CN108518055A - A kind of special constructing device of paint - Google Patents
A kind of special constructing device of paint Download PDFInfo
- Publication number
- CN108518055A CN108518055A CN201810450572.8A CN201810450572A CN108518055A CN 108518055 A CN108518055 A CN 108518055A CN 201810450572 A CN201810450572 A CN 201810450572A CN 108518055 A CN108518055 A CN 108518055A
- Authority
- CN
- China
- Prior art keywords
- operation platform
- paint
- foot
- strut
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/28—Scaffolds primarily resting on the ground designed to provide support only at a low height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
Abstract
The invention discloses a kind of special constructing devices of paint, it includes operation platform and the memory plane for storing barreled paint, the edge surrounding of the memory plane is provided with protection sideboard, it is connected by strut between the operation platform and memory plane, more than one foot-operated block is linearly distributed on one of them described strut, it is connected through the hinge between the foot-operated block and strut, the lower section of the foot-operated block is equipped with the positioning pin being connected with strut, the stop sleeve for being used to support foot-operated block is arranged on the positioning pin, offering to take object through-hole and be located on the operation platform takes the both sides of object through-hole to be respectively equipped with a location hole, it is described that object through-hole upper cover is taken to be equipped with cover board, the lower face of the cover board is equipped with the positioning vertical column for being inserted into location hole.The special constructing device of paint in the present invention can make the arrival operation platform of painter's safe ready, while can also be got on operation platform and put barreled paint on memory plane.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of special constructing device of paint.
Background technology
It is well known that interior painting paint is mostly important one of the construction link of decoration construction, painter is to interior
It when eminence metope is painted, generally requires to fulfil assignment by ladder or luggage carrier, can cause to construct using ladder operation
The shortcomings of space is small, and inconvenient and ladder is moved often, in addition, when using existing luggage carrier, worker's loading up and down
Frame is inconvenient, and carries and paint even more danger of climbing up.
Invention content
The purpose of the present invention is to provide a kind of special constructing devices of paint, can make the arrival of painter's safe ready
Operation platform, while can also be got on operation platform and put barreled paint on memory plane.
To achieve the above object, the present invention provides the following technical solutions:
A kind of special constructing device of paint comprising operation platform and the memory plane for storing barreled paint, it is described to deposit
The edge surrounding of storage plate is provided with protection sideboard, is connected by strut between the operation platform and memory plane, one of them
More than one foot-operated block is linearly distributed on the strut, is connected through the hinge between the foot-operated block and strut, the foot
The lower section of step block is equipped with the positioning pin being connected with strut, and the supporting sleeve for being used to support foot-operated block is arranged on the positioning pin
Cylinder offers on the operation platform and takes object through-hole and positioned at taking the both sides of object through-hole to be respectively equipped with a location hole, described to take
Object through-hole upper cover is equipped with cover board, and the lower face of the cover board is equipped with the positioning vertical column for being inserted into location hole.
Preferably, one jiao on the operation platform is equipped with the boom hoisting for lifting by crane barreled paint, described lifting
Set the fixes sleeve including being connected on operation platform, be inserted into rotating upright post in the fixes sleeve, the rotating upright post it is upper
End is vertically connected with roller shaft, and roller is arranged on the roller shaft, and drawstring is wound on the roller and one end connects
Connect rocking handle, one end connecting shackle of the drawstring.
Preferably, the storing barrel of the operation platform being equipped on one side for storing barreled paint.
Preferably, described that object through-hole is taken to be square.
Preferably, the foot-operated block is uniformly distributed on strut.
Compared with prior art, the beneficial effects of the invention are as follows:
Before construction, stop sleeve is sheathed in alignment pin, and foot-operated block is overlapped in alignment pin, construction personnel
It can be reached on operation platform by foot-operated block, substantially increase the safety of construction personnel or more operation platform, construction personnel
After reaching operation platform, cover board is opened, rotate rotating upright post and roller is made to be located at the top for taking object through-hole, rotates rocking handle, is realized
The lifting of barreled paint avoids construction personnel from carrying barreled paint or more operation platform and cause contingency.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the special constructing device of paint in the embodiment of the present invention;
In figure, 1, operation platform, 2, memory plane, 3, protection sideboard, 4, strut, 5, foot-operated block, 6, positioning pin, 7, supporting sleeve
Cylinder, 8, take object through-hole, 9, location hole, 10, cover board, 11, positioning vertical column, 12, barreled paint, 13, fixes sleeve, 14, rotation it is vertical
Bar, 15, roller shaft, 16, roller, 17, drawstring, 18, rocking handle, 19, suspension hook, 20, storing barrel.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its
His embodiment, shall fall within the protection scope of the present invention.
Refering to Figure 1, a kind of special constructing device of paint comprising operation platform 1 and for storing barreled paint
The edge surrounding of 12 memory plane 2, the memory plane 2 is provided with protection sideboard 3, leads between the operation platform 1 and memory plane 2
It crosses strut 4 to be connected, more than one foot-operated block 5 is linearly distributed on one of them described strut 4, the foot-operated block 5 is propping up
It is uniformly distributed on bar 4, is connected through the hinge between the foot-operated block 5 and strut 4, the lower section of the foot-operated block 5 is equipped with and strut 4
The positioning pin 6 being connected, is arranged with the stop sleeve 7 for being used to support foot-operated block 5 on the positioning pin 6, on the operation platform 1
It offers square and takes object through-hole 8 and positioned at taking the both sides of object through-hole 8 to be respectively equipped with a location hole 9, it is described to take on object through-hole 8
It is covered with cover board 10, the lower face of the cover board 10 is equipped with the positioning vertical column 11 for being inserted into location hole 9.
One jiao of boom hoisting being equipped with for lifting by crane barreled paint 12 on the operation platform 1, the boom hoisting packet
The fixes sleeve 13 being connected on operation platform 1 is included, rotating upright post 14, the rotating upright post 14 are inserted into the fixes sleeve 13
Upper end be vertically connected with roller shaft 15, roller 16 is arranged on the roller shaft 15, drawing is wound on the roller 16
Rope 17 and one end connect rocking handle 18, one end connecting shackle 19 of the drawstring 17, and being equipped on one side for the operation platform 1 is used for
Store the storing barrel 20 of barreled paint 12.
Before construction, supporting sleeve jacket casing 7 is set in alignment pin 6, and foot-operated block 5 is overlapped in alignment pin 6, is constructed
Personnel can be reached by foot-operated block 5 on operation platform 1, substantially increased the safety of construction personnel or more operation platform 1, applied
After worker person's arrival operation platform 1, cover board 10 is opened, rotate rotating upright post 14 and roller 16 is made to be located at the top for taking object through-hole 8,
Rocking handle 18 is rotated, realizes the lifting of barreled paint 12, construction personnel is avoided to carry about 12 operation platform 1 of barreled paint and cause
Contingency.
Above content is only to structure of the invention example and explanation, affiliated those skilled in the art couple
Described specific embodiment does various modifications or additions or substitutes by a similar method, without departing from the present invention
Structure or beyond the scope defined by this claim, be within the scope of protection of the invention.
Claims (5)
1. a kind of special constructing device of paint, it is characterised in that:Memory plane including operation platform and for storing barreled paint,
The edge surrounding of the memory plane is provided with protection sideboard, is connected by strut between the operation platform and memory plane,
In more than one foot-operated block is linearly distributed on a strut, be connected through the hinge between the foot-operated block and strut,
The lower section of the foot-operated block is equipped with the positioning pin being connected with strut, and the branch for being used to support foot-operated block is arranged on the positioning pin
Support set cylinder offers on the operation platform and takes object through-hole and positioned at taking the both sides of object through-hole to be respectively equipped with a location hole, institute
It states and object through-hole upper cover is taken to be equipped with cover board, the lower face of the cover board is equipped with the positioning vertical column for being inserted into location hole.
2. a kind of special constructing device of paint according to claim 1, it is characterised in that:One jiao on the operation platform
Equipped with the boom hoisting for lifting by crane barreled paint, the boom hoisting includes the fixes sleeve being connected on operation platform, institute
It states and is inserted into rotating upright post in fixes sleeve, the upper end of the rotating upright post is vertically connected with roller shaft, on the roller shaft
It is arranged with roller, drawstring, one end connecting shackle of the drawstring are wound on the roller.
3. a kind of special constructing device of paint according to claim 2, it is characterised in that:The operation platform is set on one side
It is useful for the storing barrel of storage barreled paint.
4. a kind of special constructing device of paint according to claim 2, it is characterised in that:It is described to take object through-hole for pros
Shape.
5. a kind of special constructing device of paint according to claim 4, it is characterised in that:The foot-operated block is equal on strut
Even distribution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810450572.8A CN108518055A (en) | 2018-05-11 | 2018-05-11 | A kind of special constructing device of paint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810450572.8A CN108518055A (en) | 2018-05-11 | 2018-05-11 | A kind of special constructing device of paint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108518055A true CN108518055A (en) | 2018-09-11 |
Family
ID=63430557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810450572.8A Pending CN108518055A (en) | 2018-05-11 | 2018-05-11 | A kind of special constructing device of paint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108518055A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2307069Y (en) * | 1997-06-27 | 1999-02-10 | 北京朗瑞尔装饰工程有限公司 | Movable platform for high-altitude operation |
CN203475788U (en) * | 2013-08-19 | 2014-03-12 | 重庆建工第九建设有限公司 | Decoration auxiliary scaffold |
CN204899174U (en) * | 2015-07-11 | 2015-12-23 | 宁夏宁信信息科技有限公司 | Building support frame |
CN106284955A (en) * | 2014-12-07 | 2017-01-04 | 苏州汇诚智造工业设计有限公司 | The construction method of planer-type building-construction lifting device |
CN106968427A (en) * | 2017-05-18 | 2017-07-21 | 李祥露 | A kind of new type scaffold |
-
2018
- 2018-05-11 CN CN201810450572.8A patent/CN108518055A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2307069Y (en) * | 1997-06-27 | 1999-02-10 | 北京朗瑞尔装饰工程有限公司 | Movable platform for high-altitude operation |
CN203475788U (en) * | 2013-08-19 | 2014-03-12 | 重庆建工第九建设有限公司 | Decoration auxiliary scaffold |
CN106284955A (en) * | 2014-12-07 | 2017-01-04 | 苏州汇诚智造工业设计有限公司 | The construction method of planer-type building-construction lifting device |
CN204899174U (en) * | 2015-07-11 | 2015-12-23 | 宁夏宁信信息科技有限公司 | Building support frame |
CN106968427A (en) * | 2017-05-18 | 2017-07-21 | 李祥露 | A kind of new type scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208734039U (en) | A kind of scaffold | |
CN105839988A (en) | Self-vertical positioning pole erecting device and construction method thereof | |
CN206408920U (en) | A kind of collapsible operating platform for narrow space | |
CN211342736U (en) | Ladder for power cable maintenance | |
CN208056596U (en) | A kind of Novel engineering exterior wall scaffold | |
CN109231023B (en) | Method for installing jib system of portal crane | |
CN108518055A (en) | A kind of special constructing device of paint | |
CN207110629U (en) | A kind of construction temporary cable support meanss | |
CN207260538U (en) | A kind of construction workbench | |
CN206244301U (en) | A kind of architectural engineering tower crane anti-sway control device | |
CN210885034U (en) | Lifting device for building engineering | |
CN210563298U (en) | Interior decoration is with multi-level high decoration and fitment operation platform | |
CN218467019U (en) | Scaffold for building | |
CN203800449U (en) | Overhaul platform of equipment on transformer station pillar | |
CN205367540U (en) | Prevent tower crane of empting | |
CN214739768U (en) | Portable scaffold frame of interior decoration | |
CN213265455U (en) | Building engineering lifting device | |
CN208150849U (en) | Steel vestibule integral lifting apparatus and steel vestibule installation system | |
CN205170159U (en) | Can hang hoist that hangs in overhead traveling crane | |
CN208456076U (en) | Concreting workbench is built in a kind of room | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN219654235U (en) | High-rise safety protection platform for constructional engineering | |
CN219826079U (en) | Attached scaffold for building construction | |
CN108675164A (en) | A kind of building hanging basket for house construction engineering | |
CN204858419U (en) | Transmission line hank knotting in advance twines work platform that is qualified for next round of competitions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180911 |