CN104453231B - Gantry type building construction hoisting device and its manufacturing and construction method - Google Patents

Gantry type building construction hoisting device and its manufacturing and construction method Download PDF

Info

Publication number
CN104453231B
CN104453231B CN201410736610.8A CN201410736610A CN104453231B CN 104453231 B CN104453231 B CN 104453231B CN 201410736610 A CN201410736610 A CN 201410736610A CN 104453231 B CN104453231 B CN 104453231B
Authority
CN
China
Prior art keywords
plate
fixed plate
expansion plate
column
type building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410736610.8A
Other languages
Chinese (zh)
Other versions
CN104453231A (en
Inventor
徐军
杜伟华
肖晶
赵含明
赵宇坤
王书贞
陈广森
张涛
郭光照
徐洪生
张旭升
杨志刚
韩晓华
易兰
申兰丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xu Jun
Original Assignee
Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Huicheng Zhizao Industrial Design Co Ltd filed Critical Suzhou Huicheng Zhizao Industrial Design Co Ltd
Priority to CN201610814500.8A priority Critical patent/CN106284955A/en
Priority to CN201410736610.8A priority patent/CN104453231B/en
Priority to CN201610815298.0A priority patent/CN106348188B/en
Publication of CN104453231A publication Critical patent/CN104453231A/en
Application granted granted Critical
Publication of CN104453231B publication Critical patent/CN104453231B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00—Scaffolds primarily resting on the ground
    • E04G1/18—Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20—Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C25/00—Cranes not provided for in groups B66C17/00 - B66C23/00
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00—Base supporting structures with legs
    • B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00—Portable or mobile lifting or hauling appliances
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00—Scaffolds primarily resting on the ground
    • E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/162—Handles to carry construction blocks
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00—Scaffolds primarily resting on the ground
    • E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242—Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Milling, Drilling, And Turning Of Wood (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a gantry type building construction lifting device and a manufacturing and construction method thereof, wherein the gantry type building construction lifting device comprises a bottom plate, a cross beam, a winch and an upright post; the four corners of the bottom plate are fixedly welded with the same upright posts, and a row of adjusting holes are vertically formed in the upright posts; the four upright posts are sleeved with adjusting sleeves; a left fixing plate and a right fixing plate are fixedly welded on the left and right adjusting sleeves respectively; a left expansion plate and a right expansion plate are respectively arranged in the left fixing plate and the right fixing plate; a cross beam is fixed at the upper end of the upright post, and a winch is arranged on the cross beam; four rollers are arranged on the bottom plate. According to the invention, materials are safely lifted by opening and closing the left and right telescopic plates, and the height of the fixed plate can be adjusted up and down to adapt to buildings with different heights; the device is simple to operate, the structural connection is tight, safety and reliability are realized, convenience and rapidness are realized, the roller enables the device to be used in any place, the installation and the disassembly are rapid, and the building construction efficiency is improved.

Description

龙门式建筑施工提升装置及其制造和施工方法Gantry type building construction hoisting device and its manufacturing and construction method

技术领域technical field

本发明涉及一种建筑施工设备领域,特别涉及一种龙门式建筑施工提升装置及其制造和施工方法。The invention relates to the field of building construction equipment, in particular to a gantry type building construction lifting device and its manufacturing and construction methods.

背景技术Background technique

在建筑施工过程中提升设备是输送机械的一种,是通过改变势能进行运输的机械设备,从地面将建筑所需的物料运送到高处,提升装置主要包括电梯、天车、卷扬、稳车、吊车、启闭机等,主要有斗式、绳索式、链条式、液压式等形式。其中,绳索式是由人力或机械动力驱动卷绕绳索来完成牵引提升工作的提升设备。目前绳索式提升装置需要再建筑的侧壁上安装横梁,在横梁上设置卷扬机来提升物料,这样工人在收取物料的时候需要将身体探出,由于物料的质量中,工人中心不稳,很容易酿成事故,造成人员伤亡,而且这种提升设备安装和拆卸非常麻烦,移动不便。In the process of building construction, hoisting equipment is a kind of conveying machinery. It is a mechanical equipment that can be transported by changing the potential energy. It transports the materials needed for the building from the ground to a high place. Cars, cranes, hoists, etc., mainly include bucket type, rope type, chain type, hydraulic type and other forms. Among them, the rope type is a lifting device that is driven by manpower or mechanical power to wind a rope to complete the traction and lifting work. At present, the rope-type lifting device needs to install a beam on the side wall of the building, and install a hoist on the beam to lift the material, so that the worker needs to lean out when collecting the material. Due to the quality of the material, the center of the worker is not stable, so it is easy Accidents are caused, casualties are caused, and the installation and disassembly of this lifting device is very troublesome and inconvenient to move.

发明内容Contents of the invention

本发明的目的在于提供一种操作简单,结构连接紧密,安全可靠,方便快捷,安装、拆卸快速,提高建筑施工效率的龙门式建筑施工提升装置,以解决上述背景技术中提出的问题。The object of the present invention is to provide a gantry-type building construction lifting device with simple operation, tight structural connection, safety, reliability, convenience, quick installation and disassembly, and improved construction efficiency, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种龙门式建筑施工提升装置,包括底板、横梁、卷扬机和立柱;所述底板的四角均固定焊接有相同的立柱,在立柱上竖直设置有一排调节孔;在四个立柱上均套有调节套筒,调节套筒的内圆直径与立柱的直径相等,调节套筒在立柱上滑动,在调节套筒的侧壁上开设有与调节孔对应的通孔,在通孔和调节孔内穿过有调节螺栓;在左侧的调节套筒上固定焊接有左固定板,右侧的调节套筒上固定焊接有右固定板,左固定板和右固定板均与水平面平行,在左固定板、右固定板与调节套筒之间焊接有加强块;所述左固定板和右固定板内开设有空腔,在空腔内滑动设置有与左固定板、右固定板对应的左伸缩板、右伸缩板,在左伸缩板的右端面上设有凹槽,在右伸缩板的左端面上设有与凹槽配合的凸起,在凹槽与凸起内开设有固定孔,固定孔内设置有固定螺栓,在左伸缩板、右伸缩板上表面上固定焊接有长条状的推块,且推块沿左伸缩板、右伸缩板的伸缩方向设置,在左固定板、右固定板上开设有与推块对应的推块行走槽;所述立柱的上端固定有横梁,横梁上安装有卷扬机,在卷扬机上缠绕有钢索;在底板上固定有人梯,在底板上安装带有刹车机构的滚轮。A gantry-type building construction lifting device, including a base plate, a beam, a winch and a column; the four corners of the base plate are fixedly welded with the same column, and a row of adjustment holes is vertically arranged on the column; Adjust the sleeve, the diameter of the inner circle of the adjustment sleeve is equal to the diameter of the column, the adjustment sleeve slides on the column, and a through hole corresponding to the adjustment hole is opened on the side wall of the adjustment sleeve, in the through hole and the adjustment hole There are adjusting bolts passing through; the left fixing plate is fixedly welded on the left adjusting sleeve, and the right fixing plate is fixedly welded on the right adjusting sleeve, both the left fixing plate and the right fixing plate are parallel to the horizontal plane, A reinforcing block is welded between the plate, the right fixing plate and the adjusting sleeve; a cavity is opened in the left fixing plate and the right fixing plate, and a left telescopic opening corresponding to the left fixing plate and the right fixing plate is slid in the cavity. plate, right expansion plate, a groove is provided on the right end surface of the left expansion plate, a protrusion matching the groove is provided on the left end surface of the right expansion plate, and a fixing hole is opened in the groove and the protrusion to fix Fixing bolts are arranged in the holes, and strip-shaped push blocks are fixedly welded on the upper surfaces of the left expansion plate and the right expansion plate, and the push blocks are arranged along the expansion and contraction directions of the left expansion plate and the right expansion plate. There is a push block walking groove corresponding to the push block on the fixed plate; a beam is fixed on the upper end of the column, a hoist is installed on the beam, and a steel cable is wound on the hoist; a human ladder is fixed on the bottom plate, and a belt is installed on the bottom plate Roller with brake mechanism.

进一步的:所述调节孔之间的距离为50~80mm,且四个立柱上的调节孔均相互对应。Further: the distance between the adjustment holes is 50-80mm, and the adjustment holes on the four columns are all corresponding to each other.

进一步的:所述固定孔设置有3~5个。Further: there are 3 to 5 fixing holes.

进一步的:所述钢索的下端设有挂钩,且挂钩位于左伸缩板、右伸缩板的中心对称线上。Further: the lower end of the steel cable is provided with a hook, and the hook is located on the center symmetry line of the left telescopic plate and the right telescopic plate.

本发明还公开了一种龙门式建筑施工提升装置的制造方法,包括如下工艺和步骤:The invention also discloses a manufacturing method of a gantry-type building construction lifting device, which includes the following processes and steps:

1)在矩形的底板的四角固定焊接相同尺寸的立柱,在四根立柱上分别设置调节孔,调节孔之间的距离为50~80mm,且四个立柱上的调节孔均相互水平对应;1) Fix and weld uprights of the same size at the four corners of the rectangular bottom plate, set adjustment holes on the four uprights respectively, the distance between the adjustment holes is 50-80mm, and the adjustment holes on the four uprights are all horizontally corresponding to each other;

2)在四个立柱上设置调节套筒,调节套筒的内圆直径与立柱的直径相等,调节套筒在立柱上滑动,在调节套筒的侧壁上开设有与调节孔对应的通孔,在通孔和调节孔内穿过有调节螺栓;2) Adjusting sleeves are installed on the four columns, the inner diameter of the adjusting sleeve is equal to the diameter of the column, the adjusting sleeve slides on the column, and a through hole corresponding to the adjusting hole is opened on the side wall of the adjusting sleeve , there is an adjusting bolt passing through the through hole and the adjusting hole;

3)在左侧的调节套筒上固定焊接有左固定板,右侧的调节套筒上固定焊接有右固定板,左固定板和右固定板均与水平面平行,在左固定板、右固定板与调节套筒之间焊接有加强块;所述左固定板和右固定板内开设有空腔,在空腔内滑动设置有与左固定板、右固定板对应的左伸缩板、右伸缩板,在左伸缩板的右端面上设有凹槽,在右伸缩板的左端面上设有与凹槽配合的凸起,在凹槽与凸起处纵向设置3~5个固定孔,固定孔内设置固定螺栓,在左伸缩板、右伸缩板上表面上固定焊接有长条状的推块,且推块沿左伸缩板、右伸缩板的伸缩方向设置,在左固定板、右固定板上开设有与推块对应的推块行走槽;3) The left fixing plate is fixedly welded on the left adjusting sleeve, and the right fixing plate is fixedly welded on the right adjusting sleeve. Both the left fixing plate and the right fixing plate are parallel to the horizontal plane. A reinforcing block is welded between the plate and the adjusting sleeve; a cavity is opened in the left and right fixing plates, and a left telescopic plate and a right telescopic plate corresponding to the left and right fixing plates are slid in the cavity. The plate is provided with a groove on the right end surface of the left expansion plate, and a protrusion matching the groove is provided on the left end surface of the right expansion plate. Fixing bolts are set in the holes, and strip-shaped push blocks are fixedly welded on the upper surfaces of the left and right expansion plates, and the push blocks are arranged along the telescopic directions of the left and right expansion plates, and fixed on the left and right expansion plates. There are push block walking grooves corresponding to the push block on the board;

4)在立柱的上端设置横梁,横梁上安装有卷扬机,在卷扬机上缠绕钢索,在钢索的下端设置挂钩,挂钩位于左伸缩板、右伸缩板的中心对称线上;在底板的两端设置人梯,在底板下四角分别安装带有刹车机构的滚轮。4) Set a crossbeam on the upper end of the column, and a hoist is installed on the crossbeam, and a steel cable is wound on the hoist, and a hook is set at the lower end of the steel cable. The hook is located on the center symmetry line of the left expansion plate and the right expansion plate; The people ladder is set, and rollers with brake mechanisms are respectively installed at the four corners of the bottom plate.

本发明还公开了一种龙门式建筑施工提升装置的施工方法,包括如下操作步骤:The invention also discloses a construction method of a gantry-type building construction lifting device, which includes the following steps:

1)本龙门式建筑施工提升装置在使用时,设置在建筑物的一侧,上部或中部以钢管与相邻的墙体固定,通过调节套筒来调节固定板的高度,以适应不同高度建筑平面,高度调节完成后在调节孔内插入调节螺栓,将调节套筒固定,人员站在左固定板、右固定板上作业,此时左伸缩板、右伸缩板合并在一起,由固定螺栓固定;1) When the gantry-type building construction lifting device is in use, it is installed on one side of the building, and the upper or middle part is fixed with the adjacent wall by steel pipes. The height of the fixing plate is adjusted by adjusting the sleeve to adapt to buildings of different heights. After the plane and height adjustment is completed, insert the adjustment bolt into the adjustment hole, fix the adjustment sleeve, and the personnel stand on the left fixed plate and the right fixed plate to work. At this time, the left expansion plate and the right expansion plate are combined together and fixed by the fixing bolts. ;

2)当需要提升物料时,将固定螺栓拔出,通过推块将左伸缩板、右伸缩板收回在左固定板、右固定板内,左固定板、右固定板之间留出空隙,在将挂钩通过卷扬机放下,提升物料,物料被提升上来后,在将左伸缩板、右伸缩板推出合并,固定后可取下物料;2) When it is necessary to lift the material, pull out the fixing bolt, retract the left expansion plate and the right expansion plate into the left fixing plate and the right fixing plate by pushing the block, leave a gap between the left fixing plate and the right fixing plate, Put the hook down through the hoist to lift the material. After the material is lifted up, push the left telescopic plate and the right telescopic plate together, and then remove the material after being fixed;

3)本龙门式建筑施工提升装置在施工中可通过滚轮移动到任意地方使用。3) The gantry-type building construction lifting device can be moved to any place by rollers during construction.

发明优点Advantages of the invention

与现有技术相比,本发明的有益效果是:本发明通过左伸缩板、右伸缩板的开合来实现安全提升物料,并且固定板上下调节高度,适应不同高度建筑;装置操作简单,结构连接紧密,安全可靠,方便快捷,并且通过滚轮使装置在任意地方均可使用,安装、拆卸快速,提高建筑施工效率。Compared with the prior art, the beneficial effects of the present invention are: the present invention realizes the safe lifting of materials through the opening and closing of the left telescopic plate and the right telescopic plate, and the height of the fixed plate is adjusted up and down to adapt to buildings of different heights; the device is simple to operate and the structure The connection is tight, safe and reliable, convenient and fast, and the device can be used anywhere through the rollers, and the installation and disassembly are fast, which improves the construction efficiency.

附图说明Description of drawings

图1为龙门式建筑施工提升装置的结构示意图。Fig. 1 is a structural schematic diagram of a gantry type building construction hoisting device.

图2为图1中A的放大结构示意图。FIG. 2 is a schematic diagram of an enlarged structure of A in FIG. 1 .

图3为龙门式建筑施工提升装置中左固定板和右固定板连接的俯视结构示意图。Fig. 3 is a top view structural diagram of the connection between the left fixed plate and the right fixed plate in the gantry type building construction hoisting device.

图4为龙门式建筑施工提升装置中左伸缩板和右伸缩板分开后的结构示意图。Fig. 4 is a schematic diagram of the structure after the left telescopic plate and the right telescopic plate are separated in the gantry type building construction hoisting device.

图中:1-底板,2-左固定板,3-右固定板,4-横梁,5-卷扬机,6-挂钩,7-立柱,8-调节孔,9-调节螺栓,10-调节套筒,11-人梯,12-推块,13-加强块,14-左伸缩板,15-右伸缩板,16-滚轮,17-推块行走槽,18-固定孔,19-凹槽,20-凸起,21-固定螺栓。In the figure: 1-bottom plate, 2-left fixed plate, 3-right fixed plate, 4-beam, 5-hoist, 6-hook, 7-column, 8-adjusting hole, 9-adjusting bolt, 10-adjusting sleeve , 11-person ladder, 12-push block, 13-reinforcing block, 14-left expansion plate, 15-right expansion plate, 16-roller, 17-push block walking groove, 18-fixing hole, 19-groove, 20 - Raised, 21 - Fixing bolts.

具体实施方式detailed description

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例1:请参阅图,本发明实施例中,龙门式建筑施工提升装置包括底板1、横梁4、卷扬机5和立柱7;所述底板1的四角均固定焊接有相同的立柱7,在立柱7上竖直设置有一排调节孔8,调节孔8之间的距离为50~80mm,且四个立柱7上的调节孔8均相互对应;在四个立柱7上均套有调节套筒10,调节套筒10的内圆直径与立柱7的直径相等,调节套筒10在立柱7上滑动,在调节套筒10的侧壁上开设有与调节孔8对应的通孔,在通孔和调节孔8内穿过有调节螺栓9,来保证调节套筒10固定在立柱7上,使调节套筒10能够在立柱7上调节高度;在左侧的调节套筒10上固定焊接有左固定板2,右侧的调节套筒10上固定焊接有右固定板3,左固定板2和右固定板3均与水平面平行,为了提高左固定板2和右固定板3的稳定性,在左固定板2、右固定板3与调节套筒10之间焊接有加强块13,加强块13为铸铁,提高调节套筒与左固定板2、右固定板3的接触面,增加左固定板2和右固定板3上可支撑的重量;所述左固定板2和右固定板3内开设有空腔,在空腔内滑动设置有与左固定板2、右固定板3对应的左伸缩板14、右伸缩板15,左伸缩板14、右伸缩板15能够缩在对应的左固定板2、右固定板3内,使左固定板2与右固定板3之间留出空隙,在左伸缩板14的右端面上设有凹槽19,在右伸缩板15的左端面上设有与凹槽19配合的凸起20,这样在左伸缩板14、右伸缩板15伸出后抵靠在一起时,通过凹槽19与凸起20能够将左伸缩板14、右伸缩板15固定,在凹槽19与凸起20内开设有固定孔18,固定孔18设置有3~5个,固定孔18内设置有固定螺栓21,通过固定螺栓21将凹槽19与凸起20固定连接在一起,在左伸缩板14、右伸缩板15上表面上固定焊接有长条状的推块12,且推块12沿左伸缩板14、右伸缩板15的伸缩方向设置,在左固定板2、右固定板3上开设有与推块12对应的推块行走槽17,使推块12在推块行走槽17内移动;所述立柱7的上端固定有横梁4,横梁4上安装有卷扬机5,在卷扬机5上缠绕有钢索,钢索的下端设有挂钩6,且挂钩6位于左伸缩板14、右伸缩板15的中心对称线上;在底板1上固定有人梯11,使工人能够通过攀爬人梯11来调节高度,在底板1上安装有四个滚轮16,使装置能方便移动。Embodiment 1: Please refer to the figure, in the embodiment of the present invention, the gantry type building construction lifting device includes a base plate 1, a beam 4, a hoist 5 and a column 7; the four corners of the base plate 1 are fixedly welded with the same column 7, and the column 7 is vertically provided with a row of adjustment holes 8, the distance between the adjustment holes 8 is 50 ~ 80mm, and the adjustment holes 8 on the four columns 7 are all corresponding to each other; the four columns 7 are equipped with adjustment sleeves 10 , the diameter of the inner circle of the adjustment sleeve 10 is equal to the diameter of the column 7, the adjustment sleeve 10 slides on the column 7, and a through hole corresponding to the adjustment hole 8 is provided on the side wall of the adjustment sleeve 10, between the through hole and the An adjusting bolt 9 passes through the adjusting hole 8 to ensure that the adjusting sleeve 10 is fixed on the column 7 so that the adjusting sleeve 10 can adjust the height on the column 7; Plate 2, the right fixed plate 3 is fixedly welded on the adjustment sleeve 10 on the right side, the left fixed plate 2 and the right fixed plate 3 are all parallel to the horizontal plane, in order to improve the stability of the left fixed plate 2 and the right fixed plate 3, on the left A reinforcement block 13 is welded between the fixed plate 2, the right fixed plate 3 and the adjusting sleeve 10, and the reinforced block 13 is cast iron, which improves the contact surface between the adjusting sleeve and the left fixed plate 2 and the right fixed plate 3, and increases the left fixed plate 2 and the weight that can be supported on the right fixed plate 3; a cavity is provided in the left fixed plate 2 and the right fixed plate 3, and a left telescopic plate corresponding to the left fixed plate 2 and the right fixed plate 3 is slidably arranged in the cavity 14, right telescopic plate 15, left telescopic plate 14, right telescopic plate 15 can shrink in corresponding left fixed plate 2, right fixed plate 3, leave a gap between left fixed plate 2 and right fixed plate 3, in the left The right end face of telescopic plate 14 is provided with groove 19, and the left end face of right telescopic plate 15 is provided with the protrusion 20 that cooperates with groove 19, after left telescopic plate 14, right telescopic plate 15 stretch out like this, butt against When they are together, the left telescopic plate 14 and the right telescopic plate 15 can be fixed through the groove 19 and the protrusion 20. There are 3 to 5 fixing holes 18 provided in the groove 19 and the protrusion 20. A fixing bolt 21 is arranged in the fixing hole 18, and the groove 19 and the protrusion 20 are fixedly connected together by the fixing bolt 21, and a strip-shaped push block 12 is fixedly welded on the upper surface of the left telescopic plate 14 and the right telescopic plate 15 , and the push block 12 is arranged along the telescopic direction of the left telescopic plate 14 and the right telescopic plate 15, and a push block walking groove 17 corresponding to the push block 12 is provided on the left fixed plate 2 and the right fixed plate 3, so that the push block 12 is Push the block to move in the groove 17; the upper end of the column 7 is fixed with a crossbeam 4, a hoist 5 is installed on the crossbeam 4, a steel cable is wound on the hoist 5, the lower end of the steel rope is provided with a hook 6, and the hook 6 is located on the left The central symmetry line of telescopic plate 14, right telescopic plate 15; People's ladder 11 is fixed on base plate 1, makes the worker can adjust height by climbing people's ladder 11, and four rollers 16 are installed on base plate 1, makes device can Easy to move.

本实施例还公开了一种龙门式建筑施工提升装置的制造方法,包括如下工艺和步骤:This embodiment also discloses a manufacturing method of a gantry-type building construction lifting device, including the following processes and steps:

1)在矩形的底板1的四角固定焊接相同尺寸的立柱7,在四根立柱7上分别设置调节孔8,调节孔8之间的距离为50~80mm,且四个立柱7上的调节孔8均相互水平对应;1) Fixedly weld uprights 7 of the same size at the four corners of the rectangular bottom plate 1, set adjustment holes 8 on the four uprights 7 respectively, the distance between the adjustment holes 8 is 50-80mm, and the adjustment holes on the four uprights 7 8 are horizontally corresponding to each other;

2)在四个立柱7上设置调节套筒10,调节套筒10的内圆直径与立柱7的直径相等,调节套筒10在立柱7上滑动,在调节套筒10的侧壁上开设有与调节孔8对应的通孔,在通孔和调节孔8内穿过有调节螺栓9;2) Adjusting sleeves 10 are set on the four columns 7, the inner diameter of the adjusting sleeve 10 is equal to the diameter of the columns 7, the adjusting sleeve 10 slides on the columns 7, and the side wall of the adjusting sleeve 10 is provided with The through hole corresponding to the adjustment hole 8, the adjustment bolt 9 passes through the through hole and the adjustment hole 8;

3)在左侧的调节套筒10上固定焊接有左固定板2,右侧的调节套筒10上固定焊接有右固定板3,左固定板2和右固定板3均与水平面平行,在左固定板2、右固定板3与调节套筒10之间焊接有加强块13;所述左固定板2和右固定板3内开设有空腔,在空腔内滑动设置有与左固定板2、右固定板3对应的左伸缩板14、右伸缩板15,在左伸缩板14的右端面上设有凹槽19,在右伸缩板15的左端面上设有与凹槽19配合的凸起20,在凹槽19与凸起20处纵向设置3~5个固定孔18,固定孔18内设置固定螺栓21,在左伸缩板14、右伸缩板15上表面上固定焊接有长条状的推块12,且推块12沿左伸缩板14、右伸缩板15的伸缩方向设置,在左固定板2、右固定板3上开设有与推块12对应的推块行走槽17;3) The left fixed plate 2 is fixedly welded on the left adjusting sleeve 10, and the right fixed plate 3 is fixedly welded on the right adjusting sleeve 10, and the left fixed plate 2 and the right fixed plate 3 are all parallel to the horizontal plane. A reinforcement block 13 is welded between the left fixed plate 2, the right fixed plate 3 and the adjusting sleeve 10; a cavity is provided in the left fixed plate 2 and the right fixed plate 3, and a sliding opening with the left fixed plate is arranged in the cavity. 2. The left telescopic plate 14 and the right telescopic plate 15 corresponding to the right fixed plate 3 are provided with grooves 19 on the right end face of the left telescopic plate 14, and are provided with grooves 19 on the left end face of the right telescopic plate 15. Protrusion 20, 3 to 5 fixing holes 18 are arranged longitudinally at groove 19 and protrusion 20, fixing bolts 21 are arranged in fixing holes 18, and strips are fixedly welded on the upper surfaces of left telescopic plate 14 and right telescopic plate 15. Shaped push block 12, and push block 12 is arranged along the telescopic direction of left telescopic plate 14, right telescopic plate 15, is provided with the push block walking groove 17 corresponding with push block 12 on left fixed plate 2, right fixed plate 3;

4)在立柱7的上端设置横梁4,横梁4上安装有卷扬机5,在卷扬机5上缠绕钢索,在钢索的下端设置挂钩6,挂钩6位于左伸缩板14、右伸缩板15的中心对称线上;在底板1的两端设置人梯11,在底板1下四角分别安装带有刹车机构的滚轮16。4) A crossbeam 4 is set on the upper end of the column 7, a winch 5 is installed on the crossbeam 4, a steel cable is wound on the winch 5, and a hook 6 is arranged at the lower end of the steel cable, and the hook 6 is located at the center of the left telescopic plate 14 and the right telescopic plate 15 Line of symmetry; people's ladder 11 is arranged at the two ends of base plate 1, and roller 16 with braking mechanism is respectively installed at the four corners of base plate 1.

本身是了还公开了一种龙门式建筑施工提升装置的施工方法,包括如下操作步骤:It is also disclosed a construction method of a gantry type building construction hoisting device, comprising the following steps:

1)本龙门式建筑施工提升装置在使用时,设置在建筑物的一侧,上部或中部以钢管与相邻的墙体固定,通过调节套筒10来调节固定板的高度,以适应不同高度建筑平面,高度调节完成后在调节孔8内插入调节螺栓9,将调节套筒10固定,人员站在左固定板2、右固定板3上作业,此时左伸缩板14、右伸缩板15合并在一起,由固定螺栓21固定;1) When the gantry-type building construction lifting device is in use, it is installed on one side of the building, and the upper or middle part is fixed with the adjacent wall by steel pipes. The height of the fixing plate is adjusted by adjusting the sleeve 10 to adapt to different heights. Building plane, after the height adjustment is completed, insert the adjusting bolt 9 in the adjusting hole 8, fix the adjusting sleeve 10, and the personnel stand on the left fixing plate 2 and the right fixing plate 3 to work, at this time, the left expansion plate 14 and the right expansion plate 15 Merged together, fixed by fixing bolt 21;

2)当需要提升物料时,将固定螺栓21拔出,通过推块12将左伸缩板14、右伸缩板15收回在左固定板2、右固定板3内,左固定板2、右固定板3之间留出空隙,在将挂钩6通过卷扬机5放下,提升物料,物料被提升上来后,在将左伸缩板14、右伸缩板15推出合并,固定后取下物料;2) When the material needs to be lifted, the fixing bolt 21 is pulled out, and the left expansion plate 14 and the right expansion plate 15 are retracted in the left fixing plate 2 and the right fixing plate 3 through the push block 12, and the left fixing plate 2 and the right fixing plate are Leave a gap between 3, put down the hook 6 by the hoist 5, lift the material, after the material is lifted up, push out the left expansion plate 14 and the right expansion plate 15 to merge, and take off the material after fixing;

3)本龙门式建筑施工提升装置在施工中可通过滚轮16移动到任意地方使用。3) The gantry type building construction lifting device can be moved to any place by the roller 16 during construction.

对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only includes an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.

Claims (4)

1. a kind of planer-type building-construction lifting device, including base plate (1), crossbeam (4), hoist engine And column (7) (5);It is characterized in that: the corner of described base plate (1) is all fixedly welded with identical Column (7), is vertically arranged with one on column (7) and teases and ridicule knothole (8), and four columns (7) On adjustment hole (8) mutually correspond to;Four columns (7) are all cased with regulating sleeve (10), The interior circular diameter of regulating sleeve (10) and the equal diameters of column (7), regulating sleeve (10) is in column (7) upper slip, offers through hole corresponding with adjustment hole (8) on the side wall of regulating sleeve (10), Passing through in through hole and adjustment hole (8) has regulating bolt (9);On the regulating sleeve (10) in left side It is fixedly welded with left fixed plate (2), the regulating sleeve (10) on right side is fixedly welded with right fixed plate (3), Left fixed plate (2) and right fixed plate (3) all and plane-parallel, in left fixed plate (2), right fixation It is welded with boss (13) between plate (3) and regulating sleeve (10);Described left fixed plate (2) and Cavity is offered, sliding in cavity, it is solid with left fixed plate (2), the right side to be provided with right fixed plate (3) The corresponding left expansion plate (14) of fixed board (3), right expansion plate (15), on the right side of left expansion plate (14) End face is provided with groove (19), is provided with and joins with groove (19) on the left side of right expansion plate (15) The projection (20) closed, offers fixing hole (18) in groove (19) with raised (20), fixing It is provided with fixing bolt (21), on left expansion plate (14), right expansion plate (15) in hole (18) The pushing block (12) of strip is fixedly welded with surface, and pushing block (12) along left expansion plate (14), The telescopic direction setting of right expansion plate (15), opens up on (3) in left fixed plate (2), right fixed plate There is pushing block walking trough (17) corresponding with pushing block (12);The upper end of described column (7) is fixed with crossbeam (4), crossbeam (4) is provided with hoist engine (5), hoist engine (5) is wound with cable wire, institute The lower end stating cable wire is provided with hook (6);Helper (11) is fixed with base plate (1), in base plate (1) The upper roller (16) installed with braking mechanism.
2. planer-type building-construction lifting device according to claim 1 it is characterised in that: described The distance between adjustment hole (8) is 50~80mm.
3. planer-type building-construction lifting device according to claim 1 it is characterised in that: described Fixing hole (18) is provided with 3~5.
4. a kind of planer-type building-construction lifting device according to claim 1 it is characterised in that: Described hook (6) is in left expansion plate (14), the centre symmetry line of right expansion plate (15).
CN201410736610.8A 2014-12-07 2014-12-07 Gantry type building construction hoisting device and its manufacturing and construction method Expired - Fee Related CN104453231B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201610814500.8A CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device
CN201410736610.8A CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction hoisting device and its manufacturing and construction method
CN201610815298.0A CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410736610.8A CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction hoisting device and its manufacturing and construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201610814500.8A Division CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device
CN201610815298.0A Division CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device

Publications (2)

Publication Number Publication Date
CN104453231A CN104453231A (en) 2015-03-25
CN104453231B true CN104453231B (en) 2017-01-18

Family

ID=52899920

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201410736610.8A Expired - Fee Related CN104453231B (en) 2014-12-07 2014-12-07 Gantry type building construction hoisting device and its manufacturing and construction method
CN201610815298.0A Active CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device
CN201610814500.8A Pending CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201610815298.0A Active CN106348188B (en) 2014-12-07 2014-12-07 The manufacture method of planer-type building-construction lifting device
CN201610814500.8A Pending CN106284955A (en) 2014-12-07 2014-12-07 The construction method of planer-type building-construction lifting device

Country Status (1)

Country Link
CN (3) CN104453231B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800527B (en) * 2016-05-12 2018-11-09 泉州诺黎森贸易有限公司 Material hoist for building construction
CN107140547A (en) * 2017-06-16 2017-09-08 无锡石油化工起重机有限公司 The traveller gantry of installation activity bottom plate
CN108557655A (en) * 2018-04-28 2018-09-21 中电建水环境治理技术有限公司 A kind of pipeline hanging device without spin
CN108518055A (en) * 2018-05-11 2018-09-11 桐城市永锦建筑工程有限公司 A kind of special constructing device of paint
CN108643537A (en) * 2018-05-23 2018-10-12 马飞虎 A kind of construction scaffold for being easily installed and having a safety feature
CN108999389B (en) * 2018-07-26 2021-06-22 广东电网有限责任公司广州供电局 Portable vertical lifting platform and replacement method of STATCOM valve bank
CN110948169A (en) * 2018-09-27 2020-04-03 金川集团工程建设有限公司 A steel pipe rotator
CN109649994B (en) * 2018-12-28 2020-07-10 台州职业技术学院 Material lifting machine for building engineering
CN109778710B (en) * 2019-03-15 2021-01-26 贵州大学 Simple lifting frame structure for site construction of roads and bridges
CN109896433B (en) * 2019-03-24 2021-04-06 江苏紫石机械制造有限公司 Multifunctional adjustable mechanical equipment lifting frame
CN110607752B (en) * 2019-09-30 2021-04-16 中建七局第一建筑有限公司 Beam frame for building construction
CN110777935A (en) * 2019-11-14 2020-02-11 湖南吉人住工装配式建筑有限公司 Building device is built to integration fossil fragments
CN112010174B (en) * 2020-09-24 2022-06-28 广东爱科建设工程有限公司 Electromechanical equipment installation device and use method thereof
CN112878649A (en) * 2021-01-11 2021-06-01 范会义 Hydraulic engineering scaffold in adaptable waters
CN114709790B (en) * 2022-04-11 2024-05-03 无锡德刚精工机电设备有限公司 Sealing protection device suitable for junction of low-voltage cable
CN115013349B (en) * 2022-06-24 2024-08-06 浙江鹏翔暖通设备有限公司 A low-noise axial flow fan that can be displaced, raised or lowered

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85205402U (en) * 1985-12-21 1987-04-22 哈尔滨市第一住宅建筑工程公司建华机械厂 Attached construction gantry frame with safety devices
JPH1046799A (en) * 1996-08-01 1998-02-17 Nikko Co Ltd Multi-mast mobile lifting platform
JP2000177955A (en) * 1998-12-16 2000-06-27 Kumagai Gumi Co Ltd Luggage loading / unloading device for lifting equipment
CN201071251Y (en) * 2007-07-02 2008-06-11 周爱兴 Assembled adjustable gantry
US20100096216A1 (en) * 2008-10-17 2010-04-22 Hekimo, S.R.O. Scaffolding
JP2010138652A (en) * 2008-12-15 2010-06-24 Sakamoto Katsuhiko Elevatable scaffolding
CN201473216U (en) * 2009-08-24 2010-05-19 中建三局第一建设工程有限责任公司 Rebar Mounting Hanger
CN102108786B (en) * 2010-12-09 2012-10-17 浙江省天和建材集团有限公司 Overall lifting construction method and device for super-large building components
CN202508804U (en) * 2012-03-20 2012-10-31 葛洲坝集团基础工程有限公司 Gantry derrick hoisting system
CN102745597A (en) * 2012-07-16 2012-10-24 昆山市飞荣达电子材料有限公司 Portable portal frame
CN203715155U (en) * 2013-12-11 2014-07-16 国网浙江杭州市萧山区供电公司 Heavy cover plate lifting device
CN203845761U (en) * 2014-04-18 2014-09-24 中意泰达(营口)汽车保修设备有限公司 Gantry lifter
CN203939225U (en) * 2014-06-24 2014-11-12 重庆广播电视大学 Floor concrete casting operation platform is built in room
CN204386175U (en) * 2014-12-07 2015-06-10 徐州市铜山区水利工程处 Planer-type building-construction lifting device

Also Published As

Publication number Publication date
CN104453231A (en) 2015-03-25
CN106284955A (en) 2017-01-04
CN106348188B (en) 2018-04-27
CN106348188A (en) 2017-01-25

Similar Documents

Publication Publication Date Title
CN104453231A (en) Gantry type building construction hoisting device and its manufacturing and construction method
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN202023158U (en) Movable maintenance device for bridge
CN209397501U (en) Deck crane
CN107990051B (en) Auxiliary device and method for hoisting pipe section in place
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN211848975U (en) Block mounting device for ultra-wide steel box girder of cable-stayed bridge
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN110453836B (en) Oblique glass curtain wall mounting system and mounting method
CN204675673U (en) To construct between a kind of building block layer material vertical transferring apparatus
CN107253675B (en) A self-propelled tower crown crane
CN116588819A (en) A hoisting device for a glass curtain wall plate and its construction method
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN112252741A (en) Full-rail crane for super high-rise unit curtain wall and installation and use method thereof
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN103867022B (en) One is carried and is touched formula concrete chimney construction method
CN214456405U (en) A gantry-type suspension holding pole flip-mounted lifting frame device
CN207609153U (en) A kind of elevator liftable construction operation platform
CN205575428U (en) Component hoisting system
CN103206076B (en) A kind of packaged type building loading/unloading platform and moving method
CN104060846B (en) The construction equipment of girder steel interconnection system platform and construction method
CN110029807A (en) For installing the device of steel construction traverse colored steel
CN108277994B (en) Method for quickly dismantling safety protection shed of overhead high-speed rail operation line
CN103291078B (en) A kind of steel girder erection equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xu Jun

Inventor after: Xu Hongsheng

Inventor after: Zhang Xusheng

Inventor after: Yang Zhigang

Inventor after: Han Xiaohua

Inventor after: Yi Lan

Inventor after: Shen Lanli

Inventor after: Du Weihua

Inventor after: Xiao Jing

Inventor after: Zhao Hanming

Inventor after: Zhao Yukun

Inventor after: Wang Shuzhen

Inventor after: Chen Guangsen

Inventor after: Zhang Tao

Inventor after: Guo Guangzhao

Inventor before: Zhang Chaofeng

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160918

Address after: 250000 Shandong city in Ji'nan Province Southern Quanfu Licheng District Eastern District 11 building 3 unit 602

Applicant after: Xu Jun

Address before: Kwun Tong Road Xiangcheng Development Zone in Suzhou City, Jiangsu province 215000 No. 1

Applicant before: SUZHOU HUICHENG ZHIZAO INDUSTRIAL DESIGN CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20171207

CF01 Termination of patent right due to non-payment of annual fee