Prior art keywords
storage tank
working platform
magnetic
central post
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320496810.1U
Other languages
Chinese (zh)
Inventor
李怡慧
李信纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HONG QIJUN
Original Assignee
HONG QIJUN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HONG QIJUN filed Critical HONG QIJUN
Priority to CN201320496810.1U priority Critical patent/CN203412273U/en
Application granted granted Critical
Publication of CN203412273U publication Critical patent/CN203412273U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a full-circular orbit type lifting work platform of a storage tank. The full-circular orbit type lifting work platform comprises a lower orbit, an upper orbit, a center column, a working platform and a lifting mechanism group, wherein the lower orbit uses a plurality of lower magnetic attraction discs and is attracted on the surface of the circumference under the bottom of the storage tank, a plurality of jacks are connected and arranged below the bottom of the lower orbit; the upper orbit uses a plurality of upper magnetic attraction discs and is attracted on the surface of the circumference above the petrifaction storage tank; in addition, the center column is provided with an upper wheel base and a lower wheel base and is respectively connected and arranged on the upper orbit and the lower orbit; the work platform is connected and arranged on the center column, the center column penetrates through the work platform; and the lifting mechanism group is connected and arranged between the center column and the work platform so that the work platform makes a relative vertical movement towards the center column. By adopting the structure, the erection safety is improved, and the erection cost is low.

Description

The lifting working platform of storage tank circle rail mounted
Technical field
The working platform that the utility model is used about a kind of storage tank, espespecially safe and set up a kind of structure technology fast.
Background technology
Refer to shown in Fig. 6, the round storage tank district of general petrochemical industry industry belongs to high risk zone, in factory, there is a large amount of inflammable and explosive materials, therefore maintenance engineering is important and can not postpone especially, therefore this storage tank 6 must be made routine maintenance and the upkeep operations such as annual repairs, paint, sandblast, insulation, the rust cleaning of water cutter.
The pipeline 7 of arranging in storage tank district because of petrochemical industry industry is again too many, and all can pipeline 7 between the adjacent storage tank 6 of the overwhelming majority staggered, if use crane or high-altitude operation vehicle 8 constructions are very inconvenient, difficulty is many.If traditional high-rise working still be take the construction pallet of the class of setting up scaffold 9 as main again, due to these scaffold 9 complex structures, must group establish up to a hundred thin bars 91, it sets up, and time is long, labor intensive is many, the cost amount of money is high, personnel apply narrow space, construction period security maintenance many problems such as difficult.
Summary of the invention
This novel practical new design people is because the problems referred to above, and then makes great efforts research and exploitation, and therefore main purpose of the present utility model is to provide a kind of lifting working platform of storage tank circle rail mounted of simple in structure, low cost.Secondary objective of the present utility model is to provide the lifting working platform of the higher storage tank circle rail mounted of a kind of safety.Secondary objective of the present utility model be to provide personnel comparatively spacious apply space.
For achieving the above object, the technical solution adopted in the utility model is:
A lifting working platform for storage tank circle rail mounted, is characterized in that, includes:
One lower railway, connects and establishes a plurality of lower magnetic-discs and be adsorbed in the beneath surface all around of petrochemical industry storage tank, and the beneath side of this lower railway is equipped with a plurality of jack, and the below of these a plurality of jack contacts with ground;
One gets on the right track, and connects the surface all around of establishing a plurality of upper magnetic-discs and being adsorbed in petrochemical industry storage tank top;
At least one central post, below is pivoted with respectively on one wheel seat and wheel seat once thereon, and wherein on this, wheel seat is arranged in this and gets on the right track, and this lower wheel seat is arranged in this lower railway;
One working platform, is arranged on this central post and run through by this central post, and this working platform is equipped with magnetic-disc in the middle of, and this centre magnetic-disc has retractility and is adsorbed in surperficial in the middle of petrochemical industry storage tank all around; And
One elevating mechanism group, is arranged between this central post and working platform, and this working platform can be done relative to vertically moving to this central post.
In technical scheme preferably:
This lower wheel seat, the set all wheel bodys of upper wheel seat are all that copper material manufacture forms.
This magnetic-disc can bear and bear a heavy burden more than 2 tons.
This working platform extends from the both sides of this central post and forms the space that applies of constructing for personnel.
This elevating mechanism group also includes a hoist and rope, and wherein one end of this rope is arranged in this hoist, and the other end is arranged in the top of this central post.
This centre magnetic-disc has retractility and refers to: to be fixedly arranged on a pneumatic cylinder of this working platform, promote this centre magnetic-disc.
The effect that the utility model uses above-mentioned technological means to reach is as follows:
The utility model adopt lower railway, get on the right track, central post, working platform and elevating mechanism group etc., the member that uses less, and use a plurality of lower magnetic-discs, upper magnetic-disc and middle magnetic-disc and storage tank to connect combination, so be easy to build in four circumference of petrochemical industry storage tank, its spent manpower is low again, cheap, also make the maintenance cost of petrochemical industry storage tank lower.
2. the utility model central post adopts firm and high strength pillar construction, and its central post lifting platform adopts explosion-proof type hoist, wheel body on track adopts copper material completely and is difficult for producing spark, it is solid coordinating powerful alnico magnets, itself be connected with this petrochemical industry storage tank, do not need to destroy this petrochemical industry reservoir structure completely, be not afraid of high wind and earthquake, during running, can not produce spark, static, safe.
3. the utility model working platform extends from the both sides of at least one central post, can form the comparatively spacious space that applies, and the personnel of being beneficial to apply.
Accompanying drawing explanation
Fig. 1 is the three-dimensional aspect figure of the utility model preferred embodiment;
Fig. 2 is the top view of the utility model preferred embodiment;
Fig. 3 is the lateral view of the utility model preferred embodiment;
Fig. 4 is the schematic diagram of the elevating mechanism group start of the utility model preferred embodiment;
Fig. 5 is the three-dimensional aspect figure of another embodiment of the utility model;
Fig. 6 is existing structure aspect figure.
Description of reference numerals: the lifting working platform of 1-storage tank circle rail mounted; 10-lower railway; Magnetic-disc under 11-; 12-jack; 20-gets on the right track; The upper magnetic-disc of 21-; 30-central post; The upper wheel seat of 31-; Wheel seat under 32-; 33-wheel body; 40-working platform; Magnetic-disc in the middle of 41-; 42-pneumatic cylinder; 50-elevating mechanism group; 51-hoist; 52-rope; 6-storage tank; 7-pipeline; 8-crane or high-altitude operation vehicle; 9-scaffold; 91-thin bar.
The specific embodiment
Refer to shown in Fig. 1 to Fig. 4, the utility model is a kind of lifting working platform 1 of petrochemical industry storage tank circle rail mounted, and be mainly set up in this petrochemical industry storage tank all around, it includes: a lower railway 10, gets on the right track 20, at least one central post 30, a working platform 40 and an elevating mechanism group 50; Wherein,
This lower railway 10, refer to shown in Fig. 3, connect and establish a plurality of lower magnetic-discs 11 and be adsorbed in the beneath surface all around of storage tank 6, conventionally the heavy burden of this lower magnetic-disc 11 must can reach more than 2 tons, the beneath side of this lower railway 10 is equipped with uniform a plurality of jack 12 again, and the below of these a plurality of jack 12 contacts with ground, separately this lower railway 10 must form for manufactures such as steel pipe, rail or shaped steel.
This gets on the right track 20, refers to shown in Fig. 3, connects the surface all around of establishing a plurality of upper magnetic-discs 21 and being adsorbed in these storage tank 6 tops, and on this, the heavy burden of magnetic-disc 21 also can reach more than 2 tons again, and this gets on the right track and 20 can be the manufactures such as steel pipe, rail or shaped steel and form.
At least one central post 30, refer to shown in Fig. 3, below is pivoted with respectively on one wheel seat 31 and wheel seat 32 once thereon, and on this, wheel seat 31 and lower wheel seat 32 are all provided with copper wheel body 33, wherein on this, wheel seat 31 is arranged in this and gets on the right track 20, and this lower wheel seat 32 is arranged in this lower railway 10; Also person as shown in Figure 5, uses two central posts 30 to coordinate these working platformes 40.
This working platform 40, refer to shown in Fig. 2, be arranged on this central post 30 and run through by this central post 30 and can on this central post 30, slide, and this working platform 40 is equipped with a middle magnetic-disc 41, this centre magnetic-disc 41 has retractility and is adsorbed in the middle surface all around of this storage tank 6 again; And
This elevating mechanism group 50, refer to shown in Fig. 3, be arranged between this central post 30, working platform 40, this working platform 40 must be done relative to vertically moving to this central post 30, conventionally this elevating mechanism group 50 is installed in the below of this working platform 40, this elevating mechanism group 50 more includes a hoist 51 and rope 52 again, wherein one end of this rope 52 is arranged in this hoist 51, the other end is the top that is fixed in this central post 30, by starting this hoist 51, pull this rope 52, to reach the object of lifting.
Refer to shown in Fig. 4, the lifting working platform 1 of storage tank circle rail mounted of the present utility model is when setting up, knockdown get on the right track 20 and lower railway 10 coordinate respectively magnetic-disc 21, lower magnetic-disc 11, by this get on the right track 20 and lower railway 10 be fixed in respectively top and the below of storage tank 6, and below lower railway 10, be provided with especially uniform a plurality of jack 12, hold according to this and support this lower railway 10, then by the upper wheel seat 31 of this central post 30, lower wheel seat 32 hang on respectively and gets on the right track 20 on this petrochemical industry storage tank, lower railway 10, now on this central post 30, erect this working platform 40 and be positioned at the elevating mechanism group 50 of these working platform 40 belows, the hoist 51 of this elevating mechanism group 50 is fixedly arranged on the below of this working platform 40 again, and this hoist 51 must be pullled this rope 53, causing this working platform 40 must do on central post 30, lower slider.As for moving left and right of this working platform 40, must be dependent on this central post 30 of Manual-pushing it can be moved with lower railway 10, according to this around this storage tank 6.
Special one carries, the side of the elevating mechanism group 50 below this working platform 40 must be equipped with the middle magnetic-disc 41 that tool can horizontal extension moves, conventionally this centre magnetic-disc 41 must connect and establish a pneumatic cylinder 42 at front end, to cause this centre magnetic-disc 41 to move by horizontal extension.Main the acting on of this centre magnetic-disc 41 provides this working platform 40 to be supported again, to promote the safety and firmness of the utility model structure, but when working platform 40 moves up and down, this centre magnetic-disc 41 is in contraction state, person as shown in Figure 4, when 40 liftings of this working platform arrive precalculated position, this centre magnetic-disc 41 stretches out once again and is adsorbed in this storage tank 6, as shown in Figure 3 person.
Therefore, the lifting working platform of the utility model storage tank circle rail mounted, when it is built, the required technician of setting up only needs three, and security management and control is simple, and there is no work high above the ground during setting up.After completing, working platform gets final product operation, if have any abnormal between operational period, do not affect fire control and disaster rescue space, and this working platform is firm, need not utilize the facilities such as other upper and lower equipment to get final product safe construction, for example: the 130000 Gongbing's storage tanks of take are example, must set up 3 rail mounted elevating construction platforms, only need three technicians.And build the lifting working platform of the utility model petrochemical industry storage tank circle rail mounted, and only needing 7~10 working days, its required expense is about 70% of erection construction pallet, can reduction expense expenditure.Construction period of the present utility model is short again, minimizing ssupervisor, safe supervisor send, reduce the paperwork time, indirectly save owner's manpower expense, again its to apply space identical, open, personnel apply convenience with cage, construction period supervision and the personnel that check are very clear to construction situation, apply environment good, therefore construction quality is easy to control, and ssupervisor is easy to check.
Comprehensive above embodiment illustrates, the utility model is about a kind of " lifting working platform of storage tank circle rail mounted ", main building in storage tank around, and the cost of building is lower, safe, and applies space spaciousness.
More than illustrate the utility model just illustrative; and nonrestrictive, those of ordinary skills understand, in the situation that do not depart from the spirit and scope that claim limits; can make many modifications, variation or equivalence, but within all falling into protection domain of the present utility model.

Claims (6)

1. a lifting working platform for storage tank circle rail mounted, is characterized in that, includes:
One lower railway, connects and establishes a plurality of lower magnetic-discs and be adsorbed in the beneath surface all around of petrochemical industry storage tank, and the beneath side of this lower railway is equipped with a plurality of jack, and the below of these a plurality of jack contacts with ground;
One gets on the right track, and connects the surface all around of establishing a plurality of upper magnetic-discs and being adsorbed in petrochemical industry storage tank top;
At least one central post, below is pivoted with respectively on one wheel seat and wheel seat once thereon, and wherein on this, wheel seat is arranged in this and gets on the right track, and this lower wheel seat is arranged in this lower railway;
One working platform, is arranged on this central post and run through by this central post, and this working platform is equipped with magnetic-disc in the middle of, and this centre magnetic-disc has retractility and is adsorbed in surperficial in the middle of petrochemical industry storage tank all around; And
One elevating mechanism group, is arranged between this central post and working platform, and this working platform can be done relative to vertically moving to this central post.
2. the lifting working platform of storage tank circle rail mounted according to claim 1, is characterized in that: this lower wheel seat, the set all wheel bodys of upper wheel seat are all that copper material manufacture forms.
3. the lifting working platform of storage tank circle rail mounted according to claim 1, is characterized in that: this magnetic-disc can bear and bear a heavy burden more than 2 tons.
4. the lifting working platform of storage tank circle rail mounted according to claim 1, is characterized in that: this working platform extends from the both sides of this central post and forms the space that applies of constructing for personnel.
5. the lifting working platform of storage tank circle rail mounted according to claim 1, it is characterized in that: this elevating mechanism group also includes a hoist and rope, wherein one end of this rope is arranged in this hoist, and the other end is arranged in the top of this central post.
6. the lifting working platform of storage tank circle rail mounted according to claim 1, is characterized in that: this centre magnetic-disc has retractility and refers to: to be fixedly arranged on a pneumatic cylinder of this working platform, promote this centre magnetic-disc.
CN201320496810.1U 2013-08-14 2013-08-14 Full-circular orbit type lifting work platform of storage tank Expired - Fee Related CN203412273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320496810.1U CN203412273U (en) 2013-08-14 2013-08-14 Full-circular orbit type lifting work platform of storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320496810.1U CN203412273U (en) 2013-08-14 2013-08-14 Full-circular orbit type lifting work platform of storage tank

Publications (1)

Publication Number Publication Date
CN203412273U true CN203412273U (en) 2014-01-29

Family

ID=49975169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320496810.1U Expired - Fee Related CN203412273U (en) 2013-08-14 2013-08-14 Full-circular orbit type lifting work platform of storage tank

Country Status (1)

Country Link
CN (1) CN203412273U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104261322A (en) * 2014-08-12 2015-01-07 徐州重型机械有限公司 High-altitude operation vehicle, high-altitude operation platform and stabilizing method of high-altitude operation platform
CN106703293A (en) * 2017-02-22 2017-05-24 常熟建工建设集团有限公司 Safe and quick construction method for pouring cylinder body concrete
CN108547494A (en) * 2018-04-25 2018-09-18 重庆钢铁集团建设工程有限公司 A kind of bulk tank construction method
WO2018188322A1 (en) * 2017-04-11 2018-10-18 广船国际有限公司 Platform device
CN110259096A (en) * 2019-06-26 2019-09-20 重庆科技学院 The certainly mobile operation platform of civil engineering and its application method
CN110425128A (en) * 2019-07-15 2019-11-08 上海市建筑装饰工程集团有限公司 A kind of tower mast structure lifting auxiliary frame oil pump
CN114382272A (en) * 2022-03-24 2022-04-22 中铁十七局集团建筑工程有限公司 Construction device for building circular building

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104261322A (en) * 2014-08-12 2015-01-07 徐州重型机械有限公司 High-altitude operation vehicle, high-altitude operation platform and stabilizing method of high-altitude operation platform
CN106703293A (en) * 2017-02-22 2017-05-24 常熟建工建设集团有限公司 Safe and quick construction method for pouring cylinder body concrete
WO2018188322A1 (en) * 2017-04-11 2018-10-18 广船国际有限公司 Platform device
CN108547494A (en) * 2018-04-25 2018-09-18 重庆钢铁集团建设工程有限公司 A kind of bulk tank construction method
CN110259096A (en) * 2019-06-26 2019-09-20 重庆科技学院 The certainly mobile operation platform of civil engineering and its application method
CN110425128A (en) * 2019-07-15 2019-11-08 上海市建筑装饰工程集团有限公司 A kind of tower mast structure lifting auxiliary frame oil pump
CN110425128B (en) * 2019-07-15 2024-04-26 上海市建筑装饰工程集团有限公司 Auxiliary frame oil pump for lifting tower mast structure
CN114382272A (en) * 2022-03-24 2022-04-22 中铁十七局集团建筑工程有限公司 Construction device for building circular building
CN114382272B (en) * 2022-03-24 2022-06-07 中铁十七局集团建筑工程有限公司 Construction device for building circular building

Similar Documents

Publication Publication Date Title
CN203412273U (en) Full-circular orbit type lifting work platform of storage tank
CN104453231B (en) Gantry type building construction lifting device as well as manufacturing method and construction method thereof
CN202751338U (en) Rail type suspension basket
CN203173644U (en) Multifunctional lifting shaft working platform system
CN204224064U (en) The unlatching of escalator floor plate and supporting construction
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN202658867U (en) Overhanging construction platform
CN205145443U (en) Transformer upper portion construction safety belt hanging device
CN204342237U (en) A kind of building hoist safety tread
CN202744175U (en) Sling used for hoisting precast concrete columns
CN202864736U (en) Hoist for oil tank construction in cave depot
CN105311771A (en) Safety belt suspending device for upper construction of transformer
CN202594556U (en) Anti-explosion manned lift
CN209976068U (en) Connectable steel cushion block for jacking and storey-adding
CN201756401U (en) Snap for lifting
CN211169717U (en) Building construction elevator fixing device
CN205189413U (en) Special bearing stores pylon of civil engineering
CN104249963A (en) Electric lifting basket for large-size lock drainage shaft
CN202139007U (en) Single hanging seat for overhead work
CN203499232U (en) Attached lifting scaffold
CN201631936U (en) High-rise building fire-fighting rescue device
CN103334592B (en) Step-type sliding installation construction method for convex structure of high-rise building
CN202026014U (en) Special isolation frame for overhauling GW16 type disconnecting link
CN201923647U (en) Pipe kicking device of oil-field derrick pipe conveying machine
CN205531262U (en) Steel construction construction platform can rise automatically

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

Termination date: 20150814

EXPY Termination of patent right or utility model