CN101713250A - Process for pasting construction of floor tiles - Google Patents
Process for pasting construction of floor tiles Download PDFInfo
- Publication number
- CN101713250A CN101713250A CN200910213466A CN200910213466A CN101713250A CN 101713250 A CN101713250 A CN 101713250A CN 200910213466 A CN200910213466 A CN 200910213466A CN 200910213466 A CN200910213466 A CN 200910213466A CN 101713250 A CN101713250 A CN 101713250A
- Authority
- CN
- China
- Prior art keywords
- floor tile
- mortar
- pasting construction
- construction according
- pasting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention relates to a process for building decoration, in particular to a process for the pasting construction of floor tiles. The process comprises the following steps of: treating a base course; snapping lines for positioning; plastering binder course mortar; pasting ceramic floor tiles; uniformizing seams; cleaning the floor tiles; and maintaining the floor tiles. The process has the advantages that the process is scientific and reasonable, and the pasted floor tiles have the advantages of good compactness, no heaves and no falling off.
Description
Technical field
The present invention relates to a kind of building finishing technology, specifically is a kind of floor tile process for pasting construction.
Background technology
At present, floor tile is widely used in the ground in various places, but that is the barbola work of floor tile is lack of standardization, and the phenomenon that comes off often appears heaving in the poor quality who causes subsides.
Summary of the invention
For solving the problems of the technologies described above, the invention provides a kind of floor tile process for pasting construction, the floor tile that utilizes technology of the present invention to paste, it is good to have density, does not heave, adeciduate advantage.
The present invention realizes with following technical scheme: a kind of floor tile process for pasting construction is characterized in that concrete steps are as follows: setting course mortar → stickup floor tile → even seam → cleaning → maintenance is located → smeared to base treatment → snap the line.
Described base treatment is that the hair processing is cut a hole on the ground that basic unit is smooth, and the degree of depth is 4-8mm, and cutter haircuts spacing is about 30mm; The residual mortar in ground, dust etc. need be rinsed well.
The diagonal orientation method is adopted in described snap the line location, and promptly brickwork joint becomes miter angle with the corner; Or the right angle positioning mode, promptly brickwork joint is parallel with metope; Be that initial point ejects orthogonal position line with the room to the center during snap the line.
The described setting course mortar of smearing is to lay the floor tile place at need to smear cement mortar, the general 1.8-2.5cm of thickness;
Described paving floor tile hangs over four angles, the ceramic tile back side and centre with cement paste fullly, be pressed in then on the cement mortar setting course, and strike reality with rubber hammer, and the limit welt is wiped the cement paste on surface simultaneously at once with spirit level inspection correction;
Described jointing is that paving finished maintenance after 2 hours, carries out dry cement and wipes seam, and ceramic tile surface is cleaned.
The invention has the beneficial effects as follows: reasonable with craft science of the present invention, it is good that the floor tile of stickup has density, do not heave, adeciduate advantage.
The specific embodiment
With the reinforced concrete floor is example, and concrete operation method is as follows:
If 1, basic unit's concrete building, ground, smoother then should be cut a hole hair and be handled again, and the degree of depth is 5-10mm, and cutter haircuts spacing is about 30mm, notes the residual mortar of cleaning substrate surface, dust etc., and flushing.
2, snap the line, the location:
1) diagonal orientation method---brickwork joint becomes miter angle with the corner;
2) right angle positioning mode---brickwork joint is parallel with metope;
Be that initial point ejects orthogonal position line with the room to the center during snap the line, and note:
1) reserves 200mm-300mm apart from the wall limit for adjusting the interval
2) as if the inside and outside floor tile kind difference in room, its handing-over line should be at unshowy place
3, ground standard height face is set, does T-shaped, do cross, paste two row floor tiles than big room than cubicle
4, smearing the setting course mortar, is to lay the floor tile place at need to smear cement mortar, thickness 2cm; Cement paste should hang over the ceramic tile back side fullly, and strikes reality with rubber hammer, and the limit welt is wiped the cement paste on surface simultaneously at once with spirit level inspection correction.
5, the intact maintenance of paving was carried out dry cement and is wiped seam, and ceramic tile surface is cleaned after 2 hours.
Claims (6)
1. floor tile process for pasting construction is characterized in that concrete steps are as follows:
Setting course mortar → stickup floor tile → even seam → cleaning → maintenance is located → smeared to base treatment → snap the line.
2. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described base treatment is that the hair processing is cut a hole on the ground that basic unit is smooth, and the degree of depth is 4-8mm, and cutter haircuts spacing is about 30mm; The residual mortar in ground, dust etc. need be rinsed well.
3. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described snap the line location employing diagonal orientation method, and promptly brickwork joint becomes miter angle with the corner; Or the right angle positioning mode, promptly brickwork joint is parallel with metope; Be that initial point ejects orthogonal position line with the room to the center during snap the line.
4. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that the described setting course mortar of smearing is to lay the floor tile place at need to smear cement mortar, the general 1.8-2.5cm of thickness;
5. described a kind of floor tile process for pasting construction according to claim 1, it is characterized in that the paving floor tile, cement paste is hung over four angles, the ceramic tile back side and centre fullly, be pressed in then on the cement mortar setting course, and strike reality with rubber hammer, and the limit welt is proofreaied and correct with the spirit level inspection, wipes the cement paste on surface simultaneously at once;
6. described a kind of floor tile process for pasting construction according to claim 1 is characterized in that described jointing is that paving finished maintenance after 2 hours, carries out dry cement and wipes seam, and ceramic tile surface is cleaned.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910213466A CN101713250A (en) | 2009-10-29 | 2009-10-29 | Process for pasting construction of floor tiles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910213466A CN101713250A (en) | 2009-10-29 | 2009-10-29 | Process for pasting construction of floor tiles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101713250A true CN101713250A (en) | 2010-05-26 |
Family
ID=42417207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910213466A Pending CN101713250A (en) | 2009-10-29 | 2009-10-29 | Process for pasting construction of floor tiles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101713250A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831898A (en) * | 2015-05-19 | 2015-08-12 | 天津天一建设集团有限公司 | Hidden-buried electrical tracing floor tile paving construction method |
CN105256973A (en) * | 2015-09-11 | 2016-01-20 | 苏州水木清华设计营造有限公司 | Method for paving and constructing floor tiles with elevation cushion blocks |
CN106639247A (en) * | 2016-12-12 | 2017-05-10 | 蓝振宁 | Construction technique for paving ceramic floor tiles |
CN106703411A (en) * | 2017-03-20 | 2017-05-24 | 中国十七冶集团有限公司 | Outdoor roof surface anti-skid and anti-frost crack tile laying method |
CN107489256A (en) * | 2016-06-13 | 2017-12-19 | 宜兴市周铁镇生力钻探机械厂 | A kind of large scale floor tile construction method |
CN108265946A (en) * | 2017-12-15 | 2018-07-10 | 夹江县盛世东方陶瓷有限公司 | A kind of ceramics painting and calligraphy brick patch block method |
CN111155734A (en) * | 2020-01-09 | 2020-05-15 | 中铁六局集团有限公司 | Construction process of bathroom vitrified tiles |
CN113417430A (en) * | 2021-06-30 | 2021-09-21 | 杭州市城建设计研究院有限公司 | Interior decoration construction process for office building |
CN115059260A (en) * | 2022-07-15 | 2022-09-16 | 菏泽德合建工集团有限公司开发区装饰分公司 | Paving construction process for indoor floor decoration ceramic tile |
-
2009
- 2009-10-29 CN CN200910213466A patent/CN101713250A/en active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831898A (en) * | 2015-05-19 | 2015-08-12 | 天津天一建设集团有限公司 | Hidden-buried electrical tracing floor tile paving construction method |
CN105256973A (en) * | 2015-09-11 | 2016-01-20 | 苏州水木清华设计营造有限公司 | Method for paving and constructing floor tiles with elevation cushion blocks |
CN107489256A (en) * | 2016-06-13 | 2017-12-19 | 宜兴市周铁镇生力钻探机械厂 | A kind of large scale floor tile construction method |
CN106639247A (en) * | 2016-12-12 | 2017-05-10 | 蓝振宁 | Construction technique for paving ceramic floor tiles |
CN106703411A (en) * | 2017-03-20 | 2017-05-24 | 中国十七冶集团有限公司 | Outdoor roof surface anti-skid and anti-frost crack tile laying method |
CN108265946A (en) * | 2017-12-15 | 2018-07-10 | 夹江县盛世东方陶瓷有限公司 | A kind of ceramics painting and calligraphy brick patch block method |
CN111155734A (en) * | 2020-01-09 | 2020-05-15 | 中铁六局集团有限公司 | Construction process of bathroom vitrified tiles |
CN113417430A (en) * | 2021-06-30 | 2021-09-21 | 杭州市城建设计研究院有限公司 | Interior decoration construction process for office building |
CN113417430B (en) * | 2021-06-30 | 2021-11-23 | 杭州市城建设计研究院有限公司 | Interior decoration construction process for office building |
CN115059260A (en) * | 2022-07-15 | 2022-09-16 | 菏泽德合建工集团有限公司开发区装饰分公司 | Paving construction process for indoor floor decoration ceramic tile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101713250A (en) | Process for pasting construction of floor tiles | |
CN208792663U (en) | A kind of room finishing system | |
CN104018598A (en) | Outer wall structure and construction and installation method | |
CN103938764A (en) | Rapid construction method for indoor secondary light partition wall, and partition wall | |
CN106049539A (en) | Building project construction method | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN101586370A (en) | Construction method of ceramsite light wallboard | |
CN103046714A (en) | Construction method for double-sided inorganic composite phenolic aldehyde fire-proof heat-insulating decorating integration plates | |
CN101761155A (en) | Construction method for ceramsite concrete light-weight wall boards | |
CN105525726A (en) | Aerated brick wall plastering construction method | |
CN102505762A (en) | Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof | |
CN103835505A (en) | Outer wall compound heat preservation board construction method | |
CN110158796A (en) | A kind of wall body heat insulating construction method | |
CN108468413A (en) | A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering | |
CN202099901U (en) | Troweling structure for treatment on junction part of concrete wall column and filler wall | |
CN104120848A (en) | Construction method for internal wall facing bricks | |
CN104831837A (en) | Indoor seamlessly-spliced secondary light partition wall system and rapid construction method of partition wall | |
CN104120860A (en) | Construction method for cement mortar ground leveling | |
CN106049780A (en) | Plastering-free construction technique for high-precision brickwork | |
CN103850362A (en) | GHB (Glazed Hollow Bead) heat preservation and heat insulation building wall body and construction technology | |
CN106368338A (en) | Construction method of external thermal insulation system of foam cement thermal insulation board outer wall | |
CN106639247A (en) | Construction technique for paving ceramic floor tiles | |
CN209958651U (en) | Ceramic tile outer wall waterproof construction | |
CN102182323A (en) | Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus | |
CN101748825A (en) | Wedge-shaped building method for aerated concrete blockwork top |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20100526 |