CN103758312A - Laminating construction method for facing bricks - Google Patents
Laminating construction method for facing bricks Download PDFInfo
- Publication number
- CN103758312A CN103758312A CN201110459527.7A CN201110459527A CN103758312A CN 103758312 A CN103758312 A CN 103758312A CN 201110459527 A CN201110459527 A CN 201110459527A CN 103758312 A CN103758312 A CN 103758312A
- Authority
- CN
- China
- Prior art keywords
- face brick
- jointing
- bricks
- construction method
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The invention discloses a laminating construction method for facing bricks. The method comprises the following steps: 1) processing basement layer; 2) arranging bricks; 3) snapping a basement layer; 4) uniformly brushing a layer of colorless and transparent special marble water-proofing agent on the laminated surfaces of the bricks and jointing surfaces around the bricks; 5) carrying out facing jointing by a special crack-sealer. According to the method provided by the invention, the pasted facing bricks reach the comprehensive effects of firm and durable pasting, attractiveness, antiquing and practicality, and common quality problems of saltpetering, hollowing, falling off and the like can be prevented.
Description
Technical field
The present invention relates to a kind of construction method, particularly a kind of face brick veneer construction method, belongs to technical field of building construction.
Background technology
Facing tile is the exterior wall finish made from ceramic veneer.Be characterized in: quality is closely knit, glaze is bright, wear-resisting, waterproof, corrosion resistant and frost resistance good, give sparkling and crystal-clear, the clean generous aesthetic feeling of light, be a kind of exterior wall faced deorative of commonplace application.To form with the compressing rear roasting of refractory clay.Conventionally do orthogonally, size has 100 × 100 × 10mm and 150 × 150 × 10mm etc.It has the features such as quality is solid, intensity is high, water absorption rate low (being less than 4%).Be generally light yellow, as exterior wall finish.Facing tile is the exterior wall finish made from ceramic veneer.Be characterized in: quality is closely knit, glaze is bright, wear-resisting, waterproof, corrosion resistant and frost resistance good, give sparkling and crystal-clear, the clean generous aesthetic feeling of light, be a kind of exterior wall faced deorative of commonplace application.
But in face brick construction, often there is following problem: face brick bad adhesion, easily hollowing come off, water absorption rate and permeability is strong, intensity is low, frangible, the easy edge damage arrisdefect of cutting processing, be subject to the problems such as frost heave after pasting.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of face brick veneer construction method, and the method solves the quality problems that are prone in construction.
In order to solve above-mentioned technical problem, technical scheme of the present invention is: a kind of face brick veneer construction method, and it comprises the following steps:
1) base treatment, cleans out metope, and concrete light metope needs dabbing, smears interfacial agents 1 road, by cement mortar, smears and flattens, and hair is rubbed on surface with the hands;
2) row's brick, measures the real size of wall facade, with CAD drafting electronics material cutting plan;
3) basic unit's snap the line, ejects reference line, frame bar, brickwork joint line, at metope, ejects marked rod;
4), at face brick veneer and surrounding jointing face, brush uniformly the agent of the water white marble special-purpose water-proof of one deck;
5) face brick is hung and is pasted
1. bury fixed point underground;
2. face brick fluting, colligation copper cash are temporary fixed;
3. grouting, mixing cement mortar, fills partly 3 jiaos from face brick is symmetrical with grouting spoon, plugs and pounds closely knit with bamboo chip or wood lath;
6) with special jointing agent, carry out facing jointing.
In described step 6) in, the low 1~2mm of depth ratio face brick of described jointing
The inventive method makes the face brick of pasting reach firm pasting, durable, attractive in appearance, modelled after an antique, practical resultant effect, the common quality defect such as avoid the accumulation of salt in the surface soil, hollowing, come off.
The specific embodiment
1) base treatment
The brick of having constructed (building block) metope is cleaned out, and concrete light metope needs dabbing, smears interfacial agents 1 road, by 1: 2 cement mortar, smears and flattens, and hair is rubbed on surface with the hands.
2) row's brick.Real size to wall facade is measured, with CAD drafting electronics material cutting plan.
3) basic unit's snap the line test line.After basic unit ash is slightly dry, by Art Design and row's brick figure, eject reference line, frame bar, brickwork joint line, at metope, eject marked rod, guarantee metope suitable for reading be full sized brick, at surface layer labeling on schedule.
4) select brick to soak brick.Face brick is put into water and fully soak, taking-up is dried in the shade stand-by.
5) brush waterproof agent.At face brick veneer and surrounding jointing face, brush uniformly the agent of the water white marble special-purpose water-proof of one deck, then dry in the cool.
6) thick face brick is hung and is pasted.1. bury fixed point underground.
2. face brick fluting, colligation copper cash are temporary fixed.
3. grouting.1: 1.5 cement mortar of mixing, fills half 3 jiaos from face brick is symmetrical with grouting spoon, plugs and pounds closely knit with bamboo chip or wood lath.
7) jointing.Adopt special jointing agent to carry out facing jointing, the lower slightly 1~2mm of its depth ratio face brick.Before jointing, should first face brick seam be cleaned out, first hook vertically seam, then hook horizontal joint.
Finally the residual mortar of tile surface is disposed, water and hairbrush clean up.
Above-described embodiment does not limit the present invention in any way, and every employing is equal to replaces or technical scheme that the mode of equivalent transformation obtains all drops in protection scope of the present invention.
Claims (2)
1. a face brick veneer construction method, is characterized in that comprising the following steps:
1) base treatment, cleans out metope, and concrete light metope needs dabbing, smears interfacial agents 1 road, by cement mortar, smears and flattens, and hair is rubbed on surface with the hands;
2) row's brick, measures the real size of wall facade, with CAD drafting electronics material cutting plan;
3) basic unit's snap the line, ejects reference line, frame bar, brickwork joint line, at metope, ejects marked rod;
4), at face brick veneer and surrounding jointing face, brush uniformly the agent of the water white marble special-purpose water-proof of one deck;
5) face brick is hung and is pasted
1. bury fixed point underground;
2. face brick fluting, colligation copper cash are temporary fixed;
3. grouting, mixing cement mortar, fills partly 3 jiaos from face brick is symmetrical with grouting spoon, plugs and pounds closely knit with bamboo chip or wood lath;
6) with special jointing agent, carry out facing jointing.
2. face brick veneer construction method according to claim 1, is characterized in that: in described step 6) in, the low 1~2mm of depth ratio face brick of described jointing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110459527.7A CN103758312A (en) | 2011-12-31 | 2011-12-31 | Laminating construction method for facing bricks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110459527.7A CN103758312A (en) | 2011-12-31 | 2011-12-31 | Laminating construction method for facing bricks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103758312A true CN103758312A (en) | 2014-04-30 |
Family
ID=50525620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110459527.7A Pending CN103758312A (en) | 2011-12-31 | 2011-12-31 | Laminating construction method for facing bricks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103758312A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797929A (en) * | 2018-05-31 | 2018-11-13 | 中联世纪建设集团有限公司 | Ecological stone material construction |
CN110030965A (en) * | 2019-05-22 | 2019-07-19 | 宁波希澈机械科技有限公司 | A kind of automation high-rise building exposed wall facing brick intensity detection machine |
CN110499904A (en) * | 2019-09-06 | 2019-11-26 | 深圳市建工集团股份有限公司 | Indoor wall face brick base exempts from plaster post-grouting wet combining construction method and vertical adjustment upright bar |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11350614A (en) * | 1998-06-08 | 1999-12-21 | Dyflex:Kk | Heat-insulating and water-proofing construction method for heat storage tank |
CN1693616A (en) * | 2005-06-09 | 2005-11-09 | 黄振利 | External wall tile wall on heat insulating layer of combined placing concrete and polyphenyl board and construction method |
CN1786363A (en) * | 2005-12-12 | 2006-06-14 | 张建荣 | Method for construction of binding face tile and stone material on external heat preservation system on outside wall |
CN102182286A (en) * | 2011-01-31 | 2011-09-14 | 云南巨和建设集团有限公司 | Construction technology for preventing hollow bulging and falling-off of outer wall tiles under condition of arid climate in plateau area |
-
2011
- 2011-12-31 CN CN201110459527.7A patent/CN103758312A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11350614A (en) * | 1998-06-08 | 1999-12-21 | Dyflex:Kk | Heat-insulating and water-proofing construction method for heat storage tank |
CN1693616A (en) * | 2005-06-09 | 2005-11-09 | 黄振利 | External wall tile wall on heat insulating layer of combined placing concrete and polyphenyl board and construction method |
CN1786363A (en) * | 2005-12-12 | 2006-06-14 | 张建荣 | Method for construction of binding face tile and stone material on external heat preservation system on outside wall |
CN102182286A (en) * | 2011-01-31 | 2011-09-14 | 云南巨和建设集团有限公司 | Construction technology for preventing hollow bulging and falling-off of outer wall tiles under condition of arid climate in plateau area |
Non-Patent Citations (2)
Title |
---|
袁乃勇等: "建筑装饰面砖施工工艺及质量控制", 《中国新技术新产品》 * |
陈立成等: "仿古青砖贴面施工技术", 《工程质量》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108797929A (en) * | 2018-05-31 | 2018-11-13 | 中联世纪建设集团有限公司 | Ecological stone material construction |
CN110030965A (en) * | 2019-05-22 | 2019-07-19 | 宁波希澈机械科技有限公司 | A kind of automation high-rise building exposed wall facing brick intensity detection machine |
CN110030965B (en) * | 2019-05-22 | 2019-11-19 | 东阳阿语机械科技有限公司 | A kind of automation high-rise building exposed wall facing brick intensity detection machine |
CN110499904A (en) * | 2019-09-06 | 2019-11-26 | 深圳市建工集团股份有限公司 | Indoor wall face brick base exempts from plaster post-grouting wet combining construction method and vertical adjustment upright bar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN104746772A (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN104120848A (en) | Construction method for internal wall facing bricks | |
CN103410331B (en) | The wet combining technique of vitrified tile | |
CN101736825A (en) | Method for construction of outer wall external heat preservation system | |
CN102182286A (en) | Construction technology for preventing hollow bulging and falling-off of outer wall tiles under condition of arid climate in plateau area | |
CN100535355C (en) | Rock-imitated heat-preserving decorating wall and manufacturing method thereof | |
CN104164956A (en) | Flexible connecting system for polyurethane heat preservation decorative sheets | |
CN103195218B (en) | Wall ceramic sand mortar external plastering construction method | |
CN103758312A (en) | Laminating construction method for facing bricks | |
CN103343578A (en) | STP ultra-thin vacuum heat insulation heat preservation board and application of STP ultra-thin vacuum heat insulation heat preservation board in outer wall construction | |
CN100557162C (en) | Anchoring composite insulation boards cast polyurethane exterior wall outer thermal insulation construction method | |
Foulks | Historic Building Façades: the manual for maintenance and rehabilitation | |
CN106639247A (en) | Construction technique for paving ceramic floor tiles | |
CN103806664A (en) | Construction technology of external thermal insulation mortar | |
CN203334568U (en) | Saltpetering prevention structure of garden veneer pasted block | |
CN100368641C (en) | Spraying of heat preservating decorating polyurethane wall body and its construction method | |
CN2934449Y (en) | Combined type natural sandstone board wall surface | |
CN105625650A (en) | Construction method for roofing parapet wall flashing protective layer | |
CN212405863U (en) | Building facade decoration structure | |
CN204983447U (en) | Building external tile face structure | |
CN112081334A (en) | Building facade decoration structure and construction method thereof | |
CN203097165U (en) | Internal-external wall tile-imitating artistic texture coating structure | |
CN201981558U (en) | Cement-based capillary crystalline waterproof structure | |
CN106150020A (en) | A kind of construction technology utilizing flowing mortar adhesively face brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140430 |