CN207392716U - A kind of tool-type suspension scaffold - Google Patents

A kind of tool-type suspension scaffold Download PDF

Info

Publication number
CN207392716U
CN207392716U CN201721253001.2U CN201721253001U CN207392716U CN 207392716 U CN207392716 U CN 207392716U CN 201721253001 U CN201721253001 U CN 201721253001U CN 207392716 U CN207392716 U CN 207392716U
Authority
CN
China
Prior art keywords
suspension scaffold
stent
tripod
reinforced concrete
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721253001.2U
Other languages
Chinese (zh)
Inventor
刘升逑
高峰
赖祖昌
谢勇
覃相荣
胡昌武
席郁欣
温绍启
潘洪德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Metallurgical Construction Co ltd
Original Assignee
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Metallurgical Construction Co filed Critical Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority to CN201721253001.2U priority Critical patent/CN207392716U/en
Application granted granted Critical
Publication of CN207392716U publication Critical patent/CN207392716U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of tool-type suspension scaffolds, suspension scaffold is arranged on reinforced concrete barrel, the suspension scaffold includes tripod, walkway board, arc railing and safety net, the tripod is fixedly installed on by swell fixture on reinforced concrete barrel respectively, the walkway board is arranged on tripod and forms the aisle for people colleague, the arc railing is fixedly installed on by supporting rod on tripod, the safety net is fixedly installed on supporting rod, the arc railing and safety net are located on the outside of walkway board and form protective fence, the suspension scaffold is multiple, and it arranges and is arranged on reinforced concrete barrel.After the utility model can ensure sliding formwork completely, slip form platform remove, slip form supporting rod recycling, cylindrical structure bind construction worker construction operation safety.

Description

A kind of tool-type suspension scaffold
Technical field
The utility model is related to a kind of supporting racks, particularly a kind of tool-type suspension scaffold.
Background technology
After slding form operation, in previous construction embodiment, slip form platform is removed, continues cylindrical wall and binds knot The construction of structure is carried out with " boldness of execution stems form superb skill ", and without any safety devices, the personal safety of operating personnel is not appointed What measure guarantee, only with a safety belt, but operating personnel is again usually for " convenience " frequent not hanging safety belt, therefore, Often there is operating personnel to accidentally drop and step on sky from falling from high altitude, give one's life for.Due to no safety devices, upper die is removed, support The effect of bar recycling, the binding of the formwork erection that binds, reinforcing bar, concrete perfusion, is also very low.
Utility model content
The technical problems to be solved in the utility model is:A kind of tool-type suspension scaffold is provided, for reinforced concrete cylinder Wall slding form operation ensures to top and removes sliding formwork mold, the safe construction of cylinder roof construction.
Solving the technical solution of above-mentioned technical problem is:A kind of tool-type suspension scaffold, suspension scaffold are arranged at reinforced concrete barrel On, the suspension scaffold includes tripod, walkway board, arc railing and safety net, and the tripod passes through swell fixture respectively It is fixedly installed on reinforced concrete barrel, the walkway board is arranged on tripod and forms the aisle for people colleague, the arc Railing is fixedly installed on by supporting rod on tripod, and the safety net is fixedly installed on supporting rod, the arc railing and Safety net is located on the outside of walkway board and forms protective fence, and the suspension scaffold is multiple, and arranges and be arranged on reinforced concrete barrel.
The further technical solution of the utility model is:The suspension scaffold includes interior suspension scaffold and outer suspension scaffold, described Interior suspension scaffold and outer suspension scaffold are fixedly installed on the inside and outside both sides of reinforced concrete barrel, and the overhanging of the reinforced concrete barrel both sides respectively Frame is arranged in loop configuration.
The tripod includes stent I, stent II and stent III, and described I one end of stent is fixedly connected with II one end of stent And form angle, the stent III between stent I and stent II, III both ends of stent respectively with stent I and stent II It is fixedly connected, the other end of the stent I and stent II is fixedly installed on by swell fixture on reinforced concrete barrel respectively.
One end that the tripod is connected with reinforced concrete barrel is equipped with junction steel plate, and passes through swell fixture by junction steel plate It links together with reinforced concrete barrel.
Spacing between adjacent tripod is 1.2m.
The tripod and arc railing are made of steel pipe.
Due to the adoption of the above technical scheme, a kind of tool-type suspension scaffold of the utility model has the advantages that:
The utility model includes tripod, walkway board, arc railing and safety net, and tripod is set by swell fixture fixation It is placed on reinforced concrete barrel, walkway board is arranged on tripod and forms the aisle for people colleague, such staff In the work that walkway board walking is needed, safe ready.After the utility model can ensure sliding formwork completely, slip form platform Remove, slip form supporting rod recycling, cylindrical structure bind construction worker construction operation safety.Since construction operation obtains safely Effective guarantee has been arrived, has greatly improved the efficiency of construction operation.Since the design belongs to the design of tool-type, so the device Reuse can be recycled, reduces construction cost.Compared with the existing stent built from ground, the utility model knot Structure is simple, is easy for installation and removal, and cost is greatly saved.
It is in the following, special to a kind of technology of tool-type suspension scaffold of the utility model with reference to Figure of description and specific embodiment Sign is further described.
Description of the drawings
Fig. 1:A kind of structure diagram of the tool-type suspension scaffold of the utility model.
Fig. 2:A kind of floor plan of the tool-type suspension scaffold of the utility model.
In above-mentioned attached drawing, each label declaration is as follows:
1- tripods, 2- columns(Supporting rod), 3- junction steel plates, 4- swell fixtures, the wooden walkway boards of 5-, 6- arcs column Bar, the close mesh safety nets of 7-, 8- reinforced concrete barrels, the outer suspension scaffolds of 9-, suspension scaffold in 10-.
Specific embodiment
A kind of tool-type suspension scaffold, suspension scaffold are arranged on reinforced concrete barrel, and the suspension scaffold includes tripod, aisle Plate, arc railing and safety net, the tripod are fixedly installed on by swell fixture on reinforced concrete barrel respectively, the aisle Plate is arranged on tripod and forms the aisle for people colleague, and the arc railing is fixedly installed on tripod by supporting rod On, which is 2 or more, and using 3 in the present embodiment, which is arranged at supporting rod from top to bottom On.The safety net is fixedly installed on supporting rod, and the arc railing and safety net are located on the outside of walkway board and form protection Column.The suspension scaffold is multiple, and arranges and be arranged on reinforced concrete barrel.The suspension scaffold includes interior suspension scaffold and outer outstanding Builder's jack, the interior suspension scaffold and outer suspension scaffold are fixedly installed on the inside and outside both sides of reinforced concrete barrel, and the reinforced concrete barrel two respectively The suspension scaffold of side is arranged together in loop configuration, i.e. walkway board on suspension scaffold and protective fence also according to the shape of reinforced concrete barrel Loop configuration is arranged together in, the personnel that are conveniently operated walk back and forth on walkway board and carry out operation, and protective fence can be prevented effectively Operating personnel fall.The tripod includes stent I, stent II and stent III, and described I one end of stent and II one end of stent are fixed Connect and form angle, the stent III between stent I and stent II, III both ends of stent respectively with stent I and branch Frame II is fixedly connected, and the other end of the stent I and stent II is fixedly installed on by swell fixture on reinforced concrete barrel respectively. One end that the tripod is connected with reinforced concrete barrel is equipped with junction steel plate, by swell fixture by junction steel plate and reinforced concrete cylinder Wall links together.Spacing between adjacent tripod is 1.2m.The tripod and arc railing are made of steel pipe.
The tripod is the tripod with railing post being fabricated to steel pipe Φ 48 × 3.5, and arc railing is use The railing of the corresponding radian of band of 48 × 3.5 brake formings of steel pipe Φ, walkway board are for being layed on tripod and forming platform Wood based panel, billet is attached on tripod, safety net is bound on railing.
A kind of tool-type suspension scaffold specifically makes and mounting means is:
(1)Multiple tripods, each connector of steel pipe are made with the sizes according to actual needs of steel pipe Φ 48 × 3.5 and number With being welded to connect.The width of usual tripod(That is the length of stent I)It is fabricated to 900mm, the column on tripod(It is used for The supporting rod of fixed arc railing)High 1500mm.
(2)In tripod and concrete tube wall(That is reinforced concrete barrel)The end of connection, it is thick with long 1500mm, wide 100mm The steel plate of 4mm is welded to connect therewith.Every piece of steel plate drill two holes Φ 16.
(3)The tripod made is horizontal circumferential along concrete tube wall, and adjacent tripod spacing is 1200mm, and use is swollen Swollen screw is mounted on barrel.
(4)After tripod installs, the water of tripod is laid on along barrel circumferential direction level with the solid wood plate of 50mm thickness Flat cross bar(That is stent I)On, plank is connected with plank using overlap joint, and lap-joint middle is squeezed into the iron nail of a 100mm long Wherein, prevent plank from sliding.Platform walkway board is formd, convenient for standing and walking.
(5)After setting up guidance tape convenient for walking, with 48 Χ 3.5 of steel pipe Φ bent to barrel with radian(That is arc railing)With water Flat ring is fixedly connected to mode with the column of tripod, that is, forms the annular safety railing of suspension scaffold.It is stood again in security guardrail Face hangs up close mesh safety vertical net.
Tripod, column, the connecting plate of tripod end, walkway board, the horizontal circumferential column of the tool-type suspension scaffold Bar should be customized according to corresponding actual size.Suspension scaffold is removed after the completion of suspension scaffold use.It can be simplified using the utility model The process of setting up of interior outrigger is set up in high-altitude, easy to operate.After fully meeting slding form operation, slip form platform, recycling branch are removed Strut installs the construction needs for the template that binds, during use, securely and reliably.The cantilever tripod removed can be repeated several times It is used in turn.

Claims (6)

1. a kind of tool-type suspension scaffold, it is characterised in that:Suspension scaffold is arranged on reinforced concrete barrel, and the suspension scaffold includes three Corner bracket, walkway board, arc railing and safety net, the tripod are fixedly installed on reinforced concrete barrel by swell fixture respectively On, the walkway board is arranged on tripod and forms the aisle for people colleague, and the arc railing is set by supporting rod fixation It is placed on tripod, the safety net is fixedly installed on supporting rod, and the arc railing and safety net are located on the outside of walkway board And protective fence is formed, the suspension scaffold is multiple, and arranges and be arranged on reinforced concrete barrel.
2. a kind of tool-type suspension scaffold according to claim 1, it is characterised in that:The suspension scaffold includes interior suspension scaffold With outer suspension scaffold, the interior suspension scaffold and outer suspension scaffold are fixedly installed on the inside and outside both sides of reinforced concrete barrel, and the reinforced concrete respectively The suspension scaffold of barrel both sides is arranged in loop configuration.
3. a kind of tool-type suspension scaffold according to claim 1, it is characterised in that:The tripod includes stent I, stent II and stent III, described I one end of stent be fixedly connected with II one end of stent and form angle, the stent III is located at I He of stent Between stent II, which is fixedly connected respectively with stent I and stent II, the stent I and stent II it is another End is fixedly installed on by swell fixture on reinforced concrete barrel respectively.
4. a kind of tool-type suspension scaffold according to claim 1, it is characterised in that:The tripod connects with reinforced concrete barrel The one end connect is equipped with junction steel plate, and passes through swell fixture and junction steel plate and reinforced concrete barrel link together.
5. a kind of tool-type suspension scaffold according to claim 1, it is characterised in that:Spacing between adjacent tripod is 1.2m。
6. a kind of tool-type suspension scaffold according to claim 1, it is characterised in that:The tripod and arc railing are Made of steel pipe.
CN201721253001.2U 2017-09-27 2017-09-27 A kind of tool-type suspension scaffold Expired - Fee Related CN207392716U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721253001.2U CN207392716U (en) 2017-09-27 2017-09-27 A kind of tool-type suspension scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721253001.2U CN207392716U (en) 2017-09-27 2017-09-27 A kind of tool-type suspension scaffold

Publications (1)

Publication Number Publication Date
CN207392716U true CN207392716U (en) 2018-05-22

Family

ID=62405370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721253001.2U Expired - Fee Related CN207392716U (en) 2017-09-27 2017-09-27 A kind of tool-type suspension scaffold

Country Status (1)

Country Link
CN (1) CN207392716U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979113A (en) * 2018-06-27 2018-12-11 中国核工业华兴建设有限公司 Plain type nuclear power plant equipment gate operation platform
CN109083015A (en) * 2018-08-31 2018-12-25 中交二航局第四工程有限公司 A kind of Demountable combined-type steel form operation platform
CN110029579A (en) * 2019-03-16 2019-07-19 驿涛建工股份有限公司 A kind of bridge construction suspension operation platform
CN114427287A (en) * 2022-02-23 2022-05-03 中建八局第二建设有限公司 Triangular overhanging scaffold support for frame beam and use method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979113A (en) * 2018-06-27 2018-12-11 中国核工业华兴建设有限公司 Plain type nuclear power plant equipment gate operation platform
CN108979113B (en) * 2018-06-27 2021-07-02 中国核工业华兴建设有限公司 Simple nuclear power station equipment gate construction platform
CN109083015A (en) * 2018-08-31 2018-12-25 中交二航局第四工程有限公司 A kind of Demountable combined-type steel form operation platform
CN110029579A (en) * 2019-03-16 2019-07-19 驿涛建工股份有限公司 A kind of bridge construction suspension operation platform
CN114427287A (en) * 2022-02-23 2022-05-03 中建八局第二建设有限公司 Triangular overhanging scaffold support for frame beam and use method thereof

Similar Documents

Publication Publication Date Title
CN207392716U (en) A kind of tool-type suspension scaffold
CN105971274A (en) Cantilever support frame formwork system and construction method thereof
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN206053285U (en) A kind of modular assembly of high-altitude overlength is encorbelmented steel platform
CN104763109B (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN201598820U (en) Single-point suspension external hanging rack
CN106013774B (en) A kind of sliding formwork flexibility platform device for being suitble to dispatch
CN208056596U (en) A kind of Novel engineering exterior wall scaffold
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN213418441U (en) Safety protection and operation platform for light production well
CN209798542U (en) safety construction assembled bent cap operation platform
CN205777489U (en) A kind of support system of high and big die plate
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN206016235U (en) A kind of concrete slab reinforcing bar is anti-to trample scaffold
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN110318550B (en) Inclined roof safety belt hanging device and installation process thereof
CN211114732U (en) Portable movable reinforcement operation platform
CN205873735U (en) Device is climbed to special tower built -in in superelevation layer
CN207513146U (en) Shear wall outrigger drawknot structure
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN220058769U (en) Unit type hanging construction operation platform
CN203640245U (en) Scaffold structure for building exterior wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 545002 Metallurgical Building No. 115 Beikao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: GUANGXI CONSTRUCTION ENGINEERING GROUP METALLURGICAL CONSTRUCTION Co.,Ltd.

Address before: No. 115 Beikao Road, Liuzhou City, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: GUANGXI METALLURGICAL CONSTRUCTION Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522