CN106758562A - 轨道基础预埋件与轨道整体固定的安装方法 - Google Patents

轨道基础预埋件与轨道整体固定的安装方法 Download PDF

Info

Publication number
CN106758562A
CN106758562A CN201710226141.9A CN201710226141A CN106758562A CN 106758562 A CN106758562 A CN 106758562A CN 201710226141 A CN201710226141 A CN 201710226141A CN 106758562 A CN106758562 A CN 106758562A
Authority
CN
China
Prior art keywords
track
bolt
backing plate
fitting
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710226141.9A
Other languages
English (en)
Inventor
王代发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710226141.9A priority Critical patent/CN106758562A/zh
Publication of CN106758562A publication Critical patent/CN106758562A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种轨道基础预埋件与轨道整体固定的安装方法,包括如下步骤:对条形轨道基础进行绑筋、螺栓埋设、支模;对轨道基础进行混凝土浇筑;将垫板孔对准螺栓安装在螺母上;对垫板标高进行粗找后,将轨道安装在垫板上,再将轨道压轨器套在螺栓上压住轨道;对其轨道进行中心线对中找平找正和微调下方调节螺母对轨道标高进行精确调整;进行轨道二次灌浆支模、灌浆及养生,拆除模板。本发明轨道基础预埋件与轨道整体固定的安装方法,螺栓埋设精度要求低,对于土建施工来说很容易做到;安装高效快捷、调整方便,工期加快,减少人工机械费用,节约成本。

Description

轨道基础预埋件与轨道整体固定的安装方法
技术领域
本发明涉及一种建筑施工方法,具体的说,是涉及一种轨道基础预埋件与轨道整体固定的安装方法。
背景技术
在所有冶金建设中,几乎都会遇到轨道基础,比如加热炉轨道基础、过跨车(电瓶车)轨道基础、各种支撑辊轨道基础、横移车轨道基础、步进梁轨道基础等等。而最近这几年国家大力提倡节能减排,绿色施工,钢渣“零”排放,特别是在钢渣辊压热闷处理中涉及许多轨道基础,有倾翻机轨道基础,辊压破碎机轨道基础、转运台车轨道基础以及接渣车、过跨车等轨道基础等。这些轨道基础的预埋件与轨道的安装方式主要有以下几种方法:第一种就是在轨道基础梁上通长设置钢板预埋件,然后钢轨下方间隔设置垫板与预埋件焊接,垫板上或者钢板预埋件上再直接焊接压轨器,最后进行二次灌浆;第二种就是轨道基础上间隔设置预留螺栓孔洞,轨道下方基础上设置垫板,当轨道安装粗调完毕后进行螺栓孔洞一次灌浆,然后将压轨器穿过螺栓将轨道压紧,最终调整完毕进行二次灌浆;第三种就是直接预埋螺栓,同样基础上设置垫板,轨道压轨器通过螺栓将轨道压紧,调整完毕后进行二次灌浆。上述方法均存在不同程度的不足,第一种轨道基础上设置通长埋件,浇筑混凝土困难,埋件下方振捣不密实,混凝土收缩等会产生空鼓、脱空及裂缝等现象,埋件上方再二次灌浆,造成二次灌浆层与基础混凝土分层,容易产生龟裂、脱落现场。第二种需要进行两次二次灌浆、预留孔洞较多,基础施工困难、浪费模板、费时费力、功效降低等。第三种直埋螺栓很容易造成埋设偏差,不容易保证安装精度等等。因此,针对上述缺陷,发明一种预埋件与轨道整体固定的安装方法。
发明内容
针对上述现有技术中的不足,本发明提供一种提高施工效率,降低工人劳动强度,提高施工精度的轨道基础预埋件与轨道整体固定的安装方法。
本发明所采取的技术方案是:
一种轨道基础预埋件与轨道整体固定的安装方法,包括如下步骤:
第一步:对条形轨道基础进行绑筋、螺栓埋设、支模;
第二步:对轨道基础进行混凝土浇筑;
第三步:根据螺栓的位置将垫板两端开孔,每根螺栓上设置有调整螺母,然后将垫板孔对准螺栓安装在螺母上;
第四步:对垫板标高进行粗找后,将轨道安装在垫板上,再将轨道压轨器套在螺栓上压住轨道;
第五步:对其轨道进行中心线对中找平找正和微调下方调节螺母对轨道标高进行精确调整;
第六步:进行轨道二次灌浆支模、灌浆及养生,拆除模板。
所述螺栓两根为一组沿轨道中心线左右对称设置。
所述垫板采用150mm*300mm*20mm钢板制作而成
本发明相对现有技术的有益效果:
本发明轨道基础预埋件与轨道整体固定的安装方法,螺栓埋设精度要求低,对于土建施工来说很容易做到;螺栓不但起到了支架支撑作用,同时还起到了锚筋(钢筋)作用,相当于轨道焊接锚筋直接浇筑在混凝土基础结构中,连接牢固;安装高效快捷、调整方便,工期加快,减少人工机械费用,节约成本;相对于预留孔洞,避免两次二次灌浆,工序减少;相对于基础上通长设置埋件,避免埋件下方空鼓、裂缝、不实以及二次灌浆与基础分层;相对于轨道直接焊接在埋件上,减少焊接工作量和焊接产生的变形影响。
本发明轨道基础预埋件与轨道整体固定的安装方法,避免由于轨道基础浇筑混凝土时标高误差而再次在轨道下方进行垫板的设置;也可采用同样方法来调整垫板,轨道压轨器不用穿过螺栓,而是直接将压轨器直接焊接在垫板上。
附图说明
图1是本发明轨道基础预埋件与轨道整体固定的安装方法的轨道及埋件安装示意图;
图2是本发明轨道基础预埋件与轨道整体固定的安装方法的俯视结构示意图。
附图中主要部件符号说明:
图中:
1、轨道 2、垫板
3、螺母 4、螺栓
5、压轨器 6、二次灌浆层
7、轨道基础。
具体实施方式
以下参照附图及实施例对本发明进行详细的说明:
附图1-2可知,一种轨道基础预埋件与轨道整体固定的安装方法,包括如下步骤:
第一步:对条形轨道基础进行绑筋、螺栓4埋设、支模;
第二步:对轨道基础进行混凝土浇筑;
第三步:根据螺栓4的位置将垫板2两端开孔,每根螺栓上设置有调整螺母3,然后将垫板孔对准螺栓4安装在螺母3上。螺母3支撑垫板2;
第四步:对垫板2标高进行粗找后,将轨道1安装在垫板2上,再将轨道压轨器套在螺栓上压住轨道1;
第五步:对其轨道1进行中心线对中找平找正和微调下方调节螺母3对轨道1标高进行精确调整;
第六步:进行轨道1二次灌浆支模、灌浆及养生,拆除模板。
所述螺栓两根为一组沿轨道中心线左右对称设置。
所述垫板采用150mm*300mm*20mm钢板制作而成
本发明轨道基础预埋件与轨道整体固定的安装方法,螺栓埋设精度要求低,对于土建施工来说很容易做到;螺栓不但起到了支架支撑作用,同时还起到了锚筋(钢筋)作用,相当于轨道焊接锚筋直接浇筑在混凝土基础结构中,连接牢固;安装高效快捷、调整方便,工期加快,减少人工机械费用,节约成本;相对于预留孔洞,避免两次二次灌浆,工序减少;相对于基础上通长设置埋件,避免埋件下方空鼓、裂缝、不实以及二次灌浆与基础分层;相对于轨道直接焊接在埋件上,减少焊接工作量和焊接产生的变形影响。
本发明轨道基础预埋件与轨道整体固定的安装方法,避免由于轨道基础浇筑混凝土时标高误差而再次在轨道下方进行垫板的设置;也可采用同样方法来调整垫板,轨道压轨器不用穿过螺栓,而是直接将压轨器直接焊接在垫板上。
本发明轨道基础预埋件与轨道整体固定的安装方法施工工艺如下:
基础浇筑(螺栓预埋)→垫板安装调整→轨道安装→压轨器安装→轨道调整→二次灌浆→养生。
本发明轨道基础预埋件与轨道整体固定的安装方法,螺栓提前预埋在轨道基础内;在螺栓上设置一个调节螺母和一块垫板;垫板通过下方调节螺母调整精度;轨道放置在垫板上,轨道压轨器压紧;支模后进行二次浇筑灌浆即可。
本发明轨道基础预埋件与轨道整体固定的安装方法结合钢渣热闷、辊压破碎处理中的倾翻车、破碎机、转运台车等轨道基础实例说明具体施工措施。
在轨道两侧对称间隔设置螺栓,浇筑基础时将螺栓提前预先直埋,在对称螺栓上设置一块垫板,螺栓穿过垫板两端的孔洞,垫板上方放置轨道,轨道压轨器穿过螺栓将轨道压住,通过垫板下方螺栓上的调节螺母微调来控制轨道的安装标高,精调完毕后对其整个轨道进行一次二次灌浆浇筑。此方法可将二次灌浆层通过螺栓(螺栓相当于基础钢筋)整体与轨道、基础连接起来,相当于钢筋混凝土基础;同时避免基础施工时螺栓埋设要求精度高,压板焊接量大,工序多影响;关键是安装调整高效,螺栓起到锚筋、支撑及垫板作用,整体连接强度高。
以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构作任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明的技术方案范围内。

Claims (3)

1.一种轨道基础预埋件与轨道整体固定的安装方法,其特征在于包括如下步骤:
第一步:对条形轨道基础进行绑筋、螺栓埋设、支模;
第二步:对轨道基础进行混凝土浇筑;
第三步:根据螺栓的位置将垫板两端开孔,每根螺栓上设置有调整螺母,然后将垫板孔对准螺栓安装在螺母上;
第四步:对垫板标高进行粗找后,将轨道安装在垫板上,再将轨道压轨器套在螺栓上压住轨道;
第五步:对其轨道进行中心线对中找平找正和微调下方调节螺母对轨道标高进行精确调整;
第六步:进行轨道二次灌浆支模、灌浆及养生,拆除模板。
2.根据权利要求1所述轨道基础预埋件与轨道整体固定的安装方法,其特征在于:所述螺栓两根为一组沿轨道中心线左右对称设置。
3.根据权利要求1所述轨道基础预埋件与轨道整体固定的安装方法,其特征在于:所述垫板采用150mm*300mm*20mm钢板制作而成。
CN201710226141.9A 2017-04-08 2017-04-08 轨道基础预埋件与轨道整体固定的安装方法 Pending CN106758562A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710226141.9A CN106758562A (zh) 2017-04-08 2017-04-08 轨道基础预埋件与轨道整体固定的安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710226141.9A CN106758562A (zh) 2017-04-08 2017-04-08 轨道基础预埋件与轨道整体固定的安装方法

Publications (1)

Publication Number Publication Date
CN106758562A true CN106758562A (zh) 2017-05-31

Family

ID=58965691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710226141.9A Pending CN106758562A (zh) 2017-04-08 2017-04-08 轨道基础预埋件与轨道整体固定的安装方法

Country Status (1)

Country Link
CN (1) CN106758562A (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107215776A (zh) * 2017-07-12 2017-09-29 楚雄滇中有色金属有限责任公司 一种门式起重机轨道加固的方法
CN108252321A (zh) * 2018-01-26 2018-07-06 中国冶集团有限公司 一种设备轨道整体安装方法
CN108755286A (zh) * 2018-07-02 2018-11-06 中冶焦耐(大连)工程技术有限公司 一种高度可调、抗冲击、耐高温轨道扣件
CN108951883A (zh) * 2018-04-27 2018-12-07 中国核工业华兴建设有限公司 一种核电站高精度预埋件安装方法
CN109577364A (zh) * 2018-11-23 2019-04-05 上海宝冶冶金工程有限公司 一种堆取料机用轨道基础施工方法
CN109779289A (zh) * 2019-03-23 2019-05-21 中国二十二冶集团有限公司 单轨梁轨道的安装结构及施工方法
CN110080280A (zh) * 2019-05-21 2019-08-02 成都建筑材料工业设计研究院有限公司 一种堆取料机轨道基础施工方法
CN110172878A (zh) * 2019-05-21 2019-08-27 中国华冶科工集团有限公司 地面运输轨道安装方法
CN110735368A (zh) * 2019-10-23 2020-01-31 上海宝冶集团有限公司 一种设备轨道安装系统及方法
CN111041904A (zh) * 2019-12-30 2020-04-21 济南轨道交通集团有限公司 一种减震地铁轨道装置
CN111851569A (zh) * 2020-08-19 2020-10-30 中国二十二冶集团有限公司 龙门吊轨道基础梁及其施工方法
CN114369976A (zh) * 2021-12-23 2022-04-19 中国华冶科工集团有限公司 间隔支承的地面轨道铺设方法
CN114934413A (zh) * 2022-06-29 2022-08-23 中核华辰建筑工程有限公司 一种群组地面钢轨施工方法
CN115467363A (zh) * 2022-08-05 2022-12-13 中国电建集团华东勘测设计研究院有限公司 一种便于大型机组蜗壳排水盘形阀安装及调整的埋设结构及施工方式

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107215776A (zh) * 2017-07-12 2017-09-29 楚雄滇中有色金属有限责任公司 一种门式起重机轨道加固的方法
CN108252321B (zh) * 2018-01-26 2020-01-24 中国一冶集团有限公司 一种设备轨道整体安装方法
CN108252321A (zh) * 2018-01-26 2018-07-06 中国冶集团有限公司 一种设备轨道整体安装方法
CN108951883A (zh) * 2018-04-27 2018-12-07 中国核工业华兴建设有限公司 一种核电站高精度预埋件安装方法
CN108755286A (zh) * 2018-07-02 2018-11-06 中冶焦耐(大连)工程技术有限公司 一种高度可调、抗冲击、耐高温轨道扣件
CN108755286B (zh) * 2018-07-02 2024-03-19 中冶焦耐(大连)工程技术有限公司 一种高度可调、抗冲击、耐高温轨道扣件
CN109577364A (zh) * 2018-11-23 2019-04-05 上海宝冶冶金工程有限公司 一种堆取料机用轨道基础施工方法
CN109779289A (zh) * 2019-03-23 2019-05-21 中国二十二冶集团有限公司 单轨梁轨道的安装结构及施工方法
CN110080280A (zh) * 2019-05-21 2019-08-02 成都建筑材料工业设计研究院有限公司 一种堆取料机轨道基础施工方法
CN110172878A (zh) * 2019-05-21 2019-08-27 中国华冶科工集团有限公司 地面运输轨道安装方法
CN110080280B (zh) * 2019-05-21 2021-09-21 成都建筑材料工业设计研究院有限公司 一种堆取料机轨道基础施工方法
CN110172878B (zh) * 2019-05-21 2021-01-15 中国华冶科工集团有限公司 地面运输轨道安装方法
CN110735368A (zh) * 2019-10-23 2020-01-31 上海宝冶集团有限公司 一种设备轨道安装系统及方法
CN111041904A (zh) * 2019-12-30 2020-04-21 济南轨道交通集团有限公司 一种减震地铁轨道装置
CN111851569A (zh) * 2020-08-19 2020-10-30 中国二十二冶集团有限公司 龙门吊轨道基础梁及其施工方法
CN111851569B (zh) * 2020-08-19 2024-05-14 中国二十二冶集团有限公司 龙门吊轨道基础梁及其施工方法
CN114369976A (zh) * 2021-12-23 2022-04-19 中国华冶科工集团有限公司 间隔支承的地面轨道铺设方法
CN114369976B (zh) * 2021-12-23 2023-08-22 中国华冶科工集团有限公司 间隔支承的地面轨道铺设方法
CN114934413A (zh) * 2022-06-29 2022-08-23 中核华辰建筑工程有限公司 一种群组地面钢轨施工方法
CN115467363A (zh) * 2022-08-05 2022-12-13 中国电建集团华东勘测设计研究院有限公司 一种便于大型机组蜗壳排水盘形阀安装及调整的埋设结构及施工方式
CN115467363B (zh) * 2022-08-05 2024-04-30 中国电建集团华东勘测设计研究院有限公司 一种便于大型机组蜗壳排水盘形阀安装及调整的埋设结构及施工方式

Similar Documents

Publication Publication Date Title
CN106758562A (zh) 轨道基础预埋件与轨道整体固定的安装方法
CN103061505B (zh) 一种多功能对拉螺栓及其用途
CN103352400B (zh) 预制嵌入式轨道板
CN104480802A (zh) Crtsⅲ型板式无砟轨道的施工方法
CN106759354B (zh) 一种超长超厚大体积混凝土基础的分层连续浇筑方式
CN100464026C (zh) 铁路既有线桥梁连续顶推框架法换梁施工方法
CN108004855A (zh) 一种用于板式无砟轨道结构的压紧限位装置及方法
CN101418535A (zh) 轨道交通隧道内整体道床的施工方法
CN105133487B (zh) 使用复合式桥梁临时支座快速架设连续梁的施工方法
CN101353912A (zh) 结构转换层混凝土大梁钢托架模板支撑施工方法
CN207159789U (zh) 一种装配式桥梁预制防撞墙结构
CN103321111A (zh) 有轨电车轨道连铺的施工方法
CN102286988A (zh) 灌浆法垫板施工方法
CN106049207B (zh) 一种crtsⅲ型无砟轨道自密实混凝土施工工装及工法
CN111074905A (zh) 一种深基坑内支撑体系底层支撑梁早拆结构及施工方法
WO2024114836A1 (zh) 一种铺砌路面逆作法装配式施工方法
CN105821764B (zh) 无砟轨道刚度调节装置
CN110700023A (zh) 一种基于轨道工程的钢弹簧浮置板整体道床施工方法
CN101906757A (zh) 更换公路桥桥台上板式橡胶支座的组合装配法
CN112195687B (zh) 一种装配式轨道衡整体道床施工方法
CN102733406A (zh) 大型工业厂房内整体道床铁路施工方法
CN202626787U (zh) 一种混凝土铺面接缝传力杆定位支架
CN216860140U (zh) 一种用于预制梁施工的长度可调式钢台座
CN205035732U (zh) 复合式桥梁临时支座
CN1073655C (zh) 一种设备基础垫板的施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531