CN100464026C - 铁路既有线桥梁连续顶推框架法换梁施工方法 - Google Patents

铁路既有线桥梁连续顶推框架法换梁施工方法 Download PDF

Info

Publication number
CN100464026C
CN100464026C CNB2007100603742A CN200710060374A CN100464026C CN 100464026 C CN100464026 C CN 100464026C CN B2007100603742 A CNB2007100603742 A CN B2007100603742A CN 200710060374 A CN200710060374 A CN 200710060374A CN 100464026 C CN100464026 C CN 100464026C
Authority
CN
China
Prior art keywords
existing
slideway
framework
girder
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2007100603742A
Other languages
English (en)
Other versions
CN101200881A (zh
Inventor
陈野
桑明宇
邹永红
张兵
张唯
苏在林
黄欣
张思兵
冯从
赵国兵
杨昌军
何国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CNB2007100603742A priority Critical patent/CN100464026C/zh
Publication of CN101200881A publication Critical patent/CN101200881A/zh
Application granted granted Critical
Publication of CN100464026C publication Critical patent/CN100464026C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种铁路既有线桥梁连续顶推框架法换梁施工方法,依照下列步骤完成:①在既有线一侧,分别设置分体滑道,在分体滑道分别预制框架;②在既有线桥下部设立临时支墩,用临时支墩托起轨排;并在换梁段的两段进行无缝线路锁定及安装横担轨;③用临时支墩支撑既有线梁体,拆除既有梁底支座;④用钢绞线将预制框架和既有梁连接;⑤利用连续千斤顶牵引钢绞线将串联在一起的框架和既有梁拖拉到设计要求的位置;⑥在预制框架底板下方支承面注浆加固;⑦落轨、补碴恢复线路。本发明的优点是:1.施工安全、稳定。2.减少了成本、简化了施工程序。3.缩短了工期。4.节约了工程费用。

Description

铁路既有线桥梁连续顶推框架法换梁施工方法
技术领域:
本发明涉及一种建筑施工方法,特别涉及一种铁路既有线特桥梁连续顶推框架法换梁施工方法。
背景技术:
目前铁路既有线桥梁的换梁施工方法普遍采用的是设立后背墙,在滑板上预制框架,用千斤顶反复加顶铁顶进的方法。这种方法存在如下的缺陷:1、需要解体无缝铁路,因此无法保证封锁施工时间6个小时的要求;二是顶力装置要求很大;三是施工场地受限。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种铁路既有线桥梁连续顶推框架法换梁施工方法,该方法无需解体无缝铁路、施工速度快、不受施工场地的限制。
本发明的技术方案是:一种铁路既有线桥梁连续顶推框架法换梁施工方法,其特征在于:依照下列步骤完成:①在既有线一侧,分别设置分体滑道,在分体滑道分别预制框架;②在既有线桥下部设立临时支墩,用临时支墩托起轨排;并在换梁段的两段进行无缝线路锁定及安装横担轨;③用临时支墩支撑既有线梁体,拆除既有梁底支座;④用钢绞线将预制框架和既有梁连接;⑤利用连续千斤顶牵引钢绞线将串联在一起的框架和既有梁拖拉到设计要求的位置;⑥在预制框架底板下方支承面注浆加固;⑦落轨、补碴恢复线路。
本发明还可以采用如下的技术措施:
上述分体滑道由主滑道和两个与其平行设置的附滑道组成;滑道表面设有泡沫板,泡沫板上设置滑块;滑道与反力座连为一体。
本发明的优点是:1、施工中无需解体无缝线路,保证了换梁施工的稳定安全,一次换梁仅用时6小时,最大限度地减少了对铁路运营的影响。2、采用钢绞线串联框架梁和既有梁,利用千斤顶连续顶进仅有利于结构稳定安全,而且省去了刚性连接型钢的投入,在减少了成本的同时简化了施工程序。3、在淤泥质软土地基上建立滑道并在滑道上浇注框架梁大体积混凝土的技术,加强复合地基承载力,缩短了工期。4、利用无缝线路架空技术,节约了工程费用。
附图说明:
图1是滑道与反力座的连接示意图。
图2是滑道的断面示意图。
具体实施方式:
铁路既有线桥梁连续顶推框架法换梁施工方法
总体施工方案:
1、在既有线一侧,分别设置分体滑道,在分体滑道分别预制框架。
①滑道施工:本框架桥共3孔,每孔布置3组滑道,每组滑道由一个主滑道和两个附滑道组成,在框架预制滑道1另一端设反力座2。滑道与框架间滑动层采用聚四氟乙烯滑块3,滑块尺寸为300×300×10mm,间距1.1m,中间填充15mm厚泡沫板4。
基底采用高压旋喷桩桩基施工,根据滑道基础承受荷载的不同情况,既有梁移动地段基础采用矩形板式承台,其余地段采用锥形梁式承台。
旋喷桩桩径为600mm,桩长为11.4m,桩端持力层为全风化砂砾岩,复合地基承载力经广铁科研所检测达613KPa,满足设计要求485KPa。
滑道顶面宽度为50cm,两侧通常布置50×50mm角钢,顶面与滑道顶齐平,上铺2mm厚不锈钢板锚固在角钢上,滑块固定在框架底部20mm厚钢板上。
反力座与滑道连成整体。反力座基础采用桩基承台基础。桩基5采用¢1600mm(不包括护壁厚度)的挖孔灌注桩,桩长9.5m,钢筋砼等级C30;承台6采用C30钢筋砼,外形尺寸为300×300×200cm。反力座立柱7选用4根32b工字钢,用2cm厚钢板焊接连成。
②框架预制。
a、根据现场实际情况,第1孔框架在高线左侧预制,第2、3孔在框架右侧预制。预制时,与既有桥墩保持1m的工作空间。
b、框架在滑道上预制,滑道间框架底80cm范围内采用砂底模,上抹5cm厚M10水泥砂浆,待框架砼强度达到设计强度的100%后,用人工清除砂底模,同时清理滑动面,务必保持干净并涂满黄油。
c、三个滑道上方穿钢绞线孔道用内径为¢100mm的波纹管。
2、在既有线桥下部设立临时支墩。既有梁下搭设临时支墩,支墩采用万能杆件拼装而成,长10m,宽2米,高6米,并采用加固措施。
3、在换梁段的两段进行无缝线路锁定及安装横担轨。在换梁段两侧设置54m缓冲区(满足200倍纵坡坡度),其外设置50m线路加固区,在正式换梁前1晚上,封锁线路,把加固段拧紧螺栓进行锁定,并在换梁段钢轨下安装横担轨(P50旧钢轨),按间距8根轨枕布置,横担轨用木枕垫实,两钢轨间铺绝缘胶垫隔离。横担轨贯通既有线路和框架顶道碴槽,以便拖拉平移时,既有线路轨排通过滑轮在横担轨上过渡到框架顶道碴槽内。
4、拖拉平移封锁施工。
①轨排架空
框架平移前,把换梁段线路道碴扒平轨枕底,同时拆除缓冲区钢轨扣件,把换梁段轨排用齿轮式起道机顶起架空约20cm,在轨排与横担轨之间安装滑轮(高17cm)。
②拆除桥梁接缝处道碴及盖缝板。
③顶梁。
每孔在既有墩帽上使用8台250t手动油压千斤顶,拆除支座螺帽,同时顶升既有梁体(顶100mm高),安装梁底支撑,千斤顶回油,把梁落放在万能杆件支墩上。
④拖拉平移。
a、待旧梁顶升、落梁完成后,由施工总指挥发出可牵引平移命令。
b、接到命令后,千斤顶按手动控制同步平移把箱涵和万能杆件支架运动10cm,检查箱涵、万能杆件支架在平移滑道上及相关各部分的情况是否正常。
c、起动自动整体平移。操作主控台的自动按钮进行平移梁的自动连续平移,平移过程中,观察平移过程中同步对框架的影响;注意记录平移过程中的油压最大、最小值;用外设检测装置应时刻监测箱涵的步进轨迹以适时纠偏进行修正。
d、整体平移约3个小时平移到位,调整。
e、采用手动操作直到所有的钢绞线全部卸载,撤除设备,完成施工。
⑤、桥上线路恢复
(1)、用齿轮式起道机顶起钢轨,拆除滑轮和横旦轨,使既有轨排落放在框架道碴槽里,上好两端缓冲区扣件。
(2)、在上一步时间之内,铺梁缝盖缝板,并回铺道碴。
(3)、人工起拨道,用小型养路机械进行道床捣固;
(4)、检查验收与开通线路。
⑥、开通后慢行和线路维护至常速。
5、框架底板下方支承面注浆加固。
框架就位后,框架底板下方距支承面还有10cm间隙(拖拉框架需要),在框架四周用M10水泥砂浆或砂袋封闭,利用高压注浆法注浆填充加固,浆液掺速凝剂配制,滑道两侧框架悬挑部分在框架就位后120分钟内达到设计强度。预制时预留注浆管道,间距3米,梅花形布置。
6、拆除。
(1)、既有梁拆除:用2台150吨吊车配合逐榀往下拆除,用4台150吨运梁车弃运出场外。
(2)、临时钢支墩拆除:用4台5吨倒链配合逐节往下拆除,直至地面。
(3)、既有24、25号桥墩砼拆除:使用挖掘机带振动锤配人工使用风镐分段拆除。

Claims (2)

1.一种铁路既有线桥梁连续顶推框架法换梁施工方法,其特征在于:依照下列步骤完成:①在既有线一侧,分别设置分体滑道,在分体滑道分别预制框架;②在既有线桥下部设立临时支墩,用临时支墩托起轨排;并在换梁段的两段进行无缝线路锁定及安装横担轨;③用临时支墩支撑既有线梁体,拆除既有梁底支座;④用钢绞线将预制框架和既有梁连接;⑤利用连续千斤顶牵引钢绞线将串联在一起的框架和既有梁拖拉到设计要求的位置;⑥在预制框架底板下方支承面注浆加固;⑦落轨、补碴恢复线路。
2.根据权利要求1所述的铁路既有线桥梁连续顶推框架法换梁施工方法,其特征在于:上述分体滑道由主滑道和两个与其平行设置的附滑道组成;滑道表面设有泡沫板,泡沫板上设置滑块;滑道与反力座连为一体。
CNB2007100603742A 2007-12-19 2007-12-19 铁路既有线桥梁连续顶推框架法换梁施工方法 Active CN100464026C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100603742A CN100464026C (zh) 2007-12-19 2007-12-19 铁路既有线桥梁连续顶推框架法换梁施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100603742A CN100464026C (zh) 2007-12-19 2007-12-19 铁路既有线桥梁连续顶推框架法换梁施工方法

Publications (2)

Publication Number Publication Date
CN101200881A CN101200881A (zh) 2008-06-18
CN100464026C true CN100464026C (zh) 2009-02-25

Family

ID=39516221

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100603742A Active CN100464026C (zh) 2007-12-19 2007-12-19 铁路既有线桥梁连续顶推框架法换梁施工方法

Country Status (1)

Country Link
CN (1) CN100464026C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864726A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 加固型墩身及墩身加固方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343861B (zh) * 2008-08-22 2010-06-02 中铁六局集团有限公司 一种既有铁路线路下新框架桥置换旧框架桥的施工方法
CN101660418B (zh) * 2008-08-27 2013-05-29 上海市机械施工有限公司 一种用于隧道施工的箱涵顶进置换矩形管撑法
CN101845780B (zh) * 2010-05-17 2012-08-01 中铁六局集团有限公司 站场宽枕铁路在封锁点内以5-5扣轨加固线路施工方法
CN101974883B (zh) * 2010-10-14 2012-02-01 中铁九局集团有限公司 桥梁拖拉滑道装置
CN101985827B (zh) * 2010-11-19 2012-09-26 中铁七局集团第一工程有限公司 高速公路拓宽天桥拆除方法
CN102864706B (zh) * 2012-10-11 2014-09-10 中铁六局集团天津铁路建设有限公司 一种普速铁路下地道改造及新建高速铁路联合施工方法
CN103410103B (zh) * 2013-07-24 2015-05-20 中铁大桥局集团有限公司 铁路既有线快速换梁施工方法
CN103726451B (zh) * 2014-01-16 2015-10-07 中铁六局集团有限公司 一种既有铁路拆梁桥原位顶进框构桥的施工方法
CN104631345A (zh) * 2014-12-22 2015-05-20 中国铁路总公司 双线电气化铁路混凝土桥梁快速换梁方法
CN105274907B (zh) * 2015-09-28 2016-09-21 中铁十八局集团第三工程有限公司 有砟轨道路基改造为无砟轨道的整体道床施工工艺

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1139721A (zh) * 1995-12-04 1997-01-08 河北省石家庄公路桥梁建设总公司 顶推桥梁箱梁尾部的施工法
FR2750146A1 (fr) * 1996-06-21 1997-12-26 Royer Jacques Procede de mise en place ou d'enlevement par poussage d'un tablier de pont
JP2004107972A (ja) * 2002-09-18 2004-04-08 Mitsubishi Heavy Ind Ltd 橋梁の送出し工法及び手延機

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1139721A (zh) * 1995-12-04 1997-01-08 河北省石家庄公路桥梁建设总公司 顶推桥梁箱梁尾部的施工法
FR2750146A1 (fr) * 1996-06-21 1997-12-26 Royer Jacques Procede de mise en place ou d'enlevement par poussage d'un tablier de pont
JP2004107972A (ja) * 2002-09-18 2004-04-08 Mitsubishi Heavy Ind Ltd 橋梁の送出し工法及び手延機

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
460T槽形梁置换钢梁施工技术. 杨兵.西部探矿工程,第121期. 2006
460T槽形梁置换钢梁施工技术. 杨兵.西部探矿工程,第121期. 2006 *
西直门北立交内环通道桥换梁施工关键技术. 马少军,文言.市政技术,第25卷第2期. 2007
西直门北立交内环通道桥换梁施工关键技术. 马少军,文言.市政技术,第25卷第2期. 2007 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864726A (zh) * 2010-06-11 2010-10-20 中铁大桥局集团有限公司 加固型墩身及墩身加固方法

Also Published As

Publication number Publication date
CN101200881A (zh) 2008-06-18

Similar Documents

Publication Publication Date Title
CN100464026C (zh) 铁路既有线桥梁连续顶推框架法换梁施工方法
CN100572011C (zh) 后张法预应力混凝土箱梁整孔预制施工方法
CN102587296B (zh) 一种桥梁结构自平衡体外预应力加固法
WO2017125028A1 (zh) 一种中低速磁悬浮交通工程承轨梁低置线路与高架桥过渡段结构
CN106702910A (zh) 一种双塔双索面矮塔斜拉桥的主梁施工工艺
CN101550769B (zh) 一种移动栈桥
CN103352400B (zh) 预制嵌入式轨道板
CN101691742B (zh) 斜腿刚构桥背索平衡单边悬臂灌筑梁体的施工方法
CN111676819A (zh) 组合式工便梁连续加固线路大跨度框构桥顶进施工方法
CN102587282B (zh) 大风及高空条件下大截面简支箱梁预制及拼装工艺
CN113957793A (zh) 一种复杂市域环境预制箱梁支架施工方法
CN105821764B (zh) 无砟轨道刚度调节装置
CN206219897U (zh) 中低速磁浮双线挖方地段桩基复合式承轨梁过渡段结构
KR100454406B1 (ko) 가벤트를 이용하여 철도교의 강교를 콘크리트교로치환하여 유도상화하는 공법 및 그 장치
CN106812065A (zh) 一种混凝土简支预应力箱梁施工工艺
CN202298390U (zh) 无砟轨道抢通设备
CN201363154Y (zh) 一种移动栈桥
RU2352705C1 (ru) Способ укладки верхнего строения пути
CN208167496U (zh) 斜拉桥π型混凝土主梁组合式现浇支架
CN206219912U (zh) 中低速磁浮双线填方地段桩基托梁分幅式承轨梁过渡段结构
CN211006761U (zh) 循环水管的安装结构
CN206157481U (zh) 中低速磁浮双线挖方地段桩基复合分幅式承轨梁过渡段结构
CN106283956B (zh) 中低速磁浮双线挖方地段桩基复合式承轨梁过渡段结构
CN106283953B (zh) 中低速磁浮双线填方地段桩基复合式承轨梁过渡段结构
CN106400615B (zh) 中低速磁浮单线挖方地段独立墩柱式承轨梁过渡段结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 300222 No. 18 South Dagu Road, Shuang Gang Town, Jinnan District, Tianjin

Patentee after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: 300222 Liu Lindong, Tianjin, Hexi District

Patentee before: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 300222 Tianjin Town, Jinnan District

Patentee after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: 300222 No. 18 South Dagu Road, Shuang Gang Town, Jinnan District, Tianjin

Patentee before: the Eighteenth Bureau of China's Railroad Group Co., Ltd.