CN215160260U - A hoisting structure for hoisting decorative parts under the beam of a bridge tower - Google Patents

A hoisting structure for hoisting decorative parts under the beam of a bridge tower Download PDF

Info

Publication number
CN215160260U
CN215160260U CN202120798883.0U CN202120798883U CN215160260U CN 215160260 U CN215160260 U CN 215160260U CN 202120798883 U CN202120798883 U CN 202120798883U CN 215160260 U CN215160260 U CN 215160260U
Authority
CN
China
Prior art keywords
pulley
hoisting
lifting hook
hook
bridge tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120798883.0U
Other languages
Chinese (zh)
Inventor
刘小波
王武兵
吴涛
钱杰
李志彬
潘聪
刘岱鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Changsha Construction Co ltd
Original Assignee
Cccc Changsha Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Changsha Construction Co ltd filed Critical Cccc Changsha Construction Co ltd
Priority to CN202120798883.0U priority Critical patent/CN215160260U/en
Application granted granted Critical
Publication of CN215160260U publication Critical patent/CN215160260U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hoisting structure for hoisting bridge tower crossbeam below decoration, which comprises a hanging bracket, first pulley lifting hook, the second pulley lifting hook, the fixed pulley, hoist engine and wire rope, the gallows includes mounting platform, install the support frame that is used for fixed decoration on mounting platform, construction platform has been set up on the support frame, both ends at mounting platform are connected with the lifting rope respectively, the lifting rope is connected with first pulley lifting hook, be fixed with the back-up beam that both ends extend the crossbeam on the bridge tower crossbeam, both ends at the back-up beam are connected with the second pulley lifting hook respectively, the hoist engine, the fixed pulley is installed at the bridge floor, wire rope one end is changeed on the reel of hoist engine, the fixed pulley is walked around to the other end, be connected with first pulley lifting hook behind the second pulley lifting hook. The utility model discloses simple structure, use cost is low, and the construction is light nimble, makes things convenient for the operation, has reduced the operation risk, has improved the operating efficiency.

Description

A hoisting structure for hoisting bridge tower crossbeam below decoration
Technical Field
The utility model relates to a lifting device specifically is a hoisting structure for hoisting bridge tower crossbeam below decoration.
Background
The bridge tower is an important part of a suspension bridge and a cable-stayed bridge, and a plurality of decorative components are added on the bridge tower, so that the aesthetic enjoyment can be added to a single bridge structure, and the bridge tower is an organic combination of structural engineering and building aesthetics. However, since the height of the pylons is generally high, this adds difficulty to the installation of the trim member. When the decoration component is installed, large-scale hoisting equipment is needed to hoist the decoration component to the high altitude, and then the operation personnel reinforce the decoration component, so that a large amount of equipment cost is increased. Especially, the installation of bridge tower crossbeam below decoration, current lifting device location is accurate inadequately to because the construction face is narrow, be unfavorable for the construction operation, the operation risk is big.
Disclosure of Invention
To the problem that exists among the above-mentioned prior art, the utility model provides a simple structure, with low costs, convenient operation, construction safety be used for hoist and mount bridge tower crossbeam below hoisting structure of decoration.
The utility model adopts the technical scheme as follows: a hoisting structure for hoisting a decoration part below a bridge tower beam comprises a hoisting frame, a first pulley lifting hook, a second pulley lifting hook, a fixed pulley, a winch and a steel wire rope, the first pulley lifting hook, the second pulley lifting hook, the fixed pulley, the winch and the steel wire rope are respectively provided with two groups, the hanger comprises an installation platform, a support frame for fixing the decorative piece is arranged on the mounting platform, a construction platform is arranged on the support frame, the two ends of the mounting platform are respectively connected with a lifting rope, the lifting rope is connected with a first pulley lifting hook, a supporting beam with two ends extending out of a cross beam is fixed on the bridge tower cross beam, the two ends of the supporting beam are respectively connected with the second pulley lifting hook, the fixed pulley is fixedly arranged on the bridge floor, the winch is arranged on the bridge floor, one end of the steel wire rope is wound on a winding drum of the winch in a rotating mode, and the other end of the steel wire rope is connected with the first pulley lifting hook after winding the fixed pulley and the second pulley lifting hook.
Further, the second pulley hook is a double-pulley-block hook.
Furthermore, a protective net is arranged on the construction platform in a surrounding mode.
The beneficial effects of the utility model reside in that:
(1) by adopting the hoisting structure of the utility model, large-scale hoisting equipment is not needed to enter the field, and only corresponding pulleys and I-shaped steel are needed, thereby saving a large amount of cost;
(2) the hoisting structure of the utility model can accurately position the decorative component, and is light and flexible;
(3) the utility model discloses a hoisting structure provides better construction platform for the construction operation personnel, and convenient operation reduces the operation risk, improves the operating efficiency.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural view of the hanger of the present invention.
Detailed Description
The following describes in detail specific embodiments of the present invention. It should be understood that the detailed description and specific examples, while indicating the present invention, are given by way of illustration and explanation only, not limitation.
As shown in fig. 1 and 2, the hoisting structure for hoisting a decoration part under a bridge tower beam of the present invention comprises a hoisting frame 4, a first pulley hook 5, a second pulley hook 6, a fixed pulley 2, a winch 1 and a steel wire rope 3, wherein the first pulley hook 5, the second pulley hook 6, the fixed pulley 2, the winch 1 and the steel wire rope 3 are all provided with two sets, the hoisting frame 4 comprises a mounting platform 401, a support frame 402 for fixing the decoration part 10 is installed on the mounting platform 401, a construction platform 403 is erected on the support frame 402, a protective net 404 is enclosed on the construction platform 403, two ends of the mounting platform 401 are respectively connected with a lifting rope 9, the lifting rope 9 is connected with the first pulley hook 5, a support beam 7 with two ends extending out of the beam is fixed on the bridge tower beam 8, two ends of the support beam 7 are respectively connected with the second pulley hook 6, the fixed pulley 2 is fixedly installed on the bridge tower beam, the winch 1 is arranged on the bridge floor, one end of the steel wire rope 3 is wound on a winding drum of the winch 1, and the other end of the steel wire rope is connected with the first pulley lifting hook 5 after passing around the fixed pulley 2 and the second pulley lifting hook 6.
In this embodiment, the second pulley hook 6 is a double-pulley-block hook.
The utility model discloses a hoisting structure, simple structure only needs corresponding pulley and I-steel, and use cost is low, and the construction is light nimble, can accurate location decorate the component, and for the operation personnel provide construction platform, makes things convenient for the operation, has reduced the operation risk, has improved the operating efficiency.
Many modifications and other embodiments of the invention will come to mind to one skilled in the art to which this invention pertains having the benefit of the teachings presented in the foregoing descriptions and the associated drawings. Therefore, it is to be understood that the inventions are not to be limited to the specific embodiments disclosed and that modifications and other embodiments are intended to be included within the scope of the appended claims. Although specific terms are employed herein, they are used in a generic and descriptive sense only and not for purposes of limitation.

Claims (3)

1. The hoisting structure for hoisting the decorating part below the bridge tower beam is characterized by comprising a hoisting frame, a first pulley lifting hook, a second pulley lifting hook, a fixed pulley, a winch and a steel wire rope, wherein the first pulley lifting hook, the second pulley lifting hook, the fixed pulley, the winch and the steel wire rope are arranged in two groups, the hoisting frame comprises an installation platform, a support frame for fixing the decorating part is installed on the installation platform, a construction platform is erected on the support frame, lifting ropes are respectively connected with two ends of the installation platform and connected with the first pulley lifting hook, a supporting beam with two ends extending out of the beam is fixed on the bridge tower beam, the second pulley lifting hook is respectively connected with two ends of the supporting beam, the fixed pulley is fixedly installed on a bridge floor, the winch is arranged on the bridge floor, one end of the steel wire rope is wound on a winding drum of the winch, the fixed pulley is wound by the other end of the steel wire rope, and the steel wire rope is wound on the fixed pulley, The second pulley lifting hook is connected with the first pulley lifting hook.
2. A lifting structure for lifting a trim piece below a bridge tower beam as recited in claim 1, wherein the second sheave hook is a double block hook.
3. The hoisting structure for hoisting the decorative part below the bridge tower beam as recited in claim 1, wherein the construction platform is surrounded by a protective net.
CN202120798883.0U 2021-04-19 2021-04-19 A hoisting structure for hoisting decorative parts under the beam of a bridge tower Expired - Fee Related CN215160260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120798883.0U CN215160260U (en) 2021-04-19 2021-04-19 A hoisting structure for hoisting decorative parts under the beam of a bridge tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120798883.0U CN215160260U (en) 2021-04-19 2021-04-19 A hoisting structure for hoisting decorative parts under the beam of a bridge tower

Publications (1)

Publication Number Publication Date
CN215160260U true CN215160260U (en) 2021-12-14

Family

ID=79360450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120798883.0U Expired - Fee Related CN215160260U (en) 2021-04-19 2021-04-19 A hoisting structure for hoisting decorative parts under the beam of a bridge tower

Country Status (1)

Country Link
CN (1) CN215160260U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856283A (en) * 2023-06-25 2023-10-10 中铁大桥局集团第五工程有限公司 Device for high-altitude sliding installation of main tower decoration
CN117779630A (en) * 2024-01-08 2024-03-29 中交一航局城市交通工程有限公司 Novel construction platform structure for high-altitude steel structure installation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116856283A (en) * 2023-06-25 2023-10-10 中铁大桥局集团第五工程有限公司 Device for high-altitude sliding installation of main tower decoration
CN116856283B (en) * 2023-06-25 2025-09-30 中铁大桥局集团第五工程有限公司 A device for high-altitude sliding installation of main tower decorative parts
CN117779630A (en) * 2024-01-08 2024-03-29 中交一航局城市交通工程有限公司 Novel construction platform structure for high-altitude steel structure installation

Similar Documents

Publication Publication Date Title
CN215160260U (en) A hoisting structure for hoisting decorative parts under the beam of a bridge tower
CN101913542B (en) Curtain wall unit lifting device and construction method thereof
CN101214908A (en) Gin pole integrated dismounting method for tower crane
CN109137758A (en) A kind of self-anchored suspension bridge cable construction technology
KR20100020304A (en) Installing method of wind power generator supporting horizontally tower with wire
CN203562695U (en) Pulley suspension device of power transmission tower cross-arm angle iron
CN215558536U (en) Double-machine lifting system for chimney internal structure construction
CN102849622B (en) Mast-based section-by-section vertical lifting assembling method of tower
CN108035530B (en) Oil tank inner wall construction hanging basket
CN205637536U (en) A carry and hang device for climbing frame
CN101074087A (en) Self-raising tower crane
CN201437501U (en) Hoisting and unloading device
CN204022347U (en) Balance weight self-disassembly and assembly device and hoisting crane thereof
CN202379655U (en) Gantry type hydraulic jacking device
CN214401419U (en) Tower top hanging bracket for mounting stay cable tower end
CN216894728U (en) Device is maintained to wind generating set major possession
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN202465078U (en) Hoisting mechanism of crane
CN118145476A (en) Box transformer substation lifting sling for wind power operation and maintenance and box changing method
CN113753716B (en) Method for installing guide rail of elevator arraying crane with machine room
CN114684694A (en) Pre-assembled elevator module and method of assembling a pre-assembled elevator module
CN109534205B (en) Integrated automatic turnover normal hanging hoist and mounting structure thereof
CN218467045U (en) Novel landing leg-free hanging basket
JP7787340B1 (en) Wire drawer support device and wire drawer support method
CN210240451U (en) Wire rope tensioning device for tower elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211214

CF01 Termination of patent right due to non-payment of annual fee