CN106284955A - The construction method of planer-type building-construction lifting device - Google Patents

The construction method of planer-type building-construction lifting device Download PDF

Info

Publication number
CN106284955A
CN106284955A CN201610814500.8A CN201610814500A CN106284955A CN 106284955 A CN106284955 A CN 106284955A CN 201610814500 A CN201610814500 A CN 201610814500A CN 106284955 A CN106284955 A CN 106284955A
Authority
CN
China
Prior art keywords
plate
fixed plate
expansion plate
lifting device
regulating sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610814500.8A
Other languages
Chinese (zh)
Inventor
张朝峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Original Assignee
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huicheng Zhizao Industrial Design Co Ltd filed Critical Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority to CN201610814500.8A priority Critical patent/CN106284955A/en
Publication of CN106284955A publication Critical patent/CN106284955A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C25/00Cranes not provided for in groups B66C17/00 - B66C23/00
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Milling, Drilling, And Turning Of Wood (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses the construction method of a kind of planer-type building-construction lifting device, described lifting device includes base plate, crossbeam, hoist engine and column;The corner of described base plate is all fixedly welded with identical column, is vertically arranged with one and teases and ridicule knothole on column;Four columns are all cased with regulating sleeve;The regulating sleeve of left and right side is fixedly welded with left and right fixed plate respectively;It is respectively arranged with left and right expansion plate in described left and right fixed plate;The upper end of described column is fixed with crossbeam, and crossbeam is provided with hoist engine;Base plate is provided with four rolling.Be arranged on the side of building, top or middle part when the present invention constructs to fix with adjacent body of wall with steel pipe, realize security improvement material by the folding of left and right expansion plate, and fixed plate can height up and down, adapt to differing heights building;The roller of bottom is moved easily operation.

Description

The construction method of planer-type building-construction lifting device
Technical field
The present invention relates to a kind of construction implement field, particularly to executing of a kind of planer-type building-construction lifting device Work method.
Background technology
In building construction process, lifting means is the one of conveying machinery, is by changing the machinery that potential energy carries out transporting Equipment, is transported to eminence from ground by the material needed for building, and lifting device mainly includes elevator, overhead traveling crane, elevator, stable car, hangs Car, headstock gear etc., mainly have the forms such as bucket type, cable type, chain-type, fluid pressure type.Wherein, cable type is dynamic by manpower or machinery Power drives winding cords to complete the lifting means of traction enhancement work.Cable type lifting device needs the sidewall built again at present Upper installation crossbeam, arranges hoist engine on crossbeam and carrys out improving material, and such workman needs to visit health collecting material when Go out, owing to, in the quality of material, workman center is unstable, it is easy to leads to a disaster, causes casualties, and this lifting means Installation and removal bother very much, mobile inconvenience.
Summary of the invention
It is an object of the invention to provide a kind of simple to operate, structure is completely embedded, safe and reliable, convenient and swift, install, Dismounting quickly, improves the planer-type building-construction lifting device of construction efficiency, to solve proposition in above-mentioned background technology Problem.
For achieving the above object, the present invention provides following technical scheme:
A kind of planer-type building-construction lifting device, including base plate, crossbeam, hoist engine and column;The corner of described base plate All it is fixedly welded with identical column, column is vertically arranged with one and teases and ridicule knothole;Four columns are all cased with regulation set Cylinder, the interior circular diameter of regulating sleeve and the equal diameters of column, regulating sleeve slides on column, on the sidewall of regulating sleeve Offer the through hole corresponding with adjustment hole, through there being regulation bolt in through hole and adjustment hole;On the regulating sleeve in left side admittedly Surely it is welded with left fixed plate, the regulating sleeve on right side is fixedly welded with right fixed plate, left fixed plate and right fixed plate all and water Plane is parallel, in left fixed plate, is welded with boss between right fixed plate and regulating sleeve;Described left fixed plate and right fixed plate Inside offering cavity, sliding in cavity is provided with the left expansion plate corresponding with left fixed plate, right fixed plate, right expansion plate, The right side of left expansion plate is provided with groove, is provided with the projection with groove fit on the left side of right expansion plate, groove with Offer fixing hole in projection, in fixing hole, be provided with fixing bolt, fixing welding on left expansion plate, right expansion plate upper surface There is the pushing block of strip, and pushing block is along the telescopic direction setting of left expansion plate, right expansion plate, in left fixed plate, right fixed plate Offer the pushing block walking trough corresponding with pushing block;The upper end of described column is fixed with crossbeam, and crossbeam is provided with hoist engine, at volume Raise and on machine, be wound with cable wire;Base plate is fixed with helper, base plate is installed the roller with braking mechanism.
Further: the distance between described adjustment hole is 50~80mm, and the adjustment hole on four columns is the most right Should.
Further: described fixing hole is provided with 3~5.
Further: the lower end of described cable wire is provided with hook, and hook is positioned at left expansion plate, the centrosymmetry of right expansion plate On line.
The invention also discloses the manufacture method of a kind of planer-type building-construction lifting device, including following technique and step Rapid:
1) Corner Strapped at the base plate of rectangle welds the column of same size, is respectively provided with regulation on four root posts Hole, the distance between adjustment hole is 50~80mm, and the adjustment hole level mutually on four columns is corresponding;
2) regulating sleeve is set on four columns, the interior circular diameter of regulating sleeve and the equal diameters of column, regulation set Cylinder slides on column, offers the through hole corresponding with adjustment hole, wear in through hole and adjustment hole on the sidewall of regulating sleeve Cross regulation bolt;
3) on the regulating sleeve in left side, it is fixedly welded with left fixed plate, the regulating sleeve on right side is fixedly welded with right solid Determine plate, left fixed plate and right fixed plate all and plane-parallel, in left fixed plate, be welded with between right fixed plate and regulating sleeve Boss;Offer cavity in described left fixed plate and right fixed plate, slide to be provided with in cavity and fix with left fixed plate, the right side The left expansion plate that plate is corresponding, right expansion plate, be provided with groove on the right side of left expansion plate, sets on the left side of right expansion plate There is the projection with groove fit, at groove and longitudinally disposed 3~5 fixing holes of high spot, fixing bolt is set in fixing hole, It is fixedly welded with the pushing block of strip on left expansion plate, right expansion plate upper surface, and pushing block is along left expansion plate, the stretching of right expansion plate Contracting direction is arranged, and offers the pushing block walking trough corresponding with pushing block in left fixed plate, right fixed plate;
4) upper end at column arranges crossbeam, and crossbeam is provided with hoist engine, is wound around cable wire, at cable wire on hoist engine Lower end arranges hook, and hook is positioned in the centre symmetry line of left expansion plate, right expansion plate;At the two ends of base plate, helper is set, Under base plate, corner is respectively mounted the roller with braking mechanism.
The invention also discloses the construction method of a kind of planer-type building-construction lifting device, including following operating procedure:
1) this planer-type building-construction lifting device is in use, is arranged on the side of building, top or middle part with steel Pipe is fixed with adjacent body of wall, is carried out the height of adjustment fixing plate by regulating sleeve, to adapt to differing heights architectural plane, highly Being inserted into regulating bolt at adjustment hole after having regulated, fixed by regulating sleeve, personnel stand in and make in left fixed plate, right fixed plate Industry, the most left expansion plate, right expansion plate combine, fixing bolt fix;
2) when needs improving material, fixing bolt is extracted, by pushing block, left expansion plate, right expansion plate are retracted in a left side In fixed plate, right fixed plate, reserve space between left fixed plate, right fixed plate, hook is being put down by hoist engine, promote thing Material, material is elevated come up after, left expansion plate, right expansion plate are being released and are being merged, fixing after can take off material;
3) this planer-type building-construction lifting device can move to anywhere use by roller in construction.
Invention advantage
Compared with prior art, the invention has the beneficial effects as follows: the present invention is come by the folding of left expansion plate, right expansion plate Realize security improvement material, and fixed plate height up and down, adapt to differing heights building;Device is simple to operate, and structure is even Connect closely, safe and reliable, convenient and swift, and make device the most all can use by roller, install, dismantle quickly, Improve construction efficiency.
Accompanying drawing explanation
Fig. 1 is the structural representation of planer-type building-construction lifting device.
Fig. 2 is the structure for amplifying schematic diagram of A in Fig. 1.
Fig. 3 is the plan structure schematic diagram that in planer-type building-construction lifting device, left fixed plate and right fixed plate connect.
Fig. 4 is the structural representation after left expansion plate and right expansion plate separate in planer-type building-construction lifting device.
In figure: 1-base plate, the left fixed plate of 2-, the right fixed plate of 3-, 4-crossbeam, 5-hoist engine, 6-links up with, 7-column, and 8-adjusts Knothole, 9-regulates bolt, 10-regulating sleeve, 11-helper, 12-pushing block, 13-boss, the left expansion plate of 14-, stretches in the 15-right side Plate, 16-roller, 17-pushing block walking trough, 18-fixing hole, 19-groove, 20-is protruding, and 21-fixes bolt.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Embodiment 1: refer to figure, in the embodiment of the present invention, planer-type building-construction lifting device includes base plate 1, crossbeam 4, hoist engine 5 and column 7;The corner of described base plate 1 is all fixedly welded with identical column 7, is vertically arranged with one on column 7 Teasing and ridicule knothole 8, the distance between adjustment hole 8 is 50~80mm, and the adjustment hole 8 on four columns 7 is the most corresponding;At four All being cased with regulating sleeve 10 on column 7, the interior circular diameter of regulating sleeve 10 and the equal diameters of column 7, regulating sleeve 10 is vertical Slide on post 7, the sidewall of regulating sleeve 10 offers the through hole corresponding with adjustment hole 8, passes in through hole and adjustment hole 8 There is regulation bolt 9, ensure that regulating sleeve 10 is fixed on column 7, make regulating sleeve 10 can regulate height on column 7; The regulating sleeve 10 in left side is fixedly welded with left fixed plate 2, the regulating sleeve 10 on right side is fixedly welded with right fixed plate 3, left fixed plate 2 and right fixed plate 3 all and plane-parallel, in order to improve left fixed plate 2 and the stability of right fixed plate 3, Being welded with boss 13 between left fixed plate 2, right fixed plate 3 and regulating sleeve 10, boss 13 is cast iron, improves regulating sleeve With left fixed plate 2, the contact surface of right fixed plate 3, increase sustainable weight in left fixed plate 2 and right fixed plate 3;A described left side is solid Offering cavity in determining plate 2 and right fixed plate 3, sliding in cavity is provided with a left side corresponding with left fixed plate 2, right fixed plate 3 Expansion plate 14, right expansion plate 15, left expansion plate 14, right expansion plate 15 can contract in corresponding left fixed plate 2, right fixed plate 3, Make to reserve space between left fixed plate 2 and right fixed plate 3, the right side of left expansion plate 14 is provided with groove 19, flexible on the right side The left side of plate 15 is provided with the projection 20 coordinated with groove 19, so after left expansion plate 14, right expansion plate 15 stretch out against Time together, left expansion plate 14, right expansion plate 15 can be fixed with protruding 20 by groove 19, in groove 19 is with protruding 20 Offering fixing hole 18, fixing hole 18 is provided with 3~5, is provided with fixing bolt 21 in fixing hole 18, by fixing bolt 21 Groove 19 is fixed together with protruding 20, left expansion plate 14, right expansion plate 15 upper surface are fixedly welded with strip The pushing block 12 of shape, and pushing block 12 is along the telescopic direction setting of left expansion plate 14, right expansion plate 15, in left fixed plate 2, right fixed plate Offer the pushing block walking trough 17 corresponding with pushing block 12 on 3, make pushing block 12 move in pushing block walking trough 17;Described column 7 Upper end is fixed with crossbeam 4, and crossbeam 4 is provided with hoist engine 5, is wound with cable wire on hoist engine 5, and the lower end of cable wire is provided with hook 6, and hook 6 is positioned in the centre symmetry line of left expansion plate 14, right expansion plate 15;Base plate 1 is fixed with helper 11, makes workman Height can be regulated by climbing helper 11, base plate 1 be provided with four rolling 16, makes device to be moved easily.
The present embodiment also discloses the manufacture method of a kind of planer-type building-construction lifting device, including following technique and step Rapid:
1) Corner Strapped at the base plate 1 of rectangle welds the column 7 of same size, is respectively provided with tune on four root posts 7 Knothole 8, the distance between adjustment hole 8 is 50~80mm, and adjustment hole 8 level mutually on four columns 7 is corresponding;
2) regulating sleeve 10 is set on four columns 7, the interior circular diameter of regulating sleeve 10 and the equal diameters of column 7, Regulating sleeve 10 slides on column 7, offers the through hole corresponding with adjustment hole 8, at through hole on the sidewall of regulating sleeve 10 Regulation bolt 9 is had with passing in adjustment hole 8;
3) on the regulating sleeve 10 in left side, left fixed plate 2 it is fixedly welded with, fixing welding on the regulating sleeve 10 on right side There are right fixed plate 3, left fixed plate 2 and right fixed plate 3 all and plane-parallel, at left fixed plate 2, right fixed plate 3 and regulation set It is welded with boss 13 between cylinder 10;Offering cavity in described left fixed plate 2 and right fixed plate 3, sliding in cavity is arranged There are the left expansion plate 14 corresponding with left fixed plate 2, right fixed plate 3, right expansion plate 15, the right side of left expansion plate 14 is provided with Groove 19, is provided with the projection 20 coordinated with groove 19 on the left side of right expansion plate 15, at groove 19 with protruding 20 longitudinally 3~5 fixing holes 18 are set, fixing bolt 21 is set in fixing hole 18, solid on left expansion plate 14, right expansion plate 15 upper surface Surely it is welded with the pushing block 12 of strip, and pushing block 12 is along the telescopic direction setting of left expansion plate 14, right expansion plate 15, fixes on a left side The pushing block walking trough 17 corresponding with pushing block 12 is offered in plate 2, right fixed plate 3;
4) upper end at column 7 arranges crossbeam 4, and crossbeam 4 is provided with hoist engine 5, is wound around cable wire on hoist engine 5, The lower end of cable wire arranges hook 6, and hook 6 is positioned in the centre symmetry line of left expansion plate 14, right expansion plate 15;At base plate 1 two End arranges helper 11, is respectively mounted the roller 16 with braking mechanism in 1 time corner of base plate.
Itself it has been the construction method also disclosing a kind of planer-type building-construction lifting device, including operating step as follows Rapid:
1) this planer-type building-construction lifting device is in use, is arranged on the side of building, top or middle part with steel Pipe is fixed with adjacent body of wall, is carried out the height of adjustment fixing plate by regulating sleeve 10, to adapt to differing heights architectural plane, high Degree regulation is inserted into regulating bolt 9 at adjustment hole 8 after completing, and is fixed by regulating sleeve 10, and personnel stand in left fixed plate 2, the right side admittedly Determining operation on plate 3, the most left expansion plate 14, right expansion plate 15 combine, fixing bolt 21 fix;
2) when needs improving material, fixing bolt 21 is extracted, by pushing block 12 by left expansion plate 14, right expansion plate 15 It is retracted in left fixed plate 2, right fixed plate 3, between left fixed plate 2, right fixed plate 3, reserves space, hook 6 is being passed through elevator Machine 5 puts down, improving material, material is elevated come up after, left expansion plate 14, right expansion plate 15 are being released merging, fixing after take Lower material;
3) this planer-type building-construction lifting device can move to anywhere use by roller 16 in construction.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim Change is included in the present invention.Should not be considered as limiting involved claim by any reference in claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment May be appreciated other embodiments.

Claims (5)

1. the construction method of a planer-type building-construction lifting device, it is characterised in that include following operating procedure:
1) planer-type building-construction lifting device is arranged on the side of building, top or middle part with steel pipe with adjacent body of wall admittedly Fixed, carried out the height of adjustment fixing plate by regulating sleeve (10), to adapt to differing heights architectural plane, altitude mixture control complete after Adjustment hole (8) is inserted into regulating bolt (9), is fixed by regulating sleeve (10), and personnel stand in left fixed plate (2), right fixed plate (3) Upper operation, the most left expansion plate (14), right expansion plate (15) combine, fixing bolt (21) fix;
2) when needs improving material, fixing bolt (21) is extracted, by pushing block (12) by left expansion plate (14), right expansion plate (15) it is retracted in left fixed plate (2), right fixed plate (3), between left fixed plate (2), right fixed plate (3), reserves space, then will Hook (6) is put down by hoist engine (5), improving material, material is elevated come up after, then by left expansion plate (14), right expansion plate (15) release merging, after fixing, take off material;
3) planer-type building-construction lifting device moves to the local use needed in construction by roller (16).
The construction method of planer-type building-construction lifting device the most according to claim 1, it is characterised in that: described dragon Portal architecture construction hoisting device, including base plate (1), crossbeam (4), hoist engine (5) and column (7);The corner of described base plate (1) All it is fixedly welded with identical column (7), column (7) is vertically arranged with one and teases and ridicule knothole (8);On four columns (7) All being cased with the equal diameters of regulating sleeve (10), the interior circular diameter of regulating sleeve (10) and column (7), regulating sleeve (10) is vertical Post (7) is upper to slide, and offers the through hole corresponding with adjustment hole (8), at through hole and adjustment hole on the sidewall of regulating sleeve (10) (8) through there being regulation bolt (9) in;The regulating sleeve (10) in left side is fixedly welded with left fixed plate (2), the regulation on right side Right fixed plate (3), left fixed plate (2) and right fixed plate (3) it is fixedly welded with all and plane-parallel on sleeve (10), solid on a left side Determine to be welded with boss (13) between plate (2), right fixed plate (3) and regulating sleeve (10);Described left fixed plate (2) and the right side are fixed Plate offers cavity in (3), and sliding in cavity is provided with the left expansion plate corresponding with left fixed plate (2), right fixed plate (3) (14), right expansion plate (15), the right side of left expansion plate (14) is provided with groove (19), in the left side of right expansion plate (15) It is provided with the projection (20) coordinated with groove (19), offers fixing hole (18), fixing hole at groove (19) in protruding (20) (18) it is provided with fixing bolt (21) in, left expansion plate (14), right expansion plate (15) upper surface are fixedly welded with strip Pushing block (12), and pushing block (12) along left expansion plate (14), right expansion plate (15) telescopic direction arrange, left fixed plate (2), The pushing block walking trough (17) corresponding with pushing block (12) is offered in right fixed plate (3);The upper end of described column (7) is fixed with crossbeam (4), crossbeam (4) is provided with hoist engine (5), hoist engine (5) is wound with cable wire;Base plate (1) is fixed with helper (11), at base plate (1), the roller (16) with braking mechanism is above installed.
The construction method of planer-type building-construction lifting device the most according to claim 2, it is characterised in that: described regulation Distance between hole (8) is 50~80mm, and the adjustment hole (8) on four columns (7) is corresponding mutually.
The construction method of planer-type building-construction lifting device the most according to claim 2, it is characterised in that: described fixing Hole (18) is provided with 3~5.
The construction method of planer-type building-construction lifting device the most according to claim 2, it is characterised in that: described cable wire Lower end be provided with hook (6), and hook (6) is positioned in the centre symmetry line of left expansion plate (14), right expansion plate (15).
CN201610814500.8A 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device Pending CN106284955A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610814500.8A CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610814500.8A CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device
CN201410736610.8A CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410736610.8A Division CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof

Publications (1)

Publication Number Publication Date
CN106284955A true CN106284955A (en) 2017-01-04

Family

ID=52899920

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610815298.0A Active CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device
CN201410736610.8A Expired - Fee Related CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof
CN201610814500.8A Pending CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201610815298.0A Active CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device
CN201410736610.8A Expired - Fee Related CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction lifting device as well as manufacturing method and construction method thereof

Country Status (1)

Country Link
CN (3) CN106348188B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518055A (en) * 2018-05-11 2018-09-11 桐城市永锦建筑工程有限公司 A kind of special constructing device of paint
CN108643537A (en) * 2018-05-23 2018-10-12 马飞虎 A kind of construction scaffold for being easily installed and having a safety feature
CN108999389A (en) * 2018-07-26 2018-12-14 广州供电局有限公司 The replacing options of Portable vertical hoistable platform and STATCOM valve group
CN109649994A (en) * 2018-12-28 2019-04-19 台州职业技术学院 A kind of architectural engineering material elevator
CN109778710A (en) * 2019-03-15 2019-05-21 贵州大学 A kind of plain type of the site operation of road and bridge mentions hanger structure
CN110607752A (en) * 2019-09-30 2019-12-24 中建七局第一建筑有限公司 Beam frame for building construction
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800527B (en) * 2016-05-12 2018-11-09 泉州诺黎森贸易有限公司 A kind of construction material elevator
CN107140547A (en) * 2017-06-16 2017-09-08 无锡石油化工起重机有限公司 The traveller gantry of installation activity bottom plate
CN108557655A (en) * 2018-04-28 2018-09-21 中电建水环境治理技术有限公司 A kind of pipeline hanging device without spin
CN110948169A (en) * 2018-09-27 2020-04-03 金川集团工程建设有限公司 Steel pipe rotator
CN109896433B (en) * 2019-03-24 2021-04-06 江苏紫石机械制造有限公司 Multifunctional adjustable mechanical equipment lifting frame
CN110777935A (en) * 2019-11-14 2020-02-11 湖南吉人住工装配式建筑有限公司 Building device is built to integration fossil fragments
CN112010174B (en) * 2020-09-24 2022-06-28 广东爱科建设工程有限公司 Electromechanical equipment installation device and use method thereof
CN114709790B (en) * 2022-04-11 2024-05-03 无锡德刚精工机电设备有限公司 Sealing protection device suitable for junction of low-voltage cable
CN115013349B (en) * 2022-06-24 2024-08-06 浙江鹏翔暖通设备有限公司 Low-noise axial flow fan capable of being displaced, lifted and adjusted

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100096216A1 (en) * 2008-10-17 2010-04-22 Hekimo, S.R.O. Scaffolding
JP2010138652A (en) * 2008-12-15 2010-06-24 Sakamoto Katsuhiko Elevatable scaffolding
CN102108786A (en) * 2010-12-09 2011-06-29 浙江省天和建材集团有限公司 Overall lifting construction method of ultra-large type building member and device thereof
CN202508804U (en) * 2012-03-20 2012-10-31 葛洲坝集团基础工程有限公司 Gantry derrick hoisting system
CN203715155U (en) * 2013-12-11 2014-07-16 国网浙江杭州市萧山区供电公司 Heavy cover plate lifting device
CN203845761U (en) * 2014-04-18 2014-09-24 中意泰达(营口)汽车保修设备有限公司 Gantry lifter
CN203939225U (en) * 2014-06-24 2014-11-12 重庆广播电视大学 Floor concrete casting operation platform is built in room

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205402U (en) * 1985-12-21 1987-04-22 哈尔滨市第一住宅建筑工程公司建华机械厂 Attached construction gantry frame with safety devices
JPH1046799A (en) * 1996-08-01 1998-02-17 Nikko Co Ltd Traveling type elevator scaffolding with plurality of masts
JP2000177955A (en) * 1998-12-16 2000-06-27 Kumagai Gumi Co Ltd Luggage loading/unloading device for lifting carrier device
CN201071251Y (en) * 2007-07-02 2008-06-11 周爱兴 Assembled adjustable gantry
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Steel bar mounting hanger
CN102745597A (en) * 2012-07-16 2012-10-24 昆山市飞荣达电子材料有限公司 Portable portal frame
CN204386175U (en) * 2014-12-07 2015-06-10 徐州市铜山区水利工程处 Planer-type building-construction lifting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100096216A1 (en) * 2008-10-17 2010-04-22 Hekimo, S.R.O. Scaffolding
JP2010138652A (en) * 2008-12-15 2010-06-24 Sakamoto Katsuhiko Elevatable scaffolding
CN102108786A (en) * 2010-12-09 2011-06-29 浙江省天和建材集团有限公司 Overall lifting construction method of ultra-large type building member and device thereof
CN202508804U (en) * 2012-03-20 2012-10-31 葛洲坝集团基础工程有限公司 Gantry derrick hoisting system
CN203715155U (en) * 2013-12-11 2014-07-16 国网浙江杭州市萧山区供电公司 Heavy cover plate lifting device
CN203845761U (en) * 2014-04-18 2014-09-24 中意泰达(营口)汽车保修设备有限公司 Gantry lifter
CN203939225U (en) * 2014-06-24 2014-11-12 重庆广播电视大学 Floor concrete casting operation platform is built in room

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518055A (en) * 2018-05-11 2018-09-11 桐城市永锦建筑工程有限公司 A kind of special constructing device of paint
CN108643537A (en) * 2018-05-23 2018-10-12 马飞虎 A kind of construction scaffold for being easily installed and having a safety feature
CN108999389A (en) * 2018-07-26 2018-12-14 广州供电局有限公司 The replacing options of Portable vertical hoistable platform and STATCOM valve group
CN108999389B (en) * 2018-07-26 2021-06-22 广东电网有限责任公司广州供电局 Portable vertical lifting platform and replacement method of STATCOM valve bank
CN109649994A (en) * 2018-12-28 2019-04-19 台州职业技术学院 A kind of architectural engineering material elevator
CN109778710A (en) * 2019-03-15 2019-05-21 贵州大学 A kind of plain type of the site operation of road and bridge mentions hanger structure
CN110607752A (en) * 2019-09-30 2019-12-24 中建七局第一建筑有限公司 Beam frame for building construction
CN110607752B (en) * 2019-09-30 2021-04-16 中建七局第一建筑有限公司 Beam frame for building construction
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters

Also Published As

Publication number Publication date
CN104453231B (en) 2017-01-18
CN104453231A (en) 2015-03-25
CN106348188A (en) 2017-01-25
CN106348188B (en) 2018-04-27

Similar Documents

Publication Publication Date Title
CN106284955A (en) The construction method of planer-type building-construction lifting device
CN103726421B (en) Height and span adjustable track paver for metro construction
CN105000482B (en) Tower crane with walking mechanism
CN103967284B (en) The steel column installation method of reserved stigma docking
CN105484164A (en) Spanning type bailey beam bracket and construction method thereof
CN205276887U (en) Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205048321U (en) Portable storehouse face illumination beacon
CN202064281U (en) Slip form frame
CN203795311U (en) Multi-leg high pier and slip form construction device
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN204386175U (en) Planer-type building-construction lifting device
CN212771963U (en) Movable suspension operation platform
CN204954201U (en) Blast furnace stove outer covering outer wall welding platform
CN203559909U (en) Height-adjustable lining trolley
CN203049451U (en) Movable type sound absorption groove appearance repair trolley
CN206768613U (en) For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap
CN204715773U (en) A kind of building aerial cableway
CN106703390A (en) Scaffolding mechanism capable of guiding rails
CN203346035U (en) Steel structure operating platform
CN207297035U (en) Two lining trolley structure in a kind of standard cross-section of tunnel
CN105672910A (en) Oil tube traction lifting auxiliary machine
CN206527866U (en) Roller type box beam steel internal model installs chassis
CN204038909U (en) Mobile hoisting suspension bracket equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104

WD01 Invention patent application deemed withdrawn after publication