CN106320569A - 装配式剪力墙植筋法连接工艺 - Google Patents

装配式剪力墙植筋法连接工艺 Download PDF

Info

Publication number
CN106320569A
CN106320569A CN201610719579.6A CN201610719579A CN106320569A CN 106320569 A CN106320569 A CN 106320569A CN 201610719579 A CN201610719579 A CN 201610719579A CN 106320569 A CN106320569 A CN 106320569A
Authority
CN
China
Prior art keywords
sleeve
wall
construction
component
shear wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610719579.6A
Other languages
English (en)
Inventor
王集弘
张甡
马庆元
聂堂帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201610719579.6A priority Critical patent/CN106320569A/zh
Publication of CN106320569A publication Critical patent/CN106320569A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Abstract

本发明公开了一种装配式剪力墙“植筋法”连接工艺,包括下列步骤:(1)构件加工预制;(2)套筒注浆;(3)剪力墙构件吊装;(4)施工缝支模、浇筑。本发明的有益效果:采用套筒“植筋法”连接技术连接构件时,不需要留注浆孔和排气孔,可以采用不留侧孔的套筒,降低了套筒成本;由于套筒“植筋法”连接构造特点,构件生产和施工安装工艺简化,施工操作更加简单,从而有效节省了材料,缩短了工期,减少了劳动力,降低了施工成本。

Description

装配式剪力墙植筋法连接工艺
技术领域
本发明涉及一种装配式剪力墙植筋法连接工艺,属于建筑施工技术领域。
背景技术
随着我国经济和科技的快速发展,为转变经济发展方式和建设资源节约型、环境友好型社会,政府与建筑行业大力推进现代建筑产业化,装配整体式剪力墙结构以其高度机械化、工厂化施工模式逐渐赢得了建筑行业的认同。然而,传统的剪力墙钢筋朝上插入套筒注浆连接在构件生产、现场安装操作方面还存在一些缺点。在保证剪力墙连接质量满足相关规范的前提下,优化生产及安装工艺显得尤为重要。
发明内容
本发明所要解决的技术问题是:提供一种装配式剪力墙植筋法连接工艺
为解决上述技术问题,本发明采用的技术方案是:
本发明提供的装配式剪力墙“植筋法”连接工艺,包括下列步骤:
施工准备:施工准备包括施工图纸审查,材料与设备准备、施工人员安排、方案编制、培训与交底。
(1)构件加工预制
依据设计加工预制剪力墙构件,预制构件时把套筒预埋在构件的上部,插筋预留在构件的下部。预制剪力墙不需要留注浆孔和排气孔,因此可以采用不留侧孔的套筒,降低了套筒成本。由于构件表面不需要留孔,可以采用正打或反打工艺(即可以选择任一面朝下)生产,表面平整容易收光,降低了构件生产难度、节约成本,特别是采用正打工艺使构件的外立面装饰有了更多的选择性。
(2)套筒注浆
浇筑楼面混凝土后,套筒会高出楼地面10~20mm(在套筒上做标高标志,也有利于楼面混凝土厚度的控制),依据设计放线。
测标高、放置好调整墙体标高的垫块,并安装好墙体的定位靠板。取开临时封堵套筒的塑料盖,向套筒内注入足量的调配好的浆料。
(3)剪力墙构件吊装
墙体吊装到位后顺着定位靠板缓慢放下,下部钢筋插入套筒,用钢筋自身将少量浆料排挤出,此时墙体重量由标高垫块承受,用斜支撑加固墙体并及时调整墙体垂直度,固定牢靠后吊车脱钩。拍照留档证明浆料注满的情况,此时墙下与楼面之间有一条垫块高度的缝隙,但墙体已经是临时稳定的静定结构,先不要急于向墙体下缝注入灌浆料。
(4)施工缝支模、浇筑
施工边缘构件的钢筋和模板,安装楼面叠合板临时支撑,吊装上层楼面叠合板,浇筑边缘构件和叠合楼面的混凝土,每层只需浇筑一次混凝土。之后,再在剪力墙下缝处对夹模板,压力注入灌浆料,本层施工完成。
本发明的有益效果:
一、经济效益
1采用套筒“植筋法”连接技术连接构件时,不需要留注浆孔和排气孔,可以采用不留侧孔的套筒,降低了套筒成本。
2由于套筒“植筋法”连接构造特点,构件生产和施工安装工艺简化,施工操作更加简单,从而有效节省了材料,缩短了工期,减少了劳动力,降低了施工成本。同时灌浆一次成活,施工质量更容易得到保障避免了灌浆检测及重复施工浪费。
二、社会效益
通过本工艺的应用,有效控制了预制剪力墙构件连接的施工质量,且生产和安装施工过程更加安全、简易、快捷,现场无垃圾、无污染、安装噪音小、功效高,符合绿色可持续发展理念,获得了业主及主管部门的认同,树立了良好的企业形象。
附图说明
图1是预制剪力墙构件的结构。
图2是楼面浇筑混凝土前后的结构图,左边是混凝土浇筑前,右边是浇筑后。
图3是放置垫块调整标高、向套筒注浆的附图。
图4是构件吊装的附图。
图5是施工缝支模、浇筑附图。
具体实施方式
实施例1
本实施例提供的装配式剪力墙“植筋法”连接工艺,包括下列步骤:
施工准备:施工准备包括施工图纸审查,材料与设备准备、施工人员安排、方案编制、培训与交底。
(1)构件加工预制
依据设计加工预制剪力墙构件,预制构件时把套筒预埋在构件的上部,插筋预留在构件的下部。预制剪力墙不需要留注浆孔和排气孔,因此可以采用不留侧孔的套筒,降低了套筒成本。由于构件表面不需要留孔,可以采用正打或反打工艺(即可以选择任一面朝下)生产,表面平整容易收光,降低了构件生产难度、节约成本,特别是采用正打工艺使构件的外立面装饰有了更多的选择性。预制剪力墙构件的结构如图1所示。
(2)套筒注浆
浇筑楼面混凝土后,套筒会高出楼地面10~20mm(在套筒上做标高标志,也有利于楼面混凝土厚度的控制),依据设计放线。图2是楼面浇筑混凝土前后的结构图,左边是混凝土浇筑前,右边是浇筑后。
测标高、放置好调整墙体标高的垫块,并安装好墙体的定位靠板。取开临时封堵套筒的塑料盖,向套筒内注入足量的调配好的浆料。图3是放置垫块调整标高、向套筒注浆的附图。
(3)剪力墙构件吊装
墙体吊装到位后顺着定位靠板缓慢放下,下部钢筋插入套筒,用钢筋自身将少量浆料排挤出,此时墙体重量由标高垫块承受,用斜支撑加固墙体并及时调整墙体垂直度,固定牢靠后吊车脱钩。拍照留档证明浆料注满的情况,此时墙下与楼面之间有一条垫块高度的缝隙,但墙体已经是临时稳定的静定结构,先不要急于向墙体下缝注入灌浆料。图4是构件吊装的附图。
(4)施工缝支模、浇筑
施工边缘构件的钢筋和模板,安装楼面叠合板临时支撑,吊装上层楼面叠合板,浇筑边缘构件和叠合楼面的混凝土,每层只需浇筑一次混凝土。之后,再在剪力墙下缝处对夹模板,压力注入灌浆料,本层施工完成。图5是施工缝支模、浇筑附图。

Claims (1)

1.装配式剪力墙“植筋法”连接工艺,其特征在于,包括下列步骤:
(1)构件加工预制
依据设计加工预制剪力墙构件,预制构件时把套筒预埋在构件的上部,插筋预留在构件的下部;预制剪力墙不需要留注浆孔和排气孔,采用不留侧孔的套筒,降低了套筒成本;采用正打或反打工艺(即可以选择任一面朝下)生产,表面平整容易收光,降低了构件生产难度、节约成本;
(2)套筒注浆
浇筑楼面混凝土后,套筒会高出楼地面10~20mm(在套筒上做标高标志,也有利于楼面混凝土厚度的控制),依据设计放线;
测标高、放置好调整墙体标高的垫块,并安装好墙体的定位靠板;取开临时封堵套筒的塑料盖,向套筒内注入足量的调配好的浆料;
(3)剪力墙构件吊装
墙体吊装到位后顺着定位靠板缓慢放下,下部钢筋插入套筒,用钢筋自身将少量浆料排挤出,此时墙体重量由标高垫块承受,用斜支撑加固墙体并及时调整墙体垂直度,固定牢靠后吊车脱钩;拍照留档证明浆料注满的情况,此时墙下与楼面之间有一条垫块高度的缝隙,但墙体已经是临时稳定的静定结构,先不要急于向墙体下缝注入灌浆料;
(4)施工缝支模、浇筑
施工边缘构件的钢筋和模板,安装楼面叠合板临时支撑,吊装上层楼面叠合板,浇筑边缘构件和叠合楼面的混凝土,每层只需浇筑一次混凝土;之后,再在剪力墙下缝处对夹模板,压力注入灌浆料,本层施工完成。
CN201610719579.6A 2016-08-25 2016-08-25 装配式剪力墙植筋法连接工艺 Pending CN106320569A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610719579.6A CN106320569A (zh) 2016-08-25 2016-08-25 装配式剪力墙植筋法连接工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610719579.6A CN106320569A (zh) 2016-08-25 2016-08-25 装配式剪力墙植筋法连接工艺

Publications (1)

Publication Number Publication Date
CN106320569A true CN106320569A (zh) 2017-01-11

Family

ID=57790722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610719579.6A Pending CN106320569A (zh) 2016-08-25 2016-08-25 装配式剪力墙植筋法连接工艺

Country Status (1)

Country Link
CN (1) CN106320569A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948493A (zh) * 2017-04-05 2017-07-14 桂林理工大学 一种预座浆装配式结构构件连接方法
CN111636625A (zh) * 2020-05-13 2020-09-08 天津中建建筑技术发展有限公司 一种适用于装配式建筑的钢筋套筒灌浆连接工艺
CN111705950A (zh) * 2020-05-11 2020-09-25 广城建设集团有限公司 高强度装配式剪力墙构造

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831985A (zh) * 2010-06-04 2010-09-15 北京万科企业有限公司 一种预制混凝土墙板及其制作方法
CN105155734A (zh) * 2015-08-19 2015-12-16 太原理工大学 卯榫连接装配式自保温隔热空心剪力墙体系及其吊装方法
CN205242837U (zh) * 2015-12-04 2016-05-18 文登蓝岛建筑工程有限公司 一种组合式预制墙板
CN105821978A (zh) * 2016-03-24 2016-08-03 天津住宅集团建设工程总承包有限公司 一种预制墙板半坐浆半注浆竖向连接施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831985A (zh) * 2010-06-04 2010-09-15 北京万科企业有限公司 一种预制混凝土墙板及其制作方法
CN105155734A (zh) * 2015-08-19 2015-12-16 太原理工大学 卯榫连接装配式自保温隔热空心剪力墙体系及其吊装方法
CN205242837U (zh) * 2015-12-04 2016-05-18 文登蓝岛建筑工程有限公司 一种组合式预制墙板
CN105821978A (zh) * 2016-03-24 2016-08-03 天津住宅集团建设工程总承包有限公司 一种预制墙板半坐浆半注浆竖向连接施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948493A (zh) * 2017-04-05 2017-07-14 桂林理工大学 一种预座浆装配式结构构件连接方法
CN111705950A (zh) * 2020-05-11 2020-09-25 广城建设集团有限公司 高强度装配式剪力墙构造
CN111636625A (zh) * 2020-05-13 2020-09-08 天津中建建筑技术发展有限公司 一种适用于装配式建筑的钢筋套筒灌浆连接工艺

Similar Documents

Publication Publication Date Title
CN104652830B (zh) 一种预制楼面板和预制墙板搭建的施工方法
CN106638940B (zh) 一种装配式高层住宅混凝土预制构件施工工法
CN101644079B (zh) 钢筋混凝土剪力墙墙体接茬施工方法
CN106013172A (zh) 双排桩与斜撑组合软土深基坑支护结构及施工方法
CN201588207U (zh) 施工缝处混凝土浇筑装置
CN103195087A (zh) 基坑地下室加腋剪力墙的支模方法
CN106320569A (zh) 装配式剪力墙植筋法连接工艺
CN205822221U (zh) 基础筏板超前止水后浇带钢筋混凝土基础底板结构
CN111636625A (zh) 一种适用于装配式建筑的钢筋套筒灌浆连接工艺
CN106149877B (zh) 混凝土框架结构预制柱与梁板节点处的对接结构及方法
CN110005200B (zh) 水平暗梁混凝土浇筑密实的施工工艺
CN113250494A (zh) 一种装配式集成卫生间以及施工方法
CN106149878B (zh) 混凝土框架结构预制柱与梁板节点处的连接结构及方法
CN105971201A (zh) 一种装配式坡屋面及其施工方法
CN207032468U (zh) 装配式建筑
CN109811787A (zh) 一种采用拼装式预制基础构件外加电梯结构及其施工方法
CN112112295A (zh) 一种后封闭外墙后浇带加固施工方法
CN204475714U (zh) 一种快装式预制楼梯
CN106193120A (zh) 地下室悬挑底板逆作结构及施工方法
CN106013094A (zh) 一种适用于人工挖孔桩桩身混凝土浇筑的方法
CN203603462U (zh) 后浇带梁板模板支设结构
CN207891904U (zh) 一种既有建筑外加电梯装配式预制基础构件
CN207348280U (zh) 一种新型预制楼板
CN109853803A (zh) 装配整体式楼板及制作安装方法
CN109267578A (zh) 一种斜面素混凝土结构及其施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111

RJ01 Rejection of invention patent application after publication