CN104831895A CN201510159405.4A CN201510159405A CN104831895A CN 104831895 A CN104831895 A CN 104831895A CN 201510159405 A CN201510159405 A CN 201510159405A CN 104831895 A CN104831895 A CN 104831895A
Authority
CN
China
Prior art keywords
ceramic tile
tile body
bonding
porcelain tiles
imitation rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510159405.4A
Other languages
Chinese (zh)
Inventor
武利平
赵向东
邢世春
李昌盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical Beijing Decoration Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority to CN201510159405.4A priority Critical patent/CN104831895A/en
Publication of CN104831895A publication Critical patent/CN104831895A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a building ceramic tile with mechanical biting and bonding in combination and a bonding construction technology thereof. The building ceramic tile with mechanical biting and bonding in combination comprises a ceramic tile body, and the back face of the ceramic tile body is uniformly provided with a plurality of dovetail grooves. The building ceramic tile with mechanical biting and bonding in combination and the bonding construction technology thereof have the beneficial effects that the hollowing rate of the wall ceramic tile can be effectively reduced, the quality problem that the ceramic tile falls from the bonding layer interface can be avoided, the stubborn problem that the wall ceramic tile falls troubling the building decoration industry form many years can be solved, and technical barriers when the ceramic tile is applied to the wall decoration project are cleared.

Description

The building Imitation Rock Porcelain Tiles that a kind of mechanical seaming is combined with Binder Phase and sticking construction technology thereof
Technical field
The present invention relates to architectural decoration construction field, specifically, relate to building Imitation Rock Porcelain Tiles and sticking construction technology thereof that a kind of mechanical seaming is combined with Binder Phase.
Background technology
Water absorption rate is low, intensity is high owing to having for Imitation Rock Porcelain Tiles (being commonly called as vitrified tile), the feature of decorative pattern and various colors; especially various imitation rock porcelain tiles can be made into by the design and color of lithotome; good decorating effect; price is relatively cheap, so also more and more welcome in architectural decoration metope.But sticking construction method traditionally, the easy hollowing of Imitation Rock Porcelain Tiles and coming off, maintenance cost is high, and there is certain potential safety hazard.
Through investigation and research, hollowing is caused mainly to occur in Imitation Rock Porcelain Tiles and binding sand pulp layer (cementing agent) interface with the interface come off, the main cause of this situation is caused to have two aspects, one be Imitation Rock Porcelain Tiles in process of production, decorative pattern place, the back side employs a kind of mineral release agent, this release agent is water insoluble, between ceramic tile and adhesive mortar, play buffer action, affects bond area and adhesion strength; Two is in Long-Time Service process, the repeated action that adhesive mortar and ceramic tile expand with heat and contract with cold due to the temperature difference, the situation that bonding departs from can be produced, cause hollowing and come off, thus cause certain potential safety hazard, metope Imitation Rock Porcelain Tiles comes off becomes architectural decoration large common fault and a persistent ailment in the industry, can not get for a long time well overcoming.
Thus, this patent provides a kind of sticking construction technology of building wall Imitation Rock Porcelain Tiles slip-off preventing, improves the problem of Imitation Rock Porcelain Tiles slip-off preventing for above-mentioned two problems.
Summary of the invention
For the above-mentioned technical problem in correlation technique, the present invention proposes building Imitation Rock Porcelain Tiles that a kind of mechanical seaming is combined with Binder Phase and sticking construction technology thereof, can prevent from holding caducous problem in Imitation Rock Porcelain Tiles use procedure.
For realizing above-mentioned technical purpose, technical scheme of the present invention is achieved in that
The building Imitation Rock Porcelain Tiles that mechanical seaming is combined with Binder Phase, comprises ceramic tile body, and the back side of described ceramic tile body is evenly provided with some dovetail grooves.
Further, described dovetail groove is positioned at the dual-side place at the described ceramic tile body back side, and quantity is 4.
Further, the opening of described dovetail groove is wide is 20mm, and bottom land is wide is 25mm, and flute length is 100mm, and groove depth is 3 ~ 5mm.
Further, comprise the steps:
Step one, uses the preprepared instrument of washing of rinsing to be cleaned up by the release agent at the described ceramic tile body back side;
Step 2, carries out dovetail groove processing to the described ceramic tile body back side;
Step 3, pastes preprepared cementing agent uniform application in the described ceramic tile body back side and described dovetail groove, and thickness is 5 ~ 10mm;
Step 4, application work is complete, and normal temperature maintenance, after 7 days, is carried out the process of wiping seam, so far completed whole construction.
Further, rinsing the instrument of washing described in is wire brush, duroplasts brush.
Further, the specification of described ceramic tile body is 600mm*600mm and 800mm*800mm.
Beneficial effect of the present invention: the present invention can effectively reduce the hollowing rate of metope Imitation Rock Porcelain Tiles, avoid the quality problems that ceramic tile comes off from ceramic tile-tie-layer interface, the persistent ailment that puzzlement architectural decoration metope Imitation Rock Porcelain Tiles for many years comes off can be solved, cleared away technology barrier for ceramic tile is applied in wall decoration engineering.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is that the building porcelain brickwork that the mechanical seaming according to the embodiment of the present invention is combined with Binder Phase does state diagram;
Fig. 2 is the building Imitation Rock Porcelain Tiles body that is combined with Binder Phase of the mechanical seaming according to the embodiment of the present invention and dovetail machining sketch chart.
In figure:
1, ceramic tile body; 2, dovetail groove; 3, adhesive mortar hanging prop; 4, binding sand pulp layer; 5, plaster metope basic unit.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain, all belongs to the scope of protection of the invention.
As shown in Figure 1-2, the building Imitation Rock Porcelain Tiles that a kind of mechanical seaming according to the embodiment of the present invention is combined with Binder Phase, comprises ceramic tile body 1, and the back side of described ceramic tile body 1 is evenly provided with some dovetail grooves 2.
In one embodiment, described dovetail groove 2 is positioned at the dual-side place at described ceramic tile body 1 back side, and quantity is 4.
In one embodiment, the opening of described dovetail groove 2 is wide is 20mm, and bottom land is wide is 25mm, and flute length is 100mm, and groove depth is 3 ~ 5mm.
The sticking construction technology of the building Imitation Rock Porcelain Tiles that mechanical seaming according to claim 1 is combined with Binder Phase, is characterized in that, comprise the steps:
Step one, uses the preprepared instrument of washing of rinsing to be cleaned up by the release agent at described ceramic tile body 1 back side;
Step 2, carries out dovetail groove 2 to described ceramic tile body 1 back side and processes;
Step 3, pastes preprepared cementing agent uniform application in described ceramic tile body 1 back side and described dovetail groove 2, and thickness is 5 ~ 10mm;
Step 4, application work is complete, and normal temperature maintenance, after 7 days, is carried out the process of wiping seam, so far completed whole construction.
In one embodiment, rinsing the instrument of washing described in is wire brush, duroplasts brush.
In one embodiment, the specification of described ceramic tile body 1 is 600mm*600mm and 800mm*800mm.
Conveniently understand technique scheme of the present invention, below by way of in concrete mode of occupation, technique scheme of the present invention is described in detail.
When specifically using, the building Imitation Rock Porcelain Tiles be combined with Binder Phase according to mechanical seaming of the present invention and sticking construction technology thereof, described dovetail groove is located at dual-side place, the Imitation Rock Porcelain Tiles back side, quantity is generally 4, wide about the 20mm of dovetail groove opening, wide about the 25mm of bottom land, flute length about 100mm, groove depth 3 ~ 5mm, ceramic tile body regular size is 600mm*600mm and 800mm*800mm, other specifications can be carried out specialized designs and be processed by production miller, the object driving dovetail groove uses Imitation Rock Porcelain Tiles energy and binding sand pulp layer to be mechanically interlocked, still can hang over when bonding failure in firm binding sand pulp layer, before Imitation Rock Porcelain Tiles is pasted, use wire brush or duroplasts brush to be scrubbed clean by Imitation Rock Porcelain Tiles sticking veneer, object is the contact interface improved between ceramic tile and adhesive mortar, increases effective contact area, and improves adhesion stress, in order to the requirement making the intensity of wall plastering basic unit, planeness and verticality meet specification, hair rubbed with the hands by surface wood float of plastering, adopt ceramic tile bond (a kind of polymer cement mortar) to paste, adhesive mortar denseness is moderate, spreads upon the Imitation Rock Porcelain Tiles back side and pastes, also to fill up in dovetail groove, mortar is evenly full, and thickness 5 ~ 10mm is advisable, and effect is bonded together Imitation Rock Porcelain Tiles and metope basic unit, be filled in dovetail groove simultaneously and solidify rear formation hanging prop, prevent Imitation Rock Porcelain Tiles from coming off, Imitation Rock Porcelain Tiles is pasted complete and wiping seam is carried out in natural curing after 7 days, completes whole working procedure.
In sum, by means of technique scheme of the present invention, the present invention can effectively reduce the hollowing rate of metope Imitation Rock Porcelain Tiles, avoid the quality problems that ceramic tile comes off from ceramic tile-tie-layer interface, the persistent ailment that puzzlement architectural decoration metope Imitation Rock Porcelain Tiles for many years comes off can be solved, cleared away technology barrier for ceramic tile is applied in wall decoration engineering.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. the building Imitation Rock Porcelain Tiles that is combined with Binder Phase of mechanical seaming, comprise ceramic tile body (1), it is characterized in that, the back side of described ceramic tile body (1) is evenly provided with some dovetail grooves (2).
2. the building Imitation Rock Porcelain Tiles that is combined with Binder Phase of mechanical seaming according to claim 1, it is characterized in that, described dovetail groove (2) is positioned at the dual-side place at described ceramic tile body (1) back side, and quantity is 4.
3. the building Imitation Rock Porcelain Tiles that is combined with Binder Phase of mechanical seaming according to claim 1, it is characterized in that, the opening of described dovetail groove (2) is wide is 20mm, and bottom land is wide is 25mm, and flute length is 100mm, and groove depth is 3 ~ 5mm.
4. the sticking construction technology of building Imitation Rock Porcelain Tiles that is combined with Binder Phase of mechanical seaming according to claim 1, is characterized in that, comprise the steps:
Step one, uses the preprepared instrument of washing of rinsing to be cleaned up by the release agent at described ceramic tile body (1) back side;
Step 2, carries out dovetail groove (2) processing to described ceramic tile body (1) back side;
Step 3, pasted in described ceramic tile body (1) back side and described dovetail groove (2) by preprepared cementing agent uniform application, thickness is 5 ~ 10mm;
Step 4, application work is complete, and normal temperature maintenance, after 7 days, is carried out the process of wiping seam, so far completed whole construction.
5. the building Imitation Rock Porcelain Tiles that the mechanical seaming according to step one in claim 4 is combined with Binder Phase, is characterized in that, described in rinse the instrument of washing be wire brush, duroplasts brush.
6. the building Imitation Rock Porcelain Tiles that the mechanical seaming according to step one in claim 4 is combined with Binder Phase, is characterized in that, the specification of described ceramic tile body (1) is 600mm*600mm and 800mm*800mm.
CN201510159405.4A 2015-04-03 2015-04-03 Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof Pending CN104831895A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510159405.4A CN104831895A (en) 2015-04-03 2015-04-03 Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510159405.4A CN104831895A (en) 2015-04-03 2015-04-03 Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof

Publications (1)

Publication Number Publication Date
CN104831895A true CN104831895A (en) 2015-08-12

Family

ID=53810059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510159405.4A Pending CN104831895A (en) 2015-04-03 2015-04-03 Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof

Country Status (1)

Country Link
CN (1) CN104831895A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211365A (en) * 2020-11-09 2021-01-12 聊城市高力金属材料有限公司 Novel wall brick and mounting structure
CN112297695A (en) * 2019-07-25 2021-02-02 许浒 Snap-in sandwich type flexible decorative sheet and manufacturing method thereof
CN114269998A (en) * 2019-07-17 2022-04-01 瑟登帝石膏公司 Interlocking gypsum building surface product, method of manufacture, and interlocking gypsum building surface system
US11851874B2 (en) 2019-07-17 2023-12-26 Certainteed Gypsum, Inc. Interlocking gypsum building surface products, methods of manufacture, and interlocking gypsum building surface systems
US12018493B2 (en) 2020-08-27 2024-06-25 Certainteed Gypsum, Inc. Building surface product including attachment clip, building surface system, and method of manufacture

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515347Y (en) * 2001-12-05 2002-10-09 吴伯开 Ceramic tile
CN202467067U (en) * 2012-03-12 2012-10-03 杨俊兴 Anti-fall-off ceramic tile
CN202611152U (en) * 2012-07-03 2012-12-19 陈廷 Anti-falling ceramic tile
US20150068147A1 (en) * 2011-03-09 2015-03-12 Quadrosera Corporation Clips for thin brick wall system
CN204551972U (en) * 2015-04-03 2015-08-12 北京中铁装饰工程有限公司 The building Imitation Rock Porcelain Tiles that a kind of mechanical seaming is combined with Binder Phase

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515347Y (en) * 2001-12-05 2002-10-09 吴伯开 Ceramic tile
US20150068147A1 (en) * 2011-03-09 2015-03-12 Quadrosera Corporation Clips for thin brick wall system
CN202467067U (en) * 2012-03-12 2012-10-03 杨俊兴 Anti-fall-off ceramic tile
CN202611152U (en) * 2012-07-03 2012-12-19 陈廷 Anti-falling ceramic tile
CN204551972U (en) * 2015-04-03 2015-08-12 北京中铁装饰工程有限公司 The building Imitation Rock Porcelain Tiles that a kind of mechanical seaming is combined with Binder Phase

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114269998A (en) * 2019-07-17 2022-04-01 瑟登帝石膏公司 Interlocking gypsum building surface product, method of manufacture, and interlocking gypsum building surface system
CN114269998B (en) * 2019-07-17 2023-09-26 瑟登帝石膏公司 Interlocking gypsum building surface product, method of manufacture, and interlocking gypsum building surface system
US11851874B2 (en) 2019-07-17 2023-12-26 Certainteed Gypsum, Inc. Interlocking gypsum building surface products, methods of manufacture, and interlocking gypsum building surface systems
CN112297695A (en) * 2019-07-25 2021-02-02 许浒 Snap-in sandwich type flexible decorative sheet and manufacturing method thereof
US12018493B2 (en) 2020-08-27 2024-06-25 Certainteed Gypsum, Inc. Building surface product including attachment clip, building surface system, and method of manufacture
CN112211365A (en) * 2020-11-09 2021-01-12 聊城市高力金属材料有限公司 Novel wall brick and mounting structure

Similar Documents

Publication Publication Date Title
CN104831895A (en) Building ceramic tile with mechanical biting and bonding in combination and bonding construction technology thereof
CN103410331B (en) The wet combining technique of vitrified tile
CN108625618B (en) Quick repair method for water seepage caused by rupture of waterproof layer of bathroom without disassembling bricks
CN203783173U (en) Mold-proof structure for wall surface repair construction
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN104790624B (en) A kind of Imitation Rock Porcelain Tiles sticking construction method
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN103572931B (en) Construction method of building ceramic thin plate hanging and cementing structure
CN105178547A (en) Large-unit ceramic thin sheet back-suspending and gluing structure and construction method thereof
CN103669788A (en) Paving method for polished face brick wall
CN101008192A (en) Construction method of outer wall insulation system adopting composite insulation surface tile
CN105625650B (en) A kind of parapet of roofing flashing protective layer construction method
CN109930856A (en) A kind of the old and new's wall concatenation construction method
CN204551972U (en) The building Imitation Rock Porcelain Tiles that a kind of mechanical seaming is combined with Binder Phase
CN104746832A (en) Wet-fastening method for vitrified tiles
CN203834826U (en) Novel staircase water drip tank
CN105908933A (en) Building porcelain tile with conical holes and copper wires for enhancing bonding and pasting construction method of building porcelain tile
CN205677187U (en) A kind of taper hole copper wire strengthens the building Imitation Rock Porcelain Tiles of bonding
CN109184103A (en) Building masonry wall exempts from plastering construction technique
CN205025042U (en) Big unit pottery sheet metal back of body kiss -coating bonds and constructs
CN202227573U (en) Trapezoid tongue groove crack preventing partition wall board
CN203867106U (en) Reinforced historic building single-piece brick wall
CN203569708U (en) Novel building external thermal insulation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150812

RJ01 Rejection of invention patent application after publication