CN101713250A - Process for pasting construction of floor tiles - Google Patents

Process for pasting construction of floor tiles Download PDF

Info

Publication number
CN101713250A
CN101713250A CN200910213466A CN200910213466A CN101713250A CN 101713250 A CN101713250 A CN 101713250A CN 200910213466 A CN200910213466 A CN 200910213466A CN 200910213466 A CN200910213466 A CN 200910213466A CN 101713250 A CN101713250 A CN 101713250A
Authority
CN
China
Prior art keywords
floor tile
mortar
pasting construction
construction according
pasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910213466A
Other languages
Chinese (zh)
Inventor
孙清海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910213466A priority Critical patent/CN101713250A/en
Publication of CN101713250A publication Critical patent/CN101713250A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a process for building decoration, in particular to a process for the pasting construction of floor tiles. The process comprises the following steps of: treating a base course; snapping lines for positioning; plastering binder course mortar; pasting ceramic floor tiles; uniformizing seams; cleaning the floor tiles; and maintaining the floor tiles. The process has the advantages that the process is scientific and reasonable, and the pasted floor tiles have the advantages of good compactness, no heaves and no falling off.

Description

A kind of floor tile process for pasting construction
Technical field
The present invention relates to a kind of building finishing technology, specifically is a kind of floor tile process for pasting construction.
Background technology
At present, floor tile is widely used in the ground in various places, but that is the barbola work of floor tile is lack of standardization, and the phenomenon that comes off often appears heaving in the poor quality who causes subsides.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of floor tile process for pasting construction, the floor tile that utilizes technology of the present invention to paste, it is good to have density, does not heave, adeciduate advantage.
The present invention realizes with following technical scheme: a kind of floor tile process for pasting construction is characterized in that concrete steps are as follows: setting course mortar → stickup floor tile → even seam → cleaning → maintenance is located → smeared to base treatment → snap the line.
Described base treatment is that the hair processing is cut a hole on the ground that basic unit is smooth, and the degree of depth is 4-8mm, and cutter haircuts spacing is about 30mm; The residual mortar in ground, dust etc. need be rinsed well.
The diagonal orientation method is adopted in described snap the line location, and promptly brickwork joint becomes miter angle with the corner; Or the right angle positioning mode, promptly brickwork joint is parallel with metope; Be that initial point ejects orthogonal position line with the room to the center during snap the line.
The described setting course mortar of smearing is to lay the floor tile place at need to smear cement mortar, the general 1.8-2.5cm of thickness;
Described paving floor tile hangs over four angles, the ceramic tile back side and centre with cement paste fullly, be pressed in then on the cement mortar setting course, and strike reality with rubber hammer, and the limit welt is wiped the cement paste on surface simultaneously at once with spirit level inspection correction;
Described jointing is that paving finished maintenance after 2 hours, carries out dry cement and wipes seam, and ceramic tile surface is cleaned.
The invention has the beneficial effects as follows: reasonable with craft science of the present invention, it is good that the floor tile of stickup has density, do not heave, adeciduate advantage.
The specific embodiment
With the reinforced concrete floor is example, and concrete operation method is as follows:
If 1, basic unit's concrete building, ground, smoother then should be cut a hole hair and be handled again, and the degree of depth is 5-10mm, and cutter haircuts spacing is about 30mm, notes the residual mortar of cleaning substrate surface, dust etc., and flushing.
2, snap the line, the location:
1) diagonal orientation method---brickwork joint becomes miter angle with the corner;
2) right angle positioning mode---brickwork joint is parallel with metope;
Be that initial point ejects orthogonal position line with the room to the center during snap the line, and note:
1) reserves 200mm-300mm apart from the wall limit for adjusting the interval
2) as if the inside and outside floor tile kind difference in room, its handing-over line should be at unshowy place
3, ground standard height face is set, does T-shaped, do cross, paste two row floor tiles than big room than cubicle
4, smearing the setting course mortar, is to lay the floor tile place at need to smear cement mortar, thickness 2cm; Cement paste should hang over the ceramic tile back side fullly, and strikes reality with rubber hammer, and the limit welt is wiped the cement paste on surface simultaneously at once with spirit level inspection correction.
5, the intact maintenance of paving was carried out dry cement and is wiped seam, and ceramic tile surface is cleaned after 2 hours.

Claims (6)

1. floor tile process for pasting construction is characterized in that concrete steps are as follows:
Setting course mortar → stickup floor tile → even seam → cleaning → maintenance is located → smeared to base treatment → snap the line.
2. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described base treatment is that the hair processing is cut a hole on the ground that basic unit is smooth, and the degree of depth is 4-8mm, and cutter haircuts spacing is about 30mm; The residual mortar in ground, dust etc. need be rinsed well.
3. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described snap the line location employing diagonal orientation method, and promptly brickwork joint becomes miter angle with the corner; Or the right angle positioning mode, promptly brickwork joint is parallel with metope; Be that initial point ejects orthogonal position line with the room to the center during snap the line.
4. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that the described setting course mortar of smearing is to lay the floor tile place at need to smear cement mortar, the general 1.8-2.5cm of thickness;
5. described a kind of floor tile process for pasting construction according to claim 1, it is characterized in that the paving floor tile, cement paste is hung over four angles, the ceramic tile back side and centre fullly, be pressed in then on the cement mortar setting course, and strike reality with rubber hammer, and the limit welt is proofreaied and correct with the spirit level inspection, wipes the cement paste on surface simultaneously at once;
6. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described jointing is that paving finished maintenance after 2 hours, carries out dry cement and wipes seam, and ceramic tile surface is cleaned.
CN200910213466A 2009-10-29 2009-10-29 Process for pasting construction of floor tiles Pending CN101713250A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910213466A CN101713250A (en) 2009-10-29 2009-10-29 Process for pasting construction of floor tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910213466A CN101713250A (en) 2009-10-29 2009-10-29 Process for pasting construction of floor tiles

Publications (1)

Publication Number Publication Date
CN101713250A true CN101713250A (en) 2010-05-26

Family

ID=42417207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910213466A Pending CN101713250A (en) 2009-10-29 2009-10-29 Process for pasting construction of floor tiles

Country Status (1)

Country Link
CN (1) CN101713250A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831898A (en) * 2015-05-19 2015-08-12 天津天一建设集团有限公司 Hidden-buried electrical tracing floor tile paving construction method
CN105256973A (en) * 2015-09-11 2016-01-20 苏州水木清华设计营造有限公司 Method for paving and constructing floor tiles with elevation cushion blocks
CN106639247A (en) * 2016-12-12 2017-05-10 蓝振宁 Construction technique for paving ceramic floor tiles
CN106703411A (en) * 2017-03-20 2017-05-24 中国十七冶集团有限公司 Outdoor roof surface anti-skid and anti-frost crack tile laying method
CN107489256A (en) * 2016-06-13 2017-12-19 宜兴市周铁镇生力钻探机械厂 A kind of large scale floor tile construction method
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method
CN111155734A (en) * 2020-01-09 2020-05-15 中铁六局集团有限公司 Construction process of bathroom vitrified tiles
CN113417430A (en) * 2021-06-30 2021-09-21 杭州市城建设计研究院有限公司 Interior decoration construction process for office building
CN115059260A (en) * 2022-07-15 2022-09-16 菏泽德合建工集团有限公司开发区装饰分公司 Paving construction process for indoor floor decoration ceramic tile

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831898A (en) * 2015-05-19 2015-08-12 天津天一建设集团有限公司 Hidden-buried electrical tracing floor tile paving construction method
CN105256973A (en) * 2015-09-11 2016-01-20 苏州水木清华设计营造有限公司 Method for paving and constructing floor tiles with elevation cushion blocks
CN107489256A (en) * 2016-06-13 2017-12-19 宜兴市周铁镇生力钻探机械厂 A kind of large scale floor tile construction method
CN106639247A (en) * 2016-12-12 2017-05-10 蓝振宁 Construction technique for paving ceramic floor tiles
CN106703411A (en) * 2017-03-20 2017-05-24 中国十七冶集团有限公司 Outdoor roof surface anti-skid and anti-frost crack tile laying method
CN108265946A (en) * 2017-12-15 2018-07-10 夹江县盛世东方陶瓷有限公司 A kind of ceramics painting and calligraphy brick patch block method
CN111155734A (en) * 2020-01-09 2020-05-15 中铁六局集团有限公司 Construction process of bathroom vitrified tiles
CN113417430A (en) * 2021-06-30 2021-09-21 杭州市城建设计研究院有限公司 Interior decoration construction process for office building
CN113417430B (en) * 2021-06-30 2021-11-23 杭州市城建设计研究院有限公司 Interior decoration construction process for office building
CN115059260A (en) * 2022-07-15 2022-09-16 菏泽德合建工集团有限公司开发区装饰分公司 Paving construction process for indoor floor decoration ceramic tile

Similar Documents

Publication Publication Date Title
CN101713250A (en) Process for pasting construction of floor tiles
CN208792663U (en) A kind of room finishing system
CN104018598A (en) Outer wall structure and construction and installation method
CN103938764A (en) Rapid construction method for indoor secondary light partition wall, and partition wall
CN106049539A (en) Building project construction method
CN101565997A (en) Construction method for large-area irregular floor tile
CN101586370A (en) Construction method of ceramsite light wallboard
CN103046714A (en) Construction method for double-sided inorganic composite phenolic aldehyde fire-proof heat-insulating decorating integration plates
CN101761155A (en) Construction method for ceramsite concrete light-weight wall boards
CN105525726A (en) Aerated brick wall plastering construction method
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN103835505A (en) Outer wall compound heat preservation board construction method
CN110158796A (en) A kind of wall body heat insulating construction method
CN108468413A (en) A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering
CN202099901U (en) Troweling structure for treatment on junction part of concrete wall column and filler wall
CN104120848A (en) Construction method for internal wall facing bricks
CN104831837A (en) Indoor seamlessly-spliced secondary light partition wall system and rapid construction method of partition wall
CN104120860A (en) Construction method for cement mortar ground leveling
CN106049780A (en) Plastering-free construction technique for high-precision brickwork
CN103850362A (en) GHB (Glazed Hollow Bead) heat preservation and heat insulation building wall body and construction technology
CN106368338A (en) Construction method of external thermal insulation system of foam cement thermal insulation board outer wall
CN106639247A (en) Construction technique for paving ceramic floor tiles
CN209958651U (en) Ceramic tile outer wall waterproof construction
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
CN101748825A (en) Wedge-shaped building method for aerated concrete blockwork top

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100526