CN108584646B CN201810695057.6A CN201810695057A CN108584646B CN 108584646 B CN108584646 B CN 108584646B CN 201810695057 A CN201810695057 A CN 201810695057A CN 108584646 B CN108584646 B CN 108584646B
Authority
CN
China
Prior art keywords
layer frame
layer
frame
standard
upright posts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810695057.6A
Other languages
Chinese (zh)
Other versions
CN108584646A (en
Inventor
董云爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huacheng Tianjin Building Technology Co ltd
Original Assignee
Huacheng Tianjin Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huacheng Tianjin Building Technology Co ltd filed Critical Huacheng Tianjin Building Technology Co ltd
Priority to CN201810695057.6A priority Critical patent/CN108584646B/en
Publication of CN108584646A publication Critical patent/CN108584646A/en
Application granted granted Critical
Publication of CN108584646B publication Critical patent/CN108584646B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00—Hoistway equipment
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00—Vertical ducts; Channels, e.g. for drainage
    • E04F17/005—Lift shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses an assembled external elevator shaft structure suitable for jacking construction, which comprises a foundation, a prefabricated steel frame supporting structure, a light curtain wall enclosure structure and a roof, wherein the prefabricated steel frame supporting structure is arranged on the foundation; the prefabricated steel frame supporting structure comprises a first layer, a plurality of standard layers and a top layer frame; each layer of frame comprises more than 4 upright posts with opposite positions; the bottom ends of the first-layer upright posts are connected with the foundation embedded parts, and the upright posts of each layer of frame are sequentially connected end to end; the bottoms of two adjacent upright posts in the same standard layer frame are connected with a cross beam to form a U-shaped structure; a cross beam is arranged between two adjacent upright posts of the top layer frame up and down; the outer parts of the frame supporting structures of all layers and the corresponding light curtain wall enclosure structures form independent hoistway structural units together, and the lifting of the structural units of all layers is completed in sequence; a plurality of soft connecting components are arranged between the prefabricated steel frame supporting structure and the existing building. The elevator shaft structure has high standardization degree, and the single component has light weight and small component specification, and accords with the development trend of building industrialization, standardization and assembly.

Description

Assembled type additional elevator shaft structure suitable for jacking construction
Technical Field
The invention relates to an assembled building structure, in particular to an existing multi-storey building external elevator shaft structure which is prefabricated in a factory standardized mode and assembled in a field subsection mode.
Background
At present, most of the related technologies of existing multi-storey buildings for additionally installing elevators adopt a construction mode of constructing factory prefabrication site assembly or a construction mode of factory whole prefabrication site whole hoisting. The patent document of publication CN102583131a discloses an elevator shaft wall assembled by a combined derrick, which comprises a derrick structure formed by connecting 4 upright posts distributed at four corners of a shaft with at least 8 cross beams, wherein a brace or a reinforcing plate is arranged between the cross beams and the upright posts, and the upper and lower adjacent derrick structures are aligned through upright post joints and connecting seats at the top ends of the upright posts and are connected through connecting holes by high-strength bolts. A modular hoistway monomer and hoistway thereof are also disclosed in patent document CN107117517 a. The vertical square-through type vertical channel comprises a plurality of square-through type vertical channel units, square-through type vertical channel units and channel steel welding forming cross sections, wherein the upper ends and the lower ends of two adjacent vertical square-through type vertical channel units are respectively provided with channel steel which are connected along the transverse direction, the middle parts of the two adjacent vertical square-through type vertical channel units are provided with transverse square-through type vertical channel units, and the upper ends and the lower ends of the two adjacent vertical channel units are connected through the fixing blocks welded on the side faces of the channel steel at the upper ends and the lower ends of the vertical channel units, and core columns in the vertical square-through type vertical channel units are connected. In the solution, the main frame structure can realize factory standardized prefabrication, but the number and the variety of the components are large, and the connecting nodes are complex. And even if the construction mode of factory integral prefabrication and field integral hoisting is adopted, after the construction of the main body frame structure is completed, the construction of enclosure structures such as curtain walls and the like still cannot avoid a large amount of high-altitude operation, and secondary construction such as scaffold construction, protection engineering and the like is performed. Meanwhile, in the construction process of real integral hoisting, due to narrow roads in the field, the distance between existing buildings is limited, and the interference of surrounding trees, street lamps and the like is added, so that large-sized transportation vehicles and hoisting machinery are difficult to enter. Even if the construction site can be approached, not only is the operation space limited, but also the safety measures cannot be guaranteed, and the potential safety hazard is large, so that the interference to residents is large. Although the patent document of publication CN102583131a mentioned above mentions that a jacking construction method can be adopted, the derrick proposed by the patent document has many structural members and complex connection, and does not have structural advantages suitable for jacking construction.
In addition, patent document CN107215749a discloses an elevator shaft structure and a lifting method, and proposes a construction method of sectionally lifting in a factory whole prefabricated site. However, the lifting device is installed on the side edge of the lower layer structure frame, the lifting device needs to be lifted to a new height after each lifting operation is finished, the next lifting operation is completed, the lifting operation needs to be completed in two directions of vertical and horizontal, the operation links are more, and the technology is complex.
Jacking is a construction method commonly used for roof structures with large spans, heavy-duty racks and the like. The method is characterized in that the grid structure is assembled on site, and then gradually lifted to a design position by using a jack, so that the lifting force is high and stable. The jacking method is different from the lifting method in that: the lifting devices are positioned differently, the former being located below the structural pivot point and the latter being located above; the two are different in action principle, the lifting equipment such as a jack adopted by the former can rise along with the structure, and the lifting equipment such as a winch adopted by the latter is kept unchanged in position in the lifting process.
Disclosure of Invention
Aiming at the problems of long construction period, more high-altitude operation, large interference to residents, limited site space, potential safety hazard, more operation links, complex technology and the like in the existing multi-storey building assembled additional elevator shaft engineering, the invention provides the assembled additional elevator shaft structure suitable for jacking construction.
In order to solve the technical problems, the invention provides an assembled external elevator shaft structure suitable for jacking construction, which comprises a foundation, a prefabricated steel frame supporting structure, a light curtain wall enclosure structure and a roof; the foundation adopts a reinforced concrete box foundation, or the reinforced concrete box foundation is combined with a local reinforced concrete strip foundation, or the pile foundation is combined with the reinforced concrete box foundation and the local reinforced concrete strip foundation; and the tops of the reinforced concrete box foundation and the local reinforced concrete strip foundation are provided with embedded connecting members.
The prefabricated steel frame supporting structure comprises a first-layer frame and a top-layer frame, and N standard-layer frames are arranged between the first-layer frame and the top-layer frame; the N standard layer frames are sequentially marked as a second layer frame, a third layer frame, … …, an N-1 layer frame and an N layer frame from bottom to top; the first-layer frame comprises more than 4 first-layer frame upright posts, and the bottom ends of the first-layer frame upright posts are connected with pre-buried connecting members positioned at the top of the reinforced concrete foundation; each standard layer frame comprises standard layer frame upright posts corresponding to the upright posts of the first layer frame in a one-to-one mode, and the heights of the standard layer frame upright posts are the same as the heights of corresponding layers of the existing building; a standard layer frame beam is connected between the bottoms of two adjacent standard layer frame upright posts in the same standard layer frame, and the standard layer frame beam and the standard layer frame upright posts on two sides form a U-shaped structure; the standard layer frame beam is provided with a floor slab at the elevator hall or the corridor part; the elevation of the finished layer surface of the standard layer frame floor slab is the same as the elevation of the corresponding floor of the existing building; the top layer frame comprises top layer frame upright posts which are in one-to-one correspondence with the standard layer frame upright posts of the Nth layer frame, and a top layer frame lower cross beam and a top layer frame upper cross beam are arranged between two adjacent top layer frame upright posts; the upper cross beam of the top layer frame is connected with the roof; among the first layer frame upright posts, the N standard layer frame upright posts and the top layer frame upright posts, connecting pieces are adopted to butt the upright posts of the upper and lower adjacent layers; the prefabricated steel frame support structure is externally provided with a light curtain wall enclosure structure corresponding to the first-layer frame, the standard-layer frame and the top-layer frame respectively, and correspondingly forms a relatively independent elevator shaft first-layer structure unit, a relatively independent elevator shaft standard-layer structure unit and a relatively independent elevator shaft top-layer structure unit; a plurality of soft connecting members are arranged between the prefabricated steel frame supporting structure and the outer wall of the existing building.
Furthermore, in the invention, the assembled external elevator shaft structure suitable for jacking construction is characterized in that the standard floor frame and the corresponding light curtain wall enclosure structure form a standard floor elevator shaft unit, and the top floor frame and the corresponding light curtain wall enclosure structure form a top floor elevator shaft unit; in the later jacking construction process, the elevator shaft top layer structural unit and the standard layer structural unit sequentially complete jacking operation.
The flexible connecting member is a V-shaped connecting member, a W-shaped connecting member or a U-shaped connecting member.
Deformation joints are arranged among the roof, the floor slab, the light curtain wall enclosure structure and the existing building. The roof is provided with waterproof, flashing and drainage construction measures. The floor slab adopts a reinforced concrete structure mode of casting steel bars on corrugated steel plates.
And an elevator access passage or a house entrance is reserved in the light curtain wall enclosure structure.
Compared with the prior art, the invention has the beneficial effects that:
(1) The elevator shaft structure reduces the weight of a single component through the separation of the components, simplifies a structural system, adopts a U-shaped frame and reduces the total weight. The single component design has the functions of repetition, adaptation and composite, the components are produced by factory standardized prefabrication, a large number of repeated works (cutting, welding, polishing, paint spraying and the like) are finished in batch in advance by factories, the field construction period is shortened, the engineering precision is improved, and the development trend of building industrialization, standardization and assembly is met.
(2) The elevator shaft structure of the invention has the advantages that the frame structures are all standardized components with uniform specification because the frame structures are all integrated into the rod pieces or the U-shaped structures with simple structures, so heavy transportation vehicles and hoisting equipment can be eliminated in construction, the space limitation of construction sites is reduced, and the elevator shaft structure is convenient, safe and efficient.
(3) According to the elevator shaft structure, the frame supporting structure and the curtain wall enclosure structure are integrally prefabricated and assembled in sections respectively, and main work of on-site installation is completed on the ground, so that not only is the engineering of on-site construction of the scaffold simplified, but also a large amount of overhead operation is avoided, the construction efficiency is improved, the construction period is shortened, the labor cost is saved, and the influence on daily life of residents is reduced. The frame supporting structure of the elevator well and the field assembly of the curtain wall maintenance enclosure are added, only small carrying and lifting equipment is needed, the construction mode of jacking step by step from bottom to top is adopted, the main structure of the elevator well can be constructed first, then the existing building is transformed and constructed, the main structure replaces a scaffold, the enclosure structure serves as a safety net, dregs are vertically transported through the elevator well, the interference to daily life of residents is reduced, and the safety of the construction process is improved.
Drawings
Fig. 1 is an isometric view of the structure of an elevator hoistway of the present invention;
FIG. 2 is a cross-sectional view of the foundation and prefabricated steel frame support structure shown in FIG. 1;
FIG. 3 is a cross-sectional view of the foundation shown in FIG. 2 with a strip-shaped foundation disposed in front of the foundation;
fig. 4-1 is a schematic view of an embodiment of a flexible connection member between an elevator hoistway structure and an existing building according to this invention;
FIG. 4-2 is an isometric view of the flexible connection unit of FIG. 4-1;
fig. 5-1 is a schematic view of a second embodiment of a flexible connection member between the hoistway structure of the present invention and an existing building;
FIG. 5-2 is an isometric view of the flexible connection unit of FIG. 5-1;
fig. 6-1 is a schematic view of a first embodiment of a lifting, positioning and guiding device for use in installing the hoistway structure of the present invention;
FIG. 6-2 is an isometric view of the lift guide shown in FIG. 6-1;
Fig. 7-1 is a schematic view of a second embodiment of a lifting, positioning and guiding device for use in installing the hoistway structure of the present invention;
FIG. 7-2 is an isometric view of the lift guide shown in FIG. 7-1;
fig. 8 is an isometric view of a local lifting fixture of a lifting apparatus used in installing the hoistway structure of the present invention;
fig. 9 is an overall isometric view of a lifting device used to mount the hoistway structure of the present invention;
fig. 10-1 is a schematic view of the elevator shaft structure of the present invention before lifting the installed hoisting equipment during construction;
Fig. 10-2 is a schematic diagram of the lifting process under the premise shown in fig. 10-1.
In the figure:
10-roof, 11-pile foundation, 12-reinforced concrete box foundation, 13-reinforced concrete strip foundation, 14-pre-buried connection member, 20-first-tier frame, 21-first-tier frame column, 30-standard-tier frame, 31-standard-tier frame column, 32-standard-tier frame beam, 40-top-tier frame, 41-top-tier frame column, 42-top-tier frame lower beam, 43-top-tier frame upper beam, 50-lightweight curtain wall enclosure, 60-flexible connection member, 61-wall connection member, 70-jacking guide, 71-vertical guide rail, 711-guide rail connection member, 72-positioning slide assembly, 721-positioning slide, 722-positioning buckle, 80-jacking device, 81-support frame, 811-support column, 812-diagonal brace positioning bar, 813-scissor diagonal brace, 814-fastening cable, 82-lifting device, 821-lifting cable, 822 servo motor, 823-winch, 824-fixed pulley, 826-lifting hook, 827-sling, 83-lifting device, longitudinal slide, 833-sliding block, stability-stability, 831-stability, light emitter, 91-stability monitoring device, 91-stability-and stability-monitoring device.
Detailed Description
The technical solution of the present invention will be described in further detail with reference to the accompanying drawings and the specific embodiments, which are only illustrative of the present invention and are not intended to limit the present invention.
As shown in fig. 1 and 2, the assembled external elevator shaft structure suitable for jacking construction provided by the invention comprises a foundation, a prefabricated steel frame supporting structure, a light curtain wall enclosure structure 50 and a roof 10. The foundation is an independent foundation and is provided with settlement joints and earthquake-resistant joints at the corresponding floor slabs and outer walls according to corresponding building standard requirements with the existing building. According to the concrete engineering geological conditions, the foundation adopts a reinforced concrete box foundation 12, or the reinforced concrete box foundation 12 is combined with a local reinforced concrete strip foundation 13, as shown in fig. 3, or the pile foundation 11 is combined with the reinforced concrete box foundation 12 and the local reinforced concrete strip foundation 13. The form and depth of the foundation are determined by the foundation structure design; the net depth of the interior of the foundation is determined by the technical index of the buffer space at the bottom of the elevator; the plane size of the foundation is determined by the building and structural design according to the specification of the elevator. If the pile foundation 11 is combined with the reinforced concrete box foundation 12 or the local reinforced concrete strip foundation 13, the pile foundation 11 is deep into the side wall of the box foundation or the strip foundation and is connected with the internal structural steel bars, and the position, specification, depth and number of the pile foundation 11 are determined by the design of the foundation structure. The top of the reinforced concrete box foundation 12 or the reinforced concrete bar foundation 13 is provided with a pre-buried connecting member 14, and the plane position of the pre-buried connecting member 14 is consistent with the position of the prefabricated steel frame supporting structure upright post of the elevator well.
The prefabricated steel frame supporting structure comprises a first-layer frame 20 and a top-layer frame 40, and N standard-layer frames 30 are arranged between the first-layer frame 20 and the top-layer frame 40; the N standard layer frames are sequentially marked as a second layer frame, a third layer frame, … …, an N-1 layer frame and an N layer frame from bottom to top.
The first-layer frame 20 comprises more than 4 first-layer frame upright posts 21, the positions and the heights of the upright posts 21 are determined by a building design scheme, the cross section can be square steel pipes, round steel pipes or I-steel, and the size specification of the cross section is determined by the structural design. The bottom end of the first-layer frame upright post 21 is connected with the embedded connecting member 14 positioned at the top of the reinforced concrete foundation, the connecting mode is recommended to adopt welding or bolting, and the specific form of the connecting part is determined according to the specific design of the section form and the size of the upright post 21.
Each standard layer frame 30 comprises standard layer frame upright posts 31 which are in one-to-one correspondence with the positions of the first layer frame upright posts 21, and the height of each standard layer frame upright post 31 is the same as the height of a corresponding layer of the existing building; the standard layer frame upright posts 31 are prefabricated in a factory, the bottoms between two adjacent standard layer frame upright posts 31 in the same standard layer frame are connected with standard layer frame cross beams 32, namely, the two ends of each standard layer frame upright post 31 are provided with connecting seats and connecting pieces for connecting the standard layer frame cross beams 32 through prefabrication welding, and the standard layer frame cross beams 32 and the standard layer frame upright posts 31 on the two sides form a U-shaped structure, so that the frame structure is conveniently lifted during later-stage jacking construction; the standard floor frame beam 32 is provided with a floor slab at the elevator hall or the corridor part except for the space reserved in the elevator shaft, the elevation of the floor slab finished layer of the standard floor frame 30 is the same as that of the floor corresponding to the existing building, and the floor slab can be in a reinforced concrete structure form cast on corrugated steel plates.
The top frame 40 includes top frame columns 41 corresponding to the standard layer frame columns 31 of the nth layer frame one by one, and the height of the top frame columns 41 is determined by the architectural design according to the elevator type, specification and technical index of the top buffer space. A top frame lower cross beam 42 and a top frame upper cross beam 43 are arranged between two adjacent top frame upright posts 41; the roof frame uprights 41 and roof frame upper cross members 43 are connected to the roof. The roof is provided with a waterproof, flashing, drainage structure and a roof deformation joint.
Among the first-layer frame upright posts 21, the N standard-layer frame upright posts 31 and the top-layer frame upright posts 41, the upright posts on the upper and lower adjacent layers are in butt joint by adopting connecting pieces, the form of each connecting piece is determined according to the specific design of the section form and the size of each upright post, and the connecting mode is recommended to adopt welding or bolting. The prefabricated steel frame support structure is externally provided with a light curtain wall enclosure structure 50, namely, a stress structure is formed by a transverse main keel, a vertical main keel, a transverse frame and a vertical frame outside the structural frame, and the light curtain wall enclosure structure 50 is formed by connecting light external wall panels or glass with the light external wall panels or glass. The standard floor frame 30 and the corresponding light curtain wall enclosure 50 form a standard floor elevator hoistway unit, and the top floor frame 40 and the corresponding light curtain wall enclosure 50 form a top floor elevator hoistway unit. In the post-jacking construction process, after the structure assembly of the standard floor frame is completed, the assembly of the corresponding light curtain wall enclosure structure 50 is immediately carried out, and finally jacking operation is carried out, namely, the top-layer elevator well unit and the standard floor elevator well unit are independent units of the jacking operation. The light curtain wall enclosure 50 may be made by conventional methods of various light composite curtain walls or glass curtain walls. The light curtain wall enclosure 50 is reserved with an elevator access passage or a unit access.
After the prefabricated steel frame supporting structures and the light curtain wall enclosure structures are installed, connecting the steel frame cross beams of all layers with wall connecting members 61 fixed on the existing building through a plurality of soft connecting members 60, wherein the soft connecting members are U-shaped connecting members or V-shaped connecting members as shown in fig. 4-1 and 4-2; the wall connecting member is connected with the outer wall of the existing building or the reinforced concrete beam through chemical bolts, so that flexible connection between the building plates of each floor of the existing building and the main frame structure of the newly-built elevator shaft is realized.
The apparatus for the jacking construction of the above-described hoistway structure mainly includes a jacking guide 70, a jacking device 80, and a jacking monitoring device 90.
As shown in fig. 6-1, 6-2, 7-1 and 7-1, the jacking guide 70 includes at least two vertical rails 71, and a positioning slider assembly 72 engaged with each vertical rail 71;
The vertical guide rail 71 is connected with the wall connecting member 61 through a guide rail connecting member 711, and the wall connecting member 61 is connected with the structures such as the outer wall or the reinforced concrete beam of the existing building through chemical bolts; the wall body connecting member 61 and the guide rail connecting member 711, and the guide rail connecting member 711 and the vertical guide rail 71 are connected by bolts; the bolt holes of the wall connecting member 61, the vertical guide rail 71 and the guide rail connecting member 711 are long holes, so that the position and the verticality of the vertical guide rail 71 can be corrected conveniently.
The positioning slide assembly 72 includes a positioning slide 721 and a positioning buckle 722. The positioning buckle 722 is used to connect the positioning slider 721 with the floor frame beams in the hoistway structure. As shown in figures 6-1 and 7-1,
As shown in fig. 9, the jacking device 80 includes a supporting frame 81, a lifting device 82, and a lifting stabilizer 83.
The supporting frame 81 comprises four upright posts 811, two diagonal bracing positioning strips 812 are fixed on the inner side of each upright post 811, a row of bolt holes are formed in the diagonal bracing positioning strips 812, a scissor diagonal bracing 813 is arranged between every two adjacent upright posts 811, each scissor diagonal bracing 813 consists of two equal-length crossed angle steels, bolt holes are reserved at two ends of each angle steel, the two angle steels are connected through bolts, and the two angle steels can rotate around the middle bolt. The distance between two adjacent columns 811 can be adjusted by adjusting the included angle between the crossed angle steels so as to adapt to specific spacing requirements in different projects. Both ends of each diagonal bracing 813 are fixed on the diagonal bracing positioning strips 812 through bolts, and the tops of the four upright posts 811 are connected with fastening inhaul cables 814.
The lifting device 82 comprises four sets of lifting units, each set of lifting units comprises a lifting steel rope 821, a servo motor unit 822, a winch 823 driven by the servo motor unit 822, a fixed pulley 824 arranged at the top of each upright 811, a movable pulley 825 is arranged on the lifting steel rope 821, and a lifting hook 826 and a sling 827 binding a frame beam and connecting the lifting hook 826 are arranged on the movable pulley 825, as shown in fig. 8 and 9. One end of the lifting steel rope 821 is fixed to a rotating shaft of the hoist 822, and the other end of the lifting steel rope 821 is fixed to the upright 811 after sequentially bypassing the fixed pulley 824 and the movable pulley 825 at the top of the upright. The servo motor unit comprises a servo motor, a controller and a speed reducer, and four servo motor units 822 synchronously move in the construction process.
The lifting stabilizer 83 includes: the outer side of the supporting frame upright post 811 in the jacking device 80 is provided with a longitudinal sliding chute 831, a stable sliding block 832 and a stable buckle 833, the stable sliding block 832 is fixed with the cross beam of each layer of frame through the stable buckle 833, and the stable sliding block 832 vertically slides along the longitudinal sliding chute 831 in the jacking process so as to ensure the horizontal position relationship between the structural frame and the supporting frame 81 in the jacking device 80, and form stable restraining force in the front-back direction and the left-right direction of the structural frame.
The jacking monitoring device 90 includes: the two groups of laser transmitters 91 and laser receivers 92 which are in one-to-one correspondence, wherein the laser transmitters 91 are fixed at the upper edges of two opposite side surfaces or two ends of the upper edge of the same side surface of the elevator hoistway top layer structural unit, and the laser receivers 92 are fixed on a reinforced concrete foundation to ensure that laser beams emitted by the laser transmitters 91 are vertically aligned with the laser receivers 92; in the jacking construction process, whether the structural frame is twisted in the horizontal direction or inclined in the vertical direction is monitored in real time, wherein the laser beam emitted by any one laser emitter 92 exceeds the receiving range of the laser receiver 93, the laser receiver 93 alarms, the jacking construction precision is prompted to exceed the error allowable range, and the operation needs to be suspended and the safety inspection is performed.
The construction method of the elevator shaft structure comprises the following steps of:
firstly, excavating a foundation pit, and making a reinforced concrete foundation and pre-buried connecting members;
step two, as shown in fig. 6-1, 6-2, 7-1, 7-2, 8 and 9, the mounting apparatus includes:
At first, at least two vertical guide rails 71 are installed on the existing building according to the design scheme, and when the vertical guide rails are installed, the two vertical guide rails are arranged on different sides relative to an elevator shaft, so that stable constraint forces in the front-back direction, the left-right direction and the lifting process are ensured. The vertical guide rail 71 is connected with the outer side structure of the existing building through a guide rail connecting member 711 and a wall connecting member 61; the wall connecting member 61 is connected with the existing building through chemical bolts; the wall body connecting member 61 and the guide rail connecting member 711, and the guide rail connecting member 711 and the vertical guide rail 71 are connected by bolts; the bolt holes of the wall connecting member 61, the rail connecting member 711 and the vertical rail 71 are elongated holes so as to correct the position and verticality of the vertical rail 71. Each vertical rail 71 is fitted with a positioning slide assembly 72, said positioning slide assembly 72 comprising a positioning slide 721 cooperating with the vertical rail 71, and a positioning buckle 722 for connecting said positioning slide 721 with the frame rails of the elevator hoistway structure.
Then installing a supporting frame 81 of the jacking device 80, arranging four upright posts 811 of the supporting frame 81 transversely outwards along the long side of the elevator shaft plane on one side with a longitudinal sliding chute 831 according to the plane form of the elevator shaft to be built, and fixing the bottoms of the upright posts 811 at the bottom of the reinforced concrete foundation by bolts; two diagonal bracing positioning strips 812 are fixed on the inner side of each upright 811, a row of bolt holes are formed in each diagonal bracing positioning strip 812, a pair of scissor diagonal bracing 813 is arranged between every two adjacent upright 811, and two ends of each scissor diagonal bracing 813 are fixed on each diagonal bracing positioning strip 812 through bolts; the top of the four upright posts 811 is connected with a fastening cable 814, and the perpendicularity of each upright post 811 is ensured by adjusting the length of each fastening cable 814; meanwhile, the support frame 81 is prestressed by tightening the fastening cables 814, so that the rigidity and overall stability of the entire support frame 81 are improved.
Finally, the lifting device 82 of the lifting device 80 is installed: a servo motor 822 is arranged at the bottom of each upright 811, the output end of the servo motor 822 is connected with a winch 823, and a fixed pulley 824 is arranged at the top of each upright 811; the lifting device 82 is provided with four lifting steel cables 821, one end of each lifting steel cable 821 is fixed with a rotating shaft of a winch 823, the other end of each lifting steel cable 821 sequentially bypasses a fixed pulley 824 and a movable pulley 825 at the top of a stand 811 and is then fixed on the stand 811, a lifting hook 826 is fixed on each movable pulley 825, and the fit degree of the fixed pulley 824, the movable pulley 825 and the lifting steel cable 821 is adjusted.
Step three, lifting the elevator shaft structural units of each layer:
The lifting of the elevator shaft structural units of each floor, as shown in fig. 10-1 and 10-2, comprises:
3-1, jacking a top layer structural unit: firstly, respectively standing the top layer frame upright posts 41 at the positions of the corresponding embedded connecting members 14 of the reinforced concrete foundation; then, the top frame upper beam 43 and the top frame lower beam 42 are mounted at the respective positions, and are fixed after vertical and horizontal correction; and installing the main keel or the transverse and vertical frames of the light curtain wall enclosure 50 and the light external wall panels or glass until the assembly of the top layer structural unit is completed. The corresponding positioning slide blocks 721 are respectively fixed on the upper cross beams 43 of the top layer frame 40 corresponding to the vertical rails 71 through at least two positioning buckles 722; the four fixing sliders 832 are respectively fixed to the lower cross members 42 of the top frame 40 corresponding to the longitudinal sliding grooves 831 of the supporting columns 811 of the jacking device 80 by four fixing clips 833. Simultaneously, the lengths of the four lifting steel ropes 821 are adjusted, and the lifting hooks 826 on the movable pulleys 825 are respectively hung with the slings 827 fixed on the cross beam 42 at the lower part of the top layer frame 40, so that the four servo motor units are started to synchronously operate, and the top layer structural unit is lifted to a height slightly higher than that of a standard layer frame.
In addition, in order to ensure the verticality of the jacking construction of the hoistway structure, after the assembly of the top-layer structural unit is completed, before the jacking operation of the top-layer frame 40, a jacking monitoring device 90 needs to be installed, two laser transmitters 91 are installed on two opposite sides or two ends on the same side of the top-layer structural unit of the elevator hoistway, two laser receivers 92 are installed at corresponding positions of the reinforced concrete foundation, and laser beams emitted by the laser transmitters 91 are vertically aligned with the laser receivers 92 at the corresponding positions; in the jacking construction process, whether the elevator shaft structure is twisted in the horizontal direction or inclined in the vertical direction is monitored in real time through the jacking monitoring device 90, wherein the laser beam emitted by any one laser emitter 92 exceeds the receiving range of the laser receiver 93, the laser receiver 93 alarms, the jacking construction precision is prompted to exceed the error allowable range, and the operation needs to be suspended and the safety inspection is performed.
3-2, Lifting a standard layer structure unit: the lower ends of the four upright posts 31 of the Nth standard layer frame are erected at the positions of the foundation embedded connecting members 14, the upper ends of the four upright posts 31 are aligned with the bottom ends of the upright posts 41 of the top layer frame, the top layer frame 40 is slowly lowered, and the connection of the upright posts 31 of the Nth standard layer frame and the upright posts 41 of the top layer frame and the connection of the cross beams 32 of the Nth standard layer frame and the upright posts 31 of the standard layer frame are completed; after vertical and horizontal correction, fastening by bolts; releasing the connection between the four stabilizing sliders 832 and the stabilizing buckles 833, releasing the four lifting cables (821), and releasing slings 827 on the lower cross beam 42 of the top frame (40); installing a main keel or a transverse and vertical frame of the light curtain wall enclosure structure 50 corresponding to the Nth standard layer and a light external wall panel or glass until the assembly of the Nth standard layer structure unit is completed; the corresponding positioning slide blocks 721 are respectively fixed on the lower cross beams 42 of the top layer frame 41 corresponding to the vertical rails 71 through at least two positioning buckles 722; the four fixing sliders 832 are respectively fixed on the Nth layer of standard layer frame beams 32 corresponding to the longitudinal sliding grooves 831 of the supporting upright posts 811 in the jacking device 80 by four fixing buckles 833; simultaneously, the lengths of the four lifting steel ropes 821 are adjusted, and the lifting hooks 826 on the movable pulleys 825 are respectively hung with the slings 827 fixed on the frame cross beam 32 of the Nth layer standard layer; starting the four servo motor units to synchronously operate, and lifting the Nth standard layer structure unit to a height higher than that of one standard layer frame through a lifting steel cable 821; repeating the previous construction operation content until all the standard layer structural units are installed;
3-3, mounting of a first-layer structure frame: after the second-layer structural unit is installed, the second-layer structural unit is lifted to the height of the first-layer frame through the lifting steel rope 821; the lower ends of the four stand columns 21 of the first-layer frame are erected at the positions of the foundation embedded connecting members 14, the upper ends of the four stand columns 21 are aligned with the bottom ends of the stand columns 31 of the second-layer frame, and the two-layer standard-layer frame 30 is slowly lowered to complete the connection of the stand columns 21 of the first-layer frame and the stand columns 31 of the second-layer frame; the upright post of the first-layer frame is determined according to the first-layer height of a specific project building, and one of the prefabricated sectional type bolt connecting post and the prefabricated integral type long post is adopted for installation.
And step four, dismantling equipment: the jacking device 80, the jacking monitoring device 90, and the vertical guide rail 71, the guide rail connecting member 711, and the positioning slider assembly 72 in the jacking guide 70 are removed.
Step five, connecting the frame cross beams of each layer with wall connecting members 61 fixed on the existing building layer by using flexible connecting members 60; and removing parts of walls, doors and windows and the like of the existing building adjacent to the newly-built elevator shaft.
And step six, performing construction such as reinforcing a roof, each floor slab, partition walls between an elevator hoistway and an elevator hall, unit doors, an entrance rain shed, a local wall body of an existing building, a door opening and the like, and performing first-layer curtain wall installation or wall body masonry operation.
And step seven, elevator installation is carried out.
Although the invention has been described above with reference to the accompanying drawings, the invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many modifications may be made by those of ordinary skill in the art without departing from the spirit of the invention, which fall within the protection of the invention.

Claims (6)

1. An assembled external elevator shaft structure suitable for jacking construction comprises a foundation, a prefabricated steel frame supporting structure, a light curtain wall enclosure structure (50) and a roof (10); the method is characterized in that:
The foundation adopts a reinforced concrete box foundation (12), or the reinforced concrete box foundation (12) is combined with a local reinforced concrete strip foundation (13), or the pile foundation (11) is combined with the reinforced concrete box foundation (12) and the local reinforced concrete strip foundation (13); the tops of the reinforced concrete box foundation (12) and the local reinforced concrete strip foundation (13) are provided with embedded connecting members (14);
The prefabricated steel frame supporting structure comprises a first-layer frame (20) and a top-layer frame (40), and N standard-layer frames (30) are arranged between the first-layer frame (20) and the top-layer frame (40); the N standard layer frames are sequentially marked as a second layer frame, a third layer frame, … …, an N-1 layer frame and an N layer frame from bottom to top;
the first-layer frame (20) comprises more than 4 first-layer frame upright posts (21), and the bottom ends of the first-layer frame upright posts (21) are connected with the embedded connecting members (14);
Each standard layer frame (30) comprises standard layer frame upright posts (31) which are in one-to-one correspondence with the positions of the first layer frame upright posts (21), and the height of each standard layer frame upright post (31) is the same as the height of a corresponding layer of the existing building; a standard layer frame cross beam (32) is connected between the bottoms of two adjacent standard layer frame upright posts (31) in the same standard layer frame, and the standard layer frame cross beam (32) and the standard layer frame upright posts (31) on two sides form a U-shaped structure; floor slabs are arranged on the standard layer frame beams (32) at the elevator hall or the corridor part; the elevation of the finished floor of the standard floor frame (30) floor is the same as the elevation of the corresponding floor of the existing building;
The top layer frame (40) comprises top layer frame upright posts (41) which are in one-to-one correspondence with the standard layer frame upright posts (31) of the Nth layer frame, and a top layer frame lower cross beam (42) and a top layer frame upper cross beam (43) are arranged between two adjacent top layer frame upright posts (41); the top layer frame upper cross beam (43) is connected with the roof;
among the first-layer frame upright posts (21), the N standard-layer frame upright posts (31) and the top-layer frame upright posts (41), the upright posts of the upper and lower adjacent layers are in butt joint by adopting connecting pieces;
the light curtain wall enclosure structure (50) corresponds to a first-layer frame (20), a standard-layer frame (30) and a top-layer frame (40) of the prefabricated steel frame supporting structure, and respectively forms a first-layer structure unit, a standard-layer structure unit and a top-layer structure unit of the elevator shaft which are relatively independent;
a plurality of flexible connecting members (60) are arranged between the prefabricated steel frame supporting structure and the outer wall of the existing building.
2. The assembled externally added elevator shaft structure suitable for jacking construction according to claim 1, wherein the standard layer frame (30) and the corresponding light curtain wall enclosure structure (50) form an elevator shaft standard layer structure unit, and the top layer frame (40) and the corresponding light curtain wall enclosure structure (50) form an elevator shaft top layer structure unit; in the later jacking construction process, the elevator hoistway top layer structural unit and the standard layer structural unit sequentially conduct jacking operation.
3. The assembled add-on elevator hoistway structure adapted for jacking construction of claim 1, wherein the flexible connection member (60) is a V-shaped connection member, a W-shaped connection member, or a U-shaped connection member.
4. The assembled external elevator hoistway structure adapted for jacking construction according to claim 1, characterized in that deformation joints are provided between the roof (10), floor slab and light curtain wall building envelope (50) and existing buildings.
5. The assembled externally added elevator hoistway structure suitable for jacking construction according to claim 1, wherein the floor slab is in the form of a reinforced concrete structure cast on corrugated steel plates.
6. The assembled externally added elevator hoistway structure suitable for jacking construction according to claim 1, wherein the lightweight curtain wall enclosure (50) is reserved with an elevator access or a house entrance.
CN201810695057.6A 2018-06-29 2018-06-29 Assembled type additional elevator shaft structure suitable for jacking construction Active CN108584646B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810695057.6A CN108584646B (en) 2018-06-29 2018-06-29 Assembled type additional elevator shaft structure suitable for jacking construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810695057.6A CN108584646B (en) 2018-06-29 2018-06-29 Assembled type additional elevator shaft structure suitable for jacking construction

Publications (2)

Publication Number Publication Date
CN108584646A CN108584646A (en) 2018-09-28
CN108584646B true CN108584646B (en) 2024-06-14

Family

ID=63634418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810695057.6A Active CN108584646B (en) 2018-06-29 2018-06-29 Assembled type additional elevator shaft structure suitable for jacking construction

Country Status (1)

Country Link
CN (1) CN108584646B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110397246B (en) * 2019-07-19 2021-04-16 安徽匠桥财务咨询服务有限公司 A prefabricated building power generation shaft
CN111270867B (en) * 2020-01-21 2021-12-17 山东大学 Novel roof steel truss suspension assembly type elevator structure and construction method thereof
CN113073812A (en) * 2021-04-29 2021-07-06 中核建研城市更新有限公司 Light concrete elevator shaft module prefabricated by strip steel keels and manufacturing method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208345549U (en) * 2018-06-29 2019-01-08 华城(天津)建筑科技有限公司 A kind of additional elevator shaft structure of assembled being adapted to jack-up construction

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000273847A (en) * 1999-03-25 2000-10-03 Kumagai Gumi Co Ltd Elevator shaft forming unit
JP2004352458A (en) * 2003-05-29 2004-12-16 Ohbayashi Corp Method for construction of elevator shaft structure
CN203922362U (en) * 2014-05-28 2014-11-05 江苏润安电梯工程技术服务有限公司 Build-up type modularization steel structure lift shaft
CN207211634U (en) * 2017-08-30 2018-04-10 江苏船谷重工有限公司 A kind of segmented hoistway structure and integrated form hoistway elevator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208345549U (en) * 2018-06-29 2019-01-08 华城(天津)建筑科技有限公司 A kind of additional elevator shaft structure of assembled being adapted to jack-up construction

Also Published As

Publication number Publication date
CN108584646A (en) 2018-09-28

Similar Documents

Publication Publication Date Title
CN108532769B (en) Jacking construction method of assembled additional elevator shaft structure
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
US4231148A (en) Elevator erection method
CN104520521B (en) Concept of high-rise building elevation
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
CN116181041B (en) Building machine of multilayer quick construction
CN108532768B (en) Construction device of assembled building, construction method thereof and box building
CN113443535B (en) Downward lifting equipment for shaft construction and its installation method
WO2011002120A1 (en) Composite cage for construction
CN107399656B (en) Outdoor elevator and construction method thereof
CN113152664A (en) Steel structural framework and modularized additional elevator
CN215670929U (en) Shear force wall elevator shaft assembled operation platform
CN116335398A (en) Multilayer rapid construction method
KR20250036109A (en) Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing
CN110924630B (en) Integrated steel structure hoistway with elevator hall and construction process thereof
JPH10292618A (en) Work scaffolding for wall construction
CN208345549U (en) A kind of additional elevator shaft structure of assembled being adapted to jack-up construction
AU2018247335A1 (en) Lift shaft assembly and construction and installation thereof
CN108584646A (en) A kind of additional elevator shaft structure of the assembled being adapted to jack-up construction
CN222249889U (en) Auxiliary equipment for installation and construction of air conditioning duct
CN110359697B (en) High-altitude unit-type overhead sliding splicing operation platform
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
JP2009215806A (en) Multistory parking device in void and method of constructing the same
CN215711453U (en) Modular assembly type additional elevator shaft jacking construction equipment
WO2009093974A1 (en) Frame system for supporting facade elements and use of the frame system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant