CN102226959A - Transformer lifting method - Google Patents

Transformer lifting method Download PDF

Info

Publication number
CN102226959A
CN102226959A CN 201110079425 CN201110079425A CN102226959A CN 102226959 A CN102226959 A CN 102226959A CN 201110079425 CN201110079425 CN 201110079425 CN 201110079425 A CN201110079425 A CN 201110079425A CN 102226959 A CN102226959 A CN 102226959A
Authority
CN
China
Prior art keywords
transformer
jack
crane
wire rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110079425
Other languages
Chinese (zh)
Other versions
CN102226959B (en
Inventor
彭娟
陈恒青
吴月新
郑运红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2011100794252A priority Critical patent/CN102226959B/en
Publication of CN102226959A publication Critical patent/CN102226959A/en
Application granted granted Critical
Publication of CN102226959B publication Critical patent/CN102226959B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention provides a transformer lifting method by which manpower and materials can be reduced, time is shortened and high security is ensured. The method is realized by utilizing a large transformer, and a crane and a steel wire rope which are used to lift the transformer, wherein a lifting hook is arranged on the crane. The method is characterized in that the steel wire rope and a chain block are used to reel and release in both horizontal and vertical directions of the transformer so as to place the transformer into a transformer room, and then the chain block is continuously used to move the transformer to the installation position. By adopting the method provided by the invention, the manpower and materials can be reduced, the time can be shortened and the security is high; and meanwhile, the difficulty of large size and heavy weight in the transformer lifting process can be solved.

Description

The transformer hanging method
Technical field
The invention belongs to electric equipment mounting technique field, be specifically related to the transformer hanging method.
Background technology
In the electric equipment installing engineering, transformer is installed the content that is absolutely necessary, because volume of transformer is big, Heavy Weight, the emphasis that the transformer lifting is often installed as electric equipment needs sufficient personnel and long time to go to finish.Therefore, we study the transformer hanging method.
Summary of the invention
Technical problem to be solved by this invention is the technical deficiency at above-mentioned existence, and a kind of reduced artificial and material are provided, and the time is short, safe transformer hanging method.
The present invention solves the problems of the technologies described above the technical scheme that is adopted to be: the transformer hanging method, include transformer, with the crane and the jack that are used to lift by crane transformer, it is characterized in that: on transformer level and vertical direction, utilize the folding and unfolding in the horizontal and vertical directions of steel wire rope and jack, transformer is placed in the transformer room, and continues to utilize jack, transformer is moved to the installation site.
In such scheme, described jack has three, wherein jack one end is fixed on the transformer indoor wall, the other end is connected the side of transformer bottom, No. two, No. three jack one end is connected on the suspension ring of transformer top, the other end hangs in the hook of crane, and make No. two, No. three jacks be in the transformer installation direction near transformer room's one side, crane rises to collude and makes steel wire rope and No. two, No. three jacks transformer of slinging simultaneously, and adjustment jack length, making transformer is horizontal level, and transformer is slowly moved to the limit, transformer room safely.
When treating in the transformer one side lower margin channel-section steel inlet chamber 200mm, cross transformation body bottom tub steel link to each other with a jack (figure two) with steel wire rope or hanging belt bag, tighten up jack No. one, slowly loosen No. two, No. three simultaneously jack, crane colludes simultaneously and slowly descends, and it is indoor that transformer integral body is steadily moved on to.
All unclamp No. two, No. three jacks the back in the whole inlet chamber of transformer, take off No. two, No. three and lead chain, No. one jack continues to tighten up, crane pine simultaneously colludes, after treating in the whole inlet chambers of transformer lower margin channel-section steel, the steel wire rope of crane is taken off (figure three), confirm the mounting distance about transformer, continue transformer to be moved to the installation site with a jack.Confirm about transformer on inspection and the accurate back installation of the mounting distance of front and back.
This practical approach it should be noted that No. one, No. two, No. three jacks will cooperate simultaneously with crane.In the time of the tension of jack, No. two, No. three jacks will cooperate simultaneously with crane and loosen, and when No. two, No. three jacks and crane loosen simultaneously, note confirming the level of transformer, can not tilt.
Principle of the present invention is: in the vertical direction utilizes steel wire rope and jack lifting, in the horizontal direction, utilizes jack to move, and earlier the part of transformer is put into the ground location of transformer room, slowly pulls the design and installation position into jack then.
Beneficial effect of the present invention is: reduced artificial and material, the time is short, and is safe, makes lifting volume of transformer difficulty big, Heavy Weight obtain solution.
Description of drawings
Fig. 1 is that the embodiment of the invention is installed pre-structure figure
Fig. 2 is a structure chart in the embodiment of the invention installation process
Fig. 3 is that the embodiment of the invention is installed the end structure chart
Vertical view when Fig. 4 is the lifting of embodiment of the invention transformer
Among the figure: 1-transformer, 2-steel wire rope, No. two jacks of 3-, No. three jacks of 4-, jack of 5-.
Embodiment
The present invention is further illustrated below in conjunction with accompanying drawing:
As Fig. 1 Fig. 2 Fig. 3 and transformer hanging method shown in Figure 4, include transformer 1, with the crane and the steel wire rope 2 that are used to lift by crane transformer 1, wherein on transformer 1 level and vertical direction, be provided with jack, utilize the folding and unfolding in the horizontal and vertical directions of steel wire rope 2 and jack, transformer 1 is placed in the transformer room, and continue to utilize jack, transformer 1 is moved to the installation site.
In the present embodiment, described jack has three covers, wherein jack 5 one ends are fixed on 100mm place on the transformer indoor wall, the other end is connected transformer 1 side, No. two jacks 3 and No. three jack 4 one ends are connected on the transformer 1 top suspension ring, the other end hangs in the hook of crane, and make No. two jacks 3 and No. three jacks 4 be in transformer 1 installation direction near transformer room's one side, crane rises to collude and makes steel wire rope 2, No. two jacks 3 and No. three jacks 4 transformer 1 of slinging simultaneously, and adjustment jack length, make transformer 1 be horizontal level, and transformer 1 is slowly moved to the limit, transformer room safely.
When treating in the transformer 1 one side lower margin channel-section steel inlet chambers 200mm, crossing transformer 1 body base channel-section steel with steel wire rope 2 or hanging belt bag links to each other with a jack 5, tighten up jack 5 No. one, slowly loosen simultaneously No. two jacks 3 and No. three jacks 4, crane colludes simultaneously and slowly descends, and makes transformer 1 integral body steadily move on to indoor.
All unclamp No. two jacks 3 and No. three jacks 4 back in the transformer 1 whole inlet chamber, take off No. two jacks 3 and No. three jacks 4, leading chain 5 No. one continues to tighten up, crane pine simultaneously colludes, after treating in the whole inlet chambers of transformer 1 lower margin channel-section steel, the steel wire rope 2 of crane is taken off, confirm the mounting distance of transformer about 1, continue transformer 1 to be moved to the installation site with a jack 5.Confirm the accurate back installation of mounting distance of transformer about 1 and front and back on inspection.
This practical approach it should be noted that No. one, No. two, No. three jacks will cooperate simultaneously with crane.In the time of 5 tensions of jack, No. two jacks 3 and No. three jacks 4 will cooperate simultaneously with the hook of crane and loosen, and when the hook of No. two jacks 3 and No. three jacks 4 and crane is loosened simultaneously, note confirming the level of transformer 1, can not tilt.
This method is applicable to 2000kVA and following transformer lifting.

Claims (3)

1. transformer hanging method, include transformer, with the crane and the steel wire rope that are used to lift by crane transformer, suspension hook also is housed on the crane, it is characterized in that: on transformer level and vertical direction, utilize the folding and unfolding in the horizontal and vertical directions of steel wire rope and jack, transformer is placed in the transformer room, and continue to utilize jack, transformer is moved to the installation site.
2. transformer hanging method as claimed in claim 1, it is characterized in that: described jack has three, wherein jack one end is fixed on the transformer indoor wall, the other end is connected the transformer side, No. two, No. three jack one end is connected on the transformer top suspension ring, and the other end hangs in the hook of crane, and make No. two, lead chain for No. three and be in the transformer installation direction near transformer room's one side.
3. transformer hanging method as claimed in claim 1 is characterized in that: carry out according to following steps during lifting:
Crane rises to collude and makes steel wire rope and No. two, No. three jacks transformer of slinging simultaneously, and adjusts jack, makes transformer remain horizontal level, and with transformer slowly safety move to the limit, transformer room;
When treating in the transformer one side lower margin channel-section steel inlet chamber 200mm, crossing transformation body bottom tub steel with steel wire rope or hanging belt bag links to each other with a jack, tighten up jack No. one, slowly loosen No. two, No. three simultaneously jack, crane colludes simultaneously and slowly descends, it is indoor that transformer integral body is steadily moved on to, and in whole process, remains transformer equally and be horizontal;
All unclamp No. two, No. three jacks the back in the whole inlet chamber of transformer, take off jack No. two, No. three, No. one jack continues to tighten up, crane pine simultaneously colludes, after treating in the whole inlet chambers of transformer lower margin channel-section steel, the steel wire rope of crane is taken off, confirm the mounting distance about transformer, change the transformer traffic direction by the length of adjusting a jack stay cord, continue transformer to be moved to the installation site with a jack.
CN2011100794252A 2011-03-31 2011-03-31 Transformer lifting method Expired - Fee Related CN102226959B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100794252A CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100794252A CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Publications (2)

Publication Number Publication Date
CN102226959A true CN102226959A (en) 2011-10-26
CN102226959B CN102226959B (en) 2012-10-31

Family

ID=44807922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100794252A Expired - Fee Related CN102226959B (en) 2011-03-31 2011-03-31 Transformer lifting method

Country Status (1)

Country Link
CN (1) CN102226959B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150865A (en) * 2013-02-04 2013-06-12 昆山龙腾光电有限公司 Movable type fire-alarm device
CN103288002A (en) * 2013-06-22 2013-09-11 中铁十八局集团第二工程有限公司 Simple combination portal upper-air heavy-article hoisting device
CN111029097A (en) * 2019-12-30 2020-04-17 江苏环东电气有限公司 Transformer vibration reduction hoisting system and vibration reduction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09306746A (en) * 1996-05-14 1997-11-28 Toshiba Corp Lifting of transported divided transformer
JP2007194233A (en) * 2006-01-17 2007-08-02 Kitashiba Electric Co Ltd Transportation and knockdown method of three-phase transformer
JP2007287785A (en) * 2006-04-13 2007-11-01 Chugoku Electric Power Co Inc:The Device for hanging transformer, and method for installing transformer by hanging
CN201562525U (en) * 2009-11-05 2010-08-25 保定天威集团有限公司 Box cover type device for hoisting and fixing
CN101882500A (en) * 2010-06-29 2010-11-10 江苏省电力公司太仓市供电公司 Device for assembling transformer
CN101982390A (en) * 2010-10-22 2011-03-02 河南省电力公司南阳供电公司 Hoisting method of outer cover of main transformer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09306746A (en) * 1996-05-14 1997-11-28 Toshiba Corp Lifting of transported divided transformer
JP2007194233A (en) * 2006-01-17 2007-08-02 Kitashiba Electric Co Ltd Transportation and knockdown method of three-phase transformer
JP2007287785A (en) * 2006-04-13 2007-11-01 Chugoku Electric Power Co Inc:The Device for hanging transformer, and method for installing transformer by hanging
CN201562525U (en) * 2009-11-05 2010-08-25 保定天威集团有限公司 Box cover type device for hoisting and fixing
CN101882500A (en) * 2010-06-29 2010-11-10 江苏省电力公司太仓市供电公司 Device for assembling transformer
CN101982390A (en) * 2010-10-22 2011-03-02 河南省电力公司南阳供电公司 Hoisting method of outer cover of main transformer

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150865A (en) * 2013-02-04 2013-06-12 昆山龙腾光电有限公司 Movable type fire-alarm device
CN103150865B (en) * 2013-02-04 2016-01-13 昆山龙腾光电有限公司 Portable fire-alarm device
CN103288002A (en) * 2013-06-22 2013-09-11 中铁十八局集团第二工程有限公司 Simple combination portal upper-air heavy-article hoisting device
CN103288002B (en) * 2013-06-22 2015-12-02 中铁十八局集团第二工程有限公司 Simple combination door frame high-altitude weight hanging apparatus
CN111029097A (en) * 2019-12-30 2020-04-17 江苏环东电气有限公司 Transformer vibration reduction hoisting system and vibration reduction method
CN111029097B (en) * 2019-12-30 2022-05-27 江苏环东电气有限公司 Transformer vibration reduction hoisting system and vibration reduction method

Also Published As

Publication number Publication date
CN102226959B (en) 2012-10-31

Similar Documents

Publication Publication Date Title
CN201433079Y (en) High-altitude inclined supporting wire lifting device for construction curtain wall
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN201240810Y (en) Novel manual hoister
CN106348188A (en) Method for manufacturing gantry type building construction lifting device
CN205953370U (en) Perpendicular transport means of unitized curtain wall
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN205387439U (en) Mast hoisting accessory
CN102226959B (en) Transformer lifting method
CN104495632A (en) Expanded type suspension rope lifting and hoisting system
KR20100020304A (en) Installing method of wind power generator supporting horizontally tower with wire
CN105366567A (en) Intelligent assisting platform for dismounting and mounting of GIS (Gas Insulated Substation)
CN103274315A (en) Installing and hoisting device for side plate and upright of gas chamber
KR101068229B1 (en) Dismantled tower crane cargo handling system and cargo handling method using thereof
JP2008222382A (en) Method for moving lifting device for installation
CN210031529U (en) Automatic climbing platform for construction of hanging cable
CN209585580U (en) Huge column modular is tilted from lifting operation platform
CN109552967A (en) Material lifting device and its installation method in elevator
CN107458965B (en) A kind of large scale equipment hanging method
CN202248826U (en) Lifting scaffold hoisting mechanism
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN201825635U (en) Hoisting structure of power station boiler
CN105151999A (en) Portable iron core overturning mechanism
CN205257842U (en) Lifting device of insulator pillar for electric wire netting
CN204162320U (en) Facilitate the crane-car of operation at night
CN205385385U (en) Motor rotor replacer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

CF01 Termination of patent right due to non-payment of annual fee