vertical rod, is provided with cable wind rope between the top and ground of described vertical rod.
Described vertical rod is welded on base anchor, and described base anchor uses expansion bolt to fix on the ground.
The lower end of described cable wind rope is connected to band and hooks on reinforcing bar, and described band hooks reinforcing bar and is implanted in underground.
The upper end of described cable wind rope and described vertical rod, described room cross tube and be positioned on the described room outside described roof system vertical Bar connects.
Described cable wind rope is 45 °~60 ° with the angle on ground.
The longitudinally adjacent distance between two described vertical rods is 3.6m.
This utility model has the advantage that with good effect: uses vertical rod, cross bar, vertical pole and bridging to face in construction and builds Outside forms cage construction and fixes on the ground, is effectively increased construction and faces the anti-typhoon capacity built, thus avoids personnel Injures and deaths and property loss.
Accompanying drawing explanation
Fig. 1 is side elevational view of the present utility model;
Fig. 2 is front elevation view of the present utility model;
Fig. 3 is the A portion enlarged drawing of Fig. 1;
Fig. 4 is the B portion enlarged drawing of Fig. 1;
Fig. 5 is the C portion enlarged drawing of Fig. 1;
Fig. 6 is Fig. 5 top view.
In figure: 1, vertical rod;2, room lower vertical bar;3, bridging;4, room cross tube;5, room upper vertical bar;6, guy Rope;7, base anchor;8, expansion bolt;9, band hooks reinforcing bar.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate Accompanying drawing describes in detail as follows:
Referring to Fig. 1~Fig. 6, the typhoon protection ruggedized construction built is faced in a kind of construction, including many before being arranged on room and behind room Vertical rod 1 and the roof system being formed on roofing, described vertical rod 1 fixes on the ground, and one_to_one corresponding front and back, before being positioned at room All described vertical rod 1 and all described vertical rod 1 after being positioned at room linked together by multiple tracks room lower vertical bar 2 respectively, It is provided with and described vertical rod 1 and described room lower vertical bar 2 phase outside the facade that described vertical rod 1 and described room lower vertical bar 2 are formed Bridging 3 even;Described roof system uses room cross tube 4 and room upper vertical bar 5 to be connected with each other and form, described room cross tube 4 It is connected with the top of described vertical rod 1, between top and the ground of described vertical rod 1, is provided with cable wind rope 6.
In the present embodiment, described vertical rod 1 is welded on base anchor 7, and described base anchor 7 uses expansion bolt 8 to fix On the ground.The lower end of described cable wind rope 6 is connected to band and hooks on reinforcing bar 9, and described band hooks reinforcing bar 9 and is implanted in underground. The upper end of described cable wind rope 6 and described vertical rod 1, described room cross tube 4 and be positioned on the described room outside described roof system vertical Bar 5 connects.Described cable wind rope 6 is 45 °~60 ° with the angle on ground.Between two longitudinally adjacent described vertical rods 1 Distance be 3.6m.
Construction method of the present utility model: position anchor point and the drawknot point → surface drilling of cable wind rope of vertical rod 1, squeeze into It is horizontal that expansion bolt 8, implantation belt hook reinforcing bar 9 → install vertical rod 1 and room lower vertical bar 2 → buckle room upper vertical bar 5 → set up on room Bar 4 → cable wind rope 6 is connected with room cross tube 4, room upper vertical bar 5 and vertical rod 1 → and facade arranges bridging 3, cable wind rope 6 band hook reinforcing bar 9 drawknots implanted with ground.
Although preferred embodiment of the present utility model being described above in conjunction with accompanying drawing, but this utility model not office Being limited to above-mentioned detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, this The those of ordinary skill in field, under enlightenment of the present utility model, is being protected without departing from this utility model objective and claim In the case of the scope protected, it is also possible to make a lot of form, within these belong to protection domain of the present utility model.

Claims (6)

1. the typhoon protection ruggedized construction built is faced in a construction, it is characterised in that many before including being arranged on room and behind room are stood Bar and the roof system being formed on roofing, described vertical rod fixes on the ground, one_to_one corresponding front and back, is positioned at owning before room Described vertical rod and all described vertical rod after being positioned at room are linked together by multiple tracks room lower vertical bar respectively, in described vertical rod and It is provided with, outside the facade that described room lower vertical bar is formed, the bridging being connected with described vertical rod and described room lower vertical bar;
Described roof system uses room cross tube and room upper vertical bar to be connected with each other and form, described room cross tube and the top of described vertical rod It is connected, between the top and ground of described vertical rod, is provided with cable wind rope.
The typhoon protection ruggedized construction built is faced in construction the most according to claim 1, it is characterised in that described vertical rod is welded On base anchor, described base anchor uses expansion bolt to fix on the ground.
The typhoon protection ruggedized construction built is faced in construction the most according to claim 1, it is characterised in that described cable wind rope Lower end is connected to band and hooks on reinforcing bar, and described band hooks reinforcing bar and is implanted in underground.
4. face the typhoon protection ruggedized construction built according to the construction described in claim 1 or 3, it is characterised in that described guy Upper end and described vertical rod, the described room cross tube of rope and be positioned at the described room upper vertical bar outside described roof system and be connected.
The typhoon protection ruggedized construction built is faced in construction the most according to claim 1, it is characterised in that described cable wind rope with The angle on ground is 45 °~60 °.
The typhoon protection ruggedized construction built is faced in construction the most according to claim 1, it is characterised in that longitudinally adjacent two Described in root, the distance between vertical rod is 3.6m.
CN201620426297.2U 2016-05-11 2016-05-11 The typhoon protection ruggedized construction built is faced in a kind of construction Expired - Fee Related CN205743207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620426297.2U CN205743207U (en) 2016-05-11 2016-05-11 The typhoon protection ruggedized construction built is faced in a kind of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620426297.2U CN205743207U (en) 2016-05-11 2016-05-11 The typhoon protection ruggedized construction built is faced in a kind of construction

Publications (1)

Publication Number Publication Date
CN205743207U true CN205743207U (en) 2016-11-30

Family

ID=57368698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620426297.2U Expired - Fee Related CN205743207U (en) 2016-05-11 2016-05-11 The typhoon protection ruggedized construction built is faced in a kind of construction

Country Status (1)

Country Link
CN (1) CN205743207U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836931A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 The coastal big facility typhoon protection that faces of engineering reinforces locking means
CN109339480A (en) * 2018-11-21 2019-02-15 防城港中重工有限公司 Temporarily use movable plank house radix saposhnikoviae reinforcement means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836931A (en) * 2017-03-13 2017-06-13 中国十七冶集团有限公司 The coastal big facility typhoon protection that faces of engineering reinforces locking means
CN109339480A (en) * 2018-11-21 2019-02-15 防城港中重工有限公司 Temporarily use movable plank house radix saposhnikoviae reinforcement means

Similar Documents

Publication Publication Date Title
CN104989027B (en) Joinery and its construction exempts to starch prefabricated assembled walling unit
CN103132603A (en) Temperature stress releasing structure of large-size steel structure building
CN205743207U (en) The typhoon protection ruggedized construction built is faced in a kind of construction
CN104533092B (en) The construction method of rack roofing furred ceiling
CN109577564A (en) A kind of fixed structure of heavy grade roof tile
CN106522222A (en) Operation process based on realization of embedded pile foundation in forming of furniture plant
CN208718418U (en) One kind being suitable for traditional tile roofing anti-skid mesh bracing means suit
CN207228124U (en) Lattice anchor structure for deep foundation pit support
CN106088514B (en) A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function
CN103321450A (en) Typhoon-resistant reinforcing treatment method for color prefabricated houses
CN207700557U (en) A kind of safe and stable type is used for roofing slidingtype accessory structure
CN203603443U (en) Overhanging type external scaffold bearing structure
CN206110589U (en) Stone cladding process slabstone fixed knot constructs with high anti -shock function
CN202031308U (en) Inverted-hanging type scaffold
CN205558389U (en) Modified reinforcing bar protection canopy
CN205314393U (en) Prefabrication of taking U type built -in fitting board that cornices
CN204081432U (en) External scaffold with rotary tower structure
CN205875766U (en) Regularization roofing protective structure
CN203160427U (en) Large steel structure building temperature stress relieving structure
CN209011637U (en) A kind of plane view ladder structure
CN208023595U (en) A kind of anchor pole moulds grid attachment device with steel
CN204850058U (en) Curtain and steel room lid and lower floor's large -span concrete platform connection structure that encorbelments
CN201943257U (en) Lintel for earth constructions
CN206607902U (en) A kind of construction guardrail
CN104895196A (en) Hidden steel corbel type beam column hinged node and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20210511