CN216196742U CN202122505856.2U CN202122505856U CN216196742U CN 216196742 U CN216196742 U CN 216196742U CN 202122505856 U CN202122505856 U CN 202122505856U CN 216196742 U CN216196742 U CN 216196742U
Authority
CN
China
Prior art keywords
rod
frame
position platform
wall
ladder frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122505856.2U
Other languages
Chinese (zh)
Inventor
张东方
郝省玲
张乃文
姚艳国
王保强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Multidimensional United Group Co ltd
Original Assignee
Duowei Union Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duowei Union Group Co Ltd filed Critical Duowei Union Group Co Ltd
Priority to CN202122505856.2U priority Critical patent/CN216196742U/en
Application granted granted Critical
Publication of CN216196742U publication Critical patent/CN216196742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

本实用新型实施例提供一种用于高低跨位置的墙板安装装置,高低跨位置包括第一位置平台及第二位置平台,第一位置平台高于第二位置平台;第一位置平台与第二位置平台之间设有墙面檩条架;墙板安装装置包括:笼梯架及提升装置,笼梯架的一端设置在第二位置平台上,另一端从第二位置平台向第一位置平台延伸,并与墙面檩条架连接;沿笼梯架的延伸方向,笼梯架上间隔设有多个作业平台;提升装置设置于第一位置平台上。本实用新型实施例提供的方案实现了在四周没有大型吊装设备作业空间的高低跨位置的墙板安装,墙板安装装置不仅安装架设快捷方便,还提高了作业人员安装墙板的效率,同时能为作业人员提供全方位的安全防护。

Figure 202122505856

The embodiment of the present invention provides a wall panel installation device for high and low span positions, the high and low span positions include a first position platform and a second position platform, the first position platform is higher than the second position platform; the first position platform and the second position platform A wall purlin frame is arranged between the two position platforms; the wall panel installation device includes: a cage ladder frame and a lifting device, one end of the cage ladder frame is set on the second position platform, and the other end is from the second position platform to the first position platform. It extends and is connected with the purlin frame on the wall; along the extending direction of the cage-ladder frame, a plurality of working platforms are arranged on the cage-ladder frame at intervals; the lifting device is arranged on the platform at the first position. The solution provided by the embodiment of the present utility model realizes the installation of wall panels at high and low span positions where there is no working space for large-scale hoisting equipment around. The wall panel installation device is not only fast and convenient to install and erect, but also improves the efficiency of the operator to install the wall panels, and at the same time can Provide all-round safety protection for operators.

Figure 202122505856

Description

A wallboard installation device for position is striden to height
Technical Field
The utility model relates to the field of building construction, in particular to a wallboard mounting device for high and low straddle positions.
Background
When the wall panels at the high-low span positions of buildings such as high-low span buildings and large rainshes are constructed and installed, generally, operators need to erect an operator working platform at the periphery of the buildings, and then large hoisting equipment is used for hoisting the wall panels. The concrete mode of this kind of installation is, at first hoist wallboard to predetermined position through large-scale hoisting equipment, then the operation personnel fix wallboard on the wall post of building on work platform.
Although various wallboards can be installed by using large-scale hoisting equipment and erecting a working platform, when the periphery of a high-low span building, a large canopy and other buildings does not have enough working space, the large-scale hoisting equipment cannot be close to the building, and meanwhile, the working platform with enough stability cannot be erected.
SUMMERY OF THE UTILITY MODEL
To solve or improve the above problems, embodiments of the present invention provide a wall panel installation apparatus for high and low straddle positions.
In one embodiment of the present invention, there is provided a wall panel mounting apparatus for a high-low straddle position, the high-low straddle position comprising a first position platform and a second position platform, the first position platform being higher than the second position platform; a wall surface purline frame is arranged between the first position platform and the second position platform;
the wallboard mounting arrangement includes:
one end of the cage ladder frame is arranged on the second position platform, and the other end of the cage ladder frame extends from the second position platform to the first position platform and is connected with the wall purline frame; along the extending direction of the cage ladder frame, a plurality of operation platforms are arranged on the cage ladder frame at intervals;
a lifting device disposed on the first position platform.
Preferably, the cage ladder rack comprises a plurality of vertical rods and a plurality of cross rods; the vertical rods are enclosed to form a vertical frame of the cage ladder frame; the two ends of the cross rod are respectively connected to the two adjacent vertical rods.
Preferably, cage ladder frame still includes a plurality of down tube, the both ends of down tube are connected respectively in adjacent two on the pole setting, perhaps, the both ends of down tube are connected respectively in adjacent two on the horizontal pole, perhaps, the one end of down tube connect in on the pole setting, the other end is connected the horizontal pole.
Preferably, one end of the cage ladder frame arranged on the second position platform is provided with a plurality of sliding shoes.
Preferably, the slipper comprises a connecting rod and a pulley arranged on the connecting rod;
the connecting rod with cage ladder frame is connected, and follows the extending direction of cage ladder frame, the connecting rod is adjustable the pulley is relative the relative distance of cage ladder frame.
Preferably, the sliding shoe further comprises a sliding rail used in cooperation with the sliding shoe, and the sliding rail is arranged on the second position platform.
Preferably, one end of the cage ladder frame, which is far away from the second position platform, is provided with a fixing hook, and the fixing hook is buckled on the wall purline frame.
Preferably, the fixed hook comprises a transverse lapping rod, a vertical limiting rod and an oblique pull rod;
the transverse lapping rods are connected with the cage ladder rack and are used for lapping the tops of the wall purline racks;
the vertical limiting rod is connected with the transverse lapping rod and forms a limiting space with the cage ladder frame, and when the transverse lapping rod is lapped on the wall surface purline frame, the wall surface purline frame part extends into the limiting space; the inclined pull rod is respectively connected with the transverse lapping rod and the cage ladder frame.
Preferably, the transverse lapping rod is provided with a moving wheel, and the transverse lapping rod is lapped on the top of the wall surface purline frame through the moving wheel.
Preferably, the safety device also comprises a safety rod and a safety rope;
the safety rod is fixedly connected to the wall surface purlin frame, one end of the safety rope is fixed to the safety rod, and the other end of the safety rope bypasses the wall surface purlin frame and extends to the operation platform.
Preferably, the safety rod is provided with a safety catch, and the safety catch is connected with the safety rope and used for limiting the movement of the safety rope when the movement speed of the safety rope exceeds a speed threshold value.
In addition, preferably, the lifting device comprises a lifter and a base bracket;
the hoister is arranged on the base support;
the base support is arranged on the first position platform, and a counterweight unit is arranged on the base support.
The scheme provided by the embodiment of the utility model realizes the installation of the wall boards at high and low straddling positions without hoisting spaces around, one end of the cage ladder frame of the wall board installation device is arranged on the second position platform, and the other end of the cage ladder frame extends from the second position platform to the first position platform and is connected with the wall purline frame. Lifting device sets up on first position platform, can not only simply promote the wallboard high-efficiently, can also use under multiple operating mode.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and those skilled in the art can also obtain other drawings according to the drawings without creative efforts.
Fig. 1 is a schematic perspective view of a wall panel installation apparatus according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a cage ladder stand according to an embodiment of the present invention;
FIG. 3 is a schematic view of a portion of a wall panel installation apparatus according to an embodiment of the present invention;
FIG. 4 is a schematic partial perspective view of a wall panel installation apparatus according to an embodiment of the present invention;
FIG. 5 is a partial schematic structural view of a cage ladder according to an embodiment of the present invention;
FIG. 6 is a schematic view of another partial structure of a cage ladder according to an embodiment of the present invention;
FIG. 7 is a schematic view of a portion of a cage ladder and a lifting device according to an embodiment of the present invention;
fig. 8 is a schematic structural diagram of a lifting device according to an embodiment of the present invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. It is to be understood that the embodiments described are only a few embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the terms "first" and "second" in the description of the present invention are used merely for convenience in describing different components or names, and are not to be construed as indicating or implying a sequential relationship, relative importance, or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model.
Fig. 1 is a schematic plan structure view of a wall panel installation device according to an embodiment of the present invention, and fig. 2 is a schematic three-dimensional structure view of a cage ladder according to an embodiment of the present invention, referring to fig. 1 and 2.
In one embodiment of the present invention, a wall panel installation apparatus is provided for use in a high and low straddle position comprising a first position platform 1 and a second position platform 2, the first position platform 1 being higher than the second position platform 2. A wall surface purline frame 11 is arranged between the first position platform 1 and the second position platform 2. Wallboard installation device includes: cage ladder frame 3 and hoisting device 4, the one end setting of cage ladder frame 3 is on second position platform 2, and the other end extends to first position platform 1 from second position platform 2 to be connected with the top of wall purlin frame 11 (the top of wall purlin frame 11 indicates among the purlin of wall purlin frame 11 that is higher than first platform 1, and with the position at that purlin of cage ladder frame 3 butt place). Along the extending direction of the cage ladder frame 3, a plurality of working platforms 34 are arranged on the cage ladder frame 3 at intervals. The lifting device 4 is arranged on the first position platform 1. In one embodiment of the utility model, the cage ladder 3 is attached only to the top of the wall purlin frames 11. Or in another embodiment of the utility model, the cage ladder 3 is connected with the top of the wall purlin rack 11, and at least one position is connected with other positions of the wall purlin rack 11.
When installing a wall panel of a high-low span building, the conventional implementation is to hoist the wall panel to a predetermined position through a large hoisting device, and then fix the wall panel on the wall purlin frame 11 by a worker. However, when there is not enough space around some buildings such as high-low span buildings or large rainsheds, or there is no condition for installing large hoisting equipment around the buildings, the installation of the wall panels will become difficult, and the safety of the constructors cannot be ensured in all directions in some cases.
The embodiment of the utility model provides a wallboard installation device for high and low straddle positions, which comprises the following main construction processes: referring to fig. 1 to 5, firstly, an operator installs two cage ladder frames 3 on a wall surface purlin frame 11 needing to install a wallboard, and then arranges two lifting devices 4 on a first position platform 1, wherein the lifting devices 4 are provided with lifting ropes, and the lifting ropes are lowered from a boom to a second position platform 2. Then two operation personnel enter into cage ladder frame 3 by second position platform 2 on the first operation platform 34, and the safety rope 9 has been tied, two other operation personnel use dedicated travelling bogie to transport prefabricated wallboard to the wall below after that, and with the wallboard lift sling rope and the rope of sauntering, after that, control operation personnel synchronous control two hoisting device 4, and make two hoisting device 4 synchronous lifting wallboard, then two operation personnel stimulate respectively the rope of sauntering, control wallboard moves preset position, at this moment two operation personnel in cage ladder frame 3 just can fix the wallboard on wall purlin frame 11 at the both ends of wallboard respectively. After the first wallboard is installed, the operator in the cage ladder frame 3 climbs the second operation platform 34 through the cage ladder frame 3, installs the second wallboard, and so on, completes the installation of the remaining wallboards in turn. After the wallboard installation of a wall is accomplished, remove cage ladder 3 to the wall of another side not installation wallboard, after accomplishing the removal of other equipment, just can enter into the wallboard installation of next wall fast in-process.
The scheme provided by the embodiment of the utility model realizes the installation of the wall boards at the high-low span position without hoisting space around, one end of the cage ladder frame 3 of the wall board installation device is arranged on the second position platform 2, and the other end extends from the second position platform 2 to the first position platform 1 and is connected with the wall surface purline frame 11, so that the installation and the erection are rapid and convenient, the plurality of operation platforms 34 arranged in the wall board installation device can meet the requirement that a plurality of groups of workers respectively install the wall boards at different heights, the wall board installation efficiency of the workers is improved, and meanwhile, the cage ladder frame 3 can provide all-around safety protection for the workers. Lifting device 4 sets up on first position platform 1, can not only simply promote the wallboard high-efficiently, can also use under multiple operating mode.
The technical solutions provided by the embodiments of the present invention are further described in detail below.
Referring to fig. 2, in the embodiment of the present invention, one way to realize the cage ladder rack 3 is that the cage ladder rack 3 includes a plurality of vertical bars 31 and a plurality of cross bars 32. A plurality of vertical rods 31 surround the vertical frame of the cage ladder frame 3. The two ends of the cross bar 32 are respectively connected to the two adjacent vertical rods 31. For example, the different vertical rods 31 are arranged in parallel, the vertical rods are made of steel pipes with the diameter of 20-35 mm and the thickness of 1.5-3.5 mm, and the vertical rod 31 in one implementation manner is made of steel pipes with the diameter of 25 mm and the thickness of 2 mm. Cage ladder frame 3's whole is the cuboid structure, and the cuboid structure includes 4 vertical faces, 4 long limits, and vertical face is the face that two adjacent pole setting 31 formed, and long limit is the limit that pole setting 31 formed, is provided with a plurality of work platform 34 on the long limit direction of perpendicular to cage ladder frame 3. The interval between per two adjacent operation platforms 34 can set up according to actual conditions, interval between it is 1.5 ~ 2.5 meters, wherein an achievable mode of cage ladder frame 3 is that the interval on per two adjacent operation platforms 34 along the long limit direction of cage ladder frame 3 is 2.1 meters, operation platform 34 adopts the decorative pattern steel sheet preparation of 2.5 millimeters thickness, it adopts hinged joint's form with cage ladder frame 3, operation platform 34's implementation has multiple condition, it still can be for plank, engineering plastics, bamboo slat and have the steel sheet etc. of a plurality of through-holes.
In an achievable embodiment the cross bars 32 on three of the uprights of the ladder cage 3 are in the same plane and not in the same plane as the cross bars 32 of the other upright, while the spacing of the cross bars 32 on the other upright is greater than the spacing of the cross bars 32 on the three uprights. This kind of arrangement has not only increased the structural strength of cage ladder frame 3, still makes things convenient for the operation personnel to climb different work platforms 34 through the great horizontal pole 32 of interval, and horizontal pole 32 on another vertical face is equivalent to the effect of stair, and the rail structure can be constituteed to the less horizontal pole 32 of all the other three vertical face intervals, protects the operation personnel on the different operation faces. The section of the cage ladder frame 3 is square, and also comprises rhombus, trapezoid and circle.
Referring to fig. 2, in the wall panel installation apparatus for high-low spanning position according to the embodiment of the present invention, the cage ladder 3 further includes a plurality of diagonal rods 33, two ends of the diagonal rods 33 are respectively connected to two adjacent vertical rods 31, or two ends of the diagonal rods 33 are respectively connected to two adjacent horizontal rods 32, or one end of the diagonal rod 33 is connected to the vertical rod 31, and the other end is connected to the horizontal rod 32. The setting of down tube 33 can increase different horizontal poles 32 and horizontal pole 32, horizontal pole 32 and pole setting 31 and different pole setting 31 and pole setting 31 between the framework intensity, also can strengthen the holistic structural strength of cage ladder frame 3 simultaneously, the life of extension cage ladder frame 3, the horizontal pole 32 and the down tube 33 of cage ladder frame 3 adopt to be used to the line cutting mutually, and horizontal pole 32 and pole setting 31, perhaps adopt to be used to weld mutually between down tube 33 and horizontal pole 32, the pole setting 31, and adopt the mode of full weld.
Referring to fig. 3, the embodiment of the utility model provides a wall panel installation device for high-low straddle positions, wherein a cage ladder frame 3 is provided with a plurality of sliding shoes 5 at one end arranged on a second position platform 2. The sliding shoes 5 can move on the surface of the second position platform 2, when the installation of one wallboard is completed, an operator can directly move the cage ladder frame 3 through the sliding shoes 5, so that the cage ladder frame 3 moves to the position of another wallboard needing to be installed on the second position platform 2, and the installation efficiency of the wallboard is improved by the arrangement of the sliding shoes 5.
Further, one way of realizing the slipper 5 is that the slipper 5 includes a connecting rod 51 and a pulley 52 disposed on the connecting rod 51; the connecting rod 51 is connected with the cage ladder 3, and along the extending direction of the cage ladder 3, the connecting rod 51 can adjust the relative distance of the pulley 52 relative to the cage ladder 3. One way for the connecting rod 51 to adjust the relative distance between the pulley 52 and the cage ladder rack 3 is to provide a threaded structure on the connecting rod 51, which can be matched with the threaded structure on the vertical rod 31 of the cage ladder rack 3 or matched with the nut on the vertical rod 31 of the cage ladder rack 3, and when the relative distance between the pulley 52 and the cage ladder rack 3 needs to be adjusted, only the connecting rod 51 needs to be rotated, so that the distance between the pulley 52 and the cage ladder rack 3 can be changed. The connecting rods 51 on each upright rod 31 can be adjusted independently, and when the cage ladder 3 is positioned on a platform with uneven surface, different connecting rods 51 can be adjusted, so that the cage ladder 3 can be stably erected on the second position platform 2. Meanwhile, the sliding shoes 5 have a self-locking function, and after the cage ladder frame 3 moves to a preset position, the sliding shoes 5 can be locked automatically, so that the stability of the cage ladder frame 3 is ensured.
Another way to realize the sliding shoes 5 is that vertical pipes are welded on the sliding shoes 5, and a plurality of through holes with equal intervals are arranged at the vertical pipes and one end of the cage ladder frame 3 close to the second position platform 2. The diameter of the stand pipe is larger than or smaller than the diameter of the vertical rod 31 of the cage ladder frame 3, the main purpose of the arrangement mode is to facilitate the insertion of the vertical rod 31 into the stand pipe, or facilitate the insertion of the stand pipe into the vertical rod 31, then round steel or pins are used to respectively penetrate through holes in the stand pipe and the vertical rod 31, the stand pipe and the vertical rod are limited, and the height of the sliding shoe 5 can be adjusted by adjusting the through holes penetrating through different positions. In one embodiment, the insertion amount of the two is not less than 200 mm, and the diameter of the round steel or the pin is 8 mm.
Further, a wall panel mounting device for a high-low straddle position further comprises a slide rail 53 used in cooperation with the skid shoe 5, wherein the slide rail 53 is arranged on the second position platform 2. In an embodiment of the utility model, the slide rail 53 is a 14a channel steel, the slide rail 53 and the sliding shoes 5 are matched to enable the cage ladder frame 3 to move more stably, and the local pressure of the sliding shoes 5 on the platform can be reduced, so that the structural integrity of the surface of the platform is protected, meanwhile, some positioning devices which can be displaced can be arranged on the slide rail 53, and the positioning devices can fix the cage ladder frame 3 when the cage ladder frame 3 is not moved, so that the safety of operators is ensured.
Referring to fig. 1, 2, 4 and 5, in the wall panel installation device for high-low straddle positions according to the embodiment of the present invention, a fixing hook 6 is disposed at an end of the cage ladder rack 3 away from the second position platform 2, and the fixing hook 6 is hung and fastened on a wall purlin rack 11. The fixing hooks 6 can be one, two or more, for example, when the fixing hooks 6 are two, the utility model provides an embodiment in which two fixing hooks 6 are arranged on two vertical rods 31 of the cage ladder 3 near the installation wall surface or on a cross rod 32 near the installation wall surface. The fixing hook 6 is hung and buckled on the wall surface purline frame 11 to ensure the stability of the installation of the cage ladder frame 3, and meanwhile, the supporting force can be provided for the cage ladder frame 3, so that the operation requirement of an operator can be met.
Further, a realizable mode of fixed hook 6 is, fixed hook 6 is including horizontal overlap joint pole 61, vertical gag lever post 62 and slant pull rod 63, horizontal overlap joint pole 61 is connected with cage ladder frame 3, a top for lapping at wall purlin frame 11, vertical gag lever post 62 is connected with horizontal overlap joint pole 61, and form spacing space with cage ladder frame 3, when horizontal overlap joint pole 61 overlap joint is on wall purlin frame 11, wall purlin frame 11 part stretches into in the spacing space, slant pull rod 63 is connected with horizontal overlap joint pole 61 and cage ladder frame 3 respectively, a structural strength for increasing fixed hook 6. The setting up of fixed hook 6 not only enables cage ladder frame 3 and 11 firm in connection of wall purlin frame, still makes things convenient for the operation personnel to install cage ladder frame 3 on the wall purlin, makes the degree of difficulty of construction descend by a wide margin simultaneously, and the construction speed can improve by a wide margin.
Furthermore, the transverse lapping rod 61 is provided with a moving wheel 7, and the transverse lapping rod 61 is lapped on the top of the wall surface purline frame 11 through the moving wheel 7. Be equipped with between the horizontal overlap joint pole 61 of every fixed hook 6 and the wall purlin and remove wheel 7, when cage ladder frame 3 was removed to needs, remove wheel 7 and remove along the length direction of wall purlin to move up, remove and be provided with self-lock device on the wheel 7, when needs are fixed cage ladder frame 3, only need with the self-lock device auto-lock just can make cage ladder frame 3 fixed for the wall purlin. In another embodiment of the utility model, the moving wheels 7 are welded to the transverse overlapping rods 61 of the fixed hooks 6, and the positioning of the cage 3 is limited by wedges with a large friction coefficient, for example, the wedges are respectively arranged on one side of the two transverse overlapping rods 61 of the two fixed hooks 6, and the limiting directions of the two wedges are opposite. Or two sides of the transverse lapping rod 61 of each fixing hook 6 are respectively provided with a wedge block, and the limiting directions of the two wedge blocks are opposite, so that each transverse lapping rod 61 is limited relative to the wall purline.
Referring to fig. 4 to 7, the wall panel installation device for high-low straddling positions according to the embodiment of the present invention further includes a safety rod 8 and a safety rope 9, the safety rod 8 is fixedly connected to a wall purlin frame 11, in an embodiment of the present invention, the safety rod 8 is fixed to a wall vertical purlin by a fixing screw or fixed to a wall vertical purlin by a special clamp, and the safety rod 8 is a square steel tube with a thickness of 4 mm and a length of 80 mm by 80 mm. One end of the safety rope 9 is fixed on the safety rod 8, and the other end of the safety rope bypasses the wall surface purline frame 11 and extends to the working platform 34. The safety rod 8 is fixed on the wall surface purlin rack 11 through a fastener, the safety rod 8 is arranged in parallel to the wall surface purlin rack 11, and meanwhile, one plane of the safety rod 8 is also parallel to the first position platform 1. The setting of safety lever 8 enables the one end of safety rope 9 fixed for first position platform 1, and safety rope 9 can provide the safety guarantee for the operation personnel on the operation platform 34, prevents that the operation personnel accident from falling the injury.
Furthermore, a safety catch 10 is arranged on the safety rod 8, and the safety catch 10 is connected with the safety rope 9 and used for limiting the movement of the safety rope 9 when the movement speed of the safety rope 9 exceeds a speed threshold value. One end of the safety rope 9 is fixed on the safety rod 8, the other end is fixed on the worker, and meanwhile, the safety rope 9 penetrates through the safety catch 10. In another embodiment of the utility model, the safety hook 10 is arranged on a wall purlin rack 11, one end of the safety rope 9 is fixed on the safety rod 8, the other end of the safety rope 9 is fixed on the body of a worker, and the safety rope 9 penetrates through the safety hook 10. The fall arrester 10 is arranged to provide a greater level of protection for the worker, for example, when the worker is accidentally dropped from the work platform 34, the speed of movement of the safety line 9 secured to the worker exceeds a speed threshold, at which point the fall arrester 10 can restrict the movement of the safety line 9 or slow the speed of movement of the safety line 9, thereby protecting the worker.
Referring to fig. 8, in the wallboard installation apparatus for high and low straddling positions according to the embodiment of the present invention, the lifting apparatus 4 includes a lifter (not shown in the figure) and a base bracket 42, and the lifter is disposed on the base bracket 42, wherein the lifter is implemented in a manner that the type of the lifter is 300 kg, the self weight is 56kg, the lifting height per minute is 12 meters, the length of a lifting rope on the lifter is 20 meters, and the stress structure of the lifting arm 41 and the base bracket 42 is reasonable. The structure of davit 41 adopts the duplex bearing setting, and through actual detection, has the acceptance report, can realize outage automatic braking simultaneously in the lift process. The lifting machine on the lifting device 4 adopts a copper core motor, so that the durability is good, the stability is better, the operation of the lifting machine is simple, and the movement is convenient. The base bracket 42 is disposed on the first position platform 1, and the counterweight unit 43 is disposed on the base bracket 42. The base support 42 can provide stable support for the lifting device 4, and a boom is arranged at one end of the base support 42 and has a length of 1.1 m. The other end of the base support 42 is provided with a plurality of counterweight units 43, the elevator is arranged on the base support 42, and the suspension arm is connected with the base through two reinforcing inclined rods. The embodiment of the utility model provides a wallboard mounting device for high-low straddle positions, which comprises at least one lifting device 4, wherein when a wallboard with larger volume and larger weight needs to be lifted, the wallboard can be lifted and hoisted simultaneously through a plurality of lifting devices 4, and when two lifting devices 4 are used for lifting operation, the distance between the lifting devices 4 is 2.6 meters. In another embodiment of the present invention, the counterweight unit 43 is a concrete counterweight or a metal block, at least one U-shaped member is disposed at one end of the counterweight unit 43, a through hole is disposed on the counterweight unit 43, the volume and weight of the counterweight unit 43 have various specifications, and an operator can select different counterweight units 43 according to actual needs.
Further, in a usage scenario of an embodiment of the present invention, when a worker uses the lifting device 4 in a construction site, a square steel tube may be added on the base bracket 42 to increase the stability of the lifting device 4, the square steel tube has a specification of 80 mm by 80 mm and a thickness of 4 mm, meanwhile, a column is disposed on the square steel tube, the column can be matched with a through hole on the counterweight unit 43 to position the counterweight unit 43, and the base of the lifting device 4 is disposed above a purlin having a load bearing function to ensure the structural safety of the first position platform 1. When the lifting device 4 needs to be moved, the counterweight unit 43 and the square steel tube need to be detached, then the counterweight unit 43 and the square steel tube are moved to the designated position, then the counterweight unit 43 and the square steel tube are installed, and in order to ensure the stability of the lifting device 4 for lifting the wallboard, the suspension arm of the lifting device 4 is fixed relative to the base support 42.
Usage scenario 1
One of the high-low straddle positions comprises a first position platform and a second position platform, and the first position platform is higher than the second position platform; a wall surface purline frame is arranged between the first position platform and the second position platform, a part of the wall surface purline frame, which is higher than the first platform, forms a parapet, and prefabricated wall boards need to be installed on the wall surface purline frame.
During construction, firstly, an operator installs the two cage ladder frames on a wall surface purline frame needing to be provided with the wall board, then two lifting devices are arranged on a first position platform, the suspension arms of the lifting devices cross the parapet, and lifting ropes are arranged on a second position platform from the lower part of the suspension arms. Then two operation personnel enter into the operation space of cage ladder frame by the second position platform in, and the safety rope is tied, two other operation personnel use dedicated travelling bogie to transport prefabricated wallboard to the wall below, and with the wallboard lift lifting rope and the rope of sauntering, two hoisting device of control operation personnel synchro control after that, and make two hoisting device promote the wallboard in step, then two operation personnel stimulate the rope of sauntering respectively, control wallboard removes preset position, at this moment two operation personnel in the cage ladder frame just can fix the wallboard on wall purlin frame at the both ends of wallboard respectively. After the first wallboard is installed, the operating personnel in the cage ladder frame climb to a second operation platform through the cross rod on the cage ladder frame, install the second wallboard, and then complete the installation of remaining wallboard in proper order. After the wallboard installation of a wall is accomplished, pulley and piston shoes on the accessible cage ladder frame move the cage ladder frame to the wall of another side not installing the wallboard, after accomplishing the removal of other equipment, just can enter into the wallboard installation of next wall fast.
In summary, the scheme provided by the embodiment of the utility model realizes the installation of the wall boards at the high-low span positions without hoisting spaces around, one end of the cage ladder frame of the wall board installation device is arranged on the second position platform, and the other end of the cage ladder frame extends from the second position platform to the first position platform and is connected with the wall purline frame. Lifting device sets up on first position platform, can not only simply promote the wallboard high-efficiently, can also use under multiple operating mode.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (12)

1.一种用于高低跨位置的墙板安装装置,高低跨位置包括第一位置平台及第二位置平台,所述第一位置平台高于所述第二位置平台;所述第一位置平台与所述第二位置平台之间设有墙面檩条架;1. A wall panel installation device for high and low span positions, the high and low span positions include a first position platform and a second position platform, the first position platform is higher than the second position platform; the first position platform A wall purlin frame is arranged between the platform and the second position platform; 其特征在于,所述墙板安装装置包括:It is characterized in that, the wall panel installation device includes: 笼梯架,所述笼梯架的一端设置在所述第二位置平台上,另一端从所述第二位置平台向所述第一位置平台延伸,并与所述墙面檩条架连接;沿所述笼梯架的延伸方向,所述笼梯架上间隔设有多个作业平台;A cage ladder frame, one end of the cage ladder frame is set on the second position platform, and the other end extends from the second position platform to the first position platform, and is connected with the wall purlin frame; The extension direction of the cage ladder frame, the cage ladder frame is provided with a plurality of working platforms at intervals; 提升装置,所述提升装置设置于所述第一位置平台上。A lifting device, the lifting device is arranged on the first position platform. 2.根据权利要求1所述的墙板安装装置,其特征在于,所述笼梯架包括多个立杆及多个横杆;2. The wall panel installation device according to claim 1, wherein the cage ladder frame comprises a plurality of vertical bars and a plurality of cross bars; 多个所述立杆围合成所述笼梯架的竖边框;A plurality of the vertical rods are enclosed to form a vertical frame of the cage ladder frame; 所述横杆的两端分别连接于相邻的两个所述立杆上。Both ends of the horizontal bar are respectively connected to two adjacent vertical bars. 3.根据权利要求2所述的墙板安装装置,其特征在于,所述笼梯架还包括多个斜杆,所述斜杆的两端分别连接于相邻的两个所述立杆上;3 . The wall panel installation device according to claim 2 , wherein the cage-ladder frame further comprises a plurality of inclined rods, and two ends of the inclined rods are respectively connected to two adjacent vertical rods. 4 . ; 或者,所述斜杆的两端分别连接于相邻的两个所述横杆上;Or, the two ends of the inclined rod are respectively connected to two adjacent cross rods; 或者,所述斜杆的一端连接于所述立杆上,另一端连接在所述横杆。Alternatively, one end of the inclined rod is connected to the vertical rod, and the other end is connected to the horizontal rod. 4.根据权利要求1至3中任一项所述的墙板安装装置,其特征在于,所述笼梯架设置在所述第二位置平台上的一端上设有多个滑靴。4 . The wall panel installation device according to claim 1 , wherein a plurality of sliding shoes are provided on one end of the cage ladder frame disposed on the second position platform. 5 . 5.根据权利要求4所述的墙板安装装置,其特征在于,所述滑靴包括连接杆及设置在所述连接杆上的滑轮;5. The wall panel installation device according to claim 4, wherein the sliding shoe comprises a connecting rod and a pulley arranged on the connecting rod; 所述连接杆与所述笼梯架连接,并沿所述笼梯架的延伸方向,所述连接杆可调节所述滑轮相对所述笼梯架的相对距离。The connecting rod is connected with the cage-ladder frame, and along the extending direction of the cage-ladder frame, the connecting rod can adjust the relative distance of the pulley relative to the cage-ladder frame. 6.根据权利要求4所述的墙板安装装置,其特征在于,还包括配合所述滑靴使用的滑轨,所述滑轨设置在所述第二位置平台上。6 . The wall panel installation device according to claim 4 , further comprising a sliding rail used with the sliding shoe, and the sliding rail is arranged on the second position platform. 7 . 7.根据权利要求1至3中任一项所述的墙板安装装置,其特征在于,所述笼梯架远离所述第二位置平台的一端设有固定钩,所述固定钩挂扣在所述墙面檩条架上。7. The wall panel installation device according to any one of claims 1 to 3, wherein one end of the cage ladder frame away from the second position platform is provided with a fixing hook, and the fixing hook is hooked on the on the wall purlin frame. 8.根据权利要求7所述的墙板安装装置,其特征在于,所述固定钩包括横向搭接杆、竖向限位杆及斜向拉杆;8 . The wall panel installation device according to claim 7 , wherein the fixing hook comprises a transverse lap rod, a vertical limit rod and an oblique pull rod; 8 . 所述横向搭接杆与所述笼梯架连接,用于搭接在所述墙面檩条架的顶部;The transverse lap bar is connected with the cage ladder frame, and is used for lap joint on the top of the wall purlin frame; 所述竖向限位杆与所述横向搭接杆连接,并与所述笼梯架形成限位空间,所述横向搭接杆搭接在所述墙面檩条架上时,所述墙面檩条架部分伸入所述限位空间内;The vertical limit rod is connected with the horizontal lap rod, and forms a limit space with the cage ladder frame. When the horizontal lap rod is lapped on the wall purlin frame, the wall A part of the purlin frame extends into the limiting space; 所述斜向拉杆分别与所述横向搭接杆及所述笼梯架连接。The oblique pull rods are respectively connected with the transverse lap rod and the cage ladder frame. 9.根据权利要求8所述的墙板安装装置,其特征在于,所述横向搭接杆上设有移动轮,所述横向搭接杆通过所述移动轮搭接在所述墙面檩条架的顶部。9 . The wall panel installation device according to claim 8 , wherein a moving wheel is provided on the lateral lap rod, and the lateral lap rod is lapped on the wall purlin frame through the movable wheel. 10 . the top of. 10.根据权利要求1至3中任一项所述的墙板安装装置,其特征在于,还包括安全杆及安全绳;10. The wall panel installation device according to any one of claims 1 to 3, further comprising a safety rod and a safety rope; 所述安全杆固定连接在所述墙面檩条架上,所述安全绳一端固定于所述安全杆上,另一端绕过所述墙面檩条架延伸至所述作业平台上。The safety rod is fixedly connected to the wall purlin frame, one end of the safety rope is fixed on the safety rod, and the other end bypasses the wall purlin frame and extends to the working platform. 11.根据权利要求10所述的墙板安装装置,其特征在于,所述安全杆上设有防坠器,所述防坠器与所述安全绳连接,用于所述安全绳的移动速度超出速度阈值时,限制所述安全绳移动。11 . The wall panel installation device according to claim 10 , wherein a fall arrester is provided on the safety rod, and the fall arrester is connected with the safety rope for the moving speed of the safety rope. 12 . When the speed threshold is exceeded, the safety line movement is restricted. 12.根据权利要求1至3中任一项所述的墙板安装装置,其特征在于,提升装置包括提升机及底座支架;12. The wall panel installation device according to any one of claims 1 to 3, wherein the lifting device comprises a hoist and a base bracket; 所述提升机设置在所述底座支架上;the hoist is arranged on the base bracket; 所述底座支架设置在所述第一位置平台上,所述底座支架上设有配重单元。The base support is arranged on the first position platform, and a counterweight unit is arranged on the base support.
CN202122505856.2U 2021-10-15 2021-10-15 A wallboard installation device for position is striden to height Active CN216196742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122505856.2U CN216196742U (en) 2021-10-15 2021-10-15 A wallboard installation device for position is striden to height

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122505856.2U CN216196742U (en) 2021-10-15 2021-10-15 A wallboard installation device for position is striden to height

Publications (1)

Publication Number Publication Date
CN216196742U true CN216196742U (en) 2022-04-05

Family

ID=80882837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122505856.2U Active CN216196742U (en) 2021-10-15 2021-10-15 A wallboard installation device for position is striden to height

Country Status (1)

Country Link
CN (1) CN216196742U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115559507A (en) * 2022-11-29 2023-01-03 中国二十冶集团有限公司 A movable cage ladder device and wall panel installation method for installing wall panels

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115559507A (en) * 2022-11-29 2023-01-03 中国二十冶集团有限公司 A movable cage ladder device and wall panel installation method for installing wall panels

Similar Documents

Publication Publication Date Title
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
CN216196742U (en) A wallboard installation device for position is striden to height
CA1274562A (en) Swing scaffold
CN116241061A (en) A reusable vertical operation platform setting method
CN215167838U (en) Movable overhung suspension type operating platform
WO2012155211A1 (en) A lifting apparatus for a safety screen
CN210857952U (en) Novel attached lifting scaffold
CN119122250A (en) A hanging basket device and construction method for large-area inclined glass curtain wall
CN207620384U (en) Jack device for discharging
CN215564411U (en) Sliding construction device for high-rise cylindrical building
CN207513201U (en) A kind of roofing cornices installation mobile device
CN216108092U (en) Construction system for installing steel bar formwork of building pier column
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN212334397U (en) Auxiliary tool for hoisting and moving pipeline
CN209924407U (en) Combined working platform for steel structure high-altitude installation
US20070096006A1 (en) Overhead beam assembly
CN217518116U (en) Lifting operation platform for construction of steel structure factory building top layer
JP2012233344A (en) Method for connecting mast, and device for use in the same
CN221543942U (en) Side-hung self-climbing crane
JP4841171B2 (en) Rise-up elevator installation method
CN223805818U (en) External wall color plate installation auxiliary device capable of sliding up and down rapidly
CN218493137U (en) Device for mounting steel structure wall surface purline
CN223061988U (en) Lifting device for be used for full rigid type inserted lift scaffold
JPH0755777B2 (en) Elevator installation method and installation work floor equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 88, Building B, No. 86 Wanxing Road, Changyang, Fangshan District, Beijing, 102488

Patentee after: Multidimensional United Group Co.,Ltd.

Country or region after: China

Address before: 102488 1st floor, building 1, courtyard 9, Haotian North Street, Fangshan District, Beijing

Patentee before: DUOWEI UNION GROUP Co.,Ltd.