CN106639247A - Construction technique for paving ceramic floor tiles - Google Patents
Construction technique for paving ceramic floor tiles Download PDFInfo
- Publication number
- CN106639247A CN106639247A CN201611185770.3A CN201611185770A CN106639247A CN 106639247 A CN106639247 A CN 106639247A CN 201611185770 A CN201611185770 A CN 201611185770A CN 106639247 A CN106639247 A CN 106639247A
- Authority
- CN
- China
- Prior art keywords
- paving
- ceramic floor
- floor tiles
- construction
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/08—Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/20—Implements for finishing work on buildings for laying flooring
- E04F21/22—Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Road Paving Structures (AREA)
- Floor Finish (AREA)
Abstract
The invention relates to a construction technique for paving ceramic floor tiles and relates to the technical field of construction. The construction technique comprises the following steps that (1) chiselling is conducted on a concrete floor base layer, the depth of chiselling is 3-8 mm, the separation distances of chiselling trails are 20-30 mm, and the chiseled chiselling trails form #-shapes; (2) lines are snapped, the datum lines being perpendicular to a doorway is snapped on the ground, and the snapped lines are snapped out of the longitudinal-transverse control lines; (3) the ceramic floor tiles are steeped and dried in the shade; (4) the reverse sides of the ceramic floor tiles are fully coated with cement mortar when paving is conducted, the ceramic floor tiles are knocked solidly through a rubber hammer after paving, meanwhile, checking and rectifying are conducted through a horizontal rule, and the surface cement mortar is completely cleaned through wiping; and (5) 2-3 hours after paving is completed, seams are wiped through white cement, cement mortar with cement to sand being 1:1 (the volume ratio) is used, the seams need to be densely and solidly filled, flat and smooth, and the surfaces are completely cleaned through wiping by cotton silk. According to the construction technique for paving the ceramic floor tiles, the various existing complicated ceramic floor tiles are paved, construction requirements can also be met, the construction technique is quickly and conveniently grasped by workers, and the construction effect is obvious.
Description
Technical field
The present invention relates to a kind of laying floor tile construction technology, is related to technical field of construction.
Background technology
At present, floor tile is widely used in the ground of various places, but that be floor tile barbola work it is lack of standardization, make
Into the poor quality of patch, often there is heaving the phenomenon for coming off in Jing.
In construction, there is the ripe construction technology of specification very well to meet the present various complicated floor tiles of laying
Construction technology, can meet construction requirement, and quickly and easily be grasped by workman, and construction effect is obvious.
The content of the invention
1. the technical problem to be solved:
The technical problem to be solved in the present invention is for above-mentioned technical problem, there is provided one kind laying floor tile construction work
Skill, meets the construction technology of the present various complicated floor tiles of laying, and construction requirement can be met again, and quickly and easily by workman
Grasp, construction effect is obvious.
2. technical scheme:
The technical scheme that the present invention solves its technical problem is as follows:
One kind laying floor tile construction technology, is characterized in that it is comprised the following steps:(1) by mattess basic unit
Dabbing, dabbing depth 3-8 millimeter, the spacing of dabbing trace is 20-30 millimeters, chisel trace formation " well " font chiseled, peace and quiet floating ash,
Mortar, oil stain, produce aproll brush mortar ground;(2) snap the line, ejects and gateway mouth datum line at a right angle on ground, and snap the line is from door
Mouth starts, and non-full sized brick is placed in below inner corner trim or furniture, and snap the line should eject normal control wire in length and breadth;(3) paving ceramic floor brick
Before, the immersion of ceramic floor brick is dried in the shade;(4) during paving, cement mortar should fullly be put on the ceramic floor brick back side, after paving
Reality is struck with rubber Chui, meanwhile, corrected with horizon rule inspection, clean wash cement mortar;(5) after the complete 2-3 hours of paving, with vain
Cement wiping seam, with cement, sand=1:The cement mortar of 1 (volume ratio), seam will fill closely knit, flat smooth, then will with staple
Clean on surface.
Place shady place after described ceramic floor brick immersion to dry in the shade 1-2 hours.
3. beneficial effect:
Beneficial effects of the present invention:
(1) construction technology of the present various complicated floor tiles of laying is met;
(2) construction requirement is met;
(3) quickly and easily grasped by workman, construction effect is obvious.
Specific embodiment
With reference to embodiment, the present invention is further detailed explanation:
One kind laying floor tile construction technology, comprises the following steps:(1) by mattess basic unit dabbing, dabbing depth
Degree 3-8 millimeters, the spacing of dabbing trace is 20-30 millimeters, chisel trace formation " well " font chiseled, peace and quiet floating ash, mortar, oil stain,
Produce aproll brush mortar ground;(2) snap the line, ejects and gateway mouth datum line at a right angle on ground, and snap the line is non-from the beginning of doorway
Full sized brick is placed in below inner corner trim or furniture, and snap the line should eject normal control wire in length and breadth;(3) before paving ceramic floor brick, by ceramic ground
Face brick immersion is dried in the shade;(4) during paving, cement mortar should fullly be put on the ceramic floor brick back side, be struck with rubber Chui after paving
It is real, meanwhile, corrected with horizon rule inspection, clean wash cement mortar;(5) after the complete 2-3 hours of paving, white cement wiping seam is used, is used
Cement, sand=1:The cement mortar of 1 (volume ratio), seam will fill closely knit, flat smooth, then be cleaned on surface with staple.
A kind of laying floor tile construction technology according to claim 1, is characterized in that described ceramic floor brick
Place shady place after immersion to dry in the shade 1-2 hours.
Claims (2)
1. a kind of laying floor tile construction technology, is characterized in that it is comprised the following steps:(1) mattess basic unit is dug
Hair, dabbing depth 3-8 millimeter, the spacing of dabbing trace is 20-30 millimeters, and the chisel trace chiseled forms " well " font, peace and quiet floating ash, sand
Slurry, oil stain, produce aproll brush mortar ground;(2) snap the line, ejects and gateway mouth datum line at a right angle on ground, and snap the line is from doorway
Start, non-full sized brick is placed in below inner corner trim or furniture, and snap the line should eject normal control wire in length and breadth;(3) before paving ceramic floor brick,
The immersion of ceramic floor brick is dried in the shade;(4) during paving, cement mortar should fullly be put on the ceramic floor brick back side, and rubber is used after paving
Skin Chui strikes reality, meanwhile, corrected with horizon rule inspection, clean wash cement mortar;(5) after the complete 2-3 hours of paving, white cement is used
Wiping seam, with cement, sand=1: the cement mortar of 1 (volume ratio), seam will fill closely knit, flat smooth, then with staple by surface
Clean.
2. a kind of laying floor tile construction technology according to claim 1, is characterized in that described ceramic floor brick leaching
Place shady place after bubble to dry in the shade 1-2 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611185770.3A CN106639247A (en) | 2016-12-12 | 2016-12-12 | Construction technique for paving ceramic floor tiles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611185770.3A CN106639247A (en) | 2016-12-12 | 2016-12-12 | Construction technique for paving ceramic floor tiles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106639247A true CN106639247A (en) | 2017-05-10 |
Family
ID=58834894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611185770.3A Pending CN106639247A (en) | 2016-12-12 | 2016-12-12 | Construction technique for paving ceramic floor tiles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106639247A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108166736A (en) * | 2018-01-26 | 2018-06-15 | 中冶建工集团有限公司 | The method of cement mortar tooth harrow and paving floor ceramic tile |
CN108265946A (en) * | 2017-12-15 | 2018-07-10 | 夹江县盛世东方陶瓷有限公司 | A kind of ceramics painting and calligraphy brick patch block method |
CN111155734A (en) * | 2020-01-09 | 2020-05-15 | 中铁六局集团有限公司 | Construction process of bathroom vitrified tiles |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004100425A (en) * | 2002-07-19 | 2004-04-02 | Inax Corp | Construction method and structure of floor member |
CN101713250A (en) * | 2009-10-29 | 2010-05-26 | 孙清海 | Process for pasting construction of floor tiles |
-
2016
- 2016-12-12 CN CN201611185770.3A patent/CN106639247A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004100425A (en) * | 2002-07-19 | 2004-04-02 | Inax Corp | Construction method and structure of floor member |
CN101713250A (en) * | 2009-10-29 | 2010-05-26 | 孙清海 | Process for pasting construction of floor tiles |
Non-Patent Citations (2)
Title |
---|
天路浪人8: "铺贴陶瓷地砖的施工要点", 《百度文库》 * |
汤留泉: "《商业店铺装修宝典》", 31 July 2009, 中国电力出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265946A (en) * | 2017-12-15 | 2018-07-10 | 夹江县盛世东方陶瓷有限公司 | A kind of ceramics painting and calligraphy brick patch block method |
CN108166736A (en) * | 2018-01-26 | 2018-06-15 | 中冶建工集团有限公司 | The method of cement mortar tooth harrow and paving floor ceramic tile |
CN108166736B (en) * | 2018-01-26 | 2024-09-24 | 中冶建工集团有限公司 | Cement mortar tooth rake and method for paving floor tiles |
CN111155734A (en) * | 2020-01-09 | 2020-05-15 | 中铁六局集团有限公司 | Construction process of bathroom vitrified tiles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109838065B (en) | Floor tile ground paving construction method | |
CN107254954A (en) | Ground paving ceramic tile construction technology | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN106284706A (en) | The construction method of external wall outer insulation rock cotton board | |
CN204826464U (en) | Waterproof construction of parapet | |
CN106639247A (en) | Construction technique for paving ceramic floor tiles | |
CN104120848A (en) | Construction method for internal wall facing bricks | |
CN104746772A (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN104088416A (en) | Gypsum heat preservation painting mortar construction process | |
CN101713250A (en) | Process for pasting construction of floor tiles | |
CN105525726A (en) | Aerated brick wall plastering construction method | |
CN109138215A (en) | A kind of construction wall integral construction method | |
CN113775081A (en) | Construction method of inner and outer leaf composite wall of pseudo-classic building | |
CN112575979A (en) | Construction method of plastering waterproof mortar for building exterior wall | |
CN104831895A (en) | Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN106186942B (en) | A kind of self-compacting mortar and its grout construction method | |
CN105525700A (en) | Method for building indoor wall body by high-precision building blocks and wall body structure | |
CN205063052U (en) | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom | |
CN107143104A (en) | A kind of construction technology of steel structure heat-insulating decorative integrated plate exterior wall | |
CN102182323A (en) | Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus | |
CN110005174A (en) | Improve the construction method of Machine-blasting mortar plastering quality | |
CN103758312A (en) | Laminating construction method for facing bricks | |
CN201809928U (en) | Texture planning module unit for sealing ice flaws | |
CN101092846A (en) | Construction technique for plastering vitrified brick at positive angle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |