CN106348188A CN201610815298.0A CN201610815298A CN106348188A CN 106348188 A CN106348188 A CN 106348188A CN 201610815298 A CN201610815298 A CN 201610815298A CN 106348188 A CN106348188 A CN 106348188A
Authority
CN
China
Prior art keywords
fixed plate
plate
expansion plate
regulating sleeve
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610815298.0A
Other languages
Chinese (zh)
Other versions
CN106348188B (en
Inventor
张朝峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jian Jian seventh Construction Co., Ltd.
Original Assignee
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huicheng Zhizao Industrial Design Co Ltd filed Critical Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority to CN201610815298.0A priority Critical patent/CN106348188B/en
Publication of CN106348188A publication Critical patent/CN106348188A/en
Application granted granted Critical
Publication of CN106348188B publication Critical patent/CN106348188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C25/00Cranes not provided for in groups B66C17/00 - B66C23/00
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Milling, Drilling, And Turning Of Wood (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for manufacturing a gantry type building construction lifting device. The gantry type building construction lifting device comprises a bottom plate, a transverse beam, a hoist and four upright columns. The identical upright columns are fixedly welded at four corners of the bottom plate, and a row of adjusting holes is vertically formed in each upright column; adjusting sleeves sleeve the four upright columns; left and right fixing plates are respectively fixedly welded on the adjusting sleeves on the left and right sides of the gantry type building construction lifting device; left and right expansion plates are respectively arranged in the left and right fixing plates; the transverse beam is fixed to the upper ends of the upright columns, and the hoist is arranged on the transverse beam; four rollers are mounted on the bottom plate. The method has the advantages that materials can be safely lifted under the opening and closing effects of the left and right expansion plates, the heights of the fixing plates can be adjusted in the up-down directions, and accordingly the gantry type building construction lifting device is adaptive to buildings with different heights; the gantry type building construction lifting device is easy to operate and compact in structural connection, is safe, reliable, convenient and speedy, can be used in optional places owing to the rollers and can be mounted and detached quickly, and accordingly the building construction efficiency can be improved.

Description

The manufacture method of planer-type building-construction lifting device
Technical field
The present invention relates to a kind of construction implement field, particularly to a kind of system of planer-type building-construction lifting device Make method.
Background technology
In building construction process, lifting means is one kind of conveying machinery, is by changing the machinery that potential energy is transported Equipment, is transported to eminence from ground by building required material, lifting device mainly includes elevator, overhead traveling crane, elevator, stable car, hangs Car, headstock gear etc., mainly have the forms such as bucket type, cable type, chain-type, fluid pressure type.Wherein, cable type is dynamic by manpower or machinery Power drives winding cords to complete the lifting means of traction enhancement work.Cable type lifting device needs the side wall built again at present Upper installation crossbeam, on crossbeam, setting hoist engine carrys out improving material, and such workman needs to visit body when collecting material Go out, cause casualties it is easy to lead to a disaster because, in the quality of material, workman center is unstable, and this lifting means Installation and removal bother very much, mobile inconvenience.
Content of the invention
It is an object of the invention to provide a kind of simple to operate, structure is completely embedded, safe and reliable, convenient and swift, install, Dismounting is quick, improves the planer-type building-construction lifting device of construction efficiency, to solve proposition in above-mentioned background technology Problem.
For achieving the above object, the following technical scheme of present invention offer:
A kind of planer-type building-construction lifting device, including base plate, crossbeam, hoist engine and column;The corner of described base plate All it is fixedly welded with identical column, column is vertically arranged with one and teases and ridicule knothole;Four columns are all cased with adjusting set Cylinder, the interior circular diameter of regulating sleeve and the equal diameters of column, regulating sleeve slides on column, on the side wall of regulating sleeve Offer through hole corresponding with adjustment hole, pass through and have regulating bolt in through hole and regulation in the hole;Solid on the regulating sleeve in left side Surely it is welded with left fixed plate, the regulating sleeve on right side is fixedly welded with right fixed plate, left fixed plate and right fixed plate are all and water Plane is parallel, is welded with boss between left fixed plate, right fixed plate and regulating sleeve;Described left fixed plate and right fixed plate Inside offer cavity, slide in cavity and be provided with and left fixed plate, the corresponding left expansion plate of right fixed plate, right expansion plate, The right side of left expansion plate is provided with groove, is provided with the projection with groove fit on the left side of right expansion plate, groove with Fixing hole is offered, fixing in the hole is provided with fixing bolt, fixing welding on left expansion plate, right expansion plate upper surface in projection There is a pushing block of strip, and pushing block is along the telescopic direction setting of left expansion plate, right expansion plate, in left fixed plate, right fixed plate Offer pushing block walking trough corresponding with pushing block;The upper end of described column is fixed with crossbeam, and crossbeam is provided with hoist engine, in volume Raise and cable wire is wound with machine;Helper is fixed with base plate, the roller with braking mechanism is installed on base plate.
Further: the distance between described adjustment hole is that the adjustment hole on 50~80mm, and four columns is mutually right Should.
Further: described fixing hole is provided with 3~5.
Further: the lower end of described cable wire is provided with hook, and link up with positioned at left expansion plate, the centrosymmetry of right expansion plate On line.
The invention also discloses a kind of manufacture method of planer-type building-construction lifting device, including following technique and step Rapid:
1) Corner Strapped in the base plate of rectangle welds the column of same size, is respectively provided with regulation on four root posts Hole, the distance between adjustment hole is the adjustment hole mutually level correspondence on 50~80mm, and four columns;
2) regulating sleeve, the interior circular diameter of regulating sleeve and the equal diameters of column, adjusting set are arranged on four columns Cylinder slides on column, offers through hole corresponding with adjustment hole on the side wall of regulating sleeve, wears in through hole and regulation in the hole Cross regulating bolt;
3) left fixed plate is fixedly welded with the regulating sleeve in left side, the regulating sleeve on right side is fixedly welded with right solid Fixed board, left fixed plate and right fixed plate all and plane-parallel, are welded between left fixed plate, right fixed plate and regulating sleeve Boss;Offer cavity in described left fixed plate and right fixed plate, slide in cavity and be provided with and left fixed plate, right fixation The corresponding left expansion plate of plate, right expansion plate, are provided with groove on the right side of left expansion plate, set on the left side of right expansion plate There is the projection with groove fit, in groove and longitudinally disposed 3~5 fixing holes of high spot, fixing in the hole arranges fixing bolt, The pushing block of strip is fixedly welded with left expansion plate, right expansion plate upper surface, and pushing block is along left expansion plate, the stretching of right expansion plate Contracting direction is arranged, and offers pushing block walking trough corresponding with pushing block in left fixed plate, right fixed plate;
4) crossbeam is set in the upper end of column, crossbeam is provided with hoist engine, hoist engine is wound around cable wire, in cable wire Lower end setting hook, hook is in left expansion plate, the centre symmetry line of right expansion plate;At the two ends of base plate, helper is set, Under base plate, corner is respectively mounted the roller with braking mechanism.
The invention also discloses a kind of construction method of planer-type building-construction lifting device, including following operating procedure:
1) this planer-type building-construction lifting device, when using, is arranged on the side of building, top or middle part are with steel Pipe is fixed with adjacent body of wall, by regulating sleeve come the height of adjustment fixing plate, to adapt to differing heights architectural plane, highly It is inserted into regulating bolt in adjustment hole after the completion of regulation, regulating sleeve is fixed, personnel stand in left fixed plate, make in right fixed plate Industry, now left expansion plate, right expansion plate combine, fixed by fixing bolt;
2) when needing improving material, fixing bolt is extracted, left expansion plate, right expansion plate are retracted in by a left side by pushing block In fixed plate, right fixed plate, between left fixed plate, right fixed plate, reserve space, hook is being put down by hoist engine, is lifting thing Material, material is elevated come up after, left expansion plate, right expansion plate are released and are merged, fixing after can take off material;
3) this planer-type building-construction lifting device can be moved to by roller in construction and anywhere use.
Invention advantage
Compared with prior art, the invention has the beneficial effects as follows: the present invention by left expansion plate, right expansion plate folding Lai Realize security improvement material, and fixed plate height up and down, adapt to differing heights building;Device is simple to operate, and structure is even Connect closely, safe and reliable, convenient and swift, and so that device anywhere all can be being used by roller, install, dismantle quickly, Improve construction efficiency.
Brief description
Fig. 1 is the structural representation of planer-type building-construction lifting device.
Fig. 2 is the mplifying structure schematic diagram of a in Fig. 1.
Fig. 3 is the overlooking the structure diagram of left fixed plate and the connection of right fixed plate in planer-type building-construction lifting device.
Fig. 4 be in planer-type building-construction lifting device left expansion plate and right expansion plate separately after structural representation.
In figure: 1- base plate, the left fixed plate of 2-, the right fixed plate of 3-, 4- crossbeam, 5- hoist engine, 6- links up with, 7- column, and 8- adjusts Knothole, 9- regulating bolt, 10- regulating sleeve, 11- helper, 12- pushing block, 13- boss, the left expansion plate of 14-, 15- is right flexible Plate, 16- roller, 17- pushing block walking trough, 18- fixing hole, 19- groove, 20- is raised, 21- fixing bolt.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation description is it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of not making creative work Embodiment, broadly falls into the scope of protection of the invention.
Embodiment 1: refer to figure, in the embodiment of the present invention, planer-type building-construction lifting device includes base plate 1, crossbeam 4th, hoist engine 5 and column 7;The corner of described base plate 1 is all fixedly welded with identical column 7, is vertically arranged with one on column 7 Tease and ridicule knothole 8, the distance between adjustment hole 8 is that the adjustment hole 8 on 50~80mm, and four columns 7 mutually corresponds to;At four Regulating sleeve 10, the interior circular diameter of regulating sleeve 10 and the equal diameters of column 7 are all cased with column 7, regulating sleeve 10 is vertical Slide on post 7, through hole corresponding with adjustment hole 8 is offered on the side wall of regulating sleeve 10, passes through in through hole and adjustment hole 8 There is regulating bolt 9, to ensure that regulating sleeve 10 is fixed on column 7, enable regulating sleeve 10 that height to be adjusted on column 7; Left fixed plate 2 is fixedly welded with the regulating sleeve 10 in left side, the regulating sleeve 10 on right side is fixedly welded with right fixed plate 3, left fixed plate 2 and right fixed plate 3 all and plane-parallel, in order to improve the stability of left fixed plate 2 and right fixed plate 3, It is welded with boss 13, boss 13 is cast iron, improves regulating sleeve between left fixed plate 2, right fixed plate 3 and regulating sleeve 10 With the contact surface of left fixed plate 2, right fixed plate 3, increase sustainable weight in left fixed plate 2 and right fixed plate 3;Described left solid Offer cavity in fixed board 2 and right fixed plate 3, slide in cavity and be provided with and left fixed plate 2, the corresponding left side of right fixed plate 3 Expansion plate 14, right expansion plate 15, left expansion plate 14, right expansion plate 15 can contract in corresponding left fixed plate 2, right fixed plate 3, Make to reserve space between left fixed plate 2 and right fixed plate 3, the right side of left expansion plate 14 is provided with groove 19, right flexible The left side of plate 15 be provided with groove 19 cooperation projection 20, so after left expansion plate 14, right expansion plate 15 stretch out against When together, by groove 19 with raised 20 can left expansion plate 14, right expansion plate 15 fixing, in groove 19 is with raised 20 Offer fixing hole 18, fixing hole 18 is provided with 3~5, is provided with fixing bolt 21 in fixing hole 18, by fixing bolt 21 Groove 19 is fixed together with raised 20, left expansion plate 14, right expansion plate 15 upper surface are fixedly welded with strip The pushing block 12 of shape, and pushing block 12 along left expansion plate 14, right expansion plate 15 telescopic direction setting, in left fixed plate 2, right fixed plate Offer pushing block walking trough 17 corresponding with pushing block 12 on 3, so that pushing block 12 is moved in pushing block walking trough 17;Described column 7 Upper end is fixed with crossbeam 4, and crossbeam 4 is provided with hoist engine 5, is wound with cable wire on hoist engine 5, and the lower end of cable wire is provided with hook 6, and link up with 6 in left expansion plate 14, the centre symmetry line of right expansion plate 15;Helper 11 is fixed with base plate 1, makes workman Height can be adjusted by climbing helper 11, four rolling 16 is provided with base plate 1, so that device is moved easily.
The present embodiment also discloses a kind of manufacture method of planer-type building-construction lifting device, including following technique and step Rapid:
1) Corner Strapped in the base plate 1 of rectangle welds the column 7 of same size, is respectively provided with tune on four root posts 7 Knothole 8, the distance between adjustment hole 8 is the adjustment hole 8 mutually level correspondence on 50~80mm, and four columns 7;
2) regulating sleeve 10, the interior circular diameter of regulating sleeve 10 and the equal diameters of column 7 are arranged on four columns 7, Regulating sleeve 10 slides on column 7, offers through hole corresponding with adjustment hole 8, in through hole on the side wall of regulating sleeve 10 There is regulating bolt 9 with passing through in adjustment hole 8;
3) left fixed plate 2 is fixedly welded with the regulating sleeve 10 in left side, fixing welding on the regulating sleeve 10 on right side There are right fixed plate 3, left fixed plate 2 and right fixed plate 3 all and plane-parallel, in left fixed plate 2, right fixed plate 3 and adjusting set It is welded with boss 13 between cylinder 10;Cavity is offered, setting of sliding in cavity in described left fixed plate 2 and right fixed plate 3 Have and left fixed plate 2, the corresponding left expansion plate 14 of right fixed plate 3, right expansion plate 15, the right side of left expansion plate 14 is provided with Groove 19, is provided with the projection 20 with groove 19 cooperation on the left side of right expansion plate 15, at groove 19 with raised 20 longitudinally 3~5 fixing holes 18 of setting, setting fixing bolt 21 in fixing hole 18, solid on left expansion plate 14, right expansion plate 15 upper surface Surely it is welded with the pushing block 12 of strip, and pushing block 12 is along the telescopic direction setting of left expansion plate 14, right expansion plate 15, in left fixation Pushing block walking trough 17 corresponding with pushing block 12 is offered on plate 2, right fixed plate 3;
4) crossbeam 4 is set in the upper end of column 7, crossbeam 4 is provided with hoist engine 5, cable wire is wound around on hoist engine 5, The lower end setting hook 6 of cable wire, hook 6 is in left expansion plate 14, the centre symmetry line of right expansion plate 15;In base plate 1 two End setting helper 11, is respectively mounted the roller 16 with braking mechanism in 1 time corner of base plate.
Itself it has been to also disclose a kind of construction method of planer-type building-construction lifting device, including following operation step Rapid:
1) this planer-type building-construction lifting device, when using, is arranged on the side of building, top or middle part are with steel Pipe is fixed with adjacent body of wall, by regulating sleeve 10 come the height of adjustment fixing plate, to adapt to differing heights architectural plane, high Degree is inserted into regulating bolt 9 in adjustment hole 8 after the completion of adjusting, and regulating sleeve 10 is fixing, and personnel stand in left fixed plate 2, the right side admittedly Operation in fixed board 3, now left expansion plate 14, right expansion plate 15 combine, fixed by fixing bolt 21;
2) when needing improving material, fixing bolt 21 is extracted, by pushing block 12 by left expansion plate 14, right expansion plate 15 It is retracted in left fixed plate 2, in right fixed plate 3, between left fixed plate 2, right fixed plate 3, reserves space, pass through elevator 6 will be being linked up with Machine 5 puts down, improving material, material is elevated come up after, left expansion plate 14, right expansion plate 15 are being released merging, fixing after take Lower material;
3) this planer-type building-construction lifting device can be moved to by roller 16 in construction and anywhere use.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as limiting involved claim.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment only wraps Containing an independent technical scheme, only for clarity, those skilled in the art should for this narrating mode of description Using description as an entirety, the technical scheme in each embodiment can also form those skilled in the art through appropriately combined Understandable other embodiment.

Claims (1)

1. a kind of manufacture method of planer-type building-construction lifting device is it is characterised in that include following technique and step:
1) Corner Strapped in the base plate (1) of rectangle welds the column (7) of same size, is respectively provided with four root posts (7) Adjustment hole (8), the distance between adjustment hole (8) is adjustment hole (8) the mutually level on 50~80mm, and four columns (7) Corresponding;
2) regulating sleeve (10) is set four columns (7) are upper, the diameter phase of the interior circular diameter of regulating sleeve (10) and column (7) Deng, regulating sleeve (10) slip on column (7), the side wall of regulating sleeve (10) offer corresponding with adjustment hole (8) Through hole, passing through in through hole and adjustment hole (8) has regulating bolt (9);
3) left fixed plate (2), the upper fixing weldering of regulating sleeve (10) on right side are fixedly welded with the regulating sleeve (10) in left side Be connected to right fixed plate (3), left fixed plate (2) and right fixed plate (3) all and plane-parallel, in left fixed plate (2), right fixed plate (3) it is welded with boss (13) and regulating sleeve (10) between;Open up free in described left fixed plate (2) and right fixed plate (3) Chamber, slides in cavity and is provided with and left fixed plate (2), the corresponding left expansion plate (14) of right fixed plate (3), right expansion plate (15), groove (19) is provided with the right side of left expansion plate (14), the left side of right expansion plate (15) is provided with and groove (19) projection (20) coordinating, in groove (19) and longitudinally disposed 3~5 fixing holes (18) in raised (20) place, fixing hole (18) Interior setting fixing bolt (21), is fixedly welded with the pushing block of strip on left expansion plate (14), right expansion plate (15) upper surface (12), and pushing block (12) along left expansion plate (14), right expansion plate (15) telescopic direction setting, in left fixed plate (2), right fixation Pushing block walking trough (17) corresponding with pushing block (12) is offered on plate (3);
4) in the upper end of column (7) setting crossbeam (4), crossbeam (4) is provided with hoist engine (5), in hoist engine (5) upper winding steel Rope, in the lower end of cable wire setting hook (6), hook (6) is located at left expansion plate (14), the centre symmetry line of right expansion plate (15) On;At the two ends of base plate (1) setting helper (11), under base plate (1), corner is respectively mounted the roller (16) with braking mechanism.
CN201610815298.0A 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device Active CN106348188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610815298.0A CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610815298.0A CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device
CN201410736610.8A CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410736610.8A Division CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof

Publications (2)

Publication Number Publication Date
CN106348188A true CN106348188A (en) 2017-01-25
CN106348188B CN106348188B (en) 2018-04-27

Family

ID=52899920

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201410736610.8A Expired - Fee Related CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof
CN201610814500.8A Pending CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device
CN201610815298.0A Active CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201410736610.8A Expired - Fee Related CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof
CN201610814500.8A Pending CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device

Country Status (1)

Country Link
CN (3) CN104453231B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107140547A (en) * 2017-06-16 2017-09-08 无锡石油化工起重机有限公司 The traveller gantry of installation activity bottom plate
CN109896433A (en) * 2019-03-24 2019-06-18 严传玉 A kind of multi-functional adjustable mechanical equipment upending frame
CN112010174A (en) * 2020-09-24 2020-12-01 萧县奥新农业科技有限公司 Electromechanical equipment installation device and use method thereof

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109110701A (en) * 2016-05-12 2019-01-01 李从宾 A kind of construction material elevator
CN108557655A (en) * 2018-04-28 2018-09-21 中电建水环境治理技术有限公司 A kind of pipeline hanging device without spin
CN108518055A (en) * 2018-05-11 2018-09-11 桐城市永锦建筑工程有限公司 A kind of special constructing device of paint
CN108643537A (en) * 2018-05-23 2018-10-12 马飞虎 A kind of construction scaffold for being easily installed and having a safety feature
CN108999389B (en) * 2018-07-26 2021-06-22 广东电网有限责任公司广州供电局 Portable vertical lifting platform and replacement method of STATCOM valve bank
CN110948169A (en) * 2018-09-27 2020-04-03 金川集团工程建设有限公司 Steel pipe rotator
CN109649994B (en) * 2018-12-28 2020-07-10 台州职业技术学院 Material lifting machine for building engineering
CN109778710B (en) * 2019-03-15 2021-01-26 贵州大学 Simple lifting frame structure for site construction of roads and bridges
CN110607752B (en) * 2019-09-30 2021-04-16 中建七局第一建筑有限公司 Beam frame for building construction
CN110777935A (en) * 2019-11-14 2020-02-11 湖南吉人住工装配式建筑有限公司 Building device is built to integration fossil fragments
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters
CN114709790B (en) * 2022-04-11 2024-05-03 无锡德刚精工机电设备有限公司 Sealing protection device suitable for junction of low-voltage cable
CN115013349A (en) * 2022-06-24 2022-09-06 浙江鹏翔暖通设备有限公司 Low-noise axial flow fan capable of being adjusted in a movable and liftable mode

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205402U (en) * 1985-12-21 1987-04-22 哈尔滨市第一住宅建筑工程公司建华机械厂 Attached construction gantry frame with safety devices
JPH1046799A (en) * 1996-08-01 1998-02-17 Nikko Co Ltd Traveling type elevator scaffolding with plurality of masts
JP2000177955A (en) * 1998-12-16 2000-06-27 Kumagai Gumi Co Ltd Luggage loading/unloading device for lifting carrier device
CN201071251Y (en) * 2007-07-02 2008-06-11 周爱兴 Assembled adjustable gantry
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Steel bar mounting hanger
CN102745597A (en) * 2012-07-16 2012-10-24 昆山市飞荣达电子材料有限公司 Portable portal frame

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100096216A1 (en) * 2008-10-17 2010-04-22 Hekimo, S.R.O. Scaffolding
JP2010138652A (en) * 2008-12-15 2010-06-24 Sakamoto Katsuhiko Elevatable scaffolding
CN102108786B (en) * 2010-12-09 2012-10-17 浙江省天和建材集团有限公司 Overall lifting construction method of ultra-large type building member and device thereof
CN202508804U (en) * 2012-03-20 2012-10-31 葛洲坝集团基础工程有限公司 Gantry derrick hoisting system
CN203715155U (en) * 2013-12-11 2014-07-16 国网浙江杭州市萧山区供电公司 Heavy cover plate lifting device
CN203845761U (en) * 2014-04-18 2014-09-24 中意泰达(营口)汽车保修设备有限公司 Gantry lifter
CN203939225U (en) * 2014-06-24 2014-11-12 重庆广播电视大学 Floor concrete casting operation platform is built in room
CN204386175U (en) * 2014-12-07 2015-06-10 徐州市铜山区水利工程处 Planer-type building-construction lifting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205402U (en) * 1985-12-21 1987-04-22 哈尔滨市第一住宅建筑工程公司建华机械厂 Attached construction gantry frame with safety devices
JPH1046799A (en) * 1996-08-01 1998-02-17 Nikko Co Ltd Traveling type elevator scaffolding with plurality of masts
JP2000177955A (en) * 1998-12-16 2000-06-27 Kumagai Gumi Co Ltd Luggage loading/unloading device for lifting carrier device
CN201071251Y (en) * 2007-07-02 2008-06-11 周爱兴 Assembled adjustable gantry
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Steel bar mounting hanger
CN102745597A (en) * 2012-07-16 2012-10-24 昆山市飞荣达电子材料有限公司 Portable portal frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107140547A (en) * 2017-06-16 2017-09-08 无锡石油化工起重机有限公司 The traveller gantry of installation activity bottom plate
CN109896433A (en) * 2019-03-24 2019-06-18 严传玉 A kind of multi-functional adjustable mechanical equipment upending frame
CN112010174A (en) * 2020-09-24 2020-12-01 萧县奥新农业科技有限公司 Electromechanical equipment installation device and use method thereof

Also Published As

Publication number Publication date
CN104453231B (en) 2017-01-18
CN106348188B (en) 2018-04-27
CN106284955A (en) 2017-01-04
CN104453231A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN106348188A (en) Method for manufacturing gantry type building construction lifting device
CN103726421B (en) Height and span adjustable track paver for metro construction
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN102155089A (en) Self-jacking construction platform integrating vertical transportation equipment and mold base
CN203412273U (en) Full-circular orbit type lifting work platform of storage tank
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN203255914U (en) Unit-typed curtain wall lifting device
CN205276887U (en) Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN105048336A (en) Automatic up-and-down device of line patrol robot of strain tower
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN103419279A (en) T-beam formwork integral dismantling and longitudinal sliding construction method
CN207061465U (en) A kind of adjustable mobile cable unwinding device
CN210001467U (en) Hoisting device used in limited space workshop
CN105672910B (en) Oil pipe traction lifting Aided Machine
CN212771963U (en) Movable suspension operation platform
CN102226959B (en) Transformer lifting method
CN204384733U (en) Bus plug-in strip Lift-on/Lift-off System
CN202055506U (en) Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container
CN204386175U (en) Planer-type building-construction lifting device
CN204954201U (en) Blast furnace stove outer covering outer wall welding platform
CN201208688Y (en) Fixture for welding large-sized H section steel structural part
CN204052653U (en) A kind of steel pipe linking machine governor motion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Mao Wei

Inventor after: Zhang Chaofeng

Inventor before: Zhang Chaofeng

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180321

Address after: Ming Bo Office Ma Jie Zhen Ming He Lu Xishan District 650100 Yunnan city of Kunming Province, No. 202

Applicant after: Yunnan Jian Jian seventh Construction Co., Ltd.

Address before: 215000 Xiangcheng Development Zone, Suzhou City, Jiangsu Province, Kwun Tong Road No. B403

Applicant before: SUZHOU HUICHENG ZHIZAO INDUSTRIAL DESIGN CO., LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant