CN102226959B CN2011100794252A CN201110079425A CN102226959B CN 102226959 B CN102226959 B CN 102226959B CN 2011100794252 A CN2011100794252 A CN 2011100794252A CN 201110079425 A CN201110079425 A CN 201110079425A CN 102226959 B CN102226959 B CN 102226959B
Authority
CN
China
Prior art keywords
transformer
jack
crane
wire rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100794252A
Other languages
Chinese (zh)
Other versions
CN102226959A (en
Inventor
彭娟
陈恒青
吴月新
郑运红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2011100794252A priority Critical patent/CN102226959B/en
Publication of CN102226959A publication Critical patent/CN102226959A/en
Application granted granted Critical
Publication of CN102226959B publication Critical patent/CN102226959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a transformer lifting method by which manpower and materials can be reduced, time is shortened and high security is ensured. The method is realized by utilizing a large transformer, and a crane and a steel wire rope which are used to lift the transformer, wherein a lifting hook is arranged on the crane. The method is characterized in that the steel wire rope and a chain block are used to reel and release in both horizontal and vertical directions of the transformer so as to place the transformer into a transformer room, and then the chain block is continuously used to move the transformer to the installation position. By adopting the method provided by the invention, the manpower and materials can be reduced, the time can be shortened and the security is high; and meanwhile, the difficulty of large size and heavy weight in the transformer lifting process can be solved.

Description

The transformer hanging method
Technical field
The invention belongs to electric equipment mounting technique field, be specifically related to the transformer hanging method.
Background technology
In the electric equipment installing engineering, transformer is installed the content that is absolutely necessary, because volume of transformer is big, Heavy Weight, the emphasis that the transformer lifting is often installed as electric equipment needs sufficient personnel and long time to go to accomplish.Therefore, we study the transformer hanging method.
Summary of the invention
Technical problem to be solved by this invention is the technical deficiency to above-mentioned existence, and a kind of manual work and material of having reduced is provided, and the time is short, safe transformer hanging method.
The present invention solves the problems of the technologies described above the technical scheme that is adopted to be: the transformer hanging method; Include transformer and be used to lift by crane the crane and the jack of transformer, it is characterized in that: on transformer level and vertical direction; Utilize the folding and unfolding in the horizontal and vertical directions of steel wire rope and jack; Transformer is placed in the transformer room, and continues to utilize jack, transformer is moved to the installation site.
In such scheme, described jack has three, and wherein jack one end is fixed on the transformer indoor wall; The other end is connected the side of transformer bottom; No. two, No. three jack one end is connected on the suspension ring of transformer top, and the other end hangs in the hook of crane, and makes No. two, No. three jacks be in the transformer installation direction near transformer room's one side; Crane rises to collude and makes steel wire rope and No. two, No. three jacks transformer of slinging simultaneously; And adjustment jack length, making transformer is horizontal level, and transformer is slowly moved to the limit, transformer room safely.
When treating in the transformer one side lower margin channel-section steel inlet chamber 200mm; Cross transformation body bottom tub steel link to each other with a jack (figure two) with steel wire rope or hanging belt bag; Tighten up jack No. one; Slowly loosen No. two, No. three simultaneously jack, crane colludes simultaneously and slowly descends, and it is indoor that transformer integral body is steadily moved on to.
All unclamp No. two, No. three jacks the back in the whole inlet chamber of transformer; Take off No. two, No. three and lead chain, No. one jack continues to tighten up, and crane pine simultaneously colludes; After treating in the whole inlet chambers of transformer lower margin channel-section steel; The steel wire rope of crane is taken off (figure three), confirm the mounting distance about transformer, continue transformer to be moved to the installation site with a jack.Confirm about transformer on inspection and the accurate back installation of the mounting distance of front and back.
This practical approach it should be noted that No. one, No. two, No. three jacks will cooperate with crane simultaneously.In the time of the tension of jack, No. two, No. three jacks will cooperate simultaneously with crane and loosen, and when No. two, No. three jacks and crane loosen simultaneously, note confirming the level of transformer, can not tilt.
Principle of the present invention is: in the vertical direction utilizes steel wire rope and jack lifting, in the horizontal direction, utilizes jack to move, and earlier the part of transformer is put into the ground location of transformer room, slowly pulls the design and installation position into jack then.
Beneficial effect of the present invention is: reduced manual work and material, the time is short, and is safe, makes lifting volume of transformer difficulty big, Heavy Weight obtain solution.
Description of drawings
Fig. 1 is that the embodiment of the invention is installed pre-structure figure
Fig. 2 is a structure chart in the embodiment of the invention installation process
Fig. 3 is that the embodiment of the invention is installed the end structure chart
Vertical view when Fig. 4 is the lifting of embodiment of the invention transformer
Among the figure: 1-transformer, 2-steel wire rope, No. two jacks of 3-, No. three jacks of 4-, jack of 5-.
Embodiment
Below in conjunction with accompanying drawing the present invention is further described:
Like Fig. 1 Fig. 2 Fig. 3 and transformer hanging method shown in Figure 4, include transformer 1 and be used to lift by crane the crane and the steel wire rope 2 of transformer 1; Wherein on transformer 1 level and vertical direction; Be provided with jack, utilize steel wire rope 2 and jack folding and unfolding in the horizontal and vertical directions, transformer 1 is placed in the transformer room; And continue to utilize jack, transformer 1 is moved to the installation site.
In the present embodiment, described jack has three covers, and wherein jack 5 one ends are fixed on 100mm place on the transformer indoor wall; The other end is connected transformer 1 side; No. two jacks 3 and No. three jack 4 one ends are connected on the transformer 1 top suspension ring, and the other end hangs in the hook of crane, and make No. two jacks 3 and No. three jacks 4 be in transformer 1 installation direction near transformer room's one side; Crane rises to collude and makes steel wire rope 2, No. two jacks 3 and No. three jacks 4 transformer 1 of slinging simultaneously; And adjustment jack length, make transformer 1 be horizontal level, and transformer 1 is slowly moved to the limit, transformer room safely.
When treating in the transformer 1 one side lower margin channel-section steel inlet chambers 200mm; Crossing transformer 1 body base channel-section steel with steel wire rope 2 or hanging belt bag links to each other with a jack 5; Tighten up jack 5 No. one; Slowly loosen simultaneously No. two jacks 3 and No. three jacks 4, crane colludes simultaneously and slowly descends, and makes transformer 1 integral body steadily move on to indoor.
All unclamp No. two jacks 3 and No. three jacks 4 back in the transformer 1 whole inlet chamber; Take off No. two jacks 3 and No. three jacks and lead chain 5 for 4, No. one and continue to tighten up, crane pine simultaneously colludes; After treating in the whole inlet chambers of transformer 1 lower margin channel-section steel; The steel wire rope 2 of crane is taken off, confirm the mounting distance of transformer about 1, continue transformer 1 to be moved to the installation site with a jack 5.Confirm the accurate back installation of mounting distance of transformer about 1 and front and back on inspection.
This practical approach it should be noted that No. one, No. two, No. three jacks will cooperate with crane simultaneously.In the time of 5 tensions of jack, No. two jacks 3 and No. three jacks 4 will cooperate simultaneously with the hook of crane and loosen, and when the hook of No. two jacks 3 and No. three jacks 4 and crane is loosened simultaneously, note confirming the level of transformer 1, can not tilt.
This method is applicable to 2000kVA and following transformer lifting.

Claims (1)

1. transformer hanging method includes transformer and is used to lift by crane the crane and the steel wire rope of transformer; Suspension hook also is housed on the crane; It is characterized in that: on transformer level and vertical direction, utilize the folding and unfolding in the horizontal and vertical directions of steel wire rope and jack, transformer is placed in the transformer room; And continue to utilize jack, transformer is moved to the installation site;
Wherein said jack has three; Wherein jack one end is fixed on the transformer indoor wall, and the other end is connected the transformer side, No. two; No. three jack one end is connected on the transformer top suspension ring; The other end hangs in the hook of crane, and makes No. two, and No. three jack is in the transformer installation direction near transformer room's one side;
Crane rises to collude and makes steel wire rope and No. two, No. three jacks transformer of slinging simultaneously, and the adjustment jack, makes transformer remain horizontal level, and with transformer slowly safety move to the limit, transformer room;
When treating in the transformer one side lower margin channel-section steel inlet chamber 200mm; Cross transformation body bottom tub steel with steel wire rope or hanging belt bag and link to each other, tighten up jack No. one, slowly loosen No. two, No. three jack simultaneously with a jack; Crane colludes simultaneously and slowly descends; It is indoor that transformer integral body is steadily moved on to, and in whole process, remains transformer equally and be horizontal;
All unclamp No. two, No. three jacks the back in the whole inlet chamber of transformer, takes off jack No. two, No. three, and No. one jack continues to tighten up; Crane pine simultaneously colludes; After treating in the whole inlet chambers of transformer lower margin channel-section steel, the steel wire rope of crane is taken off, confirm the mounting distance about transformer; Length through adjusting a jack stay cord changes the transformer traffic direction, continues with a jack transformer to be moved to the installation site.
CN2011100794252A 2011-03-31 2011-03-31 Transformer lifting method Expired - Fee Related CN102226959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100794252A CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100794252A CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Publications (2)

Publication Number Publication Date
CN102226959A CN102226959A (en) 2011-10-26
CN102226959B true CN102226959B (en) 2012-10-31

Family

ID=44807922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100794252A Expired - Fee Related CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Country Status (1)

Country Link
CN (1) CN102226959B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150865B (en) * 2013-02-04 2016-01-13 昆山龙腾光电有限公司 Portable fire-alarm device
CN103288002B (en) * 2013-06-22 2015-12-02 中铁十八局集团第二工程有限公司 Simple combination door frame high-altitude weight hanging apparatus
CN111029097B (en) * 2019-12-30 2022-05-27 江苏环东电气有限公司 Transformer vibration reduction hoisting system and vibration reduction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201562525U (en) * 2009-11-05 2010-08-25 保定天威集团有限公司 Box cover type device for hoisting and fixing
CN101882500A (en) * 2010-06-29 2010-11-10 江苏省电力公司太仓市供电公司 Device for assembling transformer
CN101982390A (en) * 2010-10-22 2011-03-02 河南省电力公司南阳供电公司 Hoisting method of outer cover of main transformer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09306746A (en) * 1996-05-14 1997-11-28 Toshiba Corp Lifting of transported divided transformer
JP4888887B2 (en) * 2006-01-17 2012-02-29 北芝電機株式会社 Transportation and on-site assembly method for three-phase transformers
JP4771853B2 (en) * 2006-04-13 2011-09-14 中国電力株式会社 Transformer hanging device and transformer hanging installation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201562525U (en) * 2009-11-05 2010-08-25 保定天威集团有限公司 Box cover type device for hoisting and fixing
CN101882500A (en) * 2010-06-29 2010-11-10 江苏省电力公司太仓市供电公司 Device for assembling transformer
CN101982390A (en) * 2010-10-22 2011-03-02 河南省电力公司南阳供电公司 Hoisting method of outer cover of main transformer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开2007-194233A 2007.08.02
JP特开2007-287785A 2007.11.01
JP特开平9-306746A 1997.11.28

Also Published As

Publication number Publication date
CN102226959A (en) 2011-10-26

Similar Documents

Publication Publication Date Title
CN201433079Y (en) High-altitude inclined supporting wire lifting device for construction curtain wall
CN103613031B (en) Voltage transformer simple and easy hoisting device
CN106348188A (en) Method for manufacturing gantry type building construction lifting device
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN102226959B (en) Transformer lifting method
CN104495632A (en) Expanded type suspension rope lifting and hoisting system
CN205387439U (en) Mast hoisting accessory
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
CN104989111A (en) Construction method for steel structure high-rise hoisting
JP2008222382A (en) Method for moving lifting device for installation
CN205076637U (en) Derrick material hoist
CN209585580U (en) Huge column modular is tilted from lifting operation platform
CN109552967A (en) Material lifting device and its installation method in elevator
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN202248826U (en) Lifting scaffold hoisting mechanism
CN105151999A (en) Portable iron core overturning mechanism
CN210855091U (en) Simple movable heavy object vertical lifting equipment
CN201825635U (en) Hoisting structure of power station boiler
CN215755931U (en) Large transformer hoisting equipment in factory building
CN204162320U (en) Facilitate the crane-car of operation at night
CN205312922U (en) 1000kV cluster benefit equipment is repaiied examination special use and is lifted by crane instrument
CN209493195U (en) Material lifting device in elevator
CN205662284U (en) Two poles become platform ground jack
CN205385385U (en) Motor rotor replacer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

CF01 Termination of patent right due to non-payment of annual fee