KR20100020304A - Installing method of wind power generator supporting horizontally tower with wire - Google Patents
Installing method of wind power generator supporting horizontally tower with wire Download PDFInfo
- Publication number
- KR20100020304A KR20100020304A KR1020080079021A KR20080079021A KR20100020304A KR 20100020304 A KR20100020304 A KR 20100020304A KR 1020080079021 A KR1020080079021 A KR 1020080079021A KR 20080079021 A KR20080079021 A KR 20080079021A KR 20100020304 A KR20100020304 A KR 20100020304A
- Authority
- KR
- South Korea
- Prior art keywords
- post
- nussel
- posts
- support
- wire
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 claims description 45
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 238000005034 decoration Methods 0.000 claims description 2
- 230000003028 elevating effect Effects 0.000 claims description 2
- 230000000284 resting effect Effects 0.000 claims description 2
- 230000000630 rising effect Effects 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000011900 installation process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D1/00—Wind motors with rotation axis substantially parallel to the air flow entering the rotor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/50—Building or constructing in particular ways
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Abstract
Description
본 발명은 와이어에 의하여 지주의 수평위치를 지지하는 풍력발전기 설치방법에 관한 것으로, 더욱 상세하게는 와이어에 의하여 안정적이면서 간편하게 지주를 지지할 수 있는 풍력발전기의 설치방법에 대한 것이다.The present invention relates to a wind turbine installation method for supporting the horizontal position of the support by the wire, and more particularly to a wind turbine installation method that can support the support stably by a wire.
최근에는 풍력발전기가 대체 에너지의 개발과 맞물려 각광을 받고 있다. 이러한 풍력발전기는 그 발전기 자체의 기술개발도 중요하지만, 그 풍력발전기가 설치되는 위치가 바람이 많이 부는 곳임을 감안한다면, 그 설치방법의 효율화도 상당히 중요한 문제이다.In recent years, wind power generators have been in the spotlight with the development of alternative energy. Such a wind power generator is also important for the development of its own technology, but considering the location where the wind power generator is a lot of wind, the efficiency of the installation method is also a very important problem.
종래기술에 따라 풍력발전기의 설치방법은 대한민국 등록특허 제10-0806661호에 언급되어 있다. 도 1은 종래기술에 따른 풍력발전기를 기술하는 것으로서, 풍력발전기는 적어도 다단으로 이루어진 지주(20, 30, 40)와, 상기 지주(20, 30, 40)의 상단에 설치되며 바람에 의하여 회전할 수 있는 블레이드(45)가 결합되고 그 블레이드(4%)의 회전력을 전기적인 에너지로 변환하는 발전설비가 포함된 너셀(41)로 구성된다. 이러한 종래기술에 따른 풍력발전기는 도 2 및 도 3에 도시한 바와 같이 이동식 크래인(70) 또는 천정크레인(44-1)에 의하여 지주(20, 30, 35)를 설치하게 되는데, 그 설치된 지주(20)는 포스트(61)에 고정결합된 캔틸레버 빔 형태의 수평지지대(21)에 의하여 지지를 받게 된다. 구체적으로 상기 수평지지대(21)는 포스트(61)에 미리 부착된 상태에서 지주(20)가 설치된 후에 수평방향으로 신장되어 위치이동하여 상기 지주의 외표면에 접촉하게 되고, 양쪽에서 상기 지주를 지지함에 의하여 상기 지주의 수평위치를 고정하게 되는 것이다. 이러한 수평지지대(21)는 바람이 많이 부는 경우에도 상기 지주가 안정하게 설치될 수 있도록 하기 위함이다.The installation method of the wind power generator according to the prior art is mentioned in Republic of Korea Patent No. 10-0806661. 1 illustrates a wind power generator according to the prior art, wherein a wind power generator is installed on at least one end of a
그러나, 이와 같이 포스트에 미리 설치된 수평지지대는 철골로 이루어져 있어 그 무게가 상당히 무거우며 이에 따라 그 수평지지대가 설치된 수평지지대를 상승 또는 하강시키는 것이 용이하지 않다. 또한, 이러한 수평지지대에는 포스트 내로 삽입되는 지주의 공간을 확보하기 위하여 포스트 내측으로 넣어져 있다가 지주가 포스트 내에 위치되면 신장되어 지주의 외경과 접할 수 있도록 하는 유압식 실린더 등이 구비되어 있어, 전체적인 수평지지를 위한 구조가 복잡해지고 있다. 이는 전체적인 설치비용을 증대시키는 문제점이 있다.However, the horizontal support pre-installed in the post is made of steel frame so that the weight is quite heavy, and thus it is not easy to raise or lower the horizontal support on which the horizontal support is installed. In addition, the horizontal support is provided with a hydraulic cylinder that is inserted into the post to secure the space of the post to be inserted into the post, and is extended to contact the outer diameter of the post when the post is positioned in the post, the overall horizontal The structure for support is becoming complex. This has the problem of increasing the overall installation cost.
본 발명은 상술한 문제점을 해결하기 위하여 창출된 것으로서, 더욱 상세하게는 설치된 지주를 간단하면서도 안정적인 와이어 구조에 의하여 포스트에 고정시킬 수 있는 풍력발전기의 설치방법을 제공하는 것을 목적으로 한다.The present invention has been made to solve the above problems, and more specifically, an object of the present invention is to provide a wind turbine installation method that can be fixed to the post by a simple and stable wire structure installed.
상술한 과제를 해결하기 위한 본 발명의 풍력발전기 설치방법은, 블레이드가 결합된 너셀과, 그 너셀을 지면으로부터 일정간격 이격시켜 지지하며 적어도 3개 이상으로 이루어진 지주를 포함하여 풍력발전기를 설치하는 방법에 있어서,Wind turbine generator installation method of the present invention for solving the above problems, a method for installing a wind generator including a nussel coupled to the blade, and supporting the nussel spaced apart from the ground at least a three pillars To
지면으로부터 세워지는 포스트를 일정간격을 두고 서로 마주보도록 한 쌍을 설치하는 포스트 설치단계; 천정크레인이 구비된 지지틀과, 상기 지지틀의 상측에 배치되며 너셀이 안착될 수 있는 너셀 받침대를 포스트의 상부에 설치하고, 그 너셀 받침대에는 너셀을 안착시키는 너셀 설치단계; 상기 천정크레인에 의하여 이동하는 하단지주를 상기 포스트 사이에서 지면에 세워지도록 설치하는 하단지주 설치단계; 상기 포스트 사이에 세워진 하단지주의 수평위치를 고정하기 위하여 상기 하단지주를 와이어에 의하여 상기 포스트에 고정시키는 하단지주 수평위치 고정단계; 상기 포스트를 잭업방식으로 상승시켜 천정크레인이 상기 하단지주와 충분한 이격거리를 유지할 수 있게 하는 천정크레인 상승단계; 상기 천정크레인에 의하여 이동하는 중앙지주를 상기 포스트 사이에서 상기 하단지주의 상측에 세워질 수 있도록 설치하는 중앙지주 설치단계; 상기 포스트 사이의 중앙지주가 하단지주에 안 정적으로 위치고정될 수 있도록 상기 포스트와 중앙지주를 와이어에 의하여 위치고정하는 중앙지주 수평위치 고정단계; 상기 포스트를 잭업장식으로 상승시켜 상기 천정크레인이 상기 중앙지주와 충분한 이격거리를 유지할 수 있게 하는 천정크레인 상승단계; 상기 천정크레인에 의하여 이동하는 상단지주를 상기 포스트 사이에서 상기 상단지주의 상측에 세워질 수 있도록 설치하는 상단지주 설치단계; 상기 포스트 사이의 지주가 지면에 안정적으로 위치고정될 수 있도록 상기 포스트와 상단지주를 와이어에 의하여 위치고정하는 상단지주 수평위치 고정단계; 상기 너셀을 하강시킨 후에 상단지주와 상기 너셀을 서로 부착시키는 결합단계; 상기 포스트, 지지틀, 너셀받침대를 해체하여 제거하는 제거단계; 견인와이어를 이용하여 블레이드를 상기 지주를 따라 승강시키고 나서 블레이드를 상기 너셀에 설치하는 블레이드 설치단계;를 포함하는 것이 바람직하다.A post installation step of installing a pair to face each other at a predetermined interval from the posts erected from the ground; A nussel installation step of installing a support frame provided with a ceiling crane and a nussel pedestal disposed on an upper side of the support frame, on which the nussel can be seated, on the upper part of the post, and the nussel pedestal resting on the nussel pedestal; A lower column installation step of installing the lower column holding by the ceiling crane so as to stand on the ground between the posts; A lower end horizontal position fixing step of fixing the lower end to the post by a wire to fix the horizontal position of the lower end erected between the posts; Lifting the post in the jack-up method to increase the overhead crane so that the overhead crane can maintain a sufficient distance from the lower end; A center support installation step of installing a center support moving by the ceiling crane so as to be erected above the lower support between the posts; A horizontal fixation step for fixing the posts and the central support by a wire so that the central support between the posts can be stably fixed to the lower support; Lifting the post to the jack-up decoration to increase the ceiling crane to maintain a sufficient distance away from the center crane; An upper end mounting step of installing the upper end holding moved by the ceiling crane so as to be erected above the upper end between the posts; An upper end horizontal position fixing step of fixing the post and the upper end by wires so that the posts between the posts can be stably fixed to the ground; A coupling step of attaching the upper column and the nussel to each other after lowering the nussel; A removal step of dismantling and removing the post, the support frame and the nussel base; It is preferable to include a blade installation step of elevating the blade along the post using a traction wire and then install the blade in the nussel.
상기 풍력발전기 설치방법에 있어서, 상기 하단지주, 중앙지주 및 상단지주에는 그 외주면을 감싸는 고정띠를 각각의 지주의 길이방향을 따라 등간격으로 배치한 후에, 그 고정띠에 지지되는 모노레일을 각각의 지주의 길이방향을 따라 설치하고, 그 모노레일에는 그 모노레일을 따라 승강하고 작업자가 탑승할 수 있는 작업차가 설치되는 작업차 설치단계를 더 포함하는 것이 바람직하다.In the wind generator installation method, the lower support, the central support and the upper support are arranged at equal intervals along the longitudinal direction of each strut, and each strut of the monorail supported by the strut is fixed to each of the struts. Install along the longitudinal direction of, the monorail is preferably further comprises a work vehicle installation step of lifting up along the monorail and a work vehicle that can be occupied by the operator is installed.
상기 풍력발전기 설치방법에서, 상기 하단지주 수평위치 고정단계, 중앙지주 수평위치 고정단계 및 상단지주 수평위치 고정단계에서, 상기 작업차에 승차한 작업자가 각각의 포스트로부터 연장형성된 한 쌍의 와이어의 양단을 매듭지음에 의하여 각각의 지주가 포스트에 위치고정되는 것이 바람직하다. In the wind generator installation method, in the lower stage horizontal position fixing step, the central stage horizontal position fixing step and the upper stage horizontal position fixing step, both ends of a pair of wires extending from each post by an operator riding in the work vehicle By knotting each post is preferably fixed to the post.
본 발명에 따른 풍력발전기 설치방법에 의하면, 지면에 대하여 수직하게 설치된 지주가 와이어에 의하여 간단하게 고정설치될 수 있으므로 설치비용이 절약되고 설치구조가 간단하게 될 수 있는 장점이 있다.According to the wind turbine installation method according to the present invention, since the prop installed vertically with respect to the ground can be simply fixed by the wire, the installation cost is reduced and the installation structure can be simplified.
이하, 첨부된 도면 참조하여 본 발명에 따른 바람직한 실시 예를 첨부된 도면을 참조하여 상세히 설명한다. 도 5 및 도 6은 하단지주를 지면에 세우는 모습을 나타내는 도면이고, 도 7은 도 6의 Ⅶ-Ⅶ 단면도이고, 도 8은 중앙지주를 상기 하단지주의 상단에 세우는 모습을 나타내는 도면이며, 도 9은 블레이드를 너셀에 설치하는 모습을 나타내는 도면이다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. 5 and 6 is a view showing a state in which the lower column is erected on the ground, Figure 7 is a cross-sectional view of Figure 6, Fig. 8 is a view showing a state in which the central column is erected on the upper end of the lower column, 9 is a diagram showing how the blade is installed in the nussel.
이러한 본 발명에 따른 풍력발전기는 구체적으로 풍력발전기는 블레이드가 결합된 너셀과, 그 너셀을 지면으로부터 일정간격 이격시켜 지지하며 적어도 3개 이상으로 이루어진 지주를 포함하는 것으로서, 이러한 풍력발전기의 설치방법은 포스트 설치단계; 너셀 설치단계; 하단지주 설치단계; 하단지주 수평위치 고정단계; 천정크레인 상승단계; 중앙지주 설치단계; 중앙지주 수평위치고정단계; 천정크레인 상승단계; 상단지주 설치단계; 상기 포스트 사이의 지주가 지면에 안정적으로 위치고정될 수 있도록 상기 포스트와 상단지주를 와이어에 의하여 위치고정하는 상단지주 수평위치고정단계; 상기 너셀을 하강시킨 후에 상단지주와 상기 너셀을 서로 부착시키는 결합단계; 제거단계; 블레이드 설치단계를 포함한다.The wind turbine according to the present invention specifically includes a nussel in which a wind turbine is coupled to a blade, and supports the nussel at a predetermined distance from the ground, and includes at least three pillars. Post installation step; Nussel installation step; Lower column installation step; Fixing the horizontal position of the lower end; Ceiling crane rising step; Central support installation step; A horizontal position fixing step of the center; Ceiling crane rising step; Upper column installation step; An upper end horizontal position fixing step of fixing the post and the upper end by wires so that the posts between the posts can be stably fixed to the ground; A coupling step of attaching the upper column and the nussel to each other after lowering the nussel; Removing step; Blade installation step.
상기 포스트 설치단계는 도 5에 도시된 바와 같이 지면으로부터 세워지는 포 스트(61)를 일정간격을 두고 서로 마주보도록 한 쌍을 설치하는 것이다. 이러한 포스트(61)는 철골구조로 이루어져 있으며, 그 하단은 지면에 케이지(61)에 의하여 지지된다. The post installation step is to install a pair so as to face each other at a predetermined interval to the
상기 너셀 설치단계는, 천정크레인(44-1)이 구비된 지지틀(44)과, 상기 지지틀(44)의 상측에 배치되며 너셀(41)이 안착될 수 있는 너셀 받침대(43)를 포스트(61) 상부에 먼저 설치하고, 그 너셀 받침대(43)에는 너셀(41)을 안착시킨다. 이때, 상기 천정크레인(44-1)은 지지틀(44)을 따라 수평방향으로 이동가능하게 설치된다. The nussel installation step, the
상기 하단지주 설치단계는, 천정크레인(44-1)에 의하여 상단이 고정설치되고 그 하단은 이동식 크레인(70)에 의하여 지지된 상태에서 이동하는 하단지주(20)를 상기 포스트(61) 사이에서 지면에 세워지도록 설치하는 것이다. In the lower stage installation step, the upper end is fixedly installed by the ceiling crane 44-1 and the lower end is moved between the
한편, 하단지주(20)가 설치된 후에는 도 6에 도시한 바와 같이 작업차(24)를 하단지주에 설치한다. 구체적으로는 하단지주(20)가 설치된 후에는 하단지주(20)의 외주면에 고정띠(22)를 그 하단지주(20)의 길이방향을 따라 등간격으로 배치한 후에, 그 고정띠(22)에 의하여 지지되는 모노레일(23)을 하단지주(20)의 길이방향을 따라 설치하며, 그 모노레일(23)에는 승강할 수 있는 작업차(24)가 설치되는 것이다. 이 작업차(24)에는 작업자가 탑승할 수 있는 작업공간이 마련된다. On the other hand, after the
상기 하단지주 수평위치 고정단계는, 와이어(211)에 의하여 하단지주(20)를 포스트(61)에 고정시키는 것이다. 구체적으로는 각각의 포스트(61)에는 미리 한 쌍의 와이어(211)가 부착되어 있는데, 하단지주(20)를 설치한 후에 작업차(24)를 타 고 있는 작업자가 상기 한 쌍의 와이어(211) 양단을 매듭지어 하단지주(20)가 포스트(61)에 고정될 수 있도록 하는 것이다. 와이어(211)에 의하여 묶여져서 하단지주(20)가 포스트(61)에 고정된 모습은 도 7에 도시된 바와 같다. 이와 같이 하단지주(20)는 서로 교차설치된 U 자형태의 와이어(211)가 양쪽에서 서로 당기고 있으므로 튼튼하게 고정지지될 수 있다. 이와 같이 하단지주(20)의 수평위치가 고정된 후에는 하단지주(20)에 대한 지면의 고정작업 등 기타 필요한 작업을 실시할 수 있다.The lower end horizontal position fixing step is to fix the
상기 천정크레인(44-1) 상승단계는, 상기 포스트(61)를 잭업방식으로 상승시켜 천정크레인(44-1)을 포함한 너셀(41)등이 하단지주(20)와 충분한 이격거리를 유지할 수 있게 하는 것으로서, 구체적으로는 중앙지주(30)가 하단지주(20)의 위에 설치될 수 있는 환경을 만드는 것이다. 이와 같이 천정크레인(44-1)을 상승하기 위하여, 먼저, 하단지주(20)에 고정되어 있는 와이어(211)를 푼 후에, 포스트(61)를 상승시킨다. 이후에, 도 8에 도시한 바와 같이 새로운 포스트(61-1)에 마련된 와이어(211-1)를 상기 하단지주(20)에 다시 고정한다. 이러한 작업은 작업차(24)에 탑승한 작업자에 의하여 이루어진다.In the step of raising the ceiling crane 44-1, the
상기 중앙지주 설치단계는 도 8에 도시한 바와 같이, 천정크레인(44-1)에 의하여 이동하는 중앙지주(30)를 상기 포스트(61) 사이에서 상기 하단지주(20)의 상측에 세워질 수 있도록 설치하는 것으로서, 이때 중앙지주(30)는 상단이 천정크레인(44-1)에 의하여 고정되고 하단은 이동식 크레인(70)에 의하여 지지된 상태에서 상기 천정크레인(44-1)에 의하여 이동하게 하게 된다. 이동된 중앙지주(30)가 하단 지주(20)의 위에 설치된 후에는 고정띠(22), 모노레일(23), 작업차(24)를 상술한 방법과 동일한 방법으로 중앙지주(30)에도 설치한다.As shown in FIG. 8, the center support installation step may be performed so that the
상기 중앙지주 수평위치 고정단계는, 와이어(211)에 의하여 중앙지주(30)의 수평위치를 고정하는 것으로서, 포스트(61) 사이의 중앙지주(30)를 와이어(211)에 의하여 수평위치의 고정을 수행하는 것이다. 구체적인 방법은 상술한 하단지주(20)를 고정하는 방법과 동일하다. 이후에, 중앙지주(30)에 대한 기타 마무리 작업을 실시한다.The fixing of the horizontal position of the central support is to fix the horizontal position of the
상기 천정크레인 상승단계는, 천정크레인(44-1)을 다시 상승시켜 중앙지주(30)와 충분한 이격거리를 유지할 수 있도록 하는 것이다. The overhead crane rising step is to raise the ceiling crane 44-1 again to maintain a sufficient separation distance from the central column (30).
상기 상단지주 설치단계는, 상기 천정크레인(44-1)에 의하여 이동하는 상단지주(35)를 상기 포스트(61) 사이에서 상기 상단지주의 상측에 세워질 수 있도록 설치하는 것이며, 상기 상단지주 수평위치 고정단계는, 상기 포스트(61) 사이의 상단지주(35)가 지면에 안정적으로 위치고정될 수 있도록 상기 포스트(61)와 상단지주(35)를 와이어(211)에 의하여 위치고정하는 것이다. 이러한 천정크레인 상승단계, 상단지주 설치단계 및 상단지주 수평위치 고정단계는 상술한 중앙지주(30)의 설치방법과 유사하므로 구체적인 설명은 생략한다. 상단지주(35)까지 설치가 완료되면, 상기 너셀(41)을 하강시킨 후에 상단지주(35)와 상기 너셀(41)을 서로 부착시킨다. 이후에는 상기 너셀(41)과, 각각의 지주를 제외한 나머지 포스트(61), 지지틀, 너셀(41)받침대 등을 해체하여 제거한다. 이와 같이 상단지주를 설치하는 모습을 나타내는 도면 및 기타 해체하는 모습은 도 8과 유사하므로 구체적인 도시는 생략한다.The upper end supporting step is to install an
상기 블레이드 설치단계는, 도 9에 도시한 바와 같이 견인와이어(72)를 이용하여 블레이드(45)를 상기 각각의 지주(20, 30, 35)를 따라 승강시키고 나서 블레이드(45)를 상기 너셀(41)에 설치하는 것이다. 구체적으로는 종래기술과 같이 윈치(71)에 의하여 견인되는 견인와이어(72)를 너셀(41)에 걸쳐지도록 하는 것이 아니라, 너셀(41)과 결합되는 부분과 근접한 곳에 별도의 견인와이어 지지수단(25)을 설치하여 그 견인와이어 지지수단(25)에 견인와이어(72)가 걸쳐질 수 있도로 하는 것이다. 이러한 견인와이어 지지수단(25)은 링(25a)과, 그 링에 고정설치되는 도르레(25b)로 이루어져 있게 된다. 이러한 견인와이어 지지수단(25)은 상단지주(35)의 상측에 배치된다. 기타 구체적인 블레이드 설치방법은 종래기술과 동일하므로 구체적인 설명은 생략한다.In the blade installation step, as shown in FIG. 9, the
이러한 본 발명에 따른 풍력발전기 설치방법은, 종래기술과는 달리 각각의 지주를 와이어에 의하여 손쉽게 고정설치할 수 있으므로, 상황에 따라 설치 및 해체가 비교적 단순하다. 또한, 종래기술에서는 와이어를 설치하기 위하여 복잡한 구조를 가지며 무거운 철골 빔 형태의 구조를 미리 포스트에 설치해두었으나, 본 실시예에서는 미리 포스트에 단순한 와이어만 부착시켜 두면 되고, 기타 묶고 푸는 작업은 현장의 작업자가 손쉽게 처리할 수 있어 작업이 용이하다. The wind turbine generator installation method according to the present invention, unlike the prior art, can be easily fixed to each shore by wire, installation and disassembly is relatively simple according to the situation. In addition, the prior art has a complicated structure for installing the wire, and a heavy steel beam-like structure is installed in advance in the post, in this embodiment, only a simple wire to the post in advance, other tying and loosening operations It can be easily handled by the operator, making it easy to work with.
이상에서 바람직한 실시예를 들어 본 발명을 상세하게 설명하였으나, 본 발명은 반드시 이러한 실시예에 한정되는 것은 아니고 본 발명의 기술사상을 벗어나지 않는 범위 내에서 다양하게 변형 실시될 수 있다.Although the present invention has been described in detail with reference to preferred embodiments, the present invention is not necessarily limited to these embodiments, and various modifications can be made without departing from the spirit of the present invention.
도 1은 설치된 풍력발전기의 모습을 나타내는 정면도.1 is a front view showing a state of the installed wind turbine.
도 2 및 도 3는 종래기술에 따른 풍력발전기의 지주설치 과정을 나타내는 도면.2 and 3 is a view showing the prop installation process of the wind power generator according to the prior art.
도 4는 종래기술에 따른 풍력발전기의 블레이드 설치과정을 나타내는 도면.4 is a view showing a blade installation process of the wind power generator according to the prior art.
도 5 및 도 6은 하단지주를 지면에 세우는 모습을 나타내는 도면.5 and 6 are views showing a state in which the lower column is erected on the ground.
도 7은 도 6의 Ⅶ-Ⅶ 단면도.FIG. 7 is a VIII-VIII cross-sectional view of FIG. 6. FIG.
도 8은 중앙지주를 상기 하단지주의 상단에 세우는 모습을 나타내는 도면.Figure 8 is a view showing a state in which the central column is erected on top of the lower column.
도 9은 블레이드를 너셀에 설치하는 모습을 나타내는 도면.9 is a view showing a state in which the blade is installed in the nussel.
<도면부호의 상세한 설명><Detailed Description of Drawings>
20...하단지주 22...고정띠20 ...
23...모노레일 24...작업차23
30...중앙지주 35...상단지주
41...너셀 43...너셀 받침대41 ...
44...지지틀 44-1...천정크레인44 ... support frame 44-1 ... ceiling crane
45...블레이드 61...포스트45 ...
70...이동식 크레인 71...윈치70 ...
72...견인와이어 211...와이어72 ... towing
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080079021A KR101001701B1 (en) | 2008-08-12 | 2008-08-12 | Installing method of wind power generator supporting horizontally tower with wire |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080079021A KR101001701B1 (en) | 2008-08-12 | 2008-08-12 | Installing method of wind power generator supporting horizontally tower with wire |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100020304A true KR20100020304A (en) | 2010-02-22 |
KR101001701B1 KR101001701B1 (en) | 2010-12-15 |
Family
ID=42090388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080079021A KR101001701B1 (en) | 2008-08-12 | 2008-08-12 | Installing method of wind power generator supporting horizontally tower with wire |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101001701B1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101313206B1 (en) * | 2012-06-27 | 2013-09-30 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101313811B1 (en) * | 2012-06-28 | 2013-09-30 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101313810B1 (en) * | 2012-06-27 | 2013-09-30 | 삼성중공업 주식회사 | Apparatus for connecting tower and blade |
KR101379724B1 (en) * | 2012-06-27 | 2014-03-28 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101533786B1 (en) * | 2014-10-16 | 2015-07-02 | 이레오션 주식회사 | Installing apparatus for blade of wind power generator, and installing mehtod for blade of wind power generator using the same |
KR101538720B1 (en) * | 2014-06-10 | 2015-07-24 | 남현주 | Installing method of offshore wind power plant |
KR101534672B1 (en) * | 2013-11-22 | 2015-07-24 | 이레오션 주식회사 | Installing apparatus for wind power generator and installing mehtod for wind power generator using the same |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101306031B1 (en) | 2012-01-13 | 2013-09-12 | (주)에스렌탈산업 | Establishment method for wind power electric generator and device thereof |
KR102106607B1 (en) | 2018-12-04 | 2020-05-04 | 두산중공업 주식회사 | Installing method of multi type wind turbine |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3922558B2 (en) | 2002-10-31 | 2007-05-30 | 東京電力株式会社 | Columnar structure assembly equipment |
JP2006152862A (en) | 2004-11-26 | 2006-06-15 | Ishikawajima Harima Heavy Ind Co Ltd | Method of mounting and dismounting blade in wind power generation plant |
KR100806661B1 (en) | 2007-01-11 | 2008-02-26 | 서동택 | Method of establishing wind power generator using the leading rail |
KR100798083B1 (en) | 2007-01-11 | 2008-01-28 | 서동택 | Method of establishing sea wind power generator using the leading rail |
-
2008
- 2008-08-12 KR KR1020080079021A patent/KR101001701B1/en active IP Right Grant
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101313206B1 (en) * | 2012-06-27 | 2013-09-30 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101313810B1 (en) * | 2012-06-27 | 2013-09-30 | 삼성중공업 주식회사 | Apparatus for connecting tower and blade |
KR101379724B1 (en) * | 2012-06-27 | 2014-03-28 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101313811B1 (en) * | 2012-06-28 | 2013-09-30 | 삼성중공업 주식회사 | Assembly robot for windmill blade |
KR101534672B1 (en) * | 2013-11-22 | 2015-07-24 | 이레오션 주식회사 | Installing apparatus for wind power generator and installing mehtod for wind power generator using the same |
KR101538720B1 (en) * | 2014-06-10 | 2015-07-24 | 남현주 | Installing method of offshore wind power plant |
KR101533786B1 (en) * | 2014-10-16 | 2015-07-02 | 이레오션 주식회사 | Installing apparatus for blade of wind power generator, and installing mehtod for blade of wind power generator using the same |
Also Published As
Publication number | Publication date |
---|---|
KR101001701B1 (en) | 2010-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101001701B1 (en) | Installing method of wind power generator supporting horizontally tower with wire | |
CN101548100B (en) | Suspension device for wind wheel blade, method of mounting wind wheel blade, and method of constructing wind-driven generator | |
JP6285546B2 (en) | Assembly and method for lifting a load | |
CN102213033B (en) | The method of construction of wind-driven generator mixing pylon | |
KR20140002751A (en) | Method for accessing the outer surface of wind turbine towers and device for use with this method | |
US20130081337A1 (en) | Tower erection system and method | |
CN104746883A (en) | Construction method for three-crane lifting installation used for bow-shaped space truss | |
JP3918905B2 (en) | How to install a windmill generator | |
CN109812117A (en) | A kind of movable-type intelligent lifting radar tower and its installation method | |
KR101001702B1 (en) | Installing method of wind power generator preventing damage of nacelle from wire in the process of coupling blade | |
CN106744404A (en) | Method for hoisting mill housing by using movable tower | |
JP2024531967A (en) | Improvements in wind turbine construction and maintenance | |
JP7177431B2 (en) | Lift-up device and tower-like structure construction method | |
CN104925687A (en) | Electric lifting device and working method thereof | |
CN215160260U (en) | A hoisting structure for hoisting bridge tower crossbeam below decoration | |
CN211162717U (en) | Fan blade supporting device | |
KR101317384B1 (en) | The hoisting and installing method and apparatus of wind turbines by using the self tower | |
JP2014098258A (en) | Steel tower assembling/demolition method by stand bar, and device | |
CN202899721U (en) | Steel pole provided with platform and used for high-tension transmission line iron tower | |
CN202899720U (en) | Steel pole provided with foot treadles and used for high-tension transmission line iron tower | |
CN216613758U (en) | Hoist device is used in TYD installation | |
CN202248827U (en) | Single attached lifting scaffold | |
CN216613815U (en) | Derrick mast device is used in TYD installation | |
CN201645461U (en) | Megawatt-stage wind power generator integral assembling platform | |
CN214755303U (en) | Multifunctional cable bracket for wind power engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130913 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140818 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20151001 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160912 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170829 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180823 Year of fee payment: 9 |