CN101982390A - Hoisting method of outer cover of main transformer - Google Patents

Hoisting method of outer cover of main transformer Download PDF

Info

Publication number
CN101982390A
CN101982390A CN2010105161270A CN201010516127A CN101982390A CN 101982390 A CN101982390 A CN 101982390A CN 2010105161270 A CN2010105161270 A CN 2010105161270A CN 201010516127 A CN201010516127 A CN 201010516127A CN 101982390 A CN101982390 A CN 101982390A
Authority
CN
China
Prior art keywords
main transformer
hoisting
outer cover
lifting
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105161270A
Other languages
Chinese (zh)
Other versions
CN101982390B (en
Inventor
周建军
王修庞
秦卫东
孙更
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Nanyang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201010516127.0A priority Critical patent/CN101982390B/en
Publication of CN101982390A publication Critical patent/CN101982390A/en
Application granted granted Critical
Publication of CN101982390B publication Critical patent/CN101982390B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a hoisting method of an outer cover of a main transformer, which comprises the following steps: (1) preparing before hoisting; (2) trying to hoist: hoisting is slowly started to guarantee that all hoisting ropes are stressed; a round steel temporary positioning bar passes through four-corner bolt holes of the main transformer from top to bottom, and four sway ropes are tied on the top; the center-of-gravity shift condition of the main transformer is checked; a hoisting hole on a hoisting tool is adjusted according to the hoisting center-of-gravity shift condition; the optimum balance point of the hoisting cover is found; and the balance while hoisting the outer cover of the main transformer is guaranteed by utilizing a lever principle; (3) hoisting; and (4) hoisting back. In the hoisting course, the outer cover of the main transformer is vertically hoisted so as to accurately grasp the center of gravity, thus preventing from tilting and avoiding crash or damage in the courses of hoisting and reassembling, ensuring better safety performance of the whole cover-hoisting operation and improving operating efficiency and quality.

Description

A kind of hanging method of main transformer outer cover
Technical field
The invention belongs to substation service technique field, be specifically related to a kind of hanging method of main transformer outer cover.
Background technology
The maintenance of main transformer is the work of a complexity, and its work capacity is big, and the repair time is long, and the directly reliability of influence power supply for a long time has a power failure.The tradition hoisting method is to remove annexes such as radiator, sleeve pipe before main transformer hangs cover, goes back to the dress back at the main transformer outer cover annexes such as radiator, sleeve pipe are installed, and the task amount that main transformer hangs cover work is huge.4 lifting methods are all adopted in the lifting of main transformer outer cover.Specific practice is to utilize crane as lifting appliance, utilizes wire sling, suspension ring etc. to lift by crane as the outer cover of suspender to main transformer.Before the lifting of main transformer outer cover, crane is parked in place, find the center-of-gravity position of main transformer outer cover accurately, make suspension hook aim at the center-of-gravity position of outer cover.Then the two ends of two wire slings are hung in the stress point place of main transformer outer cover, two wire slings are hung on the hoist lifting hook, check that safe and reliable back carries out 4 liftings to the main transformer outer cover, the button cover is undertaken by hanging the cover reverse order.The method of this traditional main transformer outer cover lifting is also run into core and coil easily when annexes such as dismounting radiator, sleeve pipe, increase the difficulty of lifting, and whole crane lifting service amount is big, and troublesome poeration is finished whole work and needed three days, and operating efficiency is low.The problem that the integral hoisting of main transformer outer cover exists: because the difference of size, shape and the present position of annex on the main transformer outer cover makes main transformer centre-of gravity shift, the run-off the straight of lifting rope unbalance stress outer cover lifting process.So can't realize integral lifting with conventional hanging method.
Summary of the invention
Be to solve the above-mentioned defective that prior art exists, the object of the present invention is to provide a kind of lifting convenient, guaranteed whole the safe and reliable of cover work that hang, improved the hanging method of the main transformer outer cover of the efficient of work and quality again.
For achieving the above object, the technical solution used in the present invention is: the hanging method of this main transformer outer cover, it is characterized in that operating as follows: 1, prepare before the lifting: the tie bolt of dismounting outer cover, hoist lifting hook is connected by any two lifting eyes of lifting rope and suspender, is connected the main transformer outer cover on the weight connecting bore of suspender by lifting rope again; 2, examination is hung: slowly lifting makes each lifting rope stressed, in four corner bolt holes of main transformer, wear the interim locating bar of round steel from top to bottom, and fasten four rollings at the top and restrict, check the centre-of gravity shift situation of main transformer, drift condition according to the center of gravity of slinging, adjust the lifting eye on the suspender, find the optimal balance point that hangs cover, utilize lever principle to guarantee the balance of lifting main transformer outer cover; 3, lifting: hoisting crane slowly hangs the main transformer outer cover get off; 4, return and hang: the maintenance back winches to the main transformer position with the examination of step 2 method of the hanging main transformer outer cover of steadily slinging with the main transformer outer cover, removes interim locating bar, locks tie bolt.
For improving main transformer different each lifting rope unbalance stress phenomenon that makes of effective length in the lifting process, can on the short lifting rope of effective length, install U type ring additional in described the 2nd step, make the effective length of each lifting rope isometric owing to lifting rope.
Adopt the beneficial effect of technique scheme: the hanging method of this main transformer outer cover, adopted suspender with five lifting eyes, this suspender also is provided with two weight connecting bores, hoist lifting hook is connected by any two lifting eyes of lifting rope and suspender, be connected the main transformer outer cover on the weight connecting bore of suspender by lifting rope again, when examination is hung, grasp bad for preventing center of gravity, the staff is behind the 50mm that slings, time-out has also been checked lifting center of gravity and center, and some tilts to find outer cover, adjusts the lifting eye on the suspender, find the optimal balance point that hangs cover, utilize lever principle to guarantee the balance of lifting main transformer outer cover.But owing to the reason that a lot of annexes are arranged on the main transformer outer cover, make different each lifting rope unbalance stress that makes of effective length of wire sling, also has the slight inclination phenomenon during outer cover lifting, can on the short lifting rope of effective length, install U type ring additional, make the effective length of each lifting rope isometric, the balance of main transformer outer cover center of gravity after having guaranteed to sling.This hoisting method needn't be removed main transformer part annex when hanging cover, can be with annex to carry out main transformer and hang cover work, the main transformer outer cover will vertically be sling in the lifting process, grasped center of gravity very accurately, prevented inclination, that outer cover can remain is steady, straight, maintain a certain distance with high and low pressure side lead-in wire, shunting switch support, lifting reaches back and does not bump in the process of assembling and damage, both guaranteed that the whole safety performance that hangs cover work was better, improved the efficient and the quality of work again.
Description of drawings
Below in conjunction with accompanying drawing specific embodiments of the invention are described in further detail
The double-hung balance sling that Fig. 1 adopts for the inventive method.
The specific embodiment
As Fig. 1 is double-hung balance sling of the present invention, this a kind of double-hung balance sling, comprise suspender body 1, described suspender body is connected with lifting rope by two suspension hooks 2, the two ends of suspender body are provided with two weight hooks 4, between two weight hooks a plurality of suspension hook knock holees 3 are being set on the suspender body, any two the suspension hook knock holees in described a plurality of suspension hook knock holees flexibly connect with two suspension hooks respectively.
Using this double-hung balance sling needn't remove the part annex just can integral lifting main transformer outer cover, concrete hanging method is operated as follows: 1, prepare before the lifting: the tie bolt of dismounting outer cover, hoist lifting hook is connected by any two lifting eyes of lifting rope and suspender, is connected the main transformer outer cover on the weight connecting bore of suspender by lifting rope again; 2, examination is hung: slowly lifting makes each lifting rope stressed, in four corner bolt holes of main transformer, wear the interim locating bar of round steel from top to bottom, and fasten four rollings at the top and restrict, check the centre-of gravity shift situation of main transformer, drift condition according to the center of gravity of slinging, adjust the lifting eye on the suspender, find the optimal balance point that hangs cover, utilize lever principle to guarantee the balance of lifting main transformer outer cover; If different each lifting rope unbalance stress phenomenon that makes of effective length of lifting rope can install U type ring additional on the short lifting rope of effective length, make the effective length of each lifting rope isometric; 3, lifting: hoisting crane slowly hangs the main transformer outer cover get off; 4, return and hang: the maintenance back winches to the main transformer position with the examination of step 2 method of the hanging main transformer outer cover of steadily slinging with the main transformer outer cover, removes interim locating bar, locks tie bolt.The main transformer outer cover will vertically be sling in the lifting process, grasped center of gravity very accurately, prevented inclination, outer cover can maintain a certain distance with high and low pressure side lead-in wire, shunting switch support all the time, lifting reaches back and does not bump in the process of assembling and damage, both guaranteed that the whole safety performance that hangs cover work was better, improved the efficient and the quality of work again.

Claims (2)

1. the hanging method of a main transformer outer cover is characterized in that operating as follows:
(1) prepare before the lifting: the tie bolt of dismounting outer cover, hoist lifting hook is connected by any two lifting eyes of lifting rope and suspender, is connected the main transformer outer cover on the weight connecting bore of suspender by lifting rope again;
(2) examination is hung: slowly lifting makes each lifting rope stressed, in four corner bolt holes of main transformer, wear the interim locating bar of round steel from top to bottom, and fasten four rollings at the top and restrict, check the centre-of gravity shift situation of main transformer, drift condition according to the center of gravity of slinging, adjust the lifting eye on the suspender, find the optimal balance point that hangs cover, utilize lever principle to guarantee the balance of lifting main transformer outer cover;
(3) lifting: hoisting crane slowly hangs the main transformer outer cover get off;
(4) return and hang: the maintenance back winches to the main transformer position with the examination of step 2 method of the hanging main transformer outer cover of steadily slinging with the main transformer outer cover, removes interim locating bar, locks tie bolt.
2. the hanging method of main transformer outer cover according to claim 1, it is characterized in that: be to improve main transformer different each lifting rope unbalance stress phenomenon that makes of effective length in the lifting process in described the 2nd step owing to lifting rope, can on the short lifting rope of effective length, install U type ring additional, make the effective length of each lifting rope isometric.
CN201010516127.0A 2010-10-22 2010-10-22 Hoisting method of outer cover of main transformer Expired - Fee Related CN101982390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010516127.0A CN101982390B (en) 2010-10-22 2010-10-22 Hoisting method of outer cover of main transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010516127.0A CN101982390B (en) 2010-10-22 2010-10-22 Hoisting method of outer cover of main transformer

Publications (2)

Publication Number Publication Date
CN101982390A true CN101982390A (en) 2011-03-02
CN101982390B CN101982390B (en) 2014-09-17

Family

ID=43619305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010516127.0A Expired - Fee Related CN101982390B (en) 2010-10-22 2010-10-22 Hoisting method of outer cover of main transformer

Country Status (1)

Country Link
CN (1) CN101982390B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226959A (en) * 2011-03-31 2011-10-26 中国一冶集团有限公司 Transformer lifting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114786A (en) * 2007-08-28 2008-01-30 天津二十冶建设有限公司 Hanging method using C-beam piercing core hanging large-scale electric motor and C-beam structure
CN101293616A (en) * 2008-05-28 2008-10-29 西安超码科技有限公司 Lifting appliance for large diameter tubular products and lifting method
CN101450766A (en) * 2007-11-28 2009-06-10 上海重型机器厂有限公司 Lifting installation method for ultralong workpiece and used fixture cross beam
CN101692405A (en) * 2009-09-25 2010-04-07 中国北车集团大连机车车辆有限公司 Method for assembling and overturning main transformer body of locomotive
CN201458512U (en) * 2009-05-11 2010-05-12 河南省电力公司南阳供电公司 Balance hanger
CN201458513U (en) * 2009-05-11 2010-05-12 河南省电力公司南阳供电公司 Double-hook balance lifting appliance

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114786A (en) * 2007-08-28 2008-01-30 天津二十冶建设有限公司 Hanging method using C-beam piercing core hanging large-scale electric motor and C-beam structure
CN101450766A (en) * 2007-11-28 2009-06-10 上海重型机器厂有限公司 Lifting installation method for ultralong workpiece and used fixture cross beam
CN101293616A (en) * 2008-05-28 2008-10-29 西安超码科技有限公司 Lifting appliance for large diameter tubular products and lifting method
CN201458512U (en) * 2009-05-11 2010-05-12 河南省电力公司南阳供电公司 Balance hanger
CN201458513U (en) * 2009-05-11 2010-05-12 河南省电力公司南阳供电公司 Double-hook balance lifting appliance
CN101692405A (en) * 2009-09-25 2010-04-07 中国北车集团大连机车车辆有限公司 Method for assembling and overturning main transformer body of locomotive

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226959A (en) * 2011-03-31 2011-10-26 中国一冶集团有限公司 Transformer lifting method
CN102226959B (en) * 2011-03-31 2012-10-31 中国一冶集团有限公司 Transformer lifting method

Also Published As

Publication number Publication date
CN101982390B (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN105858435A (en) Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN204342250U (en) A kind of multi-state hoisting balance beam
CN202321966U (en) Special lifting appliance for multi-lifting-point high wire coil rod
CN109095343A (en) Assembled hanger
CN203382365U (en) Lifting appliance system for lifting thin, long and thin-wall equipment integrally
CN101982390B (en) Hoisting method of outer cover of main transformer
CN204752012U (en) Wall -hanging miniature hoist
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN202558444U (en) Steel penstock hoisting balance beam device
CN204416900U (en) A kind of transformer bushing lifting device
CN204689351U (en) A kind of H profile steel structural elements suspender
CN103663090A (en) Steel plate lifting appliance provided with electro-permanent magnets
CN204355947U (en) Large-scale without eye plate lifting beam device
CN203187370U (en) Inner mast hoisting device
CN203173677U (en) Hoisting tool for replacing plate hook of large traveling crane
CN208916602U (en) Cement electric pole boom hoisting
CN211594755U (en) Lifting appliance for overhauling equipment under plant girder
CN206156568U (en) A specialized tool for hoisting hydro -generator rotor magnetic pole
CN205973554U (en) A steel shoulder pole that is used for tower crane duplex to lift method of hanging hoist and mount operation
CN220745075U (en) Multi-lifting-point curved beam lifting appliance
CN217972205U (en) Balanced hoist that case roof beam was used
CN208713832U (en) It is a kind of for replacing the tool of peach-shaped ring on elevator
CN212101642U (en) Novel ST buffer hoist
CN219652485U (en) Adjustable balance beam lifting appliance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Geng

Inventor after: Ma Kezheng

Inventor after: Wang Xiupang

Inventor after: Zhou Jianjun

Inventor after: Qin Weidong

Inventor after: Shi Yi

Inventor after: Su Changbao

Inventor after: Yu Liang

Inventor after: Zhao Miao

Inventor after: Li Juan

Inventor before: Zhou Jianjun

Inventor before: Wang Xiupang

Inventor before: Qin Weidong

Inventor before: Sun Geng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHOU JIANJUN WANG XIUPANG QIN WEIDONG SUN GENG TO: SUN GENG WANG XIUPANG ZHOU JIANJUN QIN WEIDONG SHI YI SU CHANGBAO YU LIANG ZHAO MIAO LI JUAN MA KEZHENG

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20181022