CN205063052U - Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom - Google Patents
Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom Download PDFInfo
- Publication number
- CN205063052U CN205063052U CN201520788201.2U CN201520788201U CN205063052U CN 205063052 U CN205063052 U CN 205063052U CN 201520788201 U CN201520788201 U CN 201520788201U CN 205063052 U CN205063052 U CN 205063052U
- Authority
- CN
- China
- Prior art keywords
- wall
- layer
- washroom
- multipurpose
- bathroom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses a newly build a wall to personally experience sth. Part of body and end water bar structure in bathroom, it includes the body (1) of newly building a wall that sets up in the bathroom place, the bottom of newly building the wall body by laying bricks or stones is provided with builds in the waterproof collar tie beam of concrete floor's reinforced concrete (2), the concrete floor surface is provided with screed -coat (3), newly build by laying bricks or stones the wall body towards agent layer (4), cement mortar screed -coat (5), first waterproof material layer (6), cement mortar secondary screed -coat (7), second at the bottom of bathroom one side wall sets gradually first multipurpose say waterproof material layer (8), second say agent layer (9) at the bottom of the multipurpose, second way multipurpose is located through binder (10) and at the bottom of surface course material (11) on agent layer. The beneficial effects of the utility model are that: this structure can prevent that the bathroom from newly building the wall body by laying bricks or stones and the infiltration phenomenon appearing.
Description
Technical field
The utility model relates to decorations field, especially relates to a kind of washroom and newly builds wall water seal girder construction.
Background technology
In decorations field, the body of wall that washroom is newly built by laying bricks or stones easily occurs oozing water problem usually, and this has a strong impact on quality of the life for user.Seep water between body of wall, be mostly that the waterproofing work due to body of wall is not in place.
Utility model content
The purpose of this utility model is exactly to solve the problem, and provides a kind of washroom of washroom new masonry panel appearance infiltration phenomenon that prevents newly to build wall water seal girder construction.
To achieve these goals, the utility model adopts following technical scheme:
Wall water seal girder construction newly built by washroom, it is included in the body of newly building a wall (1) that washroom place is arranged, it is characterized in that, the bottom of described new masonry panel is provided with the steel concrete waterproof collar tie beam (2) of building in concrete floor, described concrete floor surface is provided with leveling layer (3), described new masonry panel is disposed with oxidant layer (4) at the bottom of first multipurpose towards washroom one side wall, cement mortar screeding layer (5), first waterproof layer (6), cement mortar secondary leveling layer (7), second waterproof layer (8), oxidant layer (9) at the bottom of second multipurpose, the surface material (11) of oxidant layer at the bottom of second multipurpose is located at by cementing agent (10).
Wherein, first, second road waterproof layer described is the conjunctiva of thickness at more than 1mm.
Wherein, described surface material is ceramic tile or stone material, adopts this surface material can improve the first water resistance of body of wall to greatest extent.
Wherein, described steel concrete waterproof collar tie beam is provided with the bar construction embedding concrete floor, and this structure plays good facilitation in the globality improving steel concrete waterproof collar tie beam and concrete floor.
The utility model has following beneficial effect: this structure can prevent the new masonry panel in washroom from occurring infiltration phenomenon.
Accompanying drawing explanation
Fig. 1 is that wall water seal girder construction schematic diagram newly built by washroom.
Detailed description of the invention
The technological means realized to make the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with specific embodiment, setting forth the utility model further.
As shown in Figure 1, wall water seal girder construction newly built by washroom, it is included in the body 1 of newly building a wall that washroom place is arranged, the bottom of described new masonry panel is provided with the steel concrete waterproof collar tie beam 2 of building in concrete floor, described concrete floor surface is provided with leveling layer 3, described new masonry panel is disposed with oxidant layer 4 at the bottom of first multipurpose towards washroom one side wall, cement mortar screeding layer 5, first waterproof layer 6, cement mortar secondary leveling layer 7, second waterproof layer 8, oxidant layer 9 at the bottom of second multipurpose, the surface material 11 of oxidant layer at the bottom of second multipurpose is located at by cementing agent 10, such as ceramic tile or stone material.
First, second road waterproof layer described is the conjunctiva of thickness at more than 1mm.
The foregoing is only preferred embodiment of the present utility model, protection domain of the present utility model is not limited in above-mentioned embodiment, and every technical scheme belonging to the utility model principle all belongs to protection domain of the present utility model.For a person skilled in the art, the some improvement carried out under the prerequisite not departing from principle of the present utility model, these improvement also should be considered as protection domain of the present utility model.
Claims (4)
1. wall water seal girder construction newly built by washroom, it is included in the body of newly building a wall (1) that washroom place is arranged, it is characterized in that, the bottom of described new masonry panel is provided with the steel concrete waterproof collar tie beam (2) of building in concrete floor, described concrete floor surface is provided with leveling layer (3), described new masonry panel is disposed with oxidant layer (4) at the bottom of first multipurpose towards washroom one side wall, cement mortar screeding layer (5), first waterproof layer (6), cement mortar secondary leveling layer (7), second waterproof layer (8), oxidant layer (9) at the bottom of second multipurpose, the surface material (11) of oxidant layer at the bottom of second multipurpose is located at by cementing agent (10).
2. wall water seal girder construction newly built by washroom according to claim 1, it is characterized in that, first, second road waterproof layer described is the conjunctiva of thickness at more than 1mm.
3. wall water seal girder construction newly built by washroom according to claim 1, it is characterized in that, described surface material is ceramic tile or stone material.
4. wall water seal girder construction newly built by washroom according to claim 1, it is characterized in that, described steel concrete waterproof collar tie beam is provided with the bar construction embedding concrete floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520788201.2U CN205063052U (en) | 2015-10-12 | 2015-10-12 | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520788201.2U CN205063052U (en) | 2015-10-12 | 2015-10-12 | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205063052U true CN205063052U (en) | 2016-03-02 |
Family
ID=55389627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520788201.2U Active CN205063052U (en) | 2015-10-12 | 2015-10-12 | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205063052U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
CN107514141A (en) * | 2016-06-16 | 2017-12-26 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN112324014A (en) * | 2020-09-23 | 2021-02-05 | 上海美家美沪装饰科技有限公司 | Concrete reinforced ground beam and construction process |
-
2015
- 2015-10-12 CN CN201520788201.2U patent/CN205063052U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107514141A (en) * | 2016-06-16 | 2017-12-26 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN107514141B (en) * | 2016-06-16 | 2019-06-21 | 中国十七冶集团有限公司 | A kind of prefabricated prefabricating technique construction technology of superimposed sheet sealing reversed beam |
CN106759955A (en) * | 2016-11-14 | 2017-05-31 | 东方雨虹民用建材有限责任公司 | The construction method of waterproof system is laid in a kind of toilet and toilet with waterproof system |
CN112324014A (en) * | 2020-09-23 | 2021-02-05 | 上海美家美沪装饰科技有限公司 | Concrete reinforced ground beam and construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205063052U (en) | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom | |
CN203905374U (en) | Hanging piece for hanging stones or tiles in wet hanging mode | |
CN105649235A (en) | Construction technique for MS dense thin-wall building block filling | |
CN202466648U (en) | Waterproof structure of basement | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN203716410U (en) | Novel roof grid seam | |
CN204645456U (en) | waterproof wall tile structure | |
CN102758486B (en) | Anti-seepage method for building engineering | |
CN211037664U (en) | Stone material ground and ceramic tile ground handing-over department node structure | |
CN103590508A (en) | Composite thermal insulating wall structure and construction method thereof | |
CN102535847B (en) | Construction method of gypsum self-insulation external wall block masonry | |
CN203347182U (en) | Water-impermeable structural layer for toilet | |
CN206337787U (en) | A kind of indoor moisture proof cracking resistance earth construction | |
CN205063277U (en) | Zero clearance mounting structure between marble or ceramic tile skirting line and wall body | |
CN205063031U (en) | Structure that ftractures is prevented to right angle wall | |
CN204826374U (en) | Waterproof wall brick | |
CN102121243A (en) | Processing method for rolling construction joint surface of concrete dam | |
CN203373872U (en) | Cast-in-place concrete self-warm-keeping wall with dismounting-free outer formworks | |
CN204919930U (en) | Steel construction archaize building's floor structure | |
CN210508240U (en) | Vibration-damping lateral-movement-preventing structure of stone ground at elevator room | |
CN105569214A (en) | Dense thin-wall filled building block construction technology | |
CN204676711U (en) | A kind of external wall anti-leakage structure | |
CN206971023U (en) | A kind of damping power consumption concrete quality brick with self-adhesive layer | |
CN213390924U (en) | Novel shear force wall and building block wall structure | |
CN104131725B (en) | A kind of integral cast-in-situ formula main transformer oil sump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170118 Address after: 200092 Shanghai city Yangpu District Kongjiang Road No. 1142 building 23 room 5071-7 Patentee after: Shanghai Shen Yuan Architectural Design Co., Ltd. Address before: 200093 room 18A-2, Anshan Road, Shanghai, Yangpu District, 5 Patentee before: Shanghai Shen Yuan building decoration engineering Co., Ltd |