CN208056596U - A kind of Novel engineering exterior wall scaffold - Google Patents
A kind of Novel engineering exterior wall scaffold Download PDFInfo
- Publication number
- CN208056596U CN208056596U CN201820291024.0U CN201820291024U CN208056596U CN 208056596 U CN208056596 U CN 208056596U CN 201820291024 U CN201820291024 U CN 201820291024U CN 208056596 U CN208056596 U CN 208056596U
- Authority
- CN
- China
- Prior art keywords
- linking arm
- horizontal outrigger
- support posts
- interior support
- locking device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- CWFOCCVIPCEQCK-UHFFFAOYSA-N Chlorfenapyr Chemical compound BrC1=C(C(F)(F)F)N(COCC)C(C=2C=CC(Cl)=CC=2)=C1C#N CWFOCCVIPCEQCK-UHFFFAOYSA-N 0.000 claims abstract description 17
- 238000009408 flooring Methods 0.000 claims abstract description 8
- 230000001681 protective Effects 0.000 claims description 4
- 230000037250 Clearance Effects 0.000 claims description 2
- 230000035512 clearance Effects 0.000 claims description 2
- 230000000630 rising Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 14
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000007787 solid Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000789 fastener Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000001360 synchronised Effects 0.000 description 1
Abstract
The utility model discloses a kind of Novel engineering exterior wall scaffolds,Include mainly interior support posts,Horizontal outrigger,Pylon,Upper locking device,Lower locking device,First linking arm and the second linking arm,Interior support posts are arranged in the inside of external wall,Lower locking device is arranged in the lower part at interior support posts through-flooring hole,Upper locking device is arranged in the top at interior support posts through-flooring hole,Horizontal outrigger one end is fixed at the top of interior support posts,The horizontal outrigger other end chooses outside of the building,Uniform gap is set at the top of horizontal outrigger,And bolt hole is arranged in bottom in groove,Horizontal outrigger both sides outer wall is both provided with sliding slot,The first linking arm of fixed setting and the second linking arm at the top of pylon,And first linking arm and the second linking arm relative dislocation setting,It is even at the top of first linking arm and the second linking arm to be connect with horizontal outrigger,The utility model is simple in structure,Without in exterior wall box out mouth,And it can quickly be adjusted according to the distance between required operation.
Description
Technical field
The utility model is related to engineering construction technical field, specially a kind of Novel engineering exterior wall scaffold.
Background technology
Scaffold is construction site for operation and solves vertically and horizontally to transport the various holders set up.Scaffold
It is the generic term of architecture field, exterior wall, interior decoration or the higher ground that can not directly construct of floor height is generally used on construction site
Side, in order to which construction personnel up and down go along with sb. to guard him and high-altitude installation component etc. by operation or perimeter security net.External wall construction foot
Hand cradle, national standard《Construction fastener type steel pipe scaffold technical specification of security》JGJ130-2011 such as uses console mode foot
Hand cradle maximum height is 50 meters, the height of four floors is generally set up using overhanging scaffold, this scaffold sets up expense
Take material when expenses of labour, construction cost is high and is susceptible to safety accident.
Application No. is 200610118946.3 Chinese patent literatures, disclose a kind of tool-type hanging integral falsework system
The construction method of system, the tool-type hanging integral falsework include scaffold unit, it is characterised in that scaffold unit includes foot
Hand cradle over sling, hanger under the scaffold being connect with scaffold over sling are equipped with top walkway board, in foot in scaffold over sling
Hanger is equipped with lower part walkway board under hand cradle, and the bottom of hanger is equipped with bottom plate under scaffold.Scaffold unit after assembling passes through spiral shell
Bolt is connect with steel platform, and scaffold realizes Synchronous lifting in steel platform lifting process.All scaffold units are to the end of engineering
It is reused after dismountable finishing, realizes the tool of scaffold.This scaffold is suitable only for concrete shear force wall Core Walls Structure and applies
Work, and both sides, without floor, there are the building of floor in a large amount of insides and are not suitable in constructing for reality, and external scaffolding
Highly larger, material utilization amount is big, is not particularly suitable for the construction of assembled architecture.
Application No. is 201620406622.9 Chinese patent literatures, disclose a kind of special external hanging type operation horizontal of building
Platform, including overlap joint hook, outer framework, protection wire netting, overlap joint link, pedal, inner frame, pillar, support end, overlap railing,
Building corner, retractable holder, sleeve, helical axis, telescopic rod, groove and support slot;The overlap joint hook setting is outside
Frame right centre position;The outer framework is in matrix pattern, is welded by hollow steel pipe;The protection wire netting is placed in outer
On the inside of frame;The overlap joint link is welded on centre position on the left of outer framework, with same horizontal line at overlap joint hook;The inside casing
Frame is rectangle, perpendicular to outer framework, is welded by hollow steel pipe;The pedal is laid on inner frame;The support end weldering
It is connected on posts bottom, is in cylindrical shape;The retractable holder, including sleeve, helical axis, telescopic rod and groove.It is therein
Retractable holder, including sleeve, helical axis and telescopic rod are required to through walls or window, then necessary in the case of no window
Want through walls, the later stage can not handle wall-through hole, be only suitable for the maintenance construction for the building for there are enough windows that can pass through, and be not suitable for newly-built
The construction usage of engineering.
Existing new construction exterior wall scaffold, either overhanging type or external hanging type, are required for through walls or window, are not having
Can only be through walls in the case of window, cause hole on wall, post-processing get up it is pretty troublesome, especially for the outer of assembled architecture
Wall is even more difficult to handle, and therefore, it is necessary to a kind of new technical solutions to solve the problems, such as this, to meet the needs of construction.
Utility model content
The purpose of this utility model is to provide a kind of Novel engineering exterior wall scaffolds, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides the following technical solutions:A kind of Novel engineering exterior wall scaffold, including
Interior support posts, horizontal outrigger, pylon, upper locking device, lower locking device, the first linking arm and the second linking arm, it is described interior
Portion's support column is arranged in the inside of external wall, and the lower locking device is arranged in the lower part at interior support posts through-flooring hole,
The upper locking device is arranged in the top at interior support posts through-flooring hole, and described horizontal outrigger one end is fixed at internal branch
At the top of dagger, and the horizontal outrigger other end chooses outside of the building, uniform gap is arranged at the top of the horizontal outrigger, and bottom is set in groove
Set bolt hole, the horizontal outrigger both sides outer wall is both provided with sliding slot, the first linking arm of fixed setting and the at the top of the pylon
Two linking arms, and the first linking arm and the setting of the second linking arm relative dislocation, first linking arm and the second linking arm top
It is even to be connect with horizontal outrigger, it is additionally provided with bracing piece at the top of the horizontal outrigger, and bracing piece one end is fixedly connected with horizontal outrigger one end,
The bracing piece other end is fixedly connected with the horizontal outrigger other end, and gap is provided at the top of the bracing piece bottom and horizontal outrigger,
And clearance height is slightly larger than the first linking arm and the second linking arm overhead height;
First linking arm and the second connection arm configuration are completely the same, including connecting rod, pulley and motion bar, and connect
Bar is 7 fonts, is provided with pulley on the inside of the connecting rod, and pulley is engaged with sliding slot, and protrusion is provided at the top of the connecting rod
Portion, and lug boss and engagement, the lug boss are internally provided with elastic groove, and the elastic groove is internally provided with elastic component,
And be fixedly connected with elastic groove inner top at the top of elastic component, motion bar is provided on the lug boss, the motion bar top is high
At the top of lug boss, and it is provided with draw ring at the top of motion bar, the motion bar bottom end interts elastic groove, and motion bar and bullet
Property part bottom is fixedly connected, and the motion bar bottom is engaged with bolt hole.
Preferably, bottom is provided with non-slip mat in the pylon, and raised points are uniformly arranged on protective pad.
Preferably, the pylon is additionally provided with protection network, and it is 1.2m-1.5m to protect net height.
Compared with prior art, the utility model has the beneficial effects that:
(1)The utility model structural principle is simple, easy to install and use, is not necessarily in exterior wall box out mouth, while not touching and building
It builds the interior outside of exterior wall, and can quickly be adjusted according to the distance between the thickness of wall and required operation, it is ensured that is practical
Property.
(2)In the utility model, uses and pylon and horizontal outrigger are connected by the connecting rod of 7 fonts, and in horizontal outrigger
Bracing piece is equipped between connecting rod, be to be able to ensure pylon it is ambulant simultaneously, it is ensured that the intensity of horizontal outrigger,
Improve safety.
(3)In the utility model, using by motion bar and groove engage and the cooperation of pulley and sliding slot, be in order to
Enough ensure mobile and solid timing stability, while easy to use.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model the first linking arm structural schematic diagram;
Fig. 3 is the horizontal outrigger structural schematic diagram of the utility model.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 3 figures, the utility model provides a kind of technical solution:A kind of Novel engineering exterior wall scaffold, including
Interior support posts 1, horizontal outrigger 2, pylon 3, upper locking device 4, lower locking device 5, the first linking arm 6 and the second linking arm 7,
The interior support posts 1 are arranged in the inside of external wall, and the lower locking device 5 is arranged in 1 through-flooring hole of interior support posts
The lower part of mouth, the upper locking device 4 are arranged in the top at 1 through-flooring hole of interior support posts, and described 2 one end of horizontal outrigger is fixed
Setting is at 1 top of interior support posts, and 2 other end of horizontal outrigger chooses outside of the building, and uniform gap is arranged in 2 top of the horizontal outrigger
8, and bolt hole is arranged in bottom in groove 8,2 both sides outer wall of the horizontal outrigger is both provided with sliding slot 9, and 3 top of the pylon is solid
First linking arm 6 and the second linking arm 7, and the first linking arm 6 and the setting of 7 relative dislocation of the second linking arm are set surely;Pylon 3
Interior bottom is provided with non-slip mat, and raised points are uniformly arranged on protective pad;It can effectively ensure that construction personnel makees using protective pad
Skid resistance when industry;Pylon 3 is additionally provided with protection network 18, and 18 height of protection network is 1.2m-1.5m;It can using protection network
With the safety for effectively ensuring personnel;First linking arm, 6 and second linking arm, 7 top is even to be connect with horizontal outrigger 2, the cross
2 top of outrigger is additionally provided with bracing piece 10, and 10 one end of bracing piece is fixedly connected with 2 one end of horizontal outrigger, and the bracing piece 10 is another
One end is fixedly connected with 2 other end of horizontal outrigger, and 10 bottom of the bracing piece is provided with gap with 2 top of horizontal outrigger, and gap is high
Degree is slightly larger than 7 overhead height of the first linking arm 6 and the second linking arm;It is equipped with bracing piece between horizontal outrigger and connecting rod, is
In order to ensure pylon it is ambulant simultaneously, it is ensured that the intensity of horizontal outrigger improves safety, and the utility model structure is former
Reason is simple, easy to install and use, is not necessarily in exterior wall box out mouth, while not touching the interior outside of external wall, and can be according to wall
The distance between the thickness of body and required operation are quickly adjusted, it is ensured that practicability.
In the utility model, the first linking arm 6 and 7 structure of the second linking arm are completely the same, including connecting rod 11, pulley 12
With motion bar 13, and connecting rod 11 is 7 fonts, and the inside of the connecting rod 11 is provided with pulley 12, and pulley 12 is nibbled with sliding slot 9
It closes, 11 top of the connecting rod is provided with lug boss 14, and lug boss 14 is engaged with groove 8,14 inside setting of the lug boss
Flexible slot 15, the elastic groove 15 is internally provided with elastic component 16, and 16 top of elastic component is fixed with 15 inner top of elastic groove
It connects, motion bar 13 is provided on the lug boss 14,13 top of the motion bar is higher than 14 top of lug boss, and motion bar 13
Top is provided with draw ring 17, and 13 bottom end of the motion bar interts elastic groove 15, and motion bar 13 and 16 bottom of elastic component are solid
Fixed connection, 13 bottom of the motion bar is engaged with bolt hole;Using by motion bar and groove engage and pulley and sliding slot
Cooperation is to be able to ensure mobile and solid timing stability, while easy to use.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (3)
1. a kind of Novel engineering exterior wall scaffold, including interior support posts(1), horizontal outrigger(2), pylon(3), upper locking device
(4), lower locking device(5), the first linking arm(6)With the second linking arm(7), it is characterised in that:The interior support posts(1)If
It sets in the inside of external wall, the lower locking device(5)It is arranged in interior support posts(1)The lower part at through-flooring hole, it is described
Upper locking device(4)It is arranged in interior support posts(1)The top at through-flooring hole, the horizontal outrigger(2)One end is fixed at
Interior support posts(1)Top, and horizontal outrigger(2)The other end chooses outside of the building, the horizontal outrigger(2)Uniform gap is arranged in top
(8), and groove(8)Bolt hole, the horizontal outrigger is arranged in interior bottom(2)Both sides outer wall is both provided with sliding slot(9), the pylon
(3)The first linking arm is fixedly installed in top(6)With the second linking arm(7), and the first linking arm(6)With the second linking arm(7)Phase
To shifting to install, first linking arm(6)With the second linking arm(7)Top is even with horizontal outrigger(2)Connection, the horizontal outrigger
(2)Top is additionally provided with bracing piece(10), and bracing piece(10)One end and horizontal outrigger(2)One end is fixedly connected, the bracing piece
(10)The other end and horizontal outrigger(2)The other end is fixedly connected, the bracing piece(10)Bottom and horizontal outrigger(2)Between top is provided with
Gap, and clearance height is slightly larger than the first linking arm(6)With the second linking arm(7)Overhead height;
First linking arm(6)With the second linking arm(7)Structure is completely the same, including connecting rod(11), pulley(12)And work
Lever(13), and connecting rod(11)For 7 fonts, the connecting rod(11)Inside is provided with pulley(12), and pulley(12)With cunning
Slot(9)Engagement, the connecting rod(11)Top is provided with lug boss(14), and lug boss(14)With groove(8)Engagement, it is described convex
The portion of rising(14)It is internally provided with elastic groove(15), the elastic groove(15)It is internally provided with elastic component(16), and elastic component(16)
Top and elastic groove(15)Inner top is fixedly connected, the lug boss(14)On be provided with motion bar(13), the motion bar
(13)Top is higher than lug boss(14)Top, and motion bar(13)Top is provided with draw ring(17), the motion bar(13)Bottom
Intert elastic groove in one end(15), and motion bar(13)With elastic component(16)Bottom is fixedly connected, the motion bar(13)Bottom with
Bolt hole engages.
2. a kind of Novel engineering exterior wall scaffold according to claim 1, it is characterised in that:The pylon(3)Interior bottom
Portion is provided with non-slip mat, and raised points are uniformly arranged on protective pad.
3. a kind of Novel engineering exterior wall scaffold according to claim 1, it is characterised in that:The pylon(3)Also set
It is equipped with protection network(18), and protection network(18)Height is 1.2m-1.5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820291024.0U CN208056596U (en) | 2018-03-02 | 2018-03-02 | A kind of Novel engineering exterior wall scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820291024.0U CN208056596U (en) | 2018-03-02 | 2018-03-02 | A kind of Novel engineering exterior wall scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208056596U true CN208056596U (en) | 2018-11-06 |
Family
ID=63991520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820291024.0U Expired - Fee Related CN208056596U (en) | 2018-03-02 | 2018-03-02 | A kind of Novel engineering exterior wall scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208056596U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962854A (en) * | 2020-08-12 | 2020-11-20 | 鹏程建设集团有限公司 | Scaffold with safety protection mechanism and building method |
CN113250458A (en) * | 2021-06-29 | 2021-08-13 | 张会娟 | Construction template is with appearance of making level based on intelligent computer |
-
2018
- 2018-03-02 CN CN201820291024.0U patent/CN208056596U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962854A (en) * | 2020-08-12 | 2020-11-20 | 鹏程建设集团有限公司 | Scaffold with safety protection mechanism and building method |
CN111962854B (en) * | 2020-08-12 | 2021-12-10 | 鹏程建设集团有限公司 | Scaffold with safety protection mechanism and building method |
CN113250458A (en) * | 2021-06-29 | 2021-08-13 | 张会娟 | Construction template is with appearance of making level based on intelligent computer |
CN113250458B (en) * | 2021-06-29 | 2022-07-01 | 张会娟 | Construction template is with appearance of making level based on intelligent computer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208056596U (en) | A kind of Novel engineering exterior wall scaffold | |
CN205822747U (en) | Architectural engineering scaffold | |
CN106400691A (en) | Integrated construction process for anti-collision wall formwork | |
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN206233541U (en) | A kind of interior top external climbing mould bases operation platform for construction of super highrise building | |
CN207392716U (en) | A kind of tool-type suspension scaffold | |
CN101824910A (en) | Quick template supporting construction method of elevator shaft | |
CN106522541B (en) | A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN208310154U (en) | A kind of construction scaffold | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN209874468U (en) | Construction hydraulic pressure template climbing device | |
CN207003989U (en) | External hanging type scaffold is climbed in one kind | |
CN212052563U (en) | Scaffold for water conservancy construction | |
CN201401000Y (en) | Special hanging basket for installing noise barrier roof boards | |
CN210370017U (en) | Scaffold for building engineering | |
CN208685448U (en) | A kind of safety scaffold of bridge construction | |
CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
CN2216104Y (en) | Hanging lift scaffold | |
CN206328110U (en) | One kind customization hanging basket apparatus | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN107268972A (en) | External hanging type scaffold and its installation method are climbed in one kind | |
CN218843687U (en) | Portable handling frame for dismantling overhanging I-shaped steel | |
CN213654180U (en) | Scaffold structure convenient to slope building wall construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181106 Termination date: 20190302 |